Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9117445 (3)UHANCit+, UKD R NU. S PROJECT TITLE: Mulberry Redundancy Project (aka NPT improvements) CONTRACTOR: Hydro Construction Company, Inc. P.O. NUMBER: 9117445 VENDOR NUMBER: 109420 CHARGE NUMBER: 5030373617.563040.6 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time I Reconciliation for contract closeout 2. Deduction of contract cost due to completion of all items under budgeted amount 3.-$32,413.11 4. 0 days NOTE: Retainage Release will also be reduced by $5,255.10 due to late credits received by Contractor (Attach additional sheets. as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS CO: TOTAL % OF ORIGINAL CONTRACT, ALL CO'S: ADJUSTED CONTRACT COST (Assuming all change orders Mroved) ACCEPTED BY: ( actor's Representative) REVIEWED BY: (Projec `Manager) APPROVED BY: C; K /2-00 &1 (Chief Engineer) APPROVED BY: (Water Resources and Treatment Ops nager) 0.68% 5.56% $4,532,171.00 $284,325.00 $0.00 ($32,413.11) $4,784,082.89 DATE:= I►/Z" DATE: Z A Zd/ DATE:, Z DATE: ?— 13-13 CC: Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment in contract sum or contract time. Application for Payment PROJECT: H-WRF-20il-11 Mulbe n, Redundanov Pmisal Page I of 4 OWNER: City of Fort Collins- Utilities CONTRACTOR: Hydra ConsWction Co Inc APPLICATION NUMBER: Change Order 700 Woad Street 301 E. Lincoln Ave. APPLICATION DATE: 2112013 Fort Collins. CO 50522 Fort Collins.. C080524 PERIOD BEGINNING: 1/1/2013 PERIOD ENDING: lnI2013 ENGINEER: MWH Camllo EOineers 1801 California St., Suite 2900 10822 Toler Dr. Denver. CO. 80202 Littleton. CO. 80127 PO NUMBER: 9117445 CHANGE ORDERS: PAY APPLICATION: RETAINAGE: NUMBER DATE AMOU Application is made for Payment as shoran below in connection with the Contract. 1 S The present status of the account for this Contract is as follows. '31W2012 y 2 5 (32.413.11) .s� Original Contract Amount 5 4.532.171.00 Retainage to Date: 5 235.56970 D� Net Change by Change Order. $251,911.89 Relainage Previous: 5 240.824.80 PM / Revised Current Contract Amount: Total Work Completed Stored tb Dale $ $4,784,092.89 4,71408289 Change in Radlnago: S 15.255101 and C^ VLess Previous Payment" S 4.548.513:19 Amount due MIS Pay Application (before relelnage) S 235,59970 Less Relamage. S 23556970 Nei Change by Change Order. 5 251,911.89 AMOUNT DUE THIS APPLICATION: $ (0.00) Chan Order%. 556% CERTIFICATION: The undersigned CONTRACTOR terries that all obligations of CONTRACTOR incurred in connection viral the WORK have been satisfied as required in paragraph 14,3 of the General Condition of the Conrad, The obese Amounl Due Ihls Applrullon is requested by me CON T ACTOR. Date'. Apllics nis mmmded by the RESIDENT ENGINEER Payment of the above Amor-0, Dale. e Payment of the above 1 Due This Application has been reviewed by the OWNERS Project Manager. Dale / B Payment of the above Amount Due This AppAcauon is approved by the OWNER Data: By 12-01-250 Application for Payment PROJECT: H-WRF-2011-11 Mulberry Red d P I t OWNER City of Fort Collins- Utilities 700 Wood Sharer Fan Cdlms,,CO 80522 ENGINEER MWH Corolla Egineers 1801 Caltlamie Sr, Suite 2900 10822 Taller Or. Oenver. CO, 80202 Ulltelon. CO. 80127 CONTRACTOR: Hydro Construction Co. Ina 301 E. Lincoln Ave. Fort Cairns, CO 80524 SCHEDULE OF VALUES Page 2 of 3 APPLICATION NUMBER: Change Omer APPLICATION DATE: 02/01/13 PERIOD BEGINNING: 01101/13 PERIOD ENDING: 01/31/13 PO NUMBER: 9117445 It.. d Job CerN 8 Description NPT Blower Bmm�ng p UOM C.Mmid Unit Pnca SummaryBllletl Total Amount This Period Amount BIUatl Pnvious Am°unl Billed Total to Data Ameunl Stored Materials Total Billed 6 Stored to