Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7071 APP MASON CORRIDOR PROJECT'4 PROJECT TITLE: CONTRACTOR: PROJECTNUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: CHANGE ORDER NO. 01 Mason Corridor - MAX BRT Robert Tully APP Construction Agreement Art Windscreen Panel Glass Fabrication and Supply This change order adds fabrication and supply of 18 art windscreen panels for various station platforms. The construction contract for fabrication and supply of windscreen panels did not include this scope of work. Also, this scope of work was inadvertently left out of the original art in public places contract with Robert Tully. 2. Description of Change: This change order adds fabrication and supply of 18 "art windscreen; panels according to the attached supplemental inventory of materials supporting documentation and specifications. Through this change order the artist will be responsible for fabrication of art windscreen panels, approval of samples/mock ups; shipping and delivery to the jobsite (Fort Collins, CO) by July24, 2013. The artist will also be responsible for insuring the glass windscreens during transport, management of the fabrication and approval process. The current base contract with Robert Tully includes design and fabrication of art images for each windscreen (including CSU images). Therefore, this is not part of this change order. The BRT contractor will be responsible for installation at each station platform. The contractor will supply all hardware, equipment and labor for installation of windscreens. 3._ Change in Contract Cost: $56,697.00 4. Change in Contract Time: Ocalendar days. Final completion for this contract remains October 1, 2013. TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $ 56,697.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 29.43% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S, 29.43% ADJUSTED CONTRACT COST $249,347.00 (Assuming all change orders approved) ACCEPTED Contractor's REVIEWED Construction APPROVED City Project I APPROVED APP Repress DATE: 3/1,5/13 DATE: 4-1- 13 DATE: 3. IF.13 DATE: 3 -16 — /3 APPROVED BY: DATE: Purchasing Agent over $60,000 cc: City Clerk Artist Contractor Engineer Project File Purchasing max CHANGE ORDER NO. 1 SUPPORTING DOCUMENTATION Project: Mason Corridor — MAX BRT Art in Public Places Construction Agreement with Robert Tully Project No. Purchase Order No. Date: March 15, 2013 Description of Change: MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction This change order adds fabrication and supply of 18 art windscreen panels for various station platforms. The construction contract for fabrication and supply of windscreen panels did not include this scope of work. Also, this scope of work was inadvertently left out of the original art in public places contract with Robert Tully. Change in Contract Value: The contract value is being increased by $56,697.00. Please.see attached proposal from Robert Tully. W -�1-— c �__ae Item Number Description Contract Value ; Add 18 W indscreen Art Panels 1 fabrication and delivery — see attached material schedule :^'�- _-o.�vu=^rvrs. +`,^ -c^. �:y-�•-•-.�T-carxa... -r- Totat,Contract Change this.change order Total -Change Order: $56,697.00 Change in Contract Time: There is no change in contract time associated with this change order. However, the following schedule is anticipated and proposed from the artist. Contract change order complete March 15, 2013 Fabricator delivers two 12" x 12" samples by March 28, 2013; delivery to artist and Owner Owner sample review by April 5, 2013 Artist/Fabricator produce remaining samples and art windscreens April 5-July 12, 2013 (allows time for revisions, sample approvals) Deliver all crated art windscreens by July 24, 2013 • Install Aug. 1-30, 2013 (by others) ditesco Independent Cost Estimate Date of Estimate: 3/25/2012 Contract Type: Mason Corridor BRT (Hard Bid) Existing Contract or PO (YIN): Y Description of Goods (A) or Services (B): A Scope is to address need for design, fabrication and supply of 18 art windscreen panels for various station platforms. The construction contract for fabrication and supply of windscreen panels did not include this scope of work. Also, this scope of work was not included in the original art in public places contract with Robert Tully. I have obtained the following estimate from; Published Price List / Past Pricing (date) Engineering