Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7273 N COLLEGE IMPROVEMENTS PROJECT - VINE TO CONIFER (12)I Planning, Development & Transportation City of Engine .e „,a P.O.9oxb80 - nglneerin Fat COD* GO 805210580 e70.22,ssoe ans.2s,.oare-fax Change Order Form PROJECT TITLE: N. College Rd. lmprovenierit5 PROJECT NUMBER: 400g03900.8 (Bid 97273) CONTRACTOR : Connell Resouces, Inc. (PO6911am) CHANGE ORDER NUMBER:, n Prep�P9,,„ .,, ens a n er u se .. , n . peragre ng: 1. Ramon for change. 2. DesciiptEon of change. 3. Change in contract cost 4. Change in contracttime. 1 U. See attached sheet for detail, 3. The contract cost will decrease by $7,662.25 4. There will be no change In contract time. ORIGINAL CONTRACT COST $8,111,000.00 TOTAL APPROVED CHANGE ORDERS $0•00 TOTAL PENDING CHANGE ORDERS $0•60 TOTAL THIS CHANGE ORDER $7,582 25 TOTAL % OF THIS CHANGE ORDER 0.12% TOTAL C.O. % OF ORIGINAL CONTRACT 0.12% ADJUSTED CONTRACT COST $6,118,662.25 (Assuming all change oilers approved) `O` DATE: 2-/ 1 ACCEPTED BY: _;' ------- REVIEWED BY. SUBMITTED BY: APPROVED BY: APPROVED BY: UATL: (Purchasing Agent over $60,000) cc Conuadw Purcliti Project FHe a. �i 0i/l -3 a-/17/13 2-Zp-13 HANGEiORDER North College - Vine to Conifer OR 5% 0, 00raSUMMAi2Y=0FWORi<�s�%y�c?? h ri ` r� Item Quantity Unit $ / Unit Total Reinforced Barrier Curb at Mister 1 Money 1 LS $ 3,489.75 $ 3,489.75 Additional 2" Thickness to C&G at 2 Drive Approaches 740 LF $ 4.95 $ 3,663.00 Lake Canal Siphon Trash Rack 3 Installation 1 EA S 409.50 $ 409.50 Total Cost $ 7,562.25 -+`rhvs�`F' J awnL S° g �. L.'ms s .fiEASON_FORCHANGEzs fdrz�� _ 1. The barrier curbing in the drive isle at Mister Money Pawn was removed and reconstructed to facilitate the realignment of the pedestrian bridge and sidewalk. 1 additional day approved for contract final completion with this change order. 2. A change order was approved to construct all driveway approaches at 8 INCH thickness. Lawson submitted a price increase for the additional 2 Inch thickness of C&G poured to match the driveway approaches. 3. Additional resources required for the installation of the redesigned/reconstructed trash rack on the upstream side of the Lake Canal siphon CBC. MINA"�-�' HW.POSTM:,��„s,��,,,PayApplicahon#12y..W:�.., wi, Of Planning, Development & Transportation City, �%%ns E .9 281 Naei CaQsya Avxwe ngineering FodCO u.coaoMMO aT =1.B608 stoni:abie-fax Change Order Form PROJECT TITLE: N. College Rd. Improvements PROJECT NUMBER: 40090M.6 (Bid e7273) CONTRACTOR: Connell Resouces, Ino: (PO #9116026) CHANGE ORDER NUMBER: ,19 contract cost. 1&2. See attached sheet for detail. 3. The contract coat will decrease by-$7,562.25. 4. There vn11 be no change In contract tirne. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming a6 change orders apWoved) ACCEPTED BY: , REVIEWED BY: SUBMITTED BY: APPROVED BY: $6,111.000.00 $0.00 $7,562.25 ($7,562.25) -0,12% 0.00*4 $6.111,000.00 DATE: 2f�9�t3 DATE: 2-111(13 APPROVED BY: DATE: (Purchasing Agent over $60,000) ac Cantracmr Pudms4m Pr*dFie I -Mu Y ;CMNGE,_QRDER North College - Vine to Conifer