Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7189 ADVANCED METERING INFRASTRUCTURE10 u 4J 10 Sty yl�ol�3 CHANGE ORDER NO. AMFC Elster #1 PROJECT TITLE: Advanced Meter Fort Collins (AMFC) CONTRACTOR: Elster Solutions, LLC PROJECT NUMBER: NA PURCHASE ORDER NO.: 9114836 DESCRIPTION: Advanced Metering Infrastructure for AMFC 1. Reason for Change: Fort Collins has determined that the amount of equipment and funding included in this purchase order for Tropos Field Equipment is in excess of required needs. The original PO included $3,194,100 for this expense. Paid to date is $1,231,505.60 with a current balance available of $1,962,594.40, Fort Collins has determined that a current available balance for Tropos Field Equipment of $962,594.40 is adequate to meet project needs from this PO. 2. Description of Change: Removing Tropos Field Equipment and cost of $1,000,000 from this purchase order. 3. Change in Contract Cost: $1,000,000 4. Change in Contract Time: No change. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O.: TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S: ADJUSTED CONTRACT COST (Assuming all change orders approved) $17,723,800 $ 0 $ 0 $ (1,000,000) 5.9% 5.9% $16,723,800 ACCEPTED BY:. DATE: 1-IoB Robe J. Hanes, VP Contracts and Proposals- Contractor's Repre a tative THE CITY OF FORT COLLINS, COLORADO ACCEPTED BY: DATE `i 103 `2013 Dennis Sumner, Project Manager REVIEWED BY: DATE: Ste a tana fight and Power Operations Manager APPROVED BY: DATE: B n noni , Utilities Executive Director (greater than $1,000,000) APPROVED BY: James B. O'Neill, CPPO, FNIGP Director of Purchasing & Risk Management (greater than $60,000) cc: Purchasing DATE: Dennis Sumner From: Judy Dahlgren Sent: Friday, March 29, 2013 1:36 PM To: Dennis Sumner Subject: FW: PO balance From: Ellen Switzer Sent: Friday, March 29, 2013 9:42 AM To: Judy Dahlgren Subject: RE: PO balance Judy did you mean Elster PO 9114836? (The supplier number for Elster is 491280) This is the data in JDE as of today. Order ;Original Ordered Number Amount --- -- ------------- i - _--9114836 -- - 9,251,000_001 9114836 3,457,000.00[ 0114836i 3,194,100.0C 9114836i 659,600.0C Amount To Paid Receive Account Plumber 7,002, 902.401 2,248,097.601 5019100130.554999.3 700 3,014,029.801 442,970.201 50264210_00.5_5405_0._6 1988381.001 963, 719.001 5019100130.565030.3971 1,231,505.60 1,962,594.. i 5019100130.565110.397� 419,288.981 240,311.02, 5019100130.521210.3700 -- - -- --------- ---- - --------- 4-- -- --- - -- Total Elec 14,266,800.00! 8,8_52,077. Total Water 3,457,000.0Q 3,014,029. Total PC 911 - 17,723,800.0 -11,966,107_ -----Original Message ----- From: Judy Dahlgren Sent: Friday, March 29, 2013 7:57 AM To: Ellen Switzer Subject: PO balance Line Description Electric Meters Water Modules EnergyAxis tieadend' Tropos Field Equipme Project Management .......... ... - -- -- - - -i--------- -- 5,414, 722.021 442,970.201 5,857,692.22 Ellen, Is it possible to get the balance remaining for the Elster PO 491280? Dennis thought he had a beginning balance of $22 million and I need to meet with him about where we are. I just want to make sure my numbers match up with yours. Thanks Sent from my iPhone I