Date Cost Remaln)n Billed Percent complete Srlowork/Landscagrg Concretion 1 LS 5 5.469.00 S 5.469.00 0% S - 148% 3 8.101.37 148% S 8,101.33 5 Concrete I LS S 22.029.00 5 22.029.00 0% S 51% 5 11.160,47 51% 5 11,160.47 5 $ 8.101.33 S S (3,63233) 100% Stairs B Handrail 1 7 LS S 1.043.00 S 1.043.00 0% S 629% 5 6,559.16 629% S 6.559.16 5 - 11,16047 S 6,559.t6 5 10,86853 100% Bbwar Install LS S 2.336.00 S 2.336.00 0% $ - 13% S 303.48 13% S 30348 S S 5 (5,516,16) 100% Blower Piping 1 LS 5 4,262.00 S 4.262.00 0% S - 69 % 5 2,944.82 69% 5 2.944.62 5 303.48 5 S 2.032,52 IN% Sub -Electrical 1 LS 5 27I,923.00 S 271.923,00 0% 5 - 00% $ 263,841.00 5 262.050.20 S 2.944.82 S 5 1,317-18 100% - NPT East Train 1 LB 5 63,84100 5 63,84 L00 OY. S f00% S 63,841.00 100% 00% 5 63.611,00 - 5 262.050.20 5 63,841.00 5 9.872.80 100% Demolition Concrete 1 LS S 47,10900 S 47,19900 0% 3 113% 3 53.502.77 113% S 53,502Ti S 5 53.502.77 5 - 100% Sran3 HaMraO 1 1 LS LS 5 182.324.00 5 182.324, 00 0% S - 98% S 114,019.87 98% S 114.019.87 S - S 114.249.32 S 16.003T7) $ 100% Misc Metals 1 LS S ,302.00 S 0% S 98% S S 14,019.37 S S 14,0198] 1528213 5 100% FRP Wares 1 LS 5 93.81600 97,550 3 3.81600 97.550,00 5 93,81600 5 0%% S - 33.263.30 S 34,550.61 34% 1 34,550.61 5 - 1 33,263.30 282..13 S 84.28fiS0 100% 100% MLR Pumps t LS 5 83.451.00 3,451X0 3 83.503,00 0% S _ 119% 19% S 4,550.61 19% 119% S 4,550.61 S - 3 4.550,61 S (73461) 100% Ebeling Mixers, 7 LS S 62,SW.00 S 62.503.00 0% 0% S 5 99% 5 99% S S - S S 4,65209 100% Slide Gales 1 LS $ 32,189.00 S 32.189.00 0% $ 99% 61,805.54 5 6t,805.54 99X 5 61.B05.54 61.805.54 3 - S 61.BOS.Sd 61.805.54 5 697.46 100% Mud Valves t LS S 24,470.00 S 24,470.00 0% - S 44% 5 14,044.29 44% S 14.044.29 S 5 14,044.29 5 18,144.71 100% Portable Hass 7 LS 5 5 0% 5 146% S 35,645.10 146% S 35,800.75 - S 35,800.75 S (11,289.25 100% 1 LS 6.090.00 5 276.206.00 6.367.00 5 276,206.00 0% S 54% 5 S 38 % 5 800.75 5 - $ 5 800.75 3 1,269.25 100% Branch BranM-E4driric 1 LS S 5 0% S 190,431.56 /76,205.48 S 176.206.48 5 S t90,431.56 3 35,9(044 100% Feetlen- Elecbical 1 LS 16.2D8.00 5 18.OD40p 16.004.00 S 16.004A0 0 % - S 00% 103 % S 103% 00% 5 5 - 5 76.206.48 E (0.48) 100% WSre8 - Fecrical 1 LS 5 6827200 5 68.272.00 0% - 103% 16.454.37 5 16,454.37 103% 16.454.37 5 16,d54.37 5 S 16.454.37 S (45037) 100% - Electrons Fixlum9-Elecarcnl 1 LS 5 9285.00 S 9.28500 5 - 100% S 68.271.82 100% 5 55.271.82 S S 68.271.82 5 0,18 100% Dances, - Electrical 1 LS 5 6.381.00 5 6.381.00 0% $ 100% 5 9.285.24 100% S 9,285.24 5 - S 9.285.24' S (0.24) 100% Instruments- Electrical 1 LS S 119,859.00 S t49,859.OD 0% 0% S - 5 100% 3 9,30t.49 S 5 - S 3 (0.07) 100% Gear - Eleeaical 1 LS S 2250.00 S00% 0% - S 1004: S 149.859.07 100X IN% 9,38149 S 149,859.07 S 9,BBE49 5 t49,859.07 $ (007) 100% Misc. - Electrical 1 LS 5 5 3.376.00 0% - S 111% 5 111% S 5 - 5 S Demo- Ektlncol 1 LS 6.01000 S 6.010.00 6.010.00 S 6.010.00 0% - S S 3.733.45 100% 3.733.45 5 3,733.45 S S 3.733.45 S 135745) IW% 100% 4 General C°m4lions IW% f00Y. S 6,010.08 6,010.08 100Ye 5 6.010.08 5 - S 6,Ot0.OB 6.010.08 S (0.08) t00% BorMsbinsurance 1 LS S 54.354.00 S 54,354.00 0% 5 81% 3 44.WZ00 Project Management t LS S 111.205.00 5 111.205.00 -2% S (1.723.91) 1Id% 5 137,604.d6 81% $ 44,06200 S - 5 44,062.00 S 10.292 W 100% Sire Su rvision R Field O111ce, Supplies. Smear Tools 1 LS 3 t61,67600 5 161.676.00 -1% S (1,448.28) 111% 5 179,754.91) 122% 110% 1 135.860.55 5 170,306.62 S - S S 135.880.55 S (24.67555) 100% UhLlies 1 LS S 27.401.00 S 27,401.00 0% S - 117% S 32.145.19 117% 5 32.145.t9 - S S 178.306.62 78.306.62 S (16.63062) t00% safety 1 LS S 29.529.00 S 29.52900 .1% S (344.46) 106% S 31.324.01 105% S 