or Technical Estimate (performed by) Bill Renz Independent Third Party Estimate (performed by) Other (specify) Misc. Suppliers Cost Estimate Details: (Estimate calculated in US Dollars) Cnst of Standard Items DESCRIPTION ITEM # QUANTITY UNIT UNIT PRICE TOTAL Laminated Glass Panel Materia NA 667 5F 20.91 13,946.97 Artwork Fab NA 17 EA $ 1,500.00 $ 25,500.00 Polish and Art Apply NA 17 EA $ 150.00 $ 2,550.00 Shipping NA 1 LS $ 4,984.20 $ 4,984.20 Samples NA 15 EA $ 150.00 $ 2,250.00 10%Margin NA 1 LS $ 4,923.12 $ 4,923.12 TOTAL $ 54,154.29 Cost of Services, Repairs, or Non -Standard Items Item/Task: Materials or Work Description Other Direct Costs Labor Hours Labor Class Allocated Overhead SGW Profit TOTAL $ Total $ 'Selling, General and AdministraUvo Expenses Signature of Preparer: / G Change Management Checklist :-'Compliance-C ate..Reference e. - initials Reviewed for compliance with Part of the base design package; Environmental Assessment 4/3/13 included in the EA and EA re- KM evaulation Reviewed for construction/safety impacts 4/3/13 Scope was included in base plan KM Independent cost estimate prepared 3/25/13 As attached to this memo KM Reviewed for PCGA grant compliance 413/13 Part of Build Alternative KM scope is included in SCC 20.01 Reviewed for real estate impacts/needs 413/13 Construction inside guideway KM easement and right of way Reviewed for compliance with design criteria/ADA Windscreen panels do not affect htto://www.access-board.gov/ada-aba/ada- 4/3113 ADA compliance on platforms; part of original plan approval KM standards-dot.cfm System for Award Management Page 1 of 1 Search Results Current Search Terms: robert* Tully* No records found for current search. SAM I System for Award Management 1.0 Note to all Users: This is a Federal Government computer system. Use of this system constitutes consent to monitoring at all times. IBM v1.837.20130402-1804 '�U$A.gS https://www.sam.gov/portal/public/SAM/?portal:componentld=7cbf8635-61 116-41 ff-bfb6-2f .. 4/8/2013 Art Windscreen Locations and Dimensions (Material Inventory) Change Order Number I Support Artist: Robert Tully Date: February 16, 2013 Station # Station Location Windscreen Position Mark # Glass Type Number of Art Panels Dimensions Width Height Thickness I Harmony north center; east side M121 GL-3 1 5101, 8-2" 0.530" 2 Troutman north center; east side M121 GL-3 1 SIV, 87' 0.5301, 3 Horsetooth north center; east side M121 G L-3 1 510I 87' 0.530" 4 Swal low southboun d west side M4 GL-3 2 4'3" 812" 0.530" 5' -..'s wa p anels" 6 Drake north center; east side M121 G L-3 1 5'0" 8'2�� 7 Spring Creek northbound (Bay Farm) east side M4 G L-3 2 4'3" 82 8 S Creek southbodinflBa 1-1Z,.. pring y pane so, 9 Prospect north center; east side M121 G L-3 1 5'0" 8'2" 0.530" CSU panel - north side M200 G L-3 1 5-0" 87' 0.530" 10 University north center; east side M121 GL-3 1 5-0" 87- 0,530" CSU panel -north side M200 GL-3 1 5'0" 87' 0.530" 11 Laurel northbound east side M4 GL-3 2 4'3" 87- 0.530" 12� ,.,Laurel . . ......... ........ ... . �,,.. r -,, no: atpanes,,,,. . ..... .... ..Mulberry northbolund �4 .......... .. ::" . ..... R, a, rt.pane 14 Mulberry southbound north side M2 G L-3 1 3'10" 8121F 0.530" olive northbound," ,;k*, no�art s A""."i 16 Olive southbound north side M2 GL-3 1 3-10" 81211 17 Mountain northbound east side M1 GL-3 2 4-3" 8-2" 18. M tain south bo �,v oun R x. . . .... no:art pane 19 ............... "'K'R` N notarto Notes: - All other windscreens by contractor. - Distraction pattern by contractor. - Artist to provide all art panels including custom CSU images Totals: Count Dimensions Width Height Thickness 8 5101. 8'2" 0.530" 8 4'3" 8'21- 0.5301, 2 3-10" 8'2" 0.530" TULLY ARTWORKS 733 McKinley Ave., Louisville, CO 80027 720-771-8502 ww.tullyartworks.com March 14, 2013 PRICE QUOTE For: Keith Meyer MAX Project City of Fort Collins, CO 80521 Item: Production and supply of 1.8 glass windscreens with art design layers for 12 stations along the MAX Bus Rapid Transit line in Fort Collins. Description: Tully Artworks will work with Imaging Sciences to produce glass windscreens using the Dupont SGX process of embedding images on a poly vinyl butyl (PVB) layer between two 1/4" panels of tempered, laminated glass. There will be 18 windscreens of three sizes: 8 pieces TO" x 8'2" x .530" 8 pieces 4'3" x 87' x .530" 2 pieces T10"x 8'2" x .530" There would be 17 unique