HomeMy WebLinkAboutCHANGE ORDER - BID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTS (2)PROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
PURCHASE ORDER NO.:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
CHANGE ORDER NO.2
Reservoir Ridge Natural Area Improvements
J2
bid # 7434
Field adjustments
Field adjustments
Please see attached change in work reqest 2, dated 1/31/2013.
3. Change in Contract Cost: $2,915.00
4. Change in Contract Time: none
ORIGINAL CONTRACT COST
$239,360.05
TOTAL APPROVED CHANGE ORDER
$3,075.50
TOTAL PENDING CHANGE ORDER
$0.00
TOTAL THIS CHANGE ORDER
$2,915.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O..
1.22%
TOTAL % OF ORIGINAL CONTRACT,'ALL C.O.'S
2.50%
ADJUSTED CONTRACT COST
$245,360.55
(Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title: Lan cape Architebt
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
cc: City Clerk Architect
Contractor Engineer
Project File Purchasing
DATE:
DATE:
DATE: a ( 3
DATE:
DATE:
Initiation Date: 1/31/2013
Project: Reservoir Ridge Natural Area
Owner: City of Fort Collins
To: J-2 Contracting Co.
Requested by: Matt Day
Authorized by: Man Day
CHANGE IN WORK REQUEST "2"
�a q p-S7(PLI'
Please famish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every
effort will be made to Incorporate this change into the work without affecting the contract date.
Description of Proposed Changes - amount
1) Additional Natural Area Fence to Terminate Into Existing North Maint. Gate (32 LF ® $6.50A F) $208.00
2) Additional Construction Slaking (Bridge Abutments at new Bridge Location, Sidewalk given Thru Screen) $1.017.00
3) 20 LF 18" CMP and 2 Flared End Sections east of Bridge Location Including Fills $1.690.00
TOTAL $2,915.00
7-2 Caatracti g Co. agrees to change the work described above for the change in price shown below. 1 have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the
Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time.
The Contract Time will be no change by 0 Days.
No change in Contract Sum (Initial if no change)
ADD to the Contract Stun S 2,915.00
DEDUCT from the Contract Sum $
This information shall be valid for thirtv (30) calendar days from the date of signature below.
CONTRACTOR'S SIGNATURI DATE: 1/3 V2012
Caoroct�orshall^retain one(1) copy and mlum ONGINAL to Owner
APPROVED BY OWNER: i/ �� -�� DATE: oZ I(, J'Z' �
Accepted change in work request will be included in a frdure formal change order. DO NOT bill for this change until a forma/ change order has been
executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor.
r "'