30,979.55 S S 3 (4,744.19) 100% Sian -Up 1 LS 3 10,32500 5 10,325.00 09b 5 - 101% 5 10.W3.74 101% 5 - 10.383.74 - S S 30,979.55 5 S (1,450.55) 100% Wmler Condihone 6 Heeling 1 1 LS LS 5 22.570.00 5 22.870.00 0% S - 74% 5 16.932.96 74% S 16.932.96 S - 10.383.74 5 16.932.95 5 (58.74) S 100% Fuels 1 LS 5 37.65300 S S 37.683.00 0% 5 - 81% S 30.43221 81% 5 30,432.21 5 S 30.432.21 5.937,04 S :,250 T9 100% Exlemal Equipment Rental 1 LS 10,970.00 3 12670100 S 10,97000 S •1% 5 (68.60 126% 5 13,829.33 125% 5 13.760.69 5 - 5 13,760.69 S (2.790 691 100% 100% Internal Equipment Rental 1 LS S 91,500,00 /26.701.00 S 91.50000 0% 5 - 100% S 126.271.27 100% S 126.271.27 S S 126.271.27 5 429.73 100% 5 Elcctrical Equipment 0% 5 - 129% S 118,268.47 129% 5 118.268.47 S - 5 118.268.47 3 (26,78847) t00% Panels 6 Transformers MCC1207 1 LS S 21.81900 S 21.81900 0% 5 0.41 fog% S 21.819.00 f00% 5 21.819.41 S MCC1208 1 LS S 67,467.00 S 65A24.00 0% S - 101% 5 66,301.15 tOtYe S 66.301.15 - S 5 21.819.41 S (041) 100% MCC1209 1 LS $ 7;467.00 5 7.467.00 0% 5 - 100% $ 7.466.82 100% 5 7.46682 S S 68,301.15 S 1677-15) 100% MCC1210 1 LS S 7,16].00 3 i.48200 0% S - 10016 5 ],466.82 100% 5 7,46632 $ S Z46682 S S 0.18 100% 1 LS 5 10,60000 5 10,60000 0% S - 100% S 10.599.92 100% S 10,5092 S 7,466.82 S 0.16 100% - 5 10.59992 5 0,08 100% SutrTmals: 5 2,281.798.00 5 (3,58488) 3 2,202.18673 5 2.198.60E 85 S - S 2.198,601,85 5 83.196A5 t00% PROJECT: H-WRE-2011.11 Mulberry Redundancy Pmiect OWNER City of Fort Collins - Utilities 700 Wood Street Fort Collins. DO 80522 ENGINEER MWH Camillo Eginaars 1801 California St.; Suite 2900 IM22 Totter Dr, Denver. CO. 80202 Littleton. CO. 80127 AppliGbcn for Payment CONTRACTOR: Hydm Construction Co.. Inc. 301 E. Lincoln Ave. Fart Collins. CO 80524 SCHEDULE OF VALUES Page 3 of 4 APPLICATION NUMBER: Change Order APPLICATION DATE: 02/01/13 PERIOD BEGINNING: 01101M3 PERIOD ENDING: 01131113 PO NUMBER: 91 %-. "5 Ito. a Job Code A Description Oty. UOM Contract Summary Billed This Period Billed Previous Billed Total to Data Stored Materials Total Billed 8 Stared to Data Cost Remainin Billed Percent Complete Unit Pries Total Amount city. Amount Amount Oty.Amount 6 NPT Influent Mixing Box Stainless Steel Battles 1 LS S 6,694.00 S 6.694.00 0% S - 197% 5 13.201.06 197% S 13.201.06 S - S 13.201.06 5 (6.5071061 IN% 7 NPT Tunnel Demolitions 1 LS S 43,715.00 S 43,715.00 0% 5 - 97% 5 42.373.52 97% 5 42,373.52 S - $ 42.373.52 5 1.34148 IN% Painting& Labeling 1 LS S 107.120.00 S 107,120.00 -5% 5 (5,191.70) 55% 5 59.372.50 51% 5 54.180.80 S - S 54.180.80 5 52.939.20 100% NPT Deck Coaling 1 LS 5 125.224.00 5 125,224.00 0% S 68% S 110.290.77 88% S 110,290.77 S - S 110.290.77 S 14.93323 100% WAS Pump Replacement 1 LS 5 154.925A0 S 154,925.00 0% S - 102% S 157.583.81 102% S 157.583.81 $ - S 157.583.81 S (2.658 81) 100% Centrals Tank System 1 LS 5 51,125.00 S 81,125.00 0% S - 97% S 78.31948 97% S 78.319.48 S - 5 78.319 d8 S 2,80552 100% WAS Valve Replacement 1 LS S 5,037.00 5 5.037.00 0% 5 - 102% S 5,113.91 102% $ 5'111.91 S - 5 5.113.91 5 (76 DI) 100% 24-RAS Line 1 LS 5 67,379.00 S 67,379.00 0% S - 96% 5 64.656.08 96% 5 '64,656.08 S - S 64,658.08 S 2.722.92 100% NPW System 1 LS S 6.109.00 S 6,109.00 0% 5 - 124% S 7,546.91 124% S 7.Sa6.91 S S 7.S46.91 S (1.437.911 t00% NPT Lift Station t LS S 20,793.00 S 20.793.00 0% S - 133% S 27.684.82 133% S 27,684.82 S - S 27.684.82 S 16,891821 100% 8 NPT Basin Underdrain Vertical Turbine Underdrein Pumps t LS S 3,608.00 S 3.608. D0 0% 5 - 162% S 5,859.98 162% 5 5.859.98 S - S 5.659.98 5 (2,251.98) 100% Electrical i LS S 19.812.00 S 19,S2.00 -1% S (255,70) 69% 5 13.486.13 67% S 13,230,43 S - 5 