HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9131351CJ ) � 13sI
E7k�IT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
and
Deighton Associates Ltd.
DATED: March 11, 2013
Work Order Number: 03-254903300-13
Project Title: Pedestrian Access Program —Sidewalk and Ramp Integration 2013-09
Commencement Date: March 11, 2013
Completion Date: December 31, 2013
Maximum Fee: (time and reimbursable directs costs):. not to exceed $38,310.00
Project Description: See attached scope of service.
Scope of Services: See attached scope of service.
Service Provider agrees to perform the services The attached forms consisting of five (5) pages
identified. above and on the attached forms in are hereby accepted and incorporated herein by
accordance with the terms and conditions this reference, and Notice to Proceed is hereby
contained herein and in the Services Agreement given.
between the parties. In the event of a conflict
between or ambiguity in the terms of the
Services Agreement and this work order
(including the attached forms), the Services
Agreement shall control.
Service I'm , er /
By, � i ii%" Gi%/ /.�N�jj City of Fort Collins
By:
Date: March 11, 2t,
Date: March 11, 2013
Approved By:
Purchasing Agent over $60,000
Sidewalk and Ramp
Integration 2013=009
Fort Collins, CO.
Prepared by. Gary Ruck, P. Eng.
gary.ruck@deighton.com
Monday, March 11, 2013
UE
Deighton Associates Limited
223 Brock St. N., Unit 7, Whitby, Ontario, Canada LIN 41-16
Tel: (905) 665-6605 Fax: (905) 665-6645
www.deighton.com
Sidewalk and Ramp Integration 2013-009
Page 2 of 4
Deighton Associates Limited
223 Brock St. N., Unit 7, Whitby, Ontario, Canada L1N 4116
Tel: (905) 665-6605 Fax: (905) 665-6645
www.deighton.com
Introduction
Fort Collins has requested that Deighton Associates prepare a proposal for
enhancement and expansion of their dTIMS CT asset management program to
include sidewalk and ramp data that was recently collected bythe City of Ft Collins.
This proposal also includes an estimate to load your recently collected sidewalk data.
This data will be reviewed and loaded into your dTIMS CT database. Since sidewalks
are already included in your analysis, these analysis parameters will be reviewed and
updated as necessary to reflect the new data.
The goal of this proposed work is to further the development of dTl MS CT with an
objective of expanding the amount of data stored, enhancing the access to that data
and the decision support system within dTIMS CT. Another goal of this work is to
define a level of service (LOS) for sidewalks and ramps and quantify the current LOS
for the City and determine funding requirements to achieve the desired LOS.
Figure 1 is a summary of the tasks and the associated cost of each task.
Price
_ ,1
z-
f Ta - 'SHe-'j.DAL`
Dirret Mils 8
OAL rCon ulHn
and Ramp Integration
: r ; s
MO tier r..Travel MVA619MM
Sidewalk
Load Sidewalk and Ramp Data 1 5
$10,080,00
$2.690.00
$12,770.00
Analysis Parameters in dTIMS CT 5
Update Sidewalk/Ramp$1
0,080.00
$2,690.00
$12.770.00
Generate and Optimize Strategies for Sidewalks/Ram 6
$10,080.001
690.00
$12,T70.00
Total Proposed Cost
$38,310.00
Figure 1: Sidewalk and Ramp Integration Cost Proposal Summary
Sidewalk and Ramp Integration 2013-009
Page 3 of 4
s