HomeMy WebLinkAboutCHANGE ORDER - BID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTSCHANGE ORDER NO.3 PROJECT TITLE: Reservoir Ridge Natural Area Improvements CONTRACTOR: J2 PROJECT NUMBER: bid # 7434 PURCHASE ORDER NO.: DESCRIPTION: Field Changes 1. Reason for change: Unforseen subsurface conditions 2. Description of Change: Please see attached Change in Work Request#3, dated 2/2812013. 3. Change In Contract Cost $1,255.00 4. Change in Contract Time: none G a S 7o9f0(v.5'35030 ORIGINAL CONTRACT COST $239,360.05 TOTAL APPROVED CHANGE ORDER $ 5,990.50 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER 1,266.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.52% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S -o ADJUSTED CONTRACT COST 4T,9dTWb (Assuming all chance orders aooroved) ACCEPTED BY: DATE: Contractor's ReDr e e ACCEPTED BY: DATE: Project Manager REVIEWED BY: y��i�- ('�, -.-._ DATE: Title: Landscape Architdct APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc City Clerk Architect Contractor Engineer Project File Purchasing :N7r02Pit. =t CHANGE IN WORK REQUEST " 3" Initiation Date: 2/29/2013 Project: Reservoir Ridge Natural Area Owner: City of Fort Collins To: J-2 Contracting Co. Requested by: Matt Day Authorized by: Matt Day Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without q ffecting the contract data Description of Proposed Changes - amount 1) Pre -Drill Pilot Holes Thru Shallow Bedrock for Helical Pier Installation $1,255.00 EAST ABUTMENT (Auger Rental, Equipment, and Labor) TOTAL $1.265.00 J-2 Coatrectiag Co. , agrees to change the work described above for the change in prices own below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be no change by 0 Days. No change in Contract Sum (Initial if no change) ADD to the Contract Sum $ 1,255.00 DEDUCT from the Contract Sum $ This information shall be valid for thirty (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATURE DATE: 2/29/2012 Contractor shalt retain one (1) copy and return ORIGINAL to Owner APPROVED BY OWNER f / — �� � DATE: J Accepted change in work request will be included in a futureformal change order. DO NOT btll for this change until a formal change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor.