Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7007 CABLING INSTALLATION (32)WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND H&H DATED: 2/14/2013 Work Order Number 1212020 Purchase Order Number: Project Title: Collindale YAC Fiber Commencement Date: 2/14/2013 Completion Date: 3/31/2013 Maximum Fee: (time and reimbursable direct costs): $19,621.43 Project Description: Fiber installation for Collindale golf course to replace wireless network connection. Scope of Services: Each site specific project requires a work order authorized by the project manager and Purchasing agent for release of funds. Invoices to reflect specific work order number and PO number. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Work Order Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Work Order Services Agreement and this work order (including the attached forms) the Work Order Services Agreement shall control. The attached forms consisting of 1212020 are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service Provider: /* Date 1 Submitted By: Bob Singleton Network Administration Manager (Project Manager) Date:2/14/2013 Approved by: Dan Coldiron CIO Date:2/14/2013 Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: � y3y36 1310 Webster Ave. DATA Ft. Collins, Co.80524 SERVICESi �. Tel: 970-482-6064 DATA HVOICE QABLING'e..PHONESY$TEMS Fax: 970-484-3252 PROPOSAL TO: CITY OF FORT COLLINS STREET: PO BOX 580 CITY: FORT COLLINS,CO 80522 CONTACT: HILLARY KOONTZ PHONE: 217-5091 JOB NAME: COLLINDALE GOLF COURSE SM FIBER PROPOSALM 1212020 12/21/12 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT PER DESCRIPTION BELOW 'INSTALL (1) ONE 24ST SM FIBER FROM NEW VAULT TO CLOSET IN BASEMENT OF CLUBHOUSE. 'NEW CONDUIT WILL BE RUN TO CORNER OF RANGE SHED VAULT FROM STREET CORNER. 'ONCE FIBER HITS VAULT AT CORNER OF RANGE SHED IT IS PIPED IN ONE T'CONDUIT INTO THE CLOSET. 'NEW CONDUIT RUUTES PROVIDED BY SAGE TELECOMUNICATIONS. 'FLAT FIBER PULLED BY CITY FROM VAULT AT SOUTH EAST CORNER OF HORSETOOTH AND LEMAY TO BE SPLICED TO 24 STD. SM IN/OUT FIBER PULLED BY H&H INTO TELECOM ROOM / MDF. (SPLICE AT THIS POINT TO BE DONE BY UTILITIES.) TELECOM ROOM (MDF): 'INSTALL NEW RELAY RACK. (RACK TO BE PROVIDED BY CFC MIS). 'INSTALL NEW ADC FIBER HOUSING IN NEW RACK. 'SPLICE PIG TAIL ON NEW FIBER INTO NEW ADC HOUSING. 'RLEOCATE AND TERMINATE WITH PIGTALE (1) EXISTING 12 STRAND SM FINER INTO NEW ADC HOUSING. 'INSTALL (1) ONE NEW 110 BLOCK BY OTHER PHONE BLOCKS FOR CONSOLIDATION POINT. 'CONSOLIDATE (19) EXISTING VOICE FROM EXISTING 110 BLOCK AND (24) DATA CABLES FROM EXISTING PATCH PANEL. -INSTALL (1) ONE NEW 48 PORT PATCH PANEL INTO NEW RACK, INSTALL NEW CABLES FROM CONSOLIDATED VOICE AND DATA CABLES. 'INSTALL 12" LADDER RACK WHERE NECESSARY TO ROUTE NEW FIBER/CABLES TO NEW RACK LOCATION. 'INSTALL EXISTING 24 PORT PATCH PANEL IN NEW RACK FOR VOICE FIELD 25 PAIR. 'INSTALL 25PR FROM PHONE SWITCH 110 BLOCK TO NEW RACK PLACE ON EXISTING 24 PORT PATCH PANEL. TESTING AND DOCUMENTATION: 'INCLUDES LABELING WITH MACHINE GENERATED WHITE LABELS WITH BLACK LETTERING PER CUSTOMER SPECIFICATIONS. 'LABELING SCHEME: PER CITY STANDARDS. 'INCLUDES TESTING WITH LEVEL III TESTERS. 'INCLUDES (1) ONE COPY OF TEST REPORTS ON CO. 'EXCLUDES (1) ONE COPY OF AUTOCAD AS -BUILT ON CD. GENERAL: 'H&H TECHNICIANS ARE INDUSTRY AND MANUFACTURER CERTIFIED. 