HomeMy WebLinkAboutWORK ORDER - RFP - 7175 BRIDGE INSPECTION MAINTENANCE REPAIR AND REPLACEMENT PROGRAM (8)EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
and
Michael Baker Jr., Inc.
DATED: April 11,2013
Work Order Number: 06-254902100' 43
Project Title: Bridge Inspection, Maintenance, Repair and Replacement Program
Emergency Inspection & Miscellaneous Inspection Elements
Commencement Date: April 2, 2013
Completion Date: May 31, 2013
Maximum I'ee: (trig and reimbursable directs costs): not to exceed $6,500.00
Project Description: See Attached.
Scope of Services: See attached scope of service.
Service Provider agrees to perform the services
identified above and- on the attached forms in
accordance with the terms and conditions
contained herein and in the Services Agreement
between the parties. In the event of a conflict
between or ambiguity in the terms of the
Services Agreement and this worst order
(including the attached forms), the Services
Agreement shall control.
Service Provider
By: vr\sn-
Date: April 11.2013
Approved By:
Purchasing Agent over $60,000
ql
The attached forms consisting of fourteen (14)
pages are hereby accepted and incorporated
herein by this reference, and Notice to Proceed is
hereby given.
Exhibit "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
MICHAEL BAKER JR., INC.
DATED: April 2, 2013
PROJECT DESCRIPTION
This scope of work is for a number of miscellaneous inspection tasks, including:
• An emergency bridge inspection and related services of structure number MLD-WHTM-A
• Additional measurements and geometric investigation of structure numbers PRST-W-CTRE and
LAKE-W-CNTR
• New bridge inspection and related services of structure number OLIVE-LOOMIS
• Locate, expose, and mark buried manholes on Arthur Ditch and relay location to the City (CHRY-
GRNT, CHRY-SYCM-A, MAP-WHTM-A, MTN-W-WHTM, MGNL-OLIV-A/ OLIVE-LOOMIS
(same access))
This work order is performed under the master agreement for the City's Bridge Inspection, Maintenance,
Repair, and Replacement Program.
SCOPE OF SERVICES:
The scope of work for each individual work elements is described below.
Emergency Inspection of MLD-WHTM-A
It was discovered by the City that a sink hole was formed next to the existing Arthur Ditch structure,
causing a local failure of the adjacent sidewalk. The source of the sink hole is unknown and located within
the City's Right -of- Way. Since Arthur Ditch is scheduled to run water within the second week of April, it
is an urgent matter to find the cause of the sink hole. Baker is tasked to provide the City of Fort Collins an
Emergency Bridge Inspection with the intent to investigate potential causes of the sink hole.
Work elements include: Project administration, field inspection, coordination with the City regarding
immediate findings and to institute immediate repairs, photos and measurements, reporting, documentation
of the process through a memorandum, and coordination with the City regarding the recommended course
of action. A load rating will not be required.
Additional Measurements of PRST-W-CTRE and LAKE-W-CNTR
The City is considering a future retrofit of these two existing Arthur Ditch structures to improve the access
points. New manholes will be provided at the north end of both structures, while the south manhole will be
upsized on the PRST-W-CTRE structure. In preparation for this work, the City has requested that Baker
provide more detailed field measurements of these structures for use with that future design project.
Work elements include: Project administration, field inspection, photos and measurements, and
documentation of the measurements in cad details.
Exhibit A - Work Order Form — Work Order No. 8
Bridge Inspection, Maintenance, Repair and Replacement Program —Emergency Inspection & Miscellaneous Inspection Elements
Bridge Inspection of OLIVE-LOOMIS '
The City has requested that Baker provide an inspection of the existing Arthur Ditch structure. Although
the structure is not new, this will be the first such inspection and thus categorized as "new inspection". The
inspection will extend from the manhole in the Alley to Olive Street, approximately 250' in length.
Work elements include: Project administration, field inspection, photos and measurements, and
documentation of the process through a memorandum. The memorandum will be included with the other
structures of Work Orders 6 & 7.
Locate Buried Manholes for CHRY-GRNT CHRY-SYCM-A MAP-WHTM-A, MTN-W-WHTM,
MGNL-OLIV-A/ OLIVE-LOOMIS
The City has requested that Balser locate, expose, and mark buried manholes on Arthur Ditch at various
locations. Manhole location information will be presented to the City in a memorandum which will include
sketches noting the approximate location of the manholes relative to the structure.
Work elements include: field locating, exposing, and marking manhole locations, and documentation of the
locations with a memorandum. The memorandum will be included with the other structures of Work
Orders 6 & 7.
GUIDELINES AND REFERENCES
All inspections will be conducted in accordance with current NBIS standards and supervised by personnel
meeting the requirements outlined in the Code of Federal Regulations, 23 CFR 650.307. Applicable
inspection standards include:
• CDOT PONTIS Bridge Inspection Coding Guide
• Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation's
Bridges (Report No. FHWA-PD-96-001)
• .Bridge Inspector's Reference Manual (Publication No. FHWA NHI 12-049)
• AASHTO Manual for Bridge Evaluation, 2n' Ed., 2011
• CDOT Bridge Rating Manual
• Any other applicable documents as approved by the City
April 10, 2013 2 of 3
Exhibit A - Work Order Form — Work Order No. 8
Bridge Inspection, Maintenance, Repair and Replacement Program —Emergency Inspection & Miscellaneous Inspection Elements
DELIVERABLES
The following deliverables will be provided for this project.
1. Project Administration
• One progress report with invoice
• Quality Control review of all project deliverables prior to submittal
2. Emergency Inspection
• PDF file of a memorandurn, including: structure inspection and inventory report and
color photos
• Electronic sketches of the bridge in a Microstation or AutoCad format
3. New Inspection (included with deliverable for Work Orders 6 & 7)
• PDF file of a memorandum, including: structure inspection and inventory report and
color photos
• Electronic sketches of the bridge in a Microstation or AutoCad format
4. Locate Buried Manholes on Arthur Ditch (included with deliverable for Work Orders 6 & 7)
• PDF file of a memorandum
• Electronic sketches of the bridge in a Microstation or AutoCad format
SCHEDULE
All work shall be completed by May 31, 2013.
April 10, 2013 3 of 3