CHANGE ORDER FORM
PROJECT TITLE: Mason MAX BRT Project
PROJECT NUMBER: 400903250
CONTRACTOR: Tetra Tech Construction Services, Inc. (PO#9115207)
CHANGE ORDER NUMBER: 1
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1. & 2. This change order. adjusts final quantities for the project per the attached spreadsheet.
3. The total contractincrease for the quantity adjustments is $63,690.44.
4. There will be no change to the contract time.
ORIGINAL CONTRACT COST $796,303.40
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
ADJUSTED CONTRACT COST
orders approved)
ACCEPTED BY:
SUBMITTED BY: fi
ICAMATi►tgllo?,'il
$0.00
$0.00
$63,690.44
$859,993.84
DATE:-j -7_,—_) S--%
DATE:
APPROVED BY: DATE:
{Depa en Q`.
APPROVED BY: DATE: lJ I
(Pulrthaiing Agent)
cc: city Clerk
Contractor
Purchasing
Project File
Rid Na. 7073 - Change Order Nm 1
Ql- of Fnr! Collins Ummninovt Conchcit Backbone and Laterals
Item M,
Description
BRI'
Contract
RN'SF
Contract
Traffir
C tra,t
-',
Unit
"
Unit Price a
Contract'
Total
URT9'o
Date
BR Totnl"fo
Date
UR I'Cost Diff
Tn Do"
HNSFTo
Date
BNSF TLual I
U.ne
BNSF Cast
Uiff'I L. Date
'I. Lorli, To
Date'
Iraffc total
'To Date
['raffle Cast
Diff'Fo Date.
Intl Cast To
Date
Cost Dif. To
Dole
626-00001
Mobilivation
033
033
033
LS
S 2RWOM
$ 20,000b)
0.33
E 6,66667
$
033
S 6,666.67
$
0.33
S 666667
S
$ 20,000.00
$ (0.00)
630-00001
Construction Zone Traffic Control
103
033
U33
LS
S 36,000,00
S 36,000,00
033
S 12,000.00
S -
033
$ 12110000
S -
0.33
E 12.000 10
S -
S 36,00000
S (0,00)
660-00001
Trenching
640
210
125
LF
S 2050.
S 19,987.50
1200
S 399.50
$ (12,73 U.50)
92.00
S 1,681.00
S (2,624.00)
38.00
$ 779,00
S (1,783.50)
$ 2,849,50
S (17.138.00)
660-00002
Potholing
100
too
100
HR
S 136.00
$ 40,900.00
272.50
S 37,060.00
S 23,460,00
219.00
S 29,7R4.00
$ 16,184,00
219.00
E 29.79400
S 16,19400
S 96,628.00
S 55,92900
66(1-000P3
Comolled Low Strength Mamnnl
(AO
210
65
CY
S 11500
f 105.225.00
60.00
$ 6.900.00
E (66.70000)
60,00
S 6900.00
S (17,250o(i)
60.00
S 6,90D.00
S (575.00)
S 20,700.00
S (84,525,00)
660-00004
Directional Boring
4.515
5,274
1 1,955
LF
.$ 23,00
$ 270,11200
696900
.$ 160,287.00
$ 56,44200
4947.00
.$ 113,781,00
.$ (7,521.00)
1973.00
S 43,079,00
$ (1,896.00)
$ .117,147.00
,$ 47,035,00
660-00005
2"HDPESDRII
17,192
0
2600
LF
S 3,75
$ 74.220,00
15184.00
S 56.940.DO
S (7,530,00)
89,00
S 333,75
$ 333.75
2378.00
S 9.91T50
$ (932.50)
$ 66,19125
S (8,028, 75)
660-00006
3" HDPE SDR I I
0
5,824
4,400
LF
S %W
S 81 ]92.00
0.W
$ -
S
5402.00
S 43,216 00
S (3,376,00)
3936,00
S 31 499.00
$ (3,712.00)
S 74,704.00
S (7,0880U)
660-00007
4" IIDPE SDR I I
0
7,322
0
LF
S 11,00
1 90,542.00
3162.00
E 34,782.00
S 34,782.00
6405.00
$ 70455.00
$ (10,087.00)
0,00
$ -
$
$ 105,237.00
$ 24.695,00
660-00008
2"PVC SCH 40
550
U
114
LF
S Ids
S 962.90
90,00
$ 116.00
S (691.50)
23.00
$ 3735
$ 33.35
45.00
S 65.25
$ (IIID,D5)
$ 214,60
$ (748.20)
660-001009
3"PVC SCH 40
0
323
145
LF
S 275
S I,292.50
0.00
f -
S
46.00
f 126.50
$ (767.25)
0.00
S
f (398.75)
1 126,50
S (1,166.00)
660-00010
4" PVC SCH 40
0
325
0
LF
$ 3.50
S 1.137.50
ON
S
S
83.00
$ 290.50
S (947.00)
0.00
S
1
S 290.50
S (84700)
660-00011
2" PVC SCH 404s Deg Rid ION Int Div
17
0
13
EA
$ 46,50
$ 1,395.00
0.00
S -
.$ (79051)
0.00
$ -
S
0.00
$ -
$ (60450)
S -
$ (1,39500)
660-00012
3" PVC SCH 4045 Deg Rod ION lot Di.