13.230.43 5 6.581.57 100% 9 NPT West Tram Demolition 1 LS S 47.199.00 S 47.199.00 0% S - 111% S 52.359.10 111% S 52,359.10 S - S 52.359AI) 5 (5.160.10) 100% Conaele 1 LS S 182.754.00 S 182.754.D0 0% S - t00% 5 193.220.49 106% S 193.220.49 S - $ 193.220.dg $ (10466.49) 100% Stain B Handrail 1 LS S 14.302.00 S 14,302.00 0% S - 101% S 14459.28 101% S 14.459.28 S - S 14,459.28 S (157,28) 100% Misc. Metals 1 LS 5 100,550.00 S 100,550.00 0% 5 - 33% S 32,923.76 33% S 32.923.76 5 - 5 32,923.76 S 67.67624 100% FRP Weirs 1 LS S 3.816.00 S 3,816.00 0% 5 140% S 5.346.38 140% S 5,346.38 5 - 5 5.346.38 5 (1,530.38) 100% MLR Pumps I LS 5 83,451.00 S 83.451.00 0% S - 95% S 79.030.31 95% S 79.030.31 5 - S 79 030.31 S 4 42D.69 100% Floating Mixers 1 LS S 62.503.00 S 62.503.00 0% 5 - 95% 5 59,225.77 95% 5 59.225.77 S - S 59.225.77 S 3.277,23 100% Slide Gates 1 LS S 32.189.00 5 32.189.00 0% S - 44% 5 14.152.60 44% S 14,152.80 S - S 14.152.e0 S 18.03620 100% Mud Valves 1 LS S 24,190.00 5 24,190.00 0% S - 123% S 29,810,96 123% $ 29.810.96 S - S 29.810.96 -5 (562096t 100% Portable Hoist 1 LS S 358,00 5 356.00 0% 5 - 196% S 702.00 196% S 702.00 S - 5 702.W 5 134400) 100% Piping 1 LS S 222.496.00 S 272.49600 0% 5 - 84% S 187.477.70 84% S 1137,477,70 S - $ 187.4T7.70 5 35,01830 100% Branch - Electrical 1 LS 5 65,562.00 S 68.662.00 0% S - 100% S 68.662.23 100% S 68,662.23 S - S 68.662.23 S (0.231 100% Feeders• Electrical 1 LS S 14.420W 5 14.420.00 0% S - 100% S 14419.98 100% 5 14.419.98 S - S 14419.98 S 002 100% W5re 8 Termination- Etedrical 1 LS S 61.513W S 61,513.00 0% S - 100% S 61.513.06 100% $ 51.513.08 5 - S 61,513.08 S (008) 100% Fixtures - Electrical 1 LS S 8,366.D0 5 6,366.00 0% $ - 100% S 6,368.02 100% 5 8,366.02 S - S 8.366.02 S to 021 t00% Devices -Electrical 1 LS S 5,750.00 S 5.750.00 0% $ - t00% S 5.749.74 100% S 5,749.74 S - S 5.749.74 S 0.26 100% Instruments - Eledncal 1 LS S 135.012.00 S 135.012.00 0% S - 100% S 135,012.39 100% S 135,012.39 S - S 135.012.39 S (039) 100% Gem -Electrical 1 LS S 2.0W.00 S 2.03800 0% 5 - 100% S 2.038.27 100% S 2.038.27 S - 5 2.038.27 S .(027) 100% Misc. - Electrical I LS S 3.D42.00 5 3.042.00 0% S - 112% S 3.399.19 112% S 3.399.19 5 - $ 3.399.19 S 1357,19) 100% Demo - Electrical 1 LS S 5415.00 S 5,415.00 0% S - t00% 5 5,415.10 100% S 5.415.10 5 - S 5.415.10 S (0..10) 100% 10 Change Order- 1 NPT Weiser Procurement 1 LS 5 261.579.D0 S 261,579.00 0% S - 100% S 261,008.00 100% 5 261.008.00 S - S 261.008.00 S 511,00 100% Fixed Fee charges: I S 553.552.001 0%I 5 - 1100%I S 553.552.00 I 100%I 5 553.552.00 I S - I $ 553,552.D0 I S I t00% I GRAND SUS -TOTALS: S 4.81649600 5 (9,032.28) S 4.575.520.25 S 4,566487.97 S 4.556.457.97 S 230.00803 95%' PROJECT: H-WRF-2011 11 Mulborn, R tl d OWNER City of Fad CalOns - Ulditiea 700 Wood Sheet Fort Collins, CO 80522 ENGINEER: MWH Carollo Egineers 1801 California St. Suite 2800 10822 Taller Dr, Denver, CO. 80202 L II61on. CO 60127 Application for Payment CONTRACTOR: Hydro Construction Co. Inc 301 E. Lincoln Ave. Fors Collie. C080524 Page 4 014 APPLICATION NUMBER: Change Order APPLICATION DATE: 02101/13 PERIOD BEGINNING: 01/01/13 PERIOD ENDING: 01/31/13 PO NUMBER: 91:7445 SCHEDULE OF VALUES Item Pending Billed ThinPeriod Billed P 1 Stores! Total BilledI I 9 1 IUnit Price Contract ST t IA 1 I DN I A IBill dT ul�pat �� 1 2 P.I.-/4 P.I. - 15 VC Installation RAS Pipe.Demo 1 LS S 268.0 S 268.13 0% S - 100% S 268.13 100% S 268.13 $ 5 268.13 3 P.I.-5 Flom B Calibration BNlons 1 1 LS LS S 613.68 S S 613.68 016 S - 100% 5 613.68 100% S 513.68 S S 613.66 S S 100% 100% 4 PA. -28 U.V. Pilot Test 1 LS 4.843.00 S 998.20 5 4,843.00 5 0% 5 - 100% 5 4.643.00 100% S 4.843.00 S - S 4.843.00 S 100% 5 P.I. - 29 MCC1210 WAS VFD PmBbus 1 LS 5 3,000.00 99820 S O. S 100'16 5 995.20 100% $ 995.20 5 S 998.20 $ - 100% 6 P,I.