Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9131032LLC DATED: 1/31/2013 Work Ofder Number: Purchase Order. Number: Project Title: Limited Asbestos Inspection, City Hall'Building,'300 LaPorte Avenue; fort Collins, Colorado Commencement Date! -TBD Completion Date:TBD (Approximately,two weeks) • Maximum Fee: Time and Materials:`$835 Project Description: Complete' limited inspection for asbestos -containing materials related to building :boiler replacement at Cit)(Hall- Building, 300 LaPorte Avenue, Fort Collins, Colorado k Scope of Services. Collect samples of all;accessi'blesuspect asbestos -containing ,building materials and submit samples to laboratory for polarized light microscopy (PLM) analysis to determine asbestos content Perto_rm confirmatory point count analysis on materials containing less than or equal to'1 percent asbestos. All inspection, sample collection, and lab analyses: activities will'b'e performed in accordance with customary (industry. `standard) practices. The�work is• iiiiited aril will focus on piping and other miscellaneous materials associated with the boiler located in the`basement of the building, The interior portions of the boiler willnot be inspected because it will be in operation at.the time,of the. A/Z inspection. Acceptance: ,User Professional agrees-_ to. perform the The attached forms consisting of one (1) services identified above and 'on the page (1/31/20,13-Cost Estimate), are attached forms in accordance• with the. hereby accepted and`incorporated term"s and conditions•contained herein•and herein, by this reference, and Notice to in the Professional Services Agreement Proceed is hereby given.• between the parties. in the 'event of a a conflict between or ambiguity in the terms of the Professional Services .Agreement and this work order (including the'attached forms) the' Professional Services Agreement shall control Professional By: Date: January 31, 2013 City of Fo� Collins By:_14�L Ix Date:,_ ALWA11 Environmental Scientists and Engineers, LLC an ecology and environment company Tasks ESTIMATED DIRECT HOURS AND COSTS Task 1 Project Setup Task 2 Field Work Task 3 Reporting Client: City of Fort Collins Project: City Hall Building, 300 LaPorte Avenue - Limited Asbestos Inspection Rate/Hr Title Project Assignment Name Total Task 1 Task 2 Task 3 WALSH TEAM $150.00 Engineer VII - 1 Project Management Norman, Tom 1 1 $95.00 Scientist IV - 1 Inspection/Reporting Castell, Michael 5.5 1 3 1.5 TOTAL HOURS 6.5 1 3 2.5 1 a) Total Labor Cost $673 $95 $285 $293 1 b) Total Subconsultant Cost $0 2a) Total Other Direct Costs (including travel): Details below $25 $25 Fed Ex - Large Package (each) - Unit Cost: $25 $25 2b) Markup on Other Direct Costs 10% $3 $3 3) Subtotal ODCs (Lines 2a & 2b) $28 $28 4a) Subcontractors: Details below $123 $123 Reserviors Environmental Lab - Asbestos - PLM (5 day) - Unit Cost: $7 $63 Reserviors Environmental Lab - Asbestos - PC (24 hour) - Unit Cost: $20 $60 4b) Markup on Subcontractors 10% $12 $12 5) Subtotal Subcontractors (Lines 4a & 4b) $135 $135 6) Equipment Usage: details below $0 7) Subtotal All Expenses (Lines 3, 5, & 6) $163 $163 8) Total Labor & Expenses (Lines 1 & 7) $835 $95 $448 $293 CONFIDENTIAL F:\Projects\City of Fort Collins\Asbestos Projects\300 LaPorte\City Hall Building - Boiler Inspection\Limited Asbestos Inspection - City Hall Building - Boiler.xls