0
13
18
EA
S 53.50
$ 1,659.50
ON
S
S -
O.OU
$
S (695.50)
0,00
Is -
1 (963,00)
S -
$ (165A.50)
660-00013
4" PVC SCH 4045 Deg Rod ION Iat Do
D
13
0
EA
$ 96.00
f 1,118.00
0.00
S -
S
0.00
S -
S (1,118,00)
0.00
S
$ -
S -
f (11118.00)
660-00014
2"PVC SCH 40-90 Deg Rod I ON Inl Din
17
0
IS
EA
$ 144,00
$ 4,32000
13600
$ 19,594,00
$ 17,13600
000
S -
$
5500
$ 7,92000
S 6048.00
S 27.50400
$ 23,18400
660-00015
3" PVC SCH 40-90 Deg Rod ION let Din
0
❑
18
EA
S 17000
$ 5,27000
ON
S -
S
39.00
S 6630.00
S 4,420.00
99.00
$ 16,660,00
$ 13,60000
$ 23.290.00
$ 19.020.00
660-00016
4" PVC SCH 40.90 Dcg Rod ION Int Dia
0
13
0
EA
$ 282.50
1 3,672.50
0.00
S
$
41.00
S 11 582.50
$ 7,91000
2.00
$ 565.00
S 565M
S 12,14] 50
f 8.47500
660-00017
36" X 49" Conan Splice Vault
II
0
0
EA
S 975.50
S 10,73050
10,00
$ 9,755.00
f (975.50)
0,00
$ -
$ -
0.00
E -
$ -
S 9,755.00
$ (975,50)
660-00019
36" X 49" Comm Slack Storage Vault
6
0
0
EA
$ 975.50
S 5,853.00
11,00
$ ID,730.50
S 4,877.50
0.00
S -
$ -
5.00
$ 4,87750
S 4,977,50
$ I5 608.00
$ 9,755,00
66040019
36"N49"BNSF Vault
0
II
11
EA
S 975.50
$ 2146 LOO
000
f
S
12.00
S 11,70600
S 975.50
0.00
$
S (10,73050)
S Iij(1600
S (9.75500)
660-011020
I9"X31"Trmtic Vnult
0
0
6
EA
S 52060
$ 3,123.60
000
$ -
S
0,00
$
$ -
25.00
S 13.01500
S 9,89140
$ 13,015.00
$ 9.891.40
660-00021
13" X 24" Traffie Vault
0
0
7
EA
S 395.00
$ 2,765.00
1,00
$ 39500
$ 395.00
10.00
S 3,950.00
$ 3,95D.OD
4.00
$ 1,59000
$ (1,19500)
S 5,92500
$ 3,160.00
660-00022
Comm Hmldholc
3
0
U
EA
$ 955.00
$ 2,965.00
000
1
S (2%6500)
000
S -
E -
1.00
$ 955.00
S 95500
S 955.00
f (1910.00)
TOTAL PROJECT COST
S 796,303AD
'S 355,605,66
S 44,819.50
S 319,13626
$ (10,479.16)
S 185,251.91
5 29.350I0
S 859,Y)3.84
S 63,690,44
Original
Change Order
Revised
Funding Source
Contract
Nn' 1
Contract
% Cnmplctc
Amount
Amount
FTA (BRT)
S 276 73245
$ 44,819.50
$ 321,55195
116%
SB-I (BNSF+Traffic)
S 485,14390
$ 18.RX94
$ 504,014,94
104%
CSU
S 34.427,05
$
$ 34.427,05
I009
total Project
S 796,303.40
S 63.690.44
S 859,993.134
Intl%
F6rt Collins
Memorandum
Planning, Development & Transportation
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970.221.6378 - fax
fcgov. condengineering
To: John Stephen, Interim Director of Purchasing and Risk Management
From: Erika Keeton, Special Projects Entr' eer
Date: March 29, 2013
Re: Request for Change Order No. 1 - Tetra Tech Construction Services, Inc.
Downtown Conduit Backbone and Laterals Bid No. 7263
Conduit needed to provide power to the BRT stations was not included in the plan set prior to the bid, but was
provided to the contractor after award. The project requests a change order to formally add this conduit to the
contract, as well as rectify the bid quantities with the actual field -measured and installed quantities to close
out the project.