•2 Portable Hoist 1 LB 3 8.160.00 3,000.00 S 0% 5 100% 5 3.000.00 100% S 3.000.00 S S 3,000.00 S 100% 7 P.I.-26 Floating Mixer Supporsa 1 LS S 6,887.91 8.160.00 S 0% S - 100% 5 8.160.00 100% S 8.160.00 S S 8.160.00 5 100% 8 P.I.. 27 Mixer Guide Cable Embeds / LS 3 7,600.38 6,867.91 S 0% 5 - 100% S 6,867.91 100% S 6.867.91 5 S 6.867.91 5 100% 9 P.I. - 11 16- Plug Valve Replacement - NPT 1 LS 3 8,081.64 7.600.38 5 0% S - 100% S 7.600.38 100% 5 7,600.38 S - S 7.600,38 5 100% 10 P.I.-20 F991 Meter Replacement 1 LS S 660.66 8.081.64 S 660.66 0% S 100% S 8,081.64 100% S 8.051.64 S S 8.081.64 S 100% 11 PA. -23 NPT Diffuser Installation 1 LS S 22,378.02 S 22,378.02 0% S - 100% 5 660.66 100% 5 660.66 S - $ 660.66 S - 100% 13 P.I.-19 Re-Pud Cable for Flow Molar F431 1 LS S 2,560.00 S 0% S - 100% S 22,37802 100% S 22.378.02 S S 22.378.02 S 100% 14 PA. - 8 Kewonea Boiler Demolition 1 LS 3 9.77561 2.560.00 S 0% S 100% 5 2.560.00 100% S 2.560.00 S 5 2.560.00 5 100% 15 P.I. - 34 Blov,er Expansion Joint Replacement 1 LS 3 2,063,37 9,775.61 5 0% S (22.80) 100% S 9.798.41 100% S 9.775.61 S - S 9,775.61 5 100% 16 P.I. - 21 Relonale Instrument Hoists 1 LS 3 229.87 2.063.37 5 0% S 100% $ 2,06337 100% 5 2.053.37 3 3 2.063.37 S 100% 17 P.I.-33 ANN-ANX Weir Buppors 1 LS $ 157.62 229.87 S 157.62 0% 0% S 5 100% S 229.87 100'b S 2.29.87 S - S 229.87 S IW% 18 PI.-10 Central. Cross Connection 1 LS 3 2.245.36 5 2.245.36 0% - S 100% S 157.62 100% S 157.62 5 S 157.62 S 100% 19 P.1. - 17 Stairways No. 1 6 2 to Ladders 1 LS S 1.90000 S 1190000 - 100% 5 2.245.36 100% S 2.24536 5 S 2.24536 S 10046 20 P.I. - 24 Centrals 8 SIW98 Holding Sample Unit 1 LS S 404.96 5 0% S -- t00% $ 1.900.00 100SI. S 1.900.00 5 S I.I)Wo0 S 100% 21 P.I. - 30 Sod Installation B Sprinkler Repair ( LS 3 3,454.53 404.96 S 0% S - 100% S 404.96 100% 5 404.96 S S 404,96 S 100% 22 P.I. - 32 NPT Deck Lighting 1 LS 5 23,979.00 3.454.53 5 0% S - 100% 5 3.454.53 100% S 3.454,63 5 S 3.454.53 S 100% 23 PA.-16 Polymer Room Plumbing 1 LS 3 4.130,67 23.979.00 S 0% S - 100% S 23.979.00 100%. S 23.979,00 S S 23.979 00 S 100% 24 P.I. - 24 Centrals Semple Line Replacement 1 LS 5 228.88 4,13067 5 0% S - 100% 5 4,130.67 1D0% S 4.13067 3 S 4,130.67 S 100% 25 P.I. - 31 NPT Handrail Repair 1 LS S 18.363,00 226.88 S 18.363.00 0% S - 100% S 228.88 100% S 228,88 S S 22888 S 100% 26 P.I.' JB Aeration Beset Cares 1 LS 3 872.01 S 0% S - 100% 5 18.363.00 100% S 18.363,00 5 S 18,363.00 5 100% 27 P.I.-7 AHU1061 Replacement 1 LS S 58.108.08 872.01 S 58.108.08 0% 0% S - S 100% 5 872.01 100% $ 872.01 S 5 $72.01 S - 100% 28 P.I.-9 HWP Relacalion/Tunnel Repair 1 LS S 21.398.53 3 21.398.53 9% 127.17 5 100% S 57.980.91 100% S 58,108.08 5 S 51110606 S 100% 29 P.I.. 35 Mixing Box Slide Gate 1 LS 3 1,019.42 S 1,019.42 1.892.30 91% 5 19,506-23 100% S 21,398,53 S $ 21.398,53 S - 100% 30 PA. -37 Primary Effluent Channel 1 LS S 2,37663 S 0% S 100% 5 1.019.42 1007. S 1,019,42 S - S 1.019.42 S 100% 31 PA -38 Site Removal 1 LS 5 11822.14 2.376.63 S 0% S - 100% S 2.376.63 100% S 2.37663 S S 2.376.63 S 100% 32 PL- Metal Revs& 1 LS S (17,723.92) 11.822.14 S 9% S 1,045.51 91% 5 10,776.63 100% S 11,82214 5 5 11,922.14 5 100% 33 12 PA L • 12 PRPA Valve 8 FTow Meier 1 LS S 6,757.51 (17,723.82) S O% S - 100% 5 (17,723.92) 100% 5 (17.723.92) S - S '(17.723,92) S 100% 6,757.54 11% 5 735.00 99% S 6,022.54 100% 5 6.757.54 5 - S 6,757.54 S - 100% Pending Issues Sub.TOMIs: $ 217.594.92 S 3,777.18 5 213.817.74 S 217,594.92 5 217.594.92 5 - 100% PAY APPLICATION TOTALS: S 4,816.496.00 3 (5,255.10) S 4.789.337.99 S 4,784,082a9 S 4.784,082.89 CHANGE ORDER NO. 3 PROJECT TITLE: Mulberry Redundancy Project (aka NPT improvements) CONTRACTOR: Hydro Construction Company, Inc. P.O. NUMBER: 9117445 VENDOR NUMBER: 109420 CHARGE NUMBER: 5030373617.563040.6 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1 Reconciliation for contract closeout 2. Deduction of contract cost due to completion of all items under budgeted amount 3.