HomeMy WebLinkAboutBID - 7391 MISCELLANEOUS CONCRETE ANNUALAddendum 1 - Page 1 of 3
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7391: Miscellaneous Concrete Annual
OPENING DATE: 3:00 PM (Our Clock) May 25, 2012
To all prospective bidders under the specifications and contract documents described
above, the following changes/additions are hereby made and detailed in the following
sections of this addendum:
Exhibit 1 – Questions & Answers from the Prebid
Exhibit 2 – Revisions to the Specifications
Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with
any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 1 - Page 2 of 3
EXHIBIT 1 – QUESTIONS & ANSWERS FROM THE PREBID
Question: “Is the project tax exempt?”
Answer: “Yes, as stated in the bid documents.”
Question: “What are the liquidated damages?”
Answer: “No liquidated damages unless noted on the work order.”
Question: “Is a bid bond required?”
Answer: “No.”
Question: Do you have a budget or engineers estimate?
Answer: No. This is a work order agreement and each project will have its own budget.
Addendum 1 - Page 3 of 3
EXHIBIT 2 – REVISIONS TO THE SPECIFICATIONS
• Section 2000, Index of Revisions, page 1 of 42: Add to the Index Table of
Contents; “601 Finishing Hardened Concrete Surfaces”.
• Section 601, page 24 of 42, DESCRIPTION, delete first paragraph: “This work
shall consist of preparing, rolling, spraying retarder, and exposing the concrete
surface sand including all materials, labor, tools and incidentals to obtain an
exposed sand finish.”
Replace with the following: “This work shall consist of preparing, rolling, spraying
retarder, and exposing the sanded concrete surface including all materials, labor,
tools, and incidentals to obtain an exposed sand finish. The unit cost shall
include the additional work and materials for exposing the sand finish and shall
be paid in addition to the unit cost for the item installed (i.e., Flatwork 4”, Flatwork
6”, etc.).”
• Section 601, page 24 of 42, MATERIALS, delete second paragraph: “CHI
Surface Treatment or approved equivalent shall be applied to the concrete
surface to create the texture. The City Representative shall specify the depth of
penetration and integral color of the retarder. Slabs may be sealed in accordance
with the manufacture’s recommendations.”
Replace with: “CHI Surface Treatment or approved equivalent shall be applied
to the concrete surface to create the texture. The City Representative shall
specify the depth of penetration of the retarder. Slabs may be sealed in
accordance with the manufacture’s recommendations.”
• Section 601, page 24 of 42, CONSTRUCTION REQUIREMENTS, delete third
paragraph: “The Contractor shall place a 6’ x 6’ on-site referee test sample to
determine consistency.
Replace with the following: “The Contractor shall place a 6’ x 6’ on-site test
section to determine consistency.