images; one of the 5'0" wide panels is repeated with a CSU logo. No white interlayer is be used so that the windscreens are translucent for safety reasons at the bus stations. The type of tempered glass will match that of adjacent non - art windscreens because the art designs do not cover all the glass --there are open areas so the appearance will be best if it matches adjacent glass. Edges will polished. The product will be UV stable and have a 10-year warranty. Glass will also meet applicable specifications for the project as attached in a separate file, "MAX Glazing Specifications Section 08 80 00." A 12",x 12" sample from each design should be submitted for approval before producing the full glass. The production schedule is as follows: , Deliver two 12" x 12" samples to Robert Tully by March 28, 2013 Sample review by April 5 Progressively produce remaining samples and full windscreens by July 12, 2013, allowing time for artist modifications between sample and full product. Deliver crated windscreens to Fort Collins by July 24, 2013 Installation by others Aug. 1-30 COST: Glass with art layer Samples $150 x 15 Polishing (no holes) Boxing Shipping Contingency 5% Artist's mgt. 10% TOTAL $38,700 (see attached Imaging Sciences subcontractor quote) 2,250 3,302 400 3,541 2,834 5,670 $56,697 Member —International Sculpture Center IMAGING SCIENCES Date: March 7, 2013 Name: Robert Tully Address: 733 McKinley Ave. Louisville, CO 80027 Phone: 720 771 8502 Fax: Dear Robert: Thank you forthe opportunity to quote on the Fort Collins transit windscreens. Quote Number: Tully Artworks 030713 Unit Width Height Pattern Width Height Unit Tot. C'.nnnt TnrhP.c Tnrhnc Tv Pa Feef Font S R S F 8 60.00 98.00 5.00 8.17 40.83 326.64 8 51.00 98.00 4.25 8.17 35.39 283.12 2 46.00 98.00 3.83 8.17 31.31 62.62 672.38 Glass is: 1/4 s clear tempered over same with .067 (1/16a') decorative interlayer. Decorative element is 17 unique patterns with one pattern repeated. The technique quoted is Expressions. Quote includes all edges polished and 4 holes per panel. Pricing: Glass $38700 (Summary) Polishing $3302 Holes $4320 Boxing $400 Samples $150 each Terns: 50% cash in advance, balance due before shipment Freight: FOB plant Lead Time: Typical - 6 -8 weeks from receipt of complete PO and approved sample Please advise requested delivery date at time of order. We always try to accommodate request dates whenever possible. Regards: Geoff Brown MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand December 24, 2012 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: MAX Bus Rapid Transit Project Independent Cost Analysis — Robert Tully Change Order #1 Art Windscreen Panel Glass Fabrication and Supply This change order adds fabrication and supply of 18 art windscreen panels. Through this change order the artist will be responsible for fabrication of art windscreen panels, approval of samples/mock ups; shipping and delivery to the jobsite (Fort Collins, CO) by July 24, 2013. The artist will also be responsible for insuring the glass windscreens during transport, management of the fabrication and approval process. The current base contract with Robert Tully includes design and fabrication of art ima9es for each windscreen (including CSU images). Therefore, this is not part of this change order. The BRT contractor will be responsible for installation at each station platform. The contractor will supply all hardware, equipment and labor for installation of windscreens. In reviewing this request, an independent takeoff of the changed items was prepared, using a combination of independent supplier's estimates, freight quotes, and technical estimates. The freight was arrived at using an independent quote, as was the glass material supply. The art fabrication and install was arrived through technical estimating means, along with the sample preparation. costs. Markup was applied as all pricing and work was through a second tier contractor/supplier to Robert Tully. This cost estimate is attached. The estimated contract increase to add this scope of work is $54,154.29. I find Robert Tully's change order proposal in the amount of $56,697.00 to be reasonable for the required increase in scope. As such, I recommend approval of this request for an addition to the contract. t�/ ith Mey , PE Constructi n Project Manager' CH2M HILL Team 970-988-8605 keith.meyerCGDd itescoseryices.com Cc: job file