HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9131499EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INTERWEST CONSULTING GROUP INC.
DATED: 7-27-12
Work Order Number:
Purchase Order Number:
Project Title: 7392 CIVIL ENGINEERING, DESIGN, DRAFTING & SURVEY SERVICES ON -CALL
FOSSIL CREEK TRILBY UNDERPASS — STRUCTURAL AND FINAL DESIGN
Commencement Date: 3-1-13
Completion Date: 11-1-13
Maximum Fee: (time and reimbursable direct costs): $45,450
Project Description: SEE ATTACHED
Scope of Services: SEE ATTACHED
City P.M. Acceptance
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of THREE (3)
pages are hereby accepted and incorporated
herein, by this reference, and Notice to Proceed is
hereby given.
Professional: I nterwest
441,,PJ2� 644A,�,,
Date., 3-1-12
City of Fort Collins
By:
James B. O'Neill Il, CPPO, FNIGP
Director of Purchasing and Risk Management
(over $60,000.00)
Date:
RFP 7392 Civil Engineering, Design, Drafting & Survey Services On -Call
CITY OF FORT COLLINS
REQUISITION
VENDOR:
Interwest Consulting Group
DATE ENTERED:
j/Z� f j_ REQ #:
Fossil Creek Trail Underpass @ Trilby
VENDOR
zz
FOR:
Road
ADDRESS:
1218 West Ash, Suite C
BID #:
Misc Contract
Windsor, CO 80550
INSTRUCTIONS:
Pit ON17 4:
970-674-3300
PAX N:
970-674-3303
VENDOR CONTACT
Mike Oberlander
March 1, 2013
Mr. Jason Stutzman
City of Fort Collins Park Planning and Development
PO Box 580
Fort Collins, CO 80522-0580
Fossil Creel: Trilby Underpass Structural and Final Design
ProjectDescriptionand Scope of Services
Dear Jason,
IHTCRW EBT .0 Qtl :i �l tT 1 fl G Gr.b fir
This work order will provide services to prepare construction plans for the Trilby Pedestrian Underpass. The
original work order from 201I specifically excluded structural design as it was planned to be done by other
consultants.
Description
Interwest and its consultant team will provide final construction plans and box culvert plans for the Trilby
Pedestrian Underpass. Modifications are still proposed to the project layout which will be incorporated into these
final documents.
Scope of Services
Topographic and Utility Survey - King Surveyors will continue to be available for minor surveying services as
may be required to complete the design phase of the project.
Estimated Fee: S1,000
Easements — King Surveyors will provide trail and temporary construction easements as needed for the project
for a fee of $400 per easement. At this time, we anticipated 5 easements for the project.
Estimated Fee: S2,000
Trail Plan and Profile — Intenvest will finalize the plan and profile drawings for construction as well as working
profile drawings requested by the City for all utility relocations.
Estimated Fee: S6,000
Box Culvert Structural Engineering — San.Engineering will prepare constructions plans and details required
for the box culvert. Son ivill• also provide services during construction such as responses to RFIs, slurp
drawing rea .eivs, up to four structural inspections throughout construction, and as -built drawings.
Estimated Fee: S26,300
Utility Potholes — At this time, it is assumed that potholes will not be necessary as existing utilities are being
moved out of the construction area.
Estimated Fce: $0
Floodplain process assistance — Interwest will assist the City with the Floodplain Use Permit required for the
project. It is our understanding that the area will not need HEC modeling, but an analysis of the cut and fill
proposed below the Fossil Creek "pool' elevation will be required. Additionally, the Work will be in the erosion
buffer and we will Work to determine a way to keep the crossing higher than some minor flood event.
Estimated Fee: $3,500
1218 W. ASH, STE. C, WINDSOR, COLORADO 80550
TEL. 970.674.3300 — FAX 970.674.3303
SWMP — Interwest will prepare an erosion control plan and a stormwater management plan for the initial
application to the State for the project.
Estimated Fee: $2, 000
Construction Services — Interwest will be available to answer contractor questions during construction and also
prepare record drawings as necessary. All as built surveying will be by the contractor.
Estimated Fee: $4,000
Reimbursables— for prints, mileage, and deliveries, etc...
Estimated Fee: $650
Assumptions-
1. No changes to the through lanes or grade of Trilby Road are included.
2. Pedestrian bridge design will be by others.
3. Specifications, quantities, and contract documents provided by others.
4. Environmental and geotechnical engineering provided by others.
5. No construction or as built surveying is included.
Schedule
Interwest continue work on the project. Depending on the cooperation of the affected utility companies and
design changes, the project can be completed prior to April 30, 2013.
Please call me at 970-631-2671 if you have any questions or need any additional information.
Thanks,
��6j v4A',
Michael Oberlander, PE
!K
rill
-;iikc d" ifib -ir, el� Wt M i I 1U n �rpassiavTf
Ii. 7 1,
nginecring. J,
NwRK
I
U"Malnetr nneelie -.nn
)CAD
r
�-!Sti
0
C fist'llain
-1 -Xpense
S85, S!15'
1 -S' -
Preliminia" Driiun
7T
Kick,of'I'Mccliny in Fort Collins
•:1
r
S50i:.�
M-_-xS37-4=- 'I
Preliminan, UndeTpass Structural Enginecriny and Drawirn_s
ml 6:0.
24i0 z
-40,0
6:76 8
11rdimin,iry Bridge Abulnicin Structural 8rituncerinLand Driwinus (Bridge ;,fI )(if rcquin:cli
L
11rcliminary Quanlilv Calculations
',20. iz;!
4M,� +
Prdiminarv.Cost Esiiniate
-!:'-,S3242=1
Coordinalion
8:0r
c-
.Sfi(),
=IS9 l4a-
RevievvNjectint: in 17(trt Collins
I.
.:::AO:.
28.0",-
Final Design
-41:,.:,
J
Final (Inderpm"SiTuctur,,dEnLinecrinLatid DmiNintzs
60101-
Final'Bridwe Abutment St ructural Livincering and Drawinc,��, (Brid-wS I (ifrequir d)
j,
Final Brides Abuirfient Structural and. Dmwir.L% (Britive '12) 1 i F mquired)
Fintil QuantimCalculations
`73T d
't
Final Coo Fstimatc
P
CoordiwMnation
7
7
Reviecclitw'in Forl Collins
I q Ali:i4:0
Proicet SNcifications
3.0
Subtotal
lil,44:0'", ,
-
, �j 9.0
-A-S
10,9 6
Bidding Phaw
Attend 11rc-Bid Mcciiin-,
Rcspond
j
Z
...... . �L -12.7,4,S432�,
subtfital
S50.
Construction 1-haw
A,
Auend Pre-Cons;ruction Ivi,enn,
-4,0- AT�7
1 r, S50
R S4SV-,1Fr
R-eNnond to QuestionsrUl's
6'0'-� "I
I
iZ-2S648a:�7
(4) Structural Inspection,; DurinL Construction
I S300
MS2TOOO-,`:
Structural Shop Drawinja and Submittal Reviews
3:0
j . 10.0--'
As -Built Drawinus
210
.-S666,2
Sublutal
1,i' -30.0-,
-6.0;
I ... S350,
ff:. S4t970`r`r`--
;;7, M.
t
-7,�
�l 06s.
R-
" ctu s inct,,c c orcor
ur
tex oion u r
P! p
ruc
n, iw,? p-
tru er $F111 routirannin erp1wir
-P� --ve. N p
Z T,
- 1. , wi� iy��
San Unginccring. MC SAN Snuct,iii rgi ... an, I-
- Xcluding Bridgc Msigmxls 3/142013