Loading...
HomeMy WebLinkAboutRFP - 7447 ARCHITECTURAL & ENGINEERING SERVICES FOR POUDRE FIRE AUTHORITYAddendum 1 7447 Architectural & Engineering Services for Poudre Fire Authority Page 1 of 2 ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7447: Architectural & Engineering Services for Poudre Fire Authority OPENING DATE: 3:00 PM (Our Clock) December 3, 2012 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 7447 Architectural & Engineering Services for Poudre Fire Authority Page 2 of 2 EXHIBIT 1 – QUESTIONS & ANSWERS 1. Regarding the scope of work that will include the design and construction of a new Fire Station, is it Poudre Fire’s intent that this structure be classified as an Essential Services Facility? Yes, that is the intent. 2. FWA and our Consultants have interpreted this RFQ to be somewhat similar to an Indefinite Delivery Indefinite Quantity Contract (IDIQ) where the exact scope of work may not yet be known so billing/wage rate information is requested. That is correct, this is the same as a IDIQ agreement. 3. With that said, one of the Review and Assessment criteria is the Cost and Work Hours (see screenshot below) which is described as, “Do the proposed cost and work hours compare favorable with the project Manager’s estimate? Are the work hours presented reasonable for the effort required in each project task or phase?” We want to make sure we’re not missing something here but, is the Design Team, for the purposes of this RFQ, expected to include in their proposal Design Fees and scheduled hours for performing the work described in paragraph one of the General Information section of the RFQ? No. 4. It is understood that each proposal is to include wage rate information for each member of the Team and that a detailed scope of work will be provided during the work order process. That is correct. Please see II. Submittal, C of the proposal. 5. This last question is really more a confirmation that the A/E is expected to include GeoTech and Environmental Consultants within their Contract and the Owner will NOT be procuring these services 3rd party. Please confirm. PFA does use City of Fort Collins consultants for these services. They will continue to use the City consultants for this work. 6. When our office puts together proposals we indicate that we use a local contractor to provide cost estimating services. By doing this I want to make sure that if we use contractor X for cost estimating purposes during design that contractor X will not be removed or not have the ability to bid the project to construct it. Contractors that are used for estimating cannot bid on the work.