HomeMy WebLinkAboutCHANGE ORDER - BID - 7404 ELKS LODGE DECONSTRUCTIONCHANGE ORDER Project: Elks Lodge Deconstruction - Change Order No: 2 Date: December 27, 2012 To Contractor: Alpine Demolition, Inc. Project Number: 7404 5790 West 56th Ave, Suite-C Contract Date: August 31, 2012 Arvada, Colorado 60D02 Contract For: Elks Lodge Deconstruction The Reason and Description of the Contract Change Is as Follows: The purpose of this change order Is to redefine the substantial completion and final completion definition and dates, incorporate unit price and alternate items into the work , and establish parameters for final protect completion. The nev substantial completion date Is to be December 31st, 2012. On this dale all of the contractor's equipment and tools will be removed from the site with final punch list and unit price Items finished. The final acceptance date for final reconciliation will be two weeks after, on January 13, 2013. A detailed change to the contract definition of subslantial completion and final completion is attached. A total of (21) calendar days are added to the contract. 6) days for inclement vreather, (5) days for difficulties encountered in waste stream separation and encountered ACM, and (10) days for work area alteration for public use. G Supporting Documentation Change In Contract Value: (Attach addeional sheets as required) Original Contract Value: $257.613.00 Net change by previously authorized Change Orders: $0,90 Contract Value prior to this Change Order: S257,813.00 The Contract Value will be adjusted by this Change Order in the amount of. S18,759.50 The new Contract Value including this Change Order will be: $276.572.60 Total % of Original Contract Value - this change order: 7.28% Total % of Original Contract Value - all change orders: 7.28% The Change in contract time (calendar days): 21 Previous Substantial Completion Date: December 10. 2012 Revised Substantial Completion Cate: December 31, 2012 Revised Final Completion Date: Janu''arry 13, 2012 Engineer Ditesco, LLC i "1 13150akridge Drive - Suite 720 By.By7 R Date: . Fort Collins, CO 80525 Owner: Fart Collins Downtown Development Authority — 14 Old Town Square, Suite 234 8y: d Oangefiel Date: Fort Collins, 00.80524 Contractor: Alpine Demolition, Ina 5790 West 56th Ave , Suile-C Arvada, Colorado 80002 o'IZs3�� ^c:?0/Cz Change in Contract Value: The contract value is being increased by 5V:8- ;759.50. Please see summary table below. UNIT PRICE I ADDITIVE ITEMS - Item Number Description Contract Value Unit Price Item 9 Bearing Wood Trusses $750 EACH Total (7) $5.250.00 Add All 4 Complete Removal of Foundation $16,000.00 Total Unit Price Change $21,250.00 CREDITS Item Number Description Contract Value Remove and Replace Broken Sidewalk Panels ($5.3815F) Total 350 SF ($1,883) Sawout for Removal of Broken Sidewalk Panels ($4.0511-F) Total 150 LF ($607.50) Total Work Credits: $2,490.50) Total Confract Change — this change order` Chancre In Contract Time: A total of (21) calendar days are added to the contract. (6) days for inclement weather, (5) days for difficulties encountered In waste stream separation and encountered asbestos containing materials (ACM), and (10) days for opening of the fence to the public during the period of December 18, 2012 through December 28, 2012. Contract Time Summary Original Substantial Completion Date: December 5, 2012 Original Final Completion Date: December 18, 2012 Days added (change order 1 : 5 calendar Days added (change order 2) 21 calendar Revised Substantial Completion Date: December 31 2012 Revised final Completion Dale: Janus 13, 2D12 diftesco 1315 Oakridge Drive, STE 120 Fort Collins, CO 80525 ditescoservices.com CHANGE ORDER NO. 2 SUPPORTING DOCUMENTATION Project: Elks Lodge Deconstruction Project No. #7404 Date: December 27, 2012 Description of Change: The purpose of this change order is to redefine substantial completion and final completion, incorporate unit price and alternate Items Into the work, and establish parameters for final project completion. Changes to Closeout Procedures are as follows: DIVISION 01, Section 0177 00 CLOSEOUT PROCEDURES. Section 1.8, Paragraph A is hereby modified in its entirety. A. Substantial Completion shall not be allowed until each and every component of the project has been completed and approved by Engineer. When Contractor considers the Work to be substantially complete, he shall submit to Engineer: i. A written notice that the Work or designated portion thereof is substantially complete 2. A list of items to be completed or corrected . a. Substantial Completion shall be defined as the entire Elks Lodge building removed, all damaged Infrastructure repaired, all work complete, demobilization complete, site cleaned and ready for owner acceptance. DIVISION 01 — GENERAL REQUIREMENTS 01 77 00 CLOSEOUT PROCEDURES Section 1.9 — FINAL INSPECTION — Paragraph A is hereby modified in its entirety. A. When Contractor considers the Work is complete, the Contractor shall submit written certification that: 1. Contract Documents have been reviewed 2. Work has been inspected for compliance with Contract Documents 3. Work has been completed in accordance with Contract Documents 4. Work is completed and ready for final Inspection a. Final Acceptance shall be defined as all site work complete, all salvageable materials delivered and inventoried; contract reconciled and final project closeout completed.