Loading...
HomeMy WebLinkAboutBID - 7473 TREE WORK - BLOCK PRUNING & REMOVALAddendum 1 – 7473 Tree Work – Block Pruning & Removal Page 1 of 3 ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7473: Tree Work - Block Pruning & Removal OPENING DATE: 3:00 PM (Our Clock) February 20, 2013 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Additional Information & Clarifications Exhibit 2 – Overview Block Map Exhibit 3 – Bid Schedule in Microsoft Excel format (attached as a separate file) Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 – 7473 Tree Work – Block Pruning & Removal Page 2 of 3 EXHIBIT 1 – Additional Information & Clarifications • The Bid Schedule is available in Microsoft Excel format is attached to this addendum as Exhibit 3. • An overview map of all the blocks to be bid has been attached as Exhibit 2. • The second to last paragraph on page 3 of the Bid Document shall be deleted and replaced with the following: “The City of Fort Collins will use the lowest bid prices from a qualified contractor, or contractors, to award the work. The City reserves the right to award the bid on a whole or partial basis and may choose to use more than one contractor to complete the work assigned.” • The Block 1 Bid Schedule is revised to include a pruning price for 200 E Laurel, the 40inch Plains Cottonwood tree. This revised bid schedule has been attached on the following pages and is also included in Exhibit 3. • The cutoff date for American Elms is May 1 st . The Forestry Department reserves the right to include additional tree types and to change this date based on climatic conditions. • Aerial Inspections will need to occur and significant tree defects will need to be identified and brought to the attention of the Assistant City Forester in order to avoid pruning a tree that needs to be removed. Pruning should not begin until it is certain the tree will not be removed. • The previous block pruning contract can be viewed online at: http://citydocs.fcgov.com/?vid=10&cmd=search&scope=doctype&dt=CONTRA CT&dn=Purchasing&q=block+pruning Addendum 1 – 7473 Tree Work – Block Pruning & Removal Page 3 of 3 EXHIBIT 2 – Overview Block Map