'H&H DATA SERVICE'S RCDD AND A PROJECT MANAGER WILL OVERSEE THE INSTALLATION. 'INSTALLATION WILL BE PER ANSI/EIA/TIA STANDARDS AND LOCAL CODES AND ORDINANCES. 'INSTALLATION OF ALL WORK TO BE COMPLETED DURING STANDARD BUSINESS HOURS. 'INCLUDES MANUFACTURER'S WARRANTY ON MATERIALS AND ONE-YEAR WARRANTY ON WORKMANSHIP. 'EXCLUDES TAX. 'EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. 'EXCLUDES CONDUIT, J. BOXES IN WALLS AND ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS AND THROUGH WALLS. CITY UN MFG 1 EA FIBERTRON 1.100 FT CORNING 50 rT MOHAWK 1 EA ADC 24 EA CORNING 2 EA CSC 600 FT WA 1 LOT N/A 2,200 FT GENERAL 1 EA SIEMON 1 LOT N/A PART # FSPDAI I-01M 024E8P-31131-29 M56801 FL2-CB80048AN-2C52 2806031-01 CEX-I2F-LCULCU-SM-7M WA WA GS5 HD5-48 N/A DESCRIPTION FIBER JUMPER, SM, LC/LC, 1M, DUPLEX 24-STRAND, SM, INDOOR / OUTDOOR PLENUM 25-PAIR CAT3 PLENUM CABLE FL2000 Preconfigured Term/Splice Panel - 24-position (48-fibers), SM, LC Duplex SPLICE SLEEVE PROTECTORS 12 STRAND SINGLE MODE 7 METER PIGTALE/ BOTH ENDS TRACER WIRE RELOCATE AND TERM. EXISTING 12 STRAND SM FIBER. CABLE, CAT5E, PLENUM PATCH PANEL, CAT5E, 48-PORT TERM. VOICE ON EXISTING 24 PORT PATCH PANEL EXTENSION $26,29 $2.303.53 $3T94 $716,40 $20,75 $382.12 $42.35 $0,00 $517.65 $252.94 $0.00 DATA SERVICES,�L. Q VOICE CABLING � PHONE SYSTEMS J 1310 Webster Ave. Ft. Collins, Co.80524 Tel: 970-482-6064 Fax: 970484-3252 PROPOSAL TO: CITY OF FORT COLLINS STREET: PO BOX 580 CITY: FORT COLLINS,CO 80522 CONTACT: HILLARY KOONTZ PHONE: 217-5091 JOB NAME: COLLINDALE GOLF COURSE SM FIBER PROPOSALM 1212020 12/21/12 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT PER DESCRIPTION BELOW 1 EA SIEMON S110AB2-10OFT 110 BLOCK FIELD TERM KIT, WALL MOUNT, 100 PR $29,12 1 EA CPI N/A INSTALL (1) ONE OWNER PROVIDED RELAY RACK $0,00 10 ET CPI 10250-712 LADDER RACK, 12"W, BLACK $81,18 1 EA CPI 11302-001 LADDER RACK JUNCTION SPLICE KIT $8.29 3 EA CPI 11421-712 LADDER RACK WALL ANGLE SUPPORT KIT $65.29 1 EA CPI 10595-712 LADDER RACK TO RUNWAY MOUNT KIT, 12"W, BLACK $29.29 1 EA CPI 11312-712 LADDER RACK TRIANGLE WALL SUPPORT, BLACK $52.94 20 EA SIEMON MC5-8-T-03-02 CAT5E, T PATCH CORD, WITHOUT BOOT $69,41 20 EA SIEMON MC5-8-T-05-02 CAT5E, 5' PATCH CORD, WITHOUT BOOT $80.00 1 EA CPI 12816-701 POWER STRIP, HORIZ, 15 AMP, RACK MOUNT $88.24 1 EA SIEMON WM143-5 HORIZONTAL WIRE MANAGER, I $31.65 3 EA SIEMON WM144-5 HORIZONTAL WIRE MANAGER, 2U $114A8 1 LOT N/A WA MISC. CONSUMABLES $100.00 25 ET N/A WA #6 THHN GREEN WIRE, GROUNDING $17.00 6 EA ILSCO CLND-6-14-58 GROUNDING -SURE CRIMP $2725 1 EA CPI 40153-012 GROUNDING KITS $110,76 1 EA RING -TAPE 18443 LABELING TAPE $14.86 1 EA N/A N/A FOAM SEAL AT VAULS $52.94 1 LOT N/A N/A TESTING - EXCLUDES PRINTED TEST REPORTS $0.00 400 ET N/A LABOR 1-2" BORE $0.00 3 EA N/A LABOR EXCAVATION PITS $0.00 1 EA N/A LABOR SETVAULTS $0.00 2 oY NIA LABOR VAC TRUCK $0.00 400 FT N/A MATERIALS 1-2" HOPE PIPE $522.35 1 LOT N/A MATERIALS VAULTS AT 24"X36"X18" $1,000.00 1 LOT NIA MATERIALS ENGINEERING/PERMITS $264.71 0 EA $0.00 Proposal Accepted By: Printed Name: Date: `H&H proposal number shall be on all Job related documents. Note: This quote is valid for 30 days. 50 % of materials will be billed upon contract signing. MATERIAL $7,059.43 LABOR $12,562.00 TAX (0%) $0.00 TOTAL $19,621.43