-$32,413.11 4. 0 days NOTE: Retainage Release will also be reduced by $5,255.10 due to late credits received by Contractor (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS CO: TOTAL % OF ORIGINAL CONTRACT, ALL CO'S: ADJUSTED CONTRACT COST (Assuming all change orders apprpved) ACCEPTED B REVIEWED BY: (Pro' ct Manager) APPROVED BY: (Chief Engineer) APPROVED BY: (fat r Resources and Treatment Ops anager) $4,532,171.00 $284,325.00 $0.00 ($32,413.11) -0.68% 5.56% $4,784,082.89 DATE: z�hl�e/z DATE: z1l! Za/ DATE: Z S DATE: — i e — t`2 CC: Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement herewithin, including any adjustment in contract sum or contract time. � o 0 o � m O E M M M 0 O N O N L U cn ua ov K W m LU0 ti H _Z H m z O 20 o m Z z - OOwz W w o a K aamw m a R `- 0200 D z v c c rn aa$Fx z a a w w O w N N L ¢aaa a of v o m m w rn o 0 o m O N M N M OJ V M cJ < M V V V M R O U » w w w » w o L U uNi 3 m ?¢O u- c U v o H ° o v t0 O o uiU o` r v S M L U m v t � o 0 3 a O o R m O Ur w U w E `o _ Q° w 75 ¢ E a N O U z v N m 'RO u J V O 'p z a m c O L° m a a _ z a 0 0 '° Im c Q ¢ c o w Un U Z o E m Z O -vo '^ Q U a m d = w Z a E R E a E a r " w j `-" -- o Y 0 U O IL y i O a ¢ H O z tY F ¢ ¢ zO L v n .o W~ O o 6 o O E v a N y M 0 C O N O^ O r O E .. � .. 2 .. v o rnL � a o� a; c o 0 c2i u .a - .- U N w c '0'. vU C OOF NO O_ '= 0 w C `o U S U ¢ O £ E10 E U W \ U o z v m c m m m of a y rnt E t t .wvc w F U w W c- N m O U j O O O W z 0 S R R LL j O ,p iV N N N 0 z 3 ¢ z U c � �� s � E y E y w 3: z m m.Rc w v m m R a O w U z o U f- = t- o m o a o a o 0 K W 0 (D WrZ_z Z 0 Z Z Z W Z U W 0 oam0 F � 0 w caiaRa a ¢ a a K K W W Z W 2r Z O -U' C U d y d o 0 0 o o o 0 aE o0 0000 00000000000000000000 00000000000 00000 .- d o c U 00 (7�tpN m0 1�mMO�Nm Om �nm V 6. t� N W O�NO> mVJ V N TM Ih m N� �Nmmm M N m 1�7t�19 �r—� -0 V ID ID 1or � ID Nn 0.J 10 lV 0 0 0 0 0 0 r m OhmmMN V ism VJ iQ Ott Mhm N`�I� C I lO mtpOMm MONNrmm c'NN � M Nmn V'-'OlN V W (p1�Nm OV'� NrN N v E .... ............. m m M .n .a m m M f9 ........ d M 1 (D m N 0 0 N cnN� mNO II� MN 0 MO mN N c1lN Om 00 NN mN O OM V O O CJ O N O .O to Oi (7 (V N O m OJ c- lD 1p N d OlD l00'V tOV N<fIll mmNnN mO�O'IQV ONmmNYN IMl Om-0m cl NMmNM?(Il D INsmN m OM mC mV NY1 p 6 NNM oD (OmN mNNMtD V N W NmO mOMfDm �-(D 1� 1�O �- ry ........... w ..... ..... w ..... ..... N a n d •� d • r r r r r i i r i r i r r r r r r r r r r i r r r r r r i r r i r r r r i r r r r r .o N R .»m.nmmMm .».n enM m.»m.»mmmm.nmm.nM m.»» mmmmmMmm.nmm mmm M V V o Nq r oo w MmNNNtlN V CnJcc!N V OO V O O���NrmN(NDN V V �-�o� ONi ONM V O N N N m 'YN m V �-N N M O N m M N N m N�-m mN O_mlOO V t!) V O V'-l0 llJNO V V OMO lO r(�c%t R - mmO V I�mMMUh m �Om mN �.OM NOm ON0 ONt0 t�mm met N V NNMO OmMMN'QnNN mM V V t0 q C O .0 �- NN Nm�-CJ Ism M NIA m V V M r M t7� M� N � N(O 0. O E O r a d ............ .a ..... ........... ..... 0 0 o o o 0 0 0 0 0 0 o 0 0 0 0 0 0 o 0 0 0 0 mma000000070 �-N OI��o ?'-N 00 N O�-o0o M S° V mN N O r M W C m N N N r N V M ro N V O O V 0 O V O r T N M N Q O � Nm . . N Ma NNNMOmC�-u'1 NOMO N V V m V MNNN 0> N�-m mN N o� V V O� mrONO <V O I� m r0 mON V Nm MNl M N O m N N O N N r m O IQO m V N V N N M O N I� O IQm t� M M m V N N m M?? UJ ') O M O> m N N M N I� V M et N V N m m m pi f0 Oi N M f0 K n N N �- O m O tD m E£ 0 a V M r M M M A N N m N a d U)V3 .Ammmm N3mM ww mNMmmm. ........... mto mmmmm.f3. w .9m.A. . 