The potholing and sweep quantities originally identified in the bid schedule were. underestimated
considering the confines of a downtown environment and the limited space at each corner in which to
terminate a large volume of new and existing underground infrastructure. Similarly, additional conduits
and vaults were needed to react to varying field conditions and utility conflicts as work progressed.
The ICE was prepared using existing unit prices, as all work fit within the scope of the existing bid items,
and totals $97,959.00. The original proposal from the Contractor totaled $99,998.50. The negotiated
amount of this change order is $63,690.44 and is based on actual, field verified quantities, and includes
credits for items not used. .
Based on my experience, I believe the requested Change Order #1 for the amount of $63,690.44 is
reasonable and I recommend approval.
cnyof
Foy_ rt� Collins
Date of Estimate: May 16 2012
Contract Type: T&M
Existing Contract or PO (Y/N): Y
Description of Goods (A) or Services (B):
Independent Cost Estimate
Provide potholing as well as materials, labor and time to place additional 2", 3" and 4" inch conduits and related directional boring with 90 degree
sweeps into utility vaults needed to complete the project.
I have obtained thefollowing estimate from;
Published Price List / Past Pricing (date)
Engineering or Technical Estimate (performed by) Mike Lopez
Independent Third Party Estimate (performed by)
Other (specify)
Cost Estimate Details:
(Estimate calculated in US Dollars)
Cost of Standard Items
Product
Cost($/ea)
Cost ($/ea)
Notes/DataSource
Delivered
No Freight
Total
Cost of Services, Repairs, or Non -Standard Items
Itemlrask:
Item Number
Item Description
Overrun
Unit
Unit
Quantity
Price
_ SG&A'
Profit
TOTAL
660-00002
Potholing
355
$ 136.00
HR
$ 48,280.00
2" PVC SCH 40 - 90e Radius I OX
GGO-00014
Intemal Dia.
161
$ 144.00
EA
$ 23,184.00
3" PVC SCH 40 - 900 Radius IOX
660-00015
Internal Dia.
106
$ 170.00
EA
$ 18,020.00
4" PVC SCH 40 - 900 Radius 1 OX
660-00016
Internal Dia.
30
1 $ 282.501
EA
I
1
1 $ 8,475.00
Votai
'SelOW, Gemml ar MmnlstrelWe Eemmm
Signature of Prepa er:
System for Award Management
Page 1 of I
Search Results
Current Search Terms: Tetra* Tech* construction* services* Inc*
No records found for Current search.
SAM I System for Award Management 1.0 IBM v1.821.20130326-0005' ry
Note to all Users: This is a Federal Government computer system. Use of this a '�USA.go v
system constitutes consent to monitoring at all tlmes. NOW
https://www.sam.gov/portal/public/SAMI?portal:componentld=7cbf863 5-6l f6-41 ff-bfb6-2f .. 4/3/2013
Title: Tetra Tech Change Order 1
Date: 4-3-13
CONTRACT CHECKLIST FOR NON-COMPETITIVE PROPOSALS (SOLE SOURCE)
Checklist Item
Contract File
Comments
Location
7) Independent Cost Estimate
The City made and documented an
YES
independent cost estimate before receipt of
proposals.
10) Unnecessary Experience and
Excessive Bonding
Unnecessary experience and excessive
NO
bonding requirements were not included in
this solicitation or contract documents.
11) Organizational Conflict of
Interest (OCI)
If there is an apparent or potential OCI the
solicitation contains provisions to eliminate or
mitigate the conflict (e.g. by inserting a clause
NO
that prohibits the contractor from competing
for the follow-on contract to the current design
or research contact) and OCI Certification is
submitted by the contractor.
12) Arbitrary Action
There was no arbitrary action in the
procurement process. (An example of
arbitrary action is when award is made to
NO
other than the contractor who most satisfied
all the City requirements as specified in the
solicitation and as evaluated by staff.
13) Brand Name Restrictions
Brand Name or Equal. When it is impractical
or uneconomical to provide a clear and
accurate description of the technical
requirements of the property to be acquired, a
"brand name or equal" description may be
used to define the performance or other
salient characteristics of a specific type of
property. The City must identify the salient
characteristics of the named brand that
NO
offerors must provide. When using a "brand
name" specification, the City does not need to
reverse -engineer a complicated part to
identify precise measurements or
specifications in order to describe its salient
characteristics. FT A's "Best Practices
Procurement Manual," (BPPM) contains
additional information on preparation of
specifications including examples with
—specific language.
14) Geographic Preferences
The solicitation contains no in -State or local
NO
geographic preference except where Federal
statutes mandate or encourage them.
15) Contract Term Limitation
The contract period of performance for rolling
stock and replacement parts does not exceed
five (5) years inclusive of options without prior
NA
written FTA approval. For all other types of
contracts, the procurement file contains
evidence that the contract term is based on
sound business judgment.
18) Award to Responsible
Contractor
The City made a determination that it was
awarding to a responsible contractor
considering such matters as contractor
integrity, compliance with public policy, record
of past performance, and financial and
1. Y
technical resources.
2. Y
1. Appropriate Financial, equipment, facility
3. Y
and personnel. (Y/N)
4. Y
2. Ability to meet delivery schedule. (Y/N)
5. Y
3. Satisfactory period of performance. (Y/N)
4. Satisfactory record of integrity, not on
declined or suspended listings. (Y/N)
5. Receipt of all necessary data from
vendor. (Y/N)
19) Sound and Complete Agreement
This contract is a sound and complete
agreement. In addition, it includes remedies
YES CHANGE ORDER
for breach of contract and provisions covering
termination for cause and convenience.
24) Clear, Accurate, and Complete
Specification
A complete, adequate, and realistic
specification or purchased description was
YES
available and included any specifications and
pertinent attachments which define the items
or services sought in order for the bidder to
properly respond.
38) Sole Source if other Award is
Infeasible
The contract file contains documentation that
award of a contract was infeasible under
small purchase procedures, sealed bids, or
competitive proposals and at least one
of the following circumstances applies:
(1) The item was available only from a single
source. (Verify prices are no higher than price
for such item by likely customers.)
CHANGE ORDER
(2) Public exigency for the requirement did
CONTRACTOR IS Tetra Tech
not permit a delay resulting from a
competitive solicitation.
(3) An emergency for the requirement did not
permit a delay resulting from a competitive
solicitation.
(4) The FT A authorized noncompetitive
negotiations.
(5) Competition was determined inadequate
after solicitation of a number of sources.
39) Cost Analysis Required
Cost analysis and profit negations were
performed (initial award and modifications)
And documented for price reasonableness
YES
was established on the basis of a catalog or
market price of a commercial product sold in
substantial quantities to the general public or
on the basis of prices set by law or regulation.
40) Evaluation of Options
The option quantities or periods contained in
the contractor's bid or offer were evaluated in
order to determine contract award. (To be
NA
eligible for Federal funding, options must be
evaluated as part of the price evaluation of
offers, or must be treated as sole source
awards.
42) Written Record of Procurement
History
The file contains records detailing the history
YES ORIGINALLY SELECTED
of this procurement. At a minimum, these
BY BID PROCESS
records include:
CONTRACTOR HAS BEEN
(1) the rationale for the method of
RESPONSIVE AND PRICES
procurement,
(2) Selection of contract type,
ARE FROM EXISTING LINE
(3) reasons for contractor selection or
ITEM PRICING FROM BID
rejection, and
4 the basis for the contract price.
43) Exercise of Options
The grantee exercised an option on this
contract adhering to the terms and conditions
of the option stated in the contract and
determined that the option price was better
NO
than prices available in the market or that the
option was a more advantageous offer at the
time the option was exercised.
If an option was not exercised under this
contract, check NA.
44) Out of Scope Changes
The grantee amended this contract outside
the scope of the original contract. The
YES, THE WORK IS OUTSIDE
amendment was treated as a sole source
THE ORIGINAL AGREEMENT
procurement (complying with the FTA
requirements for a justification, cost analysis
and profit negotiation).
45) Advance Payment Provisions
The contractor did not receive an advance
payment utilizing FTA funds and the contract
NO
does not contain advance payment provisions
or, if it did, prior written concurrence was
obtained from FTA.
46) Progress Payment Provisions
The contract contains progress payments
based on costs incurred (as opposed to
percent of completion) and the contract
contains a provision giving the grantee title to
YES
property (materials, work in progress, and
finished goods) for which progress payments
are made. The contract may contain other
security in lieu of obtaining title.
47) Time and Materials Contracts
This is a time and materials contract; the
grantee determined that no other type of
NO
contract is suitable; and the contract specifies
a ceiling rice.
48) Cost Plus Percentage of Cost
This is not a cost plus a percentage of cost
NO
type contract.
49) Liquidated Damages Provisions
This contract contains liquidated damages
provisions and the assessment for damages
NO
is specified in the contract at a specific rate
per day for each day of overrun in contract
time.
50) Piggybacking
1) The file contains: Assignability provisions.
NO
2) The procurement file contains: Price
reasonableness determination.
56) Clauses
This contract contains the appropriate FTA
YES
required clauses.
Excluded Parties Search
YES
EPS run and include in the file.