HomeMy WebLinkAbout108423 VOGEL CONCRETE INC - CONTRACT - BID - 7290 CRACK SEAL & FILL PROJECT 2012 (2)City of -
le Fort Collins
urchasin
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
Financial Services
Purchasing Division
215 N. Mason St. 2"" Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/Pumhasing
CRACK SEAL & FILL PROJECT — 2013 RENEWAL
BID NO. 7290
u
PURCHASING DIVISION
215 NORTH MASON STREET, 21ND FLOOR, FORT COLLINS
0
• 7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as follows:
None
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
7.4. Addenda Numbers 1 to 1, inclusive.
7.5. The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or incorporated by
reference in this Article 7. The Contract Documents may only be amended,
modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General
Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the written
consent of the party sought to be bound; and specifically but not without
limitations, moneys that may become due and moneys that are due may not be
assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically stated to the contrary in
any written consent to an assignment no assignment will release or discharge
that assignor from any duty or responsibility under the Contract Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
SECTION 01410
TESTING
1.1 GENERAL
A. Provide such equipment and facilities as required for conducting field tests and for collecting and
forwarding samples. Do not use any materials or equipment represented by samples until tests, if required,
have been made and the materials or equipment are found to be acceptable. Any product which becomes
unfit for use after approval shall not be incorporated into the work.
B. The contractor and sub -contractors shall have visible company names on all vehicles that enter the work
zone.
C. All materials or equipment proposed to be used may be tested at any time during their preparation or use.
Furnish the required samples without charge and give sufficient notice of the placing of orders to permit the
testing. Products may be sampled either prior to shipment or after being received at the site of the work.
D. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise
provided, sampling and testing of all materials and the laboratory methods and testing equipment shall be in
accordance with the latest standards and tentative methods of the American Society for Testing Materials
(ASTM).
E. Where additional or specified information concerning testing methods, sample sizes, etc., is required, such
information is included under the applicable sections of the Specifications. Any modification of, or
elaboration on, these test procedures, which may be included for specific materials under their respective
sections in the Specifications, shall take precedence over these procedures.
1.2 OWNER'S RESPONSIBILITIES
10
A. Owner shall be responsible for and shall pay all costs in connection with testing for the following:
1. Soil tests, except those called for under Submittals thereof. •
2. Tests not called for by the Specifications of materials delivered to the site but deemed necessary by
Owner.
1.3 CONTRACTOR'S RESPONSIBILITIES
A. In addition to those inspections and tests called for in the General Conditions, Contractor shall also be
responsible for and shall pay all costs in connection with testing required for the following:
1. All performance and field testing specifically called for by the specifications.
2. All retesting for Work or materials found defective or unsatisfactory, including tests covered under 1.2
above.
3. All minimum call out charges or stand by time charges from the tester due to the Contractor's failure to
pave or fill on schedule for any reason except by action of the Project Engineer/City Representative.
B. Contractor shall notify the Engineer 48 hours prior to performing an operation that would require testing.
1.4 CONTRACTOR'S QUALITY CONTROL SYSTEM
A. General: The Contractor shall establish a quality control system to perform sufficient inspection and tests of
all items of Work, including that of their subcontractors, to ensure conformance to the functional
performance of this project. This control shall be established for all construction except where the Contract
Documents provide for specific compliance tests by testing laboratories or engineers employed by the
Owner. The Contractors' control system shall specifically include all testing required by the various
sections of these Specifications.
General Requirements - Page 10 of 15
SECTION 01410
TESTING
•, B. Superintendence: The Contractor shall employ a full time Superintendent to monitor and coordinate all
facets of the Work. The Superintendent shall have adequate experience to perform the duties of
Superintendent.
•
0
C. Contractor's quality control system is the means by which he assures himself/herself that the construction
complies with the requirements of the Contract Documents. Controls shall be adequate to cover all
construction operations and should be keyed to the proposed construction schedule.
D. Records: Maintain correct records on an appropriate form for all inspections and tests performed,
instructions received from the Engineer and actions taken as a result of those instructions. These records
shall include evidence that the required inspections or tests have been performed (including type and
number of inspections or test, nature of defects, causes for rejection, etc.) proposed or directed remedial
action, and corrective action taken. Document inspections and tests as required by each section of the
Specifications. Provide copies to the Engineer weekly.
END Of SECTION
General Requirements - Page 1 I of 15
SECTION 01510
TEMPORARY UTILITIES
1.1 UTILITIES
A. Furnish all utilities necessary for construction.
B. Make arrangements with Owner as to the amount of water required and time when water will be needed.
1. Meters may be obtained through the Water Utility Meter Shop at 221-6759
2. Unnecessary waste of water will not be tolerated.
C. Furnish necessary water trucks, pipes, hoses, nozzles, and tools and perform all necessary labor.
1.2 SANITARY FACILITIES
A. Furnish temporary sanitary facilities at each site for the needs of construction workers and others
performing work or furnishing services on the Project.
B. Properly maintain sanitary facilities of reasonable capacity throughout construction periods.
C. Enforce the use of such sanitary facilities by all personnel at the site.
D. Obscure from public view to the greatest practical extent.
END OF SECTION
•
General Requirements - Page 12 of 15
SECTION 01560
TEMPORARY CONTROLS
1.1 NOISE CONTROL
A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed in
populated areas. Review the requirements of Revision of Section 108.
B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and
operated in a manner to cause the least noise consistent with efficient performance of the Work.
C. Cease operation of all machinery and vehicles between the hours of 6:00 p.m. and 7:00 a.m. Start-up of
the hot pot shall be in accordance with Section 108.
1.2 DUST CONTROL
A. The Contractor shall be respectful to pedestrians and bicyclist when blowing clear cracks or sweeping
road surfaces. The Contractor shall cease operation till the citizen has cleared the area.
B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be
kept moist with water or by application of a chemical dust suppressant.
1. Chemical dust suppressant shall not be injurious to existing or future vegetation.
1.3 POLLUTION CONTROL
A. Prevent the pollution of drains and water courses by sanitary wastes, concrete, sediment, debris and other
substances resulting from construction activities.
1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the site.
2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and culverts.
1.4 EROSION CONTROL
A. Preserve natural vegetation to the greatest extent possible.
B. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize erosion.
C. Comply with the City of Fort Collins' Storm Drainage and Erosion Control Manual (latest edition).
1.5 TRAFFIC CONTROL
A. Maintain traffic control in accordance with the latest revisions of the "Manual of Uniform Traffic Control
Devices" (MUTCD), the City of Fort Collins "Work Area Traffic Control Handbook," and the "Larimer
County Urban Area Street Standards." In the event of a conflict between the MUTCD criteria and the
City's criteria, the City's criteria shall govern.
1.6 PARKED VEHICLES
Refer to Revision of Section 104 for issues related to parked vehicles.
END OF SECTION
General Requirements - Page 13 of 15
SECTION 01700
CONTRACT CLOSEOUT
1.1 CLEANING AND RESTORATION S
A. Return the premises and adjacent properties to conditