Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7163 ON CALL PROFESSIONAL ELECTRICAL AND INSTRUMENTATION ENGINEERING SERVICE (4)WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CAROLLO ENGINEERS PC DATED: October 25, 2010 Work Order Number: CE-WR-2013-1 Purchase Order Number: Project Title: Rigden Gravel Pit Storage Reservoir Commencement Date: February 1, 2013 Completion Date: June 30, 2014 Maximum Fee: (time and reimbursable direct costs): $75,000 Project Description: Pump station electrical and instrumentation design and construction support. Scope of Services: See attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. cc: Purchasing Prof sio�nal:��1 By2'��' Date: z[�fi3 City of Fort Collins Submitted By: Specieff Project Manager Date: tzll 1*0 Reviewed By: Senior Utility -Engineer Date: Reviewed By: { Water Reso rces,td Treatment Mgr. Approved By: Approved By: D;L f t 9 — i3 Manager Scope of Services Electrical & Instrumentation Engineering Design and Construction Services I. Attend design and construction meetings as required 2. Inspect electrical and instrumentation installation during its construction 3. Review shop drawings and other submittals 4. Review and comment on RFIs or other construction questions 5. Develop Record Drawings 6. Review O&M Manuals 7. Develop Startup Plan and assist with startup activities 8. Develop a punch list