Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTS (3)CHANGE ORDER NO.4 PROJECT TITLE: Reservoir Ridge Natural Area Improvements CONTRACTOR: J2 PROJECT NUMBER: bld # 7434 -q 1 ZS7(0t/ PURCHASE ORDER NO.: DESCRIPTION: Field Changes 1. Reason for change: Field alterations and additional clean-up items 2. Description of Change: Please see attached Change in Work Request #4, dated 3/31/2013. 3. Change in Contract Cost: $6,060.40 4. Change in Contract Time: none ORIGINAL CONTRACT COST $239,360.05_ TOTAL APPROVED CHANGE ORDER 7 245:50 " TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $. 6,060.40 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. _ 2 53%. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 5.56% ADJUSTED CONTRACT COST 5 , 5- 5 ,(Assur iirig all, change orders approved) ACCEPTED BY: DATE: __ y�B12913 Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: Landscape Architect APPROVED BY: Purchasing Agent over $30,000 de City Clerk Architect Contractor Engineer Project File Purchasing DATE: DATE: DATE:. DATE: CHANCE IN WORK REQUEST" C Initiation Date: 3/31/2013 Projeec Reservoir Ridge Natural At" Owner: City of Fort Collins To: J-2 Contracting Co. - Requested by: Matt Day Authorized by: Man Day Please famish change in contract sum for the change in work described below Do not order material or start any work until approval is received Every effort will be made to incorporate this change into the work wllhour offeenng the contract data Description of Proposed -Changes - 1) Removal and Disposal of Concrete Slab end Curb North of Vault Toilet (8 Truckloads). Cut/Fill Topsoil to fill hole tram slab including grading. Seeding of appra irnately 900 SF to reclaim aura (1 LS) amount $2.560.00 2) Grading Modifications to Accorrmodele Wider Parking Lot Entrance and Padting Stalls (Cut)Fill of 14 CY Topsoil ® $4.201CY and Placement of S5.8 Torts Recyled Asphalt @ $16rrON from Bid Tab) $951.60 3) Additional Colored Concrete Paving 5` Think (254 SF ® $5.40GF) $1.371.60 $$78.00 4) Thickened Edge A" ADA Parking Stall (Colored Concrete) (52 LF ® $7.001LF) 5) Additional Nativist Area Fence to accommodate Larger Parking Stalls an North End of lot (12 LF (M $6.501LF) . 6) Remove and Resat Natural Area Fence to Accommodate Layer Parking Stalls an South End of lot (72 LF ® $4.10rtF) $29595.20 7) 31Li' Dry Sump (Miriil 16ON geoteacle with 1.5- Rock and 4" Pa. Pipe French Drain) East or Restroan Drain (1 LS) $$90.00 8) Addition of 3 Rabbithnrsh between Restrooln and Entry Sign (3 at $30.001EA) $� '� TOTAL $6,060.40 J-a c*ab oas ea.. agrees to change the work described above for the ettattge in price shown below. i have attached a breakdown which lists all costs of labor, materials, taus. overhead, profit, and oil other changes and/or charges involved Signature of the Contractor indicates his agreement herewith, including any 4usmuMt in the Contract Sum or Conosct Time. The Contract Time will be no change by 0 Days, No Change in Contract Snm1 llmad tiro dmrpe) - ADD to the Conmtu Sam: S 6.060.40 DEDUCT from the Connect Sum This information shall be valid for thirty (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATURE - DATE:. 31372013 t'onmcw rlx:ll rennin mr (1) rnpyradr wri ONGMA/, a Omer APPROVED BY OWNER: Accepted change in work request will be included in a fudge jnrmal change order. Do NOT bill for this change until o formal change order has been arecmed by all panics. Acceptance is direction to prucred wdh the work described heron Not valid unless signed by the owner and the contractor.