Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9131262EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC. DATED: FEBRUARY 16, 2010 Work Order Number: SCP-CRI-SR&E-030413 Purchase Order Number: Project Title: Utilities Stream Rehabilitation and Enhancement — Fossil Creek Project Design Commencement Date: March 1. 2013 Completion Date: April 1, 2014 Maximum Fee: (time and reimbursable direct costs): $45,378.00 Project Description: Vision and design assistance for the Stream Rehabilitation and Enhancement Program's first project which consists of input on the vision and design from a construction standpoint for the Fossil Creek and Mail Creek watersheds. Scope of Services: see Connell Resources, Inc. Work Plan Attached Service Provider agrees to perform the services identified above and on the attached form in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of one exhibit, a work plan consisting of one (1) page is hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given Ser'jce Provider: & \ \\ City of Fort Collins Submitted By: O Special ojects Manager Date: �' 2 (J Reviewed by: Chief Engineer Date: ./ / / ? Reviewed by: Water Engineering & Operations Mgr 317( Date: / 3 Date: 1 13 v Approved by:_ Dir. Of Purchasing & Risk Mgmt Date: STREAM REHAB VISION & DESIGN 2013 - CONNELL RESOURCES INC. WORK PLAN Labor Category or Subkonsuhant I Proj Mgr Construction Super I Cons"Oon ManageryI EH&S / CAD TECH Pothole Cron. Expenses TASK TOTAL TOTAL Individual Rate/hour Dan G. $87 j Clint F. / Shawn O John W. Connell $84 $107 $54 $205 VISION AND DESIGN PHASE SERVICES Task 1 Vision & Design Meetings _ 1.1 Alternative Analysis Meeting (6) --- — 20 4 12 _ _ $3,360 12 vision & Design Meetlngs (48) 144 4 12 1 000 $14,248 1.3 Public Outreach Meeting (1) 5 5 $970 1.4 Partnering kickoff(1) -__ $ 8 _I 8 1 _ $2,224 Task 2 Field Investigation _ subtotal 177 I 16 � 37 I 1 0 I 0 100 Task 1 subtotal: 20,802 _ 2.1 UNury Locales - — -- 2 I _ 2 — - __— I— _ $342 2.3 _ 2.4 Pomdmg SiteMeetinge(3) Test hole excavation and of casings (if needed)_ Cost Estimates for Alternatives -I I Subtotal: 5 9 2 1 18 I 5 - 9 5 21 g— 9 I I 0 5 30 35 600 600 $1,880 $2,502 $7,344 Task 2 subtotal: -- 12,068 2.5 Task 3 3..1 Lemay [o Confluence of Mail Fossil Creeks ¢ 2 ¢ $2,941 3.15 — --- _ $0 3.3 1 $0 3.5 I $0 —__ — $0 — Task 4 Cost Estimating I Contract Negotiation Subtotal: 25 1 4 1 2 4 1 1 0 I 0 Task 3 subtotal 2,941 5.1 Kickoff meeting with Independent Estimators —I 5 _ 2 �_ 2___j �_ 5.15 5.15 Estimate Preparation Estimate RecorrcilNatlon If QO 51 Q 8 2 ___$817 $4,780 $435 Task 5 Administration subtotal: I 50 6 1 10 I1 1 2 1 0 0 Task 5 subtotal: $6,0321 _ 6.1 6.15 Administration Permits (SWMPIConstruction vewa~wngl N) I 24 1 I 4 I 4 I 4 I 500 $2 732 $803 �- subtotal: 25 0 4 8 0 1 500 Task 6 subtotal: 3,535 1 1 I level o/effort total costs perlaborca o' per labor cats (hours): , sub -consult. 6 ex nses: 295 $ 25 665 47 $ 3,948 62 $ 6,634 14 $ 756 35 $ 7,175 $ 1,200 453 Total Costs» <<Total Manhours $ 45,378 stet►weeks: 7.38 1.18 1.55 0.35 0.88 Total Man -weeks: 11.33 Page 1