HomeMy WebLinkAboutWORK ORDER - RFP - 7337 ELECTRICAL CONTRACTOR 2012 (2)I•:\Flllll'1•'A' '
\VORK 011l)l.11 FORM
MMSIIANT 1.O AN ACRI'.fn1EN"I' I31:'I'1\rL'P.N
THE CITY Of IP�OH'1' COLLINS
GiL't<��IL1Z�� �f11i11U.c�l tnti
\\'ork Order 1'u nbcr:—_J—O�-----------------------
Pun'Irase Ordt
Projecl'fide:
Coil) ncncenn
C'umplelioll D;uc: _ " 79 /—/-----------
�ta�innnn Pcc: (lime and teimbursnble direct cusul t 2LL'1L- -----
Scups of serviecs:
service Provider :Itia'ces to perform Ile seniccs
idcuulicd above and un Ibc auachcd forms in
uu•cun dance nigh the Ic•rogs and Conditions contained
herein :Ind in the Sen•iccs Ahn'eement
hetweeu dIc panics. Ill the event ol'a conflict bemecn
ur :unbigntip• ill the terms ul' the Scivices Ahg,eemeol
ail this work order (including; the :dmched linens) the
Sctvices Ag iectucnl shall control.
S l•1\'Icl' lrrocidcr
13v:
CC: Purchasing
The attached furms consisting of ---- U pages are
hereby acccpled and iururpurttcd herein b)' dgis
Icferenre.:utd Nulice to Proceed is hcrebl• ovell.
412001
City of Purl Collins
m
Date:
Director 01' Polrlgesiug nod Risk M;IM19cgncnl
Over S30,000
CONSTRUCTION SERVICES
November 27, 2012
Attn: Bryan Garrett
Re: Lee Martinez Pole Light Repair Project
Interstates Construction Services, Inc. is pleased to present pricing for the above
referenced project.
All direction for this project has been taken from the job walk between yourself and Josh
Barber.
Pricing includes the following:
• Install all new underground raceways and wire to each of the six existing pole
lights to replace the existing underground feeders.
• Each pole light to have a new underground box next to it to provide a point to
make the electrical connections.
• New Underground j-box to be installed near the existing distribution panel
with new raceways from the box to the distribution panel to pull in new wiring.
Clarifications:
- Pricing is good for 30 Days.
- A one year warranty applies for all installation and materials except where
manufacturer warranties apply.
- This pricing assumes that work can be done during normal working hours Monday -
Friday between the hours of 7:00 am and 5:00 pm. If this work needs to happen
outside of these hours then it may be at additional cost.
- Pricing includes the cost of a subcontractor to execute the underground boring.
Our Total T&M Not To Exceed Price for this proiect is: $20,1133.00
If you have any questions or I can be of further service please feel free to contact me at
your convenience.