Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7337 ELECTRICAL CONTRACTOR 2012 (2)I•:\Flllll'1•'A' ' \VORK 011l)l.11 FORM MMSIIANT 1.O AN ACRI'.fn1EN"I' I31:'I'1\rL'P.N THE CITY Of IP�OH'1' COLLINS GiL't<��IL1Z�� �f11i11U.c�l tnti \\'ork Order 1'u nbcr:—_J—O�----------------------- Pun'Irase Ordt Projecl'fide: Coil) ncncenn C'umplelioll D;uc: _ " 79 /—/----------- �ta�innnn Pcc: (lime and teimbursnble direct cusul t 2LL'1L- ----- Scups of serviecs: service Provider :Itia'ces to perform Ile seniccs idcuulicd above and un Ibc auachcd forms in uu•cun dance nigh the Ic•rogs and Conditions contained herein :Ind in the Sen•iccs Ahn'eement hetweeu dIc panics. Ill the event ol'a conflict bemecn ur :unbigntip• ill the terms ul' the Scivices Ahg,eemeol ail this work order (including; the :dmched linens) the Sctvices Ag iectucnl shall control. S l•1\'Icl' lrrocidcr 13v: CC: Purchasing The attached furms consisting of ---- U pages are hereby acccpled and iururpurttcd herein b)' dgis Icferenre.:utd Nulice to Proceed is hcrebl• ovell. 412001 City of Purl Collins m Date: Director 01' Polrlgesiug nod Risk M;IM19cgncnl Over S30,000 CONSTRUCTION SERVICES November 27, 2012 Attn: Bryan Garrett Re: Lee Martinez Pole Light Repair Project Interstates Construction Services, Inc. is pleased to present pricing for the above referenced project. All direction for this project has been taken from the job walk between yourself and Josh Barber. Pricing includes the following: • Install all new underground raceways and wire to each of the six existing pole lights to replace the existing underground feeders. • Each pole light to have a new underground box next to it to provide a point to make the electrical connections. • New Underground j-box to be installed near the existing distribution panel with new raceways from the box to the distribution panel to pull in new wiring. Clarifications: - Pricing is good for 30 Days. - A one year warranty applies for all installation and materials except where manufacturer warranties apply. - This pricing assumes that work can be done during normal working hours Monday - Friday between the hours of 7:00 am and 5:00 pm. If this work needs to happen outside of these hours then it may be at additional cost. - Pricing includes the cost of a subcontractor to execute the underground boring. Our Total T&M Not To Exceed Price for this proiect is: $20,1133.00 If you have any questions or I can be of further service please feel free to contact me at your convenience.