Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTS (2)PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: 2. Description of Change: CHANGE ORDER NO.2 Reservoir Ridge Natural Area Improvements J2 bid # 7434 Field adjustments Field adjustments Please see attached change in work reqest 2, dated 1/31/2013. 3. Change in Contract Cost: $2,915.00 4. Change in Contract Time: none ORIGINAL CONTRACT COST $239,360.05 TOTAL APPROVED CHANGE ORDER $3,075.50 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $2,915.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O.. 1.22% TOTAL % OF ORIGINAL CONTRACT,'ALL C.O.'S 2.50% ADJUSTED CONTRACT COST $245,360.55 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: Lan cape Architebt APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing DATE: DATE: DATE: a ( 3 DATE: DATE: Initiation Date: 1/31/2013 Project: Reservoir Ridge Natural Area Owner: City of Fort Collins To: J-2 Contracting Co. Requested by: Matt Day Authorized by: Man Day CHANGE IN WORK REQUEST "2" �a q p-S7(PLI' Please famish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to Incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount 1) Additional Natural Area Fence to Terminate Into Existing North Maint. Gate (32 LF ® $6.50A F) $208.00 2) Additional Construction Slaking (Bridge Abutments at new Bridge Location, Sidewalk given Thru Screen) $1.017.00 3) 20 LF 18" CMP and 2 Flared End Sections east of Bridge Location Including Fills $1.690.00 TOTAL $2,915.00 7-2 Caatracti g Co. agrees to change the work described above for the change in price shown below. 1 have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be no change by 0 Days. No change in Contract Sum (Initial if no change) ADD to the Contract Stun S 2,915.00 DEDUCT from the Contract Sum $ This information shall be valid for thirtv (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATURI DATE: 1/3 V2012 Caoroct�orshall^retain one(1) copy and mlum ONGINAL to Owner APPROVED BY OWNER: i/ �� -�� DATE: oZ I(, J'Z' � Accepted change in work request will be included in a frdure formal change order. DO NOT bill for this change until a forma/ change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor. r "'