DATED: 1/31/2013
Work Ofder Number:
Purchase Order. Number:
Project Title: Limited Asbestos Inspection, City Hall'Building,'300 LaPorte Avenue; fort Collins, Colorado
Commencement Date! -TBD
Completion Date:TBD (Approximately,two weeks)
•
Maximum Fee: Time and Materials:`$835
Project Description: Complete' limited inspection for asbestos -containing materials related to building
:boiler replacement at Cit)(Hall- Building, 300 LaPorte Avenue, Fort Collins, Colorado k
Scope of Services. Collect samples of all;accessi'blesuspect asbestos -containing ,building materials and
submit samples to laboratory for polarized light microscopy (PLM) analysis to determine asbestos
content Perto_rm confirmatory point count analysis on materials containing less than or equal to'1
percent asbestos. All inspection, sample collection, and lab analyses: activities will'b'e performed in
accordance with customary (industry. `standard) practices. The�work is• iiiiited aril will focus on piping and
other miscellaneous materials associated with the boiler located in the`basement of the building, The
interior portions of the boiler willnot be inspected because it will be in operation at.the time,of the.
A/Z
inspection.
Acceptance:
,User
Professional agrees-_ to. perform the The attached forms consisting of one (1)
services identified above and 'on the page (1/31/20,13-Cost Estimate), are
attached forms in accordance• with the. hereby accepted and`incorporated
term"s and conditions•contained herein•and herein, by this reference, and Notice to
in the Professional Services Agreement Proceed is hereby given.•
between the parties. in the 'event of a a
conflict between or ambiguity in the terms
of the Professional Services .Agreement
and this work order (including the'attached
forms) the' Professional Services
Agreement shall control
Professional
By:
Date: January 31, 2013
City of Fo� Collins
By:_14�L Ix
Date:,_
ALWA11
Environmental Scientists and Engineers, LLC
an ecology and environment company
Tasks
ESTIMATED DIRECT HOURS AND COSTS Task 1 Project Setup
Task 2 Field Work
Task 3 Reporting
Client: City of Fort Collins
Project: City Hall Building, 300 LaPorte Avenue - Limited Asbestos Inspection
Rate/Hr Title Project Assignment Name Total Task 1 Task 2 Task 3
WALSH TEAM
$150.00 Engineer VII - 1 Project Management Norman, Tom 1 1
$95.00 Scientist IV - 1 Inspection/Reporting Castell, Michael 5.5 1 3 1.5
TOTAL HOURS 6.5 1 3 2.5
1 a)
Total Labor Cost
$673
$95 $285 $293
1 b)
Total Subconsultant Cost
$0
2a)
Total Other Direct Costs (including travel): Details below
$25
$25
Fed Ex - Large Package (each) - Unit Cost: $25
$25
2b)
Markup on Other Direct Costs
10% $3
$3
3)
Subtotal ODCs (Lines 2a & 2b)
$28
$28
4a)
Subcontractors: Details below
$123
$123
Reserviors Environmental Lab - Asbestos - PLM (5 day) - Unit Cost: $7
$63
Reserviors Environmental Lab - Asbestos - PC (24 hour) - Unit Cost: $20
$60
4b)
Markup on Subcontractors
10% $12
$12
5)
Subtotal Subcontractors (Lines 4a & 4b)
$135
$135
6)
Equipment Usage: details below
$0
7)
Subtotal All Expenses (Lines 3, 5, & 6)
$163
$163
8)
Total Labor & Expenses (Lines 1 & 7)
$835
$95 $448 $293