Change Order Form
PROJECT TITLE:
Tumbeny Rd. Improvements
PROJECT NUMBER:
400901718 (Bid #7405)'
CONTRACTOR:
Connell Resorice's; Iris (PC) 49124395)
.........".-�' 'rri •,i ,aio�e
do '
1. Reasonforchange. 2. D-68&016
3. Change in caritraot cost 4. Change'tn
1&2. See attached sheet for detall.
3. The contract cost will not change. $7.552.00
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING.CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY: 9!
( ontrac
REVIEWED BY: (% ► W
(Engjgal
SUBMITTED BY:
(Project
0.32%
2.80%
$2,329,248.20
$57,800.63
$0.00
$7.652.00
$2,394,400.83
DATE: , is i ,
DATE:
DATE: �; — I �L l ( J
APPROVED BY: DATE:
(Department Head)
APPROVED BY: DATE:
(Purchasing Agent over.$80,000)
00: Coa0aU0r
Puicfiigrp
Proteri Re
':. }a;`-. ':CHANGE ORDER - .:.:.
Turnberry Road Improvement Project
. .. SUMMARYOFWORK
Item# Item Quantitv Unit $/Unit Total
9
Retrofit Gate Valve to Existing Manhole
1
LS
3548
$ 3,548.00
2
Install Art in Public Places pavers in concrete sidewalk
1
LS
$ 560.00
$ 560.00
3
Cost Adjustment for Sidewalk Removal Over -run
1
LS
$ 3,444.00
$ 3,444.00
TOTAL
$7,552.00
REASON FOR CHANGE
An existing gate valve in an existing manhole had to be modified to adjust the top of the manhole to the new elevation in
1
Richards Lakerrurnbeery Road intersection. This work included removing the old valve, modifying the manhole, fabricating
new bracket assemblies and installing a new manhole lid so that the valve is accessible by valve wrench.
2
Granite paver stones were provided to the contractor to "wetset" into the concrete pavement.
The bid price for sidewalk removal was bid as a SY cost, but the work was measured as a SF cost. This resulted in a very
3
high cost for sidewalk removal.
WHEN POSTED
Posted to Pay App M5