HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9113172CHANGE ORDER NO.2 PROJECT TITLE: Reservoir Ridge Improvements CONTRACTOR: Interwest Consulting Group PROJECT NUMBER: Bid # 7434 PURCHASE ORDER NO.: DESCRIPTION: Add Services # 2 1. Reason for change: Additional consulting for Reservoir Ridge Natural Area improvements. 2. Description of Change: Interwest to provide as built plans of the parking lot and trail head at Reservoir Ridge Natural Area. Scope to include preparation of the legal description of the ditch crossing as required by the ditch company. See attached Add Service #2, dated March 18, 2013. 3. Change in Contract Cost: $1,500.00 4. Change in Contract Time: none ORIGINAL CONTRACT COST. $15,400.00 TOTAL APPROVED CHANGE ORDER $1,600.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $1,500.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 9.74% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 20.13% ADJUSTED CONTRACT COST 18,500.00 . (Assuming all change orders approved) ACCEPTED BY:/ �^�f DATE: 3 /7-0/3 Contractor's Representative ACCEPTED BY: DATE: 2 0 Z D l 3 Project Manager REVIEWED BY: DATE: Title: ., IRTCRW!•T CONSULTING GROU P Reservoir. Ridge Natural Area Trailhead Parking Lot Project Description and Scope of Services Interwest Consulting Group — PO#9113172 REVISED MARCH 18, 2013 ADD SERVICE 2 ADDITIONAL SCOPE AND FEES IN ITALIC FOR ADD #1 ADDITIONAL SCOPE AND FEES IN BOLD ITALIC FOR ADD #2 Description Interwest and King Surveyors will provide engineering.and surveying services necessary to create plans for constriction .and permitting for the proposed access and parking lot off of Overland Trail and two pedestrian crossings along the proposed trail alignment at Reservoir Ridge Natural Area. The project required additional coordination throughout the County submittal process that was not accounted for in the original scope. Interwest also assisted with quantity calculations and the drafting of a landscape plan that was required by the County. This additional service will alsocover any construction administration services necessary for the remainder of the project. Interwest and King Surveyors will provide as built plans of the parking lot and trail head at Reservoir Ridge Natural Area. Scone of Services Surveying - Topographic survey - King Surveyors will provide the topographic survey required for the design of the proposed parking lot and trail head and the two pedestrian bridge crossing locations. King will also prepare . a legal description of the ditch crossing as required by the ditch company. Surveying As Built survey — King Surveyors will provide an. as built survey of the entrance drive off of . Overland Trail and the parking lot area at Reservoir Ridge Natural Area. Estimated Fee: $4,100—Add#2: $850 . Final Grading Plans and Site Plans— The final construction.plans for the project will include: • Cover Sheet • Grading plan with sufficient spot grades to facilitate construction • Drainage and Erosion Control Plan • Possible pedestrian crossing -across Overland Trail to Headwater Drive Details • Landscape plane Quantities:.. . Estimated Fee: $3,000-.Add #1: $300 Pedestrian Bridge plan,:profile and grading — Interwest will prepare, plan,. profile, and associated grading for the two proposed pedestrian bridge crossings as well as coordination the plans with the Structural design. Estimated Fee. $2,400. Final Drainage Report 4 prepare a drainage report with calculations to show how the new parking lot and access drive works with the existing drainage patterns. If necessary, Interwest will design a small detention pond to mitigate the increased impervious area associated with the new parking lot. Estimated Fee: $2,200 j County & Ditch Processing —attend meetings with the County as required and assistance with the ditch crossing agreement. . j Estimated'Fee: $2, 000 —Add #1: $800 j Stormwater Management Plan --create a SWMP and template of the permits required by the State for the construction. Estimated Fee: $1,500 i Construction Administration - assist the project manager with any civil related questions throughout the construction process. iEstimated. Feer $500 Record Drawing — Interwest will compile the as built survey from King into a record drawing set that conveys the as built grades of the parking lot and storm sewer, displays the limits of concrete and recycled asphalt material, and displays the fence alignment. Estimated Fee: $650 Reimbursables=.for prints, mileage, and deliveries, etc... Estimated Fee: $200 Total of Original PO = $15,400 Total Additional Service #1 = $1,600 _ Total Additional Service #2 = $1,500 Total Contract with Add #1 & #2 = $18,500 I. Assumptions — Specifications, and contract documents provided by others. 2. No improvements to Overland Trail will be.required. 3. Environmental and geotechnical engineering provided by others. 4. No CA or CM work is included. 5. No permitting tasks will be completed by Interwest. Thanks; i ! Michael Oberlander, PE