CHANGE ORDER
Project: Elks Lodge Deconstruction
To Contractor: Alpine Demolition, Inc.
5790 West 56th Ave, Suite-C
Arvada, Colorado 80002
Contract For: Elks Lodge Deconstruction
The Reason and Description of the Contract Change Is as follows:
Change Order No: 3
Date: February 25. 2013
Project Number: 7404
Contract Date: August 31, 2012
The purpose of this change order is to incorporate salvageable recovery and finalize the contract.
Three items are credited to the contract. Item number 1 is one half of the total value of material recycled during the
project. Item number 2 is a credit for damage caused by Alpine Demolition to the adjacent building, 143 Remington St.
This item covers brick repointing, door repairs, scratch removal, CMU block refacing, CMU block grouting, and gutter
repairs. Item number 3 reduces the additive bid item for foundation removal by ten percent. Item number 4 reduces the
Schedule of Values item for basement and foundation renloval by ten percent.
9/VS399
390 a
Change In Contract Value:
(Attach additional sheets as required)
Original Contract Value:
$257,813.00
Net change by previously authorized Change Orders:
$18,759.50
Contract Value prior to this Change Order:
$276,572.50
The Contract Value will be adjusted by this Change Order in the amount of:
($13,747.40)
The new Contract Value including this Change Order will be:
$262,825.10
Total % of Original Contract Value - this change order:
•5.33%
Total % of Original Contract Value - all change orders:
1.94%
The Change in contract time (calendar days):
0
Previous Substantial Completion Date:
December 10, 2012
rix
Revised Substantial Completion Date:
Decembet3 , 2012
Revised Final Completion Date:
January 132012
Engineer Ditesco, LLC
S (r Iy)
1315 Oakridge Drive - Suite 120 By: E61 Re z
Fort Collins, CO 80525
Owner: Fort Collins Downtown Development Authority
Dangeeld
19 Old Town Square, Suite 230 By: TodDanger
field D e:
^
Fort Collins, CO. 80524 - / ,/
Contractor: Alpine Demolition, Inc.
5790 West 56th Ave, Suite-C
,. Arvada, Colorado 80002
.-s
.,] IzNjd1:ZPF;YjMyMXw vLjE=
may=
https: //doc-Oo-ag-docsviewer. googleusercontent.con✓viewer/secu re...
1315 Oakridge Drive, STE 120
Fort Collins, CO 80525
ditescoservices.com
CHANGE ORDER NO. 3
SUPPORTING DOCUMENTATION
Project: Elks Lodge Deconstruction
Project No. 0404
Date: February 25°, 2013
Description of Change:
The purpose of this change order is to incorporate salvageable recovery and finalize the contract.
Change in Contract Value:
The contract value is being Decreased by $13.747.40. Please see summary table below.
;CREDITS
Item Number
Description
Contract Value
Shared Savings of 50% of Recycled Materials
($7.077.00)__
2
Credit for lama a to 143 Remington during construction
$2.295.00
3 -
Reduction in `Foundation Removal" item
$1.600.00
3
- -
_Reduction in 'Remove Basement and Foundation" Ite 29 .
Total Work Credits
$13,747.40 "�
Total Contract Change this,change order
Total Change Ordec ($13.747.40)
Item number 1 is one half of the total value of material recycled during the project as described in: Division 01 —
General Requirements, 012200 Measurement and Payment. Section 1.7 A, Shared Savings.
Item number 2 is a credit for damage to the adjacent building, 143 Remington. This item covers brick repoinling,
door repairs, scratch removal, CMU block refacing, CMU block grouting, and gutter repairs.
Item number 3 is a reduction of the "Foundation Removal" item added in Change Order 2 by by 10% (from $16,000
to $14,400). This reduction reflects the field decision to leave the west foundation wall/system in place to maintain
alley paver integrity. 11
Item number 4 is a 10% reduction in the "Schedule of Values" item 2g — Remove Basement and Foundation. The
item is reduced from (from $27,754.00 to $24,978.00). This reduction reflects the field decision to leave the west
foundation wall/system in place to maintain alley paver integrity.
Change in Contract Time:
No change in contract time will be awarded.