0 0 ov oho � o 'Q �o N 00� O.� W iDO MN'm O.<O> V fD� "tom M0000 OOO N� m N O •- N N M N N R V (� m 0 0 0 0 0 0 0 •- O m� �- � O O I� m O N O O O O O cmo c c a r r r r r r r r r r r r r r r r r r r r N N V r m r r o d 0 o a L r .p ....... ..... d3 V3 .9 to m m .9 rA tl3 M to eA t9 t,9 t9 m to di .A .9 .9 to to t9 a3 to to .9 .A to m m O 0 ...... .. 0 0 ... 0 ......... 0 0 0 O ... 0 0 0o 0 o 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 S. 0 0 0 0 0 8.8.8.8.8. O0.00 0 0 N0 0 0 8.8.8. O0O0 888 0 8888 0 0 0 0 0 0 00 0 N NMmNM� N'?NOm�MN(V N�0 -m(O 'a{N(p �O)YJOMO Oi V rt�O m N o M m N V N O r m m N N r N O r O N N r 'S O M N N m M M (O N O NNM m N M 0 M N m V N M m (D C � tON�N'C M I�Na1�cJmNN V'Nl0 lD l0 OJ N.pmN(Mm N�- 1�mO NI�OlO l[l (�nO N Ism V m N mMN NIA m � �mNN�NM�NN N(D p E N N �- „a � o Nr u ry Cto .9 di to to mtA ... mVi .A lA m.9 m M.H m m m fA M mmm .-w U3m tAmtAm M.13 —.0. O U O o 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d O f. N �( N N E Oi 0 l0 - 4. mNoo V NN OIp oc! W I�Nm O O lam m h In l��- NOnO NN(c m 1�.0O -N.DmO V OOMNNm MMm m'Y N�erOMNONNMmNMO MNmolOMmmNh N_ mC'Q 'Pm 'C h NNN V �M I�NOrM NN V NmmmmN m NMm V � i� ONt`O(p I�nO N Nm V m N W OM N Nr m V N �mN N�-N M�-N N Nc0 � m m m w .a .n m w ..... » m ... M m ... w - M o .s .n 0.—. (n M (n (n (n M U) N N !n N In M (n N !n V) M (n N M U) In N !n N J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J .. O -------.-.-.-.---.-.-.-.-------- -- - .-.-.-.---c-.-.--- .-.--- - _ O o W A E _ W Q N = N 12 N ' U -it d —_ E, o. r U d N N N V d E m u v-o W 0--2 a x mRH r� my.a�0r o.., wWEwW o dmocm2°' �'o'w I= E _ O _« Uf C (L W N 45 N N (6 d ' yr r r 4. W W W @ C W N W NNN N yrm02 Ec33,orEo'�Na�o�Ora�ydo>2 `mEccoyo'.Nd-.-..mrcd%c'�UUUU y O O O. d o 0 0 a d o K O ._ d 1C d d d N d ;Y p (� W U U U U ZrnO U(9 tt]mm ZOU(9 �u. �ti rq� aamLL`S ii O �020 (7 m d w ii�N N�tL W � W d���� a d 1 c U E ate N a n U � 7 F U O aE ,o o 000000000 Oo 0000 00 000000000000000000000 0 o' o 0 0 d U `0000 co o WOM�N��mN Wr V N N W N m W T N O01�VaDWM fOOOMNONW&F OF O V N N M W N N A O M N O O O N M N O r O mci of viro �ir� aMMNOrNMm N W o(d r(000r(oov oi000000ono W W NNMNrMN V'�- �(O "� r •C N. c6 c4?(4 cq 'i 0 N(O NO�r,:�?coWLovM U E K M ......... ... W W f9 W W W W W W W W W-- W- W - N ao W r W V W W a MOOMGiMN(O V OiO V NrMMr W Q)O1�N000r MN O W ONMtOOrONONrNTCJ (O Oi NNmN OD V =r tlla N M r W OJ W LQ M�N,o M�-(ON W �N N<OrNN vrr ,A MN V W MONK W rvt0 V NMrOOM V O NMI NN W D7YT m W � W NtoNMrO A V N f• y (b M W di (9 t9 MM W MM 4i V3 to W M W tflW d3 t,9 W t9MW UiW Vi Hi tflWWW W a � c °1 W wW w...... W. WWW toM W W W W W- W M WWW W W W W - (O O N O r W S W N W V> W r W V mOA W O) V O m W (O W r W 00 M W W N v rn ?NrMMr W m rNmOOrMN O N MO MmM (O t0 V W r W R W �--�-N V W NM N(O M�M�(pN W N W M W NNONrNT Ml9 N W NNENKMNN M N'1 W MONK- mr V W M V Nr O_OM V O w ry C 0 0 M N'YO r �,ri orr rnM - NM V NN m V A rO>K�-�N NMN r O Q A O F- a V WW(AWWWWWW Hi fA N3 V3W WMWMWW....to.. . • ^ o o W NrN W V M Nr �- W � MOio iO <lA iO CW 0000000V0 O (O o NOr W W N W M ,n uJrmvm Om W m� W W e-r OW mOOMm W N'C r47O O �RNrMMr OrN OOr(� N� O C 0 O O N MrO�MW �-IQC W W M N N M W N W W V rO N,oN V MNN Or(O (OC coM M N O A M O N �- W r v W O r f 1 M r O O M R O ') O E M � N W Or W N �trr N M NM?�,nO W a6� r W Q�-00NNN M,O i a Y W W W W t9 W W MKVi N e9 t9W f9 :9NW (AW (flW 43W to tAW 43 ViWWW (fl O y 0 N a E N V ¢ F .o «nWWW(»W(a We» .. (»wwoMus (nW v>W ......... F» o O 00 .00000 O to 0 0 0 0 0 0 0 O. ................. 