HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9131499EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP INC. DATED: 7-27-12 Work Order Number: Purchase Order Number: Project Title: 7392 CIVIL ENGINEERING, DESIGN, DRAFTING & SURVEY SERVICES ON -CALL FOSSIL CREEK TRILBY UNDERPASS — STRUCTURAL AND FINAL DESIGN Commencement Date: 3-1-13 Completion Date: 11-1-13 Maximum Fee: (time and reimbursable direct costs): $45,450 Project Description: SEE ATTACHED Scope of Services: SEE ATTACHED City P.M. Acceptance Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of THREE (3) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: I nterwest 441,,PJ2� 644A,�,, Date., 3-1-12 City of Fort Collins By: James B. O'Neill Il, CPPO, FNIGP Director of Purchasing and Risk Management (over $60,000.00) Date: RFP 7392 Civil Engineering, Design, Drafting & Survey Services On -Call CITY OF FORT COLLINS REQUISITION VENDOR: Interwest Consulting Group DATE ENTERED: j/Z� f j_ REQ #: Fossil Creek Trail Underpass @ Trilby VENDOR zz FOR: Road ADDRESS: 1218 West Ash, Suite C BID #: Misc Contract Windsor, CO 80550 INSTRUCTIONS: Pit ON17 4: 970-674-3300 PAX N: 970-674-3303 VENDOR CONTACT Mike Oberlander March 1, 2013 Mr. Jason Stutzman City of Fort Collins Park Planning and Development PO Box 580 Fort Collins, CO 80522-0580 Fossil Creel: Trilby Underpass Structural and Final Design ProjectDescriptionand Scope of Services Dear Jason, IHTCRW EBT .0 Qtl :i �l tT 1 fl G Gr.b fir This work order will provide services to prepare construction plans for the Trilby Pedestrian Underpass. The original work order from 201I specifically excluded structural design as it was planned to be done by other consultants. Description Interwest and its consultant team will provide final construction plans and box culvert plans for the Trilby Pedestrian Underpass. Modifications are still proposed to the project layout which will be incorporated into these final documents. Scope of Services Topographic and Utility Survey - King Surveyors will continue to be available for minor surveying services as may be required to complete the design phase of the project. Estimated Fee: S1,000 Easements — King Surveyors will provide trail and temporary construction easements as needed for the project for a fee of $400 per easement. At this time, we anticipated 5 easements for the project. Estimated Fee: S2,000 Trail Plan and Profile — Intenvest will finalize the plan and profile drawings for construction as well as working profile drawings requested by the City for all utility relocations. Estimated Fee: S6,000 Box Culvert Structural Engineering — San.Engineering will prepare constructions plans and details required for the box culvert. Son ivill• also provide services during construction such as responses to RFIs, slurp drawing rea .eivs, up to four structural inspections throughout construction, and as -built drawings. Estimated Fee: S26,300 Utility Potholes — At this time, it is assumed that potholes will not be necessary as existing utilities are being moved out of the construction area. Estimated Fce: $0 Floodplain process assistance — Interwest will assist the City with the Floodplain Use Permit required for the project. It is our understanding that the area will not need HEC modeling, but an analysis of the cut and fill proposed below the Fossil Creek "pool' elevation will be required. Additionally, the Work will be in the erosion buffer and we will Work to determine a way to keep the crossing higher than some minor flood event. Estimated Fee: $3,500 1218 W. ASH, STE. C, WINDSOR, COLORADO 80550 TEL. 970.674.3300 — FAX 970.674.3303 SWMP — Interwest will prepare an erosion control plan and a stormwater management plan for the initial application to the State for the project. Estimated Fee: $2, 000 Construction Services — Interwest will be available to answer contractor questions during construction and also prepare record drawings as necessary. All as built surveying will be by the contractor. Estimated Fee: $4,000 Reimbursables— for prints, mileage, and deliveries, etc... Estimated Fee: $650 Assumptions- 1. No changes to the through lanes or grade of Trilby Road are included. 2. Pedestrian bridge design will be by others. 3. Specifications, quantities, and contract documents provided by others. 4. Environmental and geotechnical engineering provided by others. 5. No construction or as built surveying is included. Schedule Interwest continue work on the project. Depending on the cooperation of the affected utility companies and design changes, the project can be completed prior to April 30, 2013. Please call me at 970-631-2671 if you have any questions or need any additional information. Thanks, ��6j v4A', Michael Oberlander, PE !K rill -;iikc d" ifib -ir, el� Wt M i I 1U n �rpassiavTf Ii. 7 1, nginecring. J, NwRK I U"Malnetr nneelie -.nn )CAD r �-!Sti 0 C fist'llain -1 -Xpense S85, S!15' 1 -S' - Preliminia" Driiun 7T Kick,of'I'Mccliny in Fort Collins •:1 r S50i:.� M-_-xS37-4=- 'I Preliminan, UndeTpass Structural Enginecriny and Drawirn_s ml 6:0. 24i0 z -40,0 6:76 8 11rdimin,iry Bridge Abulnicin Structural 8rituncerinLand Driwinus (Bridge ;,fI )(if rcquin:cli L 11rcliminary Quanlilv Calculations ',20. iz;! 4M,� + Prdiminarv.Cost Esiiniate -!:'-,S3242=1 Coordinalion 8:0r c- .Sfi(), =IS9 l4a- RevievvNjectint: in 17(trt Collins I. .:::AO:. 28.0",- Final Design -41:,.:, J Final (Inderpm"SiTuctur,,dEnLinecrinLatid DmiNintzs 60101- Final'Bridwe Abutment St ructural Livincering and Drawinc,��, (Brid-wS I (ifrequir d) j, Final Brides Abuirfient Structural and. Dmwir.L% (Britive '12) 1 i F mquired) Fintil QuantimCalculations `73T d 't Final Coo Fstimatc P CoordiwMnation 7 7 Reviecclitw'in Forl Collins I q Ali:i4:0 Proicet SNcifications 3.0 Subtotal lil,44:0'", , - , �j 9.0 -A-S 10,9 6 Bidding Phaw Attend 11rc-Bid Mcciiin-, Rcspond j Z ...... . �L -12.7,4,S432�, subtfital S50. Construction 1-haw A, Auend Pre-Cons;ruction Ivi,enn, -4,0- AT�7 1 r, S50 R S4SV-,1Fr R-eNnond to QuestionsrUl's 6'0'-� "I I iZ-2S648a:�7 (4) Structural Inspection,; DurinL Construction I S300 MS2TOOO-,`: Structural Shop Drawinja and Submittal Reviews 3:0 j . 10.0--' As -Built Drawinus 210 .-S666,2 Sublutal 1,i' -30.0-, -6.0; I ... S350, ff:. S4t970`r`r`-- ;;7, M. t -7,� �l 06s. R- " ctu s inct,,c c orcor ur tex oion u r P! p ruc n, iw,? p- tru er $F111 routirannin erp1wir -P� --ve. N p Z T, - 1. , wi� iy�� San Unginccring. MC SAN Snuct,iii rgi ... an, I- - Xcluding Bridgc Msigmxls 3/142013