Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7125 WATERS WAY NEIGHBORHOOD PARK (9)Fart Collins Park Planning & Development To: Jim O'Neil, Director of Purchasing and Risk Management John Stephen, Sr. Buyer, Purchasing From: Matthew Day, Landscape Architect City of Fort Collins Park Planning and Development Date: 3/4/2013 Re: Waters Way Neighborhood Park Construction Park Planning and Development is completing the construction of Waters Way Neighborhood Park (Purchase Order # 9111356) with Walsh Construction Incorporated. Waters Way Neighborhood Park was designed to be constructed in phases due to the adjacent development and the changes with future infrastructure. When park construction started, McWhinney's builders (Shadow Creek Homes, Crow Creek Homes, and Journey Homes) advanced their plans and started construction of Provincetowne Filling 3 and 4. Their housing projects extended Bellewood Court and Eden Ridge Court on both sides of our neighborhood park project and created the new San Juan Drive and Snowy Plain Road. The new roadways created the need for our project to complete the ROW improvements. These improvements included a new hillside, a landscaped stairway entrance off of San Juan Drive, sidewalk improvements, access ramps, street trees, irrigation and grass. The development project to our North also included a stormwater improvement project which installed a stormwater line to divert off -site water across the park to a regional dentition pond. The majority of changes were handled with unit prices determined by the contract. These items included grading and earthwork, concrete sidewalks and landscape .items such as street trees, turf grass, and irrigation. We were able to incorporate the changes into our park construction, but it has put us over the 15% contract maximum. Our final change order # 12 with Walsh Construction brings the total percentage of all change orders to 16.32% of the original contract. I worked with my supervisor, Craig Foreman, and John Stephen to incorporate the changes without going over the 15%, but I did not anticipate the extent of the off -site coordination, construction and cleanup. Walsh Construction is complete with all work items, including change orders and we are ready to close out of the contract. Thank you and please contact me anytime with any questions at (970)224-6096 or Mday@fcgov.com. fcgov.com. Matthew Day, Landscape Architect PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: 2. Description of Change: CHANGE ORDER NO. 12 Watees Way Neighborhood Park Walsh Construction Incorporated 07125 9111356 Change in work request final cleanup total: 19,3 .94 3. Change in Contract Cost: $ 19,318.94 4. Change in Contract Time: 40 TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all change orders approved) $ 179,177.79 $ - $ 19,318.94 1.59% 16.32% 1,41 , 3. ACCEPTED BY: DATE: Z 7 /, Contractor's Representative 77 -(,- Z _ ACCEPTED BY:� DATE: f Project Manager REVIEWED BY: _ DATE: Title: ^ APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing Field Order 28 Initiation Date: 10/11/2012 Project: Water'.s Way Neighborhood Park Owner. City of Fort Collins To: Walsh Construction Inc. Requested by: Mau Day Authorized by: Matt Day, Project Manager Please famish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date, Description of Proposed Changes- Proposal Request andlor Supplemental Information Grand Opening Cleanup Install 6" ads drain behind pump station to carry pump backwash water to channel. Mow weeds at drainage channel and at pedestrian bridge. Remove silt fence and old fence post from natural area, clean up debris from adjacent construction. Repare drainage ruts from the cleanup of the skatepark. Install fan cover at pumphouse ventilation window. Walsh Construction Lac. , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be (increased) (decreased) (unchanged) by Days. No change in Contract Sum (inirint if no change) ADD to the Contract Sum S DEDUCT from the Contract Sums S This information shall be valid for thirty (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATURE DATE: Contmetor shall retam one (1) copy and return ONOLVAL to Amer APPROVED BY OWNER ��_ . DATE: Accepted change in work request will be included in a frame formal charge order. DO NOT bill for this change until a formal change order has been erecated bil all pnrlies. Acceptance is direction to proceed with the work described herein. Not valid unless signed br the owner and the contractor. CHANGE ORDER PROPOSAL JOB MUM: WATERS WAY JOBNLWAWL lam vvCPR ':21:.. •1. .T DA'W 12MIaM2 NUMBER 1•l. ADOMORALCONTRACTTM: 40 DAYS APPROVED BY• APPROVED BY:_( VVALwk " 011NEtOM �.