0 0 0 O Q 0 0 V o o ....... 0 o 0 0 0 0 0 0 0 0 0 0 ,oO V NNr W W M W N o 00 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q7 '?N O(D�NM O10 ¢>tp N W Ni0 m �-NNNNMrOQ• O �- NOc�(DON O),OON�NO W 01NmM E A ¢ E - N 0 CW ......... .. V3W ti3 ViWWWW (flW N W b9 fAW t+9 W V3WW (A o U o ......... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d V � ,2 o NNuNrM gO�- VY"1NO OhlD MO mW NW�O�N WMNC,�O 'C a W (O rDOO r �-NO �-_O M �r (D W N mN WO r M N W'YN � �-M'(tW �,O M r000'•t N_ •C (O M o -1 W '- O N (O (O M (O V -N � � � � N N ......... M. fA N W W W M N W W W W W W M W- to W M to M � J 0000 Ow J J J J J J J J J J J In (n cs fn fn (n (n (n (n (n V1 f11 (n cn (n (n (n (n (n fn (0 J J J J J J J J J J J J J J J J J J J J J .. Q - ---«---- -- .-.-.-- ----- -.-.---.-.-.-.--- .- E a' 'o o ^ N N E � W O N E In V ryry �pp d U a c a m m o o c c m c m -• 0 c u u W (16i a s J U m 5 E c:o c m x u d.- a a- o d w E w w u 8 o «din ,C m ... Ef- J HU m- aoi uo, = R" g� v= w �d'>vEo,m�vmmwW N�oovammW Q(n JM v N W U r ol- �F- O E cF-(n cN��F-Fr"F N>.0 C O �❑ E E ya�`m�a= d O a O a Z(9Z0 N (p a Q o Q y a a a y d a z�U� NZZZ> W z0U N o w ._ J O_ J O .�- N O 31, y O a in: W �EU2iaaM �S 12 �U' �O UZ a d 1 o U y# W r W w a v rn 0r- Z: r- a m o o r c o. a E.,.. V o 0 o m O m U U m 62 m Q z Z m 7 z Z W j C F W O z z 2 o'A U Q J O W 0 On.2a Ja a a a a a I 0 o a o 0 0 0 0 0 0 0 0 0 0 0 e o o e o 0 o e o 0 0 0 0 0 0 0 oo\000008.o oo.S o o0 c o 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 O0` 00 ` O o 0 0 0 0 f9 M M M W M M .......... M M ........... M M M M O O O O M V' M N O r r N fD O M M O r M O M M N M 7 N V' �(DONOOMMtOMOOIDMMMMOM.00MM000M V M� - MN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IO"I cr O V OONnM NtMOnO m �N NNN N fD M M O� M M O M M N r O N � N M V V M � N M O M M r r MMM. .......... www ---w w..M.s.a M M q Mcl! c -M V MN O�-rr N 1D O M M O r ofO N M M NM V N V' � O M M fp M O O N M M M M O M N O tD M O O O N 'Y M M N f0M M O O r 0 O M O N M M r N O V V M N M M N N M M M N M r �<ct M(DO W Mr W rMNN'QOONr NIDr �r NNN NMNMO a- MIDOMMNrOMrr ? MM(D rtO N N M N N� M M V N W c-�N•-rl0 fAM M M M M MMtA M. MMM NMM M.A MM..... M w w... 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 HMO NOOMM(D IDOOa{MMMMOMMyOM MOOMNKfDM M N M MV M O (r0 O� (OD vl (OD m (MO N h NP 0 0 YJ r M N N r 0 M M r r N N N (OMM O �-MfOO(DM hrON�NM V V M� NMMNN OMrrO N .9 fAMM M MN MM M MMMMMM M MMEA M M M MMf9 o 0 0 0 0 o o . o 0 0 0 o o o 0 0 0 0 0 0 0 0 0 0 0 0 ..0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m o o M o m I M n o rrrN t6 N N M C M �- .- M O r M efi 49 MM N M M-M M NM M N-to to -to w. w M.f3..A w.A.A.Aw 0 0 0 .............. 0 0 0 0 0 0 0 0 0 0 0— O1 O .tMDO NOOMM.�D lM000Mcr�rM tNO CMJ O�NOfro �000.MD V ��ONiN lb KlM �00I�O�-OOJONo>�I�r(l O V OmO mNJNMMMMNMr N M�OMIOR IQOfMDMNrON�III M? V T.M-NfM'J W �RMOM�rr V M N M h a0 N N m( V N wvi.».arflw.».»»M.»w M.».»wMMMM.»w.»MwM.»MM w.»eA M MOOO M KMNO�rrNMOMMOrMO�--M M NM N'Q M O N O O M M lD M O O fD M M M M O M .0 0 lD MOO O tD V fD �- M .D 4JM MabOOr O�-000ONMOI n.NO V'atM W MNM M M(D NMr M�-CMOMtD OMMrMrID N.pC00NrCJN Mr O M �r NNU> M � M O M M r r V MO>M rlO NN6iN N�- t7M V mMm�-�-N�-rM K W.A cn H?u t? 9t? •A ui f?t?e4 t9 !9 t?H3M tP. eP t9 pc9K W, H H� W HK .- — — v C .. J N �' n v°1 Q V N en0 aW 10 E w OEO� a c N x y c .2 N a c E=�eoca10sm-ia >NON._ p_c u3J >o U> W m2K-6Q U Q o? U o o xiD m a w m« Z d d o a o m d d 2 x c °= K > �x �2 (K 11 ��LLZ0Z< YM o6, U(b Za. UZ Q Qx �R U2 d N N N N N N �- N N M oaJ N M ar- N M M N M M r M M M M N a a a a aaaaaaaaaaaaaaaao.aaaaaaaaaaa �-NM V N(DrMMO�MaNIprMM N C Mr NM N