Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7390 CONSTRUCTION MANAGER FOR MAX BRT PROJECTPage 1 of 2 MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction CHANGE ORDER NO. 1 SUPPORTING DOCUMENTATION Project: Construction Manager for MAX BRT Project Project No. 7390 (CEI project # 457230) Date: February 1, 2013 Description of Change: This change order primarily adjusts the assigned personnel from the consultant Construction Management (CM) Team, the anticipated level of effort by the consultant team members and the amount of monies allocated for project expenses for the consultant team. These changes are intended to focus the consultant team’s efforts of the team to better address the needs of the MAX BRT project. Additionally, scope adjustments are being made to address items of work not clearly identified in the original scope for the CM contract. Finally, Amendment 1 to the CM Agreement directed CH2M HILL to purchase RR Liability Protective Insurance at the City’s expense. This change order includes the budget adjustments to cover the cost of that insurance, and adjust the expense budget to include other unanticipated office equipment expenses which have been incurred. Scope Adjustments The following tasks are added to the Construction Phase of Exhibit A (Scope of Work) • Perform geotechnical investigations as needed to characterize soil conditions, evaluate existing pavement structures, etc. Work associated with a geotechnical investigation includes, drilling, lab analyses, and report writing. Providing traffic control during drilling operations is part of this task. • Provide environmental oversight/monitoring to address the control and transfer of noxious weed material as part of construction and post-construction activities related to the MAX BRT Project. Staffing/LOE Changes The staffing/level of effort changes fall into three areas: (1) reducing the anticipated level of effort for staff from award through the end of December 2012 to match the actual time charged; (2) Adjusting the forecast hours for staff assigned to the project based on a better understanding of the required work; and (3) adding new staff to the project (including an inspector from RockSol Consulting Group, Inc. vs. the TBD second inspector from LS Gallegos, Inc.) to meet the needs of the project. Following is a list of the specific staffing/level of effort changes included: • In the original staffing plan attached as Exhibit B to the CM Agreement a total of 9,592 hours were forecast to be spent by the CM Team between July and the end of December 2012. The actual number of hours expended in that timeframe was 5,848. This under run occurred primarily because the construction work by CEI and Growling Bear was slower to start than anticipated and because Heath did not begin construction at all in 2012. • As the extent of Materials Testing needed for the project has become clearer it is apparent that the need for CTL Thompson’s (CTL) time was over estimated in the original staffing plan. In addition to the significant reduction in effort for 2012 discussed in the above bullet, it is forecast that CTL will utilize approximately 80% of the hours forecast for 2013. The revised staffing plan attached to this change order reflects a reduction in hours from 6,072 to 4,855 for CTL’s remaining work through the end of construction. • Another change to the CTL level of effort is that they have subcontracted with Custom Auger Drilling Service, Inc. to provide geotechnical borings to evaluate the existing pavement structure for McClelland Drive, and also a boring near Prospect and Lake Street for the jacked boring operations. Concurrently they Page 2 of 2 have subcontracted with Highway Technologies, Inc. to provide traffic control for the drilling operation. Costs for these subcontractors are included as an expense to CTL in the revised staffing plan. • The original staffing plan did not include a Biologist to support the project by providing environmental oversight/monitoring of the control of the transfer of noxious weed material. CH2M HILL has identified Amy Hammontree to provide the necessary monitoring to ensure compliance with the noxious weed mitigation requirements of the FONSI. To meet the project needs it is now forecast that Amy will be providing support for the project an average of three days a month through the end of 2013. • The original staffing plan included time for Ditesco’s Jill Burrell to provide full time onsite inspection only during the period when BNSF was reconstructing the track along Mason Street. To meet the project needs it is now forecast that Jill will be providing full time support for the project through the 1st quarter of 2014. • The original staffing plan did not include a dedicated inspector for bridges as it was assumed that City supplied inspectors would have the specialized skills to perform those inspections. Because the other project inspectors either lacked this experience or were assigned to other parts of the project, Bill Renz from Ditesco has been added to the team. It is forecast that Bill will provide full time inspection support for the project through the end of April 2013, when the bridge construction is complete. • The original staffing plan did not include any administrative support staff for the project from the consultant team. All such support was to be provided by City staff. Because City administrative support has been less available than anticipated Lindsay Reichel from Ditesco has been added to the team to prepare meeting minutes of the weekly Construction Meetings with CEI and to periodically provide support for the preparation of reports and other minor administrative functions. Her time is forecast to be approximately three days a month through the first quarter of 2014. • The original staffing plan called for a second inspector from our DBE subcontractor LS Gallegos (LSG) to work from January through October 2013. LSG was unable to put forward a qualified inspector so the time for that person has been assigned to a new DBE subcontractor, RockSol Consulting Group, Inc. The new inspector (Steve Bignall) will begin in mid February and continue through October 2013. Additionally, the existing LSG inspector (Ray Leon) was forecast to be working only 160 hours per month. To date it is apparent that the project is best served if he works approximately 200 hours per month. The revised staffing plan includes this change. Other Budget adjustments Adjustments to the expense budgets for CH2M HILL and Ditesco are needed to ensure that there are enough funds available to cover the expenses expected to be incurred through the remainder of the contract. The following increases are included in the revised budget: • Increasing CH2M HILL’s expense budget by approximately $25,000 to cover the unanticipated costs of the RR Liability Insurance premium and also the purchase of a photo copier/printer for the project office. • Increasing Ditesco’s expense budget by approximately $3,400 for miscellaneous expenses expected to be incurred during the remainder of the project. Change in Contract Value: Because of the significant reductions in the budgeted level of effort actually incurred for 2012, plus the forecast reduction in level of effort for CTL, the costs for adding staff and increasing expense budgets have been offset. Although there is a redistribution of cost among the firms making up the consultant CM Team, there is a zero dollar ($0.00) net change in the contract value. Please see attached resource allocation plan that details the distribution of both labor and expenses based on the changes described above. Change in Contract Time: There is no change in contract time associated with this change order. Month Mason Staffing Plan 7/1/12 8/1/12 9/1/12 10/1/12 11/1/12 12/1/12 1/1/13 2/1/13 3/1/13 4/1/13 5/1/13 6/1/13 7/1/13 8/1/13 9/1/13 10/1/13 11/1/13 12/1/13 1/1/14 2/1/14 3/1/14 4/1/14 5/1/14 thru 4/1/13 after 4/1/13 total thru 4/1/13 after 4/1/13 overhead overhead period 1 burdened labor period 2 burdened labor CH2M HILL fee total burdened labor hours hours hours Direct $/hr Direct $/hr home office field Dan Heilig/CH2M HILL Project Principal 20 47 31 11 41 18 24 24 24 24 24 24 24 24 24 24 24 24 16 16 16 16 26 240 306 546 $ 100.08 $ 104.08 X $ 51,440 $ 68,209 $ 14,358 $ 134,006 Jeff Mack, PE/CH2M HILL CM Principal 012 0 0 04 408 008 00 8 00828 24 52 $ 92.55 $ 96.25 X $ 5,550 $ 4,947 $ 1,260 $ 11,757 Jon Spencer, PE/CH2M HILL Assistant Construction 76 195 141 149 191 144 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 16 16 1,376 1,952 3,328 $ 77.45 $ 80.55 X $ 202,549 $ 298,831 $ 60,166 $ 561,546 Tim Hackworth /CH2M HILL Senior Construction 112 162 163 187 186 154 200 200 200 200 200 200 200 200 200 160 160 160 1,564 1,680 3,244 $ 60.00 $ 62.40 X $ 178,352 $ 199,244 $ 45,312 $ 422,908 Joe Biedenbach/CH2M HILL Bus Maintenance Facility as needed 40 40 40 40 80 80 160 $ 63.50 $ 66.04 X $ 10,879 $ 11,315 $ 2,663 $ 24,857 Diana Yust/CH2M HILL Financial Coordinator 0 7 23 20 15 0 40 40 40 40 40 40 40 40 40 40 40 40 185 360 545 $ 51.12 $ 53.16 X $ 20,254 $ 40,989 $ 7,349 $ 68,591 Willie Franklin/CH2M HILL DBE Coordinator 0 7 13 1 15 24 24 24 24 24 24 24 24 24 24 24 24 24 8 8 132 232 364 $ 62.49 $ 64.99 X $ 17,665 $ 32,290 $ 5,995 $ 55,950 Wayne Gilles/CH2M HILL Safety and Security 03 0 0 00 40 40 40 40 40 40 40 40 3 320 323 $ 81.92 $ 85.20 X $ 526 $ 58,386 $ 7,070 $ 65,982 Nancie Boccio/CH2M HILL Contract Administrator-for 48 0 4 40 4 4 4 4 4 4 4 4 4 4 4 4 40 20 20 8 8 32 132 164 $ 68.85 $ 71.60 X $ 4,718 $ 20,242 $ 2,995 $ 27,955 Gayle Burgess/CH2M HILL Contract Accountant- 3.6 7.9 9.3 6.9 9.4 6.1 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 8 8 91 208 299 $ 25.11 $ 26.11 X $ 4,904 $ 11,633 $ 1,984 $ 18,522 Rosemary McGurn/CH2M HILL Sub Contract 16 24 2 4 3 5 54 ‐ 54 $ 34.13 $ 35.50 X $ 3,947 $ ‐ $ 474 $ 4,421 Sabrina Becker/CH2M HILL Technical Writer 1 0 0 0 20 4 32 57 ‐ 57 $ 42.71 $ 44.42 X $ 5,214 $ ‐ $ 626 $ 5,839 Carol Hullinger Technical Writer 12.8 16 29 ‐ 29 $ 30.64 $ 31.87 X $ 1,890 $ ‐ $ 227 $ 2,117 Corbin Young Technical Writer 4.5 5 ‐ 5 $ 30.96 $ 32.20 X $ 298 $ ‐ $ 36 $ 334 Christine Rudzinskas Word Processor 24 5 29 ‐ 29 $ 18.32 $ 19.05 X $ 1,138 $ ‐ $ 137 $ 1,274 Melody Brock Graphic Artist 2 2 ‐ 2 $ 29.04 $ 30.20 X $ 124 $ ‐ $ 15 $ 139 Ron Crumm Contract Admin-Vacation 13 0 0 4 ‐ 4 $ 62.01 $ 64.49 X $ 531 $ ‐ $ 64 $ 595 Amy Hammontree Biologist 2 4 16 24 24 40 24 24 16 16 40 24 8 8 8 40 254 248 502 $ 28.26 $ 29.39 X $ 15,372 $ 15,610 $ 3,718 $ 34,700 TBD Inspector ‐ ‐ ‐ $ 45.00 $ 46.80 X $ ‐ $ ‐ $ ‐ $ ‐ $ 1,441,493 Keith Meyer, PE/Ditesco Construction Project Manager 168 220 201 255 221 210 200 200 200 200 200 200 200 200 200 200 200 200 200 80 80 80 80 1,875 2,320 4,195 $ 165.00 $ 165.00 included included $ 309,293 $ 382,800 $ 692,093 Jill Colasuonno, EI/Ditesco Field Engineer/Station Inspector 47 18.5 29 65.5 75 141 160 160 160 200 200 200 200 200 200 200 160 160 160 160 160 856 2,200 3,056 $ 95.00 $ 95.00 included included $ 81,320 $ 209,000 $ 290,320 Beau Javernick/Ditesco Scheduling and Cost Estimating 2.5 1 0.5 11.5 11.5 33 40 40 40 40 40 40 40 40 40 40 40 40 180 360 540 $ 120.00 $ 120.00 included included $ 21,600 $ 43,200 $ 64,800 Lindsay Reichel/Ditesco Admin Support 37 35.5 29.5 9.5 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 184 288 472 $ 55.00 $ 55.00 included included $ 10,093 $ 15,840 $ 25,933 Bill Renz/Ditesco Structures/Bridge Inspection 34 10 23.5 45 160 160 160 160 593 160 753 $ 98.00 $ 98.00 included included $ 58,065 $ 15,680 $ 73,745 $ 1,146,890 Raymundo Leon/LS Gallegos Construction Inspector 200 190 212 167 139 200 200 200 200 200 200 200 200 200 100 1,507 1,300 2,807 $ 32.00 $ 33.28 X Same $ 106,093 $ 95,181 $ 201,274 Steve Bignall/Rocksol Construction Inspector 80 200 200 200 200 200 200 200 100 280 1,300 1,580 $ 113.00 $ 113.00 included included $ 31,640 $ 146,900 $ 178,540 Admin/Rocksol 444444 444 8 28 36 $ 87.00 $ 87.00 included included $ 696 $ 2,436 $ 3,132 Chip Leadbetter, PE/CTL QC / Materials Testing Project Principal 00 5 3333333 333333 14 30 44 $ 100.00 $ 100.00 included included $ 1,400 $ 3,000 $ 4,400 Heather Grubb/CTL Materials Testing Field Operations Manager 0 20 29 15 13.5 12.5 16 16 16 16 16 16 16 16 16 16 16 16 16 138 160 298 $ 100.00 $ 100.00 included included $ 13,800 $ 16,000 $ 29,800 Craig Ellis/CTL Lab Manager 0 8 7.5 16 7 30 32 32 32 32 32 32 32 32 32 32 165 224 389 $ 80.00 $ 80.00 included included $ 13,160 $ 17,920 $ 31,080 Melissa Chalona/CTL Environmental Compliance Officer 00 016 16 1616 16 16 48 48 96 $ 100.00 $ 100.00 included included $ 4,800 $ 4,800 $ 9,600 Jeff Odell/CTL Material Testing 0 0 0 0 0 2.5 192 192 192 192 192 192 192 192 192 192 128 128 128 579 1,728 2,307 $ 80.00 $ 80.00 included included $ 46,280 $ 138,240 $ 184,520 Jack Pappert/CTL Material Testing 0 26.5 39 50.5 71.5 45 144 144 144 144 144 144 144 144 96 96 665 912 1,577 $ 60.00 $ 60.00 included included $ 39,870 $ 54,720 $ 94,590 Lee Giffin/CTL 0 17.5 25.5 11 4 21.5 80 ‐ 80 $ 60.00 $ 60.00 included included $ 4,770 $ ‐ $ 4,770 Julstin Volz/CTL 0 11.5 7.5 3 20.5 33.5 76 ‐ 76 $ 60.00 $ 60.00 included included $ 4,560 $ ‐ $ 4,560 Wyatt Knutson/CTL 00 1 3 45 13 ‐ 13 $ 100.00 $ 100.00 included included $ 1,300 $ ‐ $ 1,300 DJ Kotchuck 4 4 ‐ 4 $ 60.00 $ 60.00 included included $ 240 $ ‐ $ 240 Jay Turner 2.5 3 19.5 25 ‐ 25 $ 60.00 $ 60.00 included included $ 1,500 $ ‐ $ 1,500 Spencer Schram 0.25 0 ‐ 0 $ 100.00 $ 100.00 included included $ 25 $ ‐ $ 25 Chad Hofmann 12.5 13 ‐ 13 $ 60.00 $ 60.00 included included $ 750 $ ‐ $ 750 Fred Braun/CTL Material Testing Technician 0 00110 2264 64 646464 646464 64 225 384 609 $ 60.00 $ 60.00 included included $ 13,500 $ 23,040 $ 36,540 CTL Reduced by ~200 K $ 403,675 HOURS LABOR COST EXPENSES TOTAL FEE TOTAL Contract Cost Revised Hours Revised Labor Revised Expenses Original Fee Fee on new or Reduced Staff Time & Sub Exp Jill's Added Hours Reduction in CTL Cost from Jan 2013 to Jan 2014 Revised TOTAL Contract Cost Change from Contract CM Services CH2M HILL, Inc. 10,022 $ 1,380,164 $ 254,951 $ 1,800,735 $ 165,620 $ 1,800,735 9,707 $ 1,287,047 $ 280,000 $ 165,620 $3,718 Amy $ 1,736,385 ($64,350) Ditesco 5,820 $ 860,300 $ 8,603 $ 868,903 $ 34,756 $ 903,659 9,015 $ 1,146,890 $ 12,000 $ 34,756 $12,164 Lindsay, Jill, Bill 2,116 $ 1,205,810 $302,151 LS Gallegos (DBE) 4,320 $ 345,016 $ 64,460 $ 409,476 $ 16,379 $ 425,855 2,807 $ 201,274 $ 35,000 $ 16,379 ($6,928) Remove TBD Insp $ 245,725 ($180,131) Rocksol (DBE) 1,580 $ 178,540 $ 30,000 $8,342 New Inspector $ 216,882 $216,882 subtotal 20,162 $ 2,585,480 $ 328,014 $ 3,079,114 $ 216,755 $ 3,130,249 23,108 $ 2,813,751 $ 357,000 $ 216,755 $17,295 $ 3,404,801 $274,552 QA Testing $ ‐ CTL Thompson 9,252 $ ‐ $ 678,000 $ 678,000 $ 27,120 $ 705,120 5,529 $ 403,675 $ 4,507 $ 27,120 ($4,734) Reduced Forecast Hrs only ($118,340) $ 430,568 ($274,552) total 29,414 $ 2,585,480 $ 1,006,014 $ 3,757,114 $ 243,875 $3,835,369 28,637 $ 3,217,426 $ 361,507 $ 243,875 $12,562 $3,835,369 $0 Notes DBE% 13.6% DBE% 13.6% 0.0% Hours thru Sept based on actual invoices CH2M HILL Expenses increased to include $21 K RR Insurance premium, and an allowance for the Xerox Printer = allowance for drilling/boring geotech reports Ditesco expenses increased because they are 80% spent as of Nov 2012 LSG expenses split with Rocksol CurrentContract