Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7405 TURNBERRY ROAD IMPROVEMENTS PROJECT (5)f�_ Ctty Of T t V --` `!nS Planning, Development & Transportation Engineefing Yet C09e99AVenuO W-hglneerin P.O.Sox Box 680 Folk oti;,000522.0680 - 910.221.6 05 870.221.8370 • fax Change Order Form PROJECT TITLE: Tumbeny Rd. Improvements PROJECT NUMBER: 400901718 (Bid #7405)' CONTRACTOR: Connell Resorice's; Iris (PC) 49124395) .........".-�' 'rri •,i ,aio�e do ' 1. Reasonforchange. 2. D-68&016 3. Change in caritraot cost 4. Change'tn 1&2. See attached sheet for detall. 3. The contract cost will not change. $7.552.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING.CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: 9! ( ontrac REVIEWED BY: (% ► W (Engjgal SUBMITTED BY: (Project 0.32% 2.80% $2,329,248.20 $57,800.63 $0.00 $7.652.00 $2,394,400.83 DATE: , is i , DATE: DATE: �; — I �L l ( J APPROVED BY: DATE: (Department Head) APPROVED BY: DATE: (Purchasing Agent over.$80,000) 00: Coa0aU0r Puicfiigrp Proteri Re ':. }a;`-. ':CHANGE ORDER - .:.:. Turnberry Road Improvement Project . .. SUMMARYOFWORK Item# Item Quantitv Unit $/Unit Total 9 Retrofit Gate Valve to Existing Manhole 1 LS 3548 $ 3,548.00 2 Install Art in Public Places pavers in concrete sidewalk 1 LS $ 560.00 $ 560.00 3 Cost Adjustment for Sidewalk Removal Over -run 1 LS $ 3,444.00 $ 3,444.00 TOTAL $7,552.00 REASON FOR CHANGE An existing gate valve in an existing manhole had to be modified to adjust the top of the manhole to the new elevation in 1 Richards Lakerrurnbeery Road intersection. This work included removing the old valve, modifying the manhole, fabricating new bracket assemblies and installing a new manhole lid so that the valve is accessible by valve wrench. 2 Granite paver stones were provided to the contractor to "wetset" into the concrete pavement. The bid price for sidewalk removal was bid as a SY cost, but the work was measured as a SF cost. This resulted in a very 3 high cost for sidewalk removal. WHEN POSTED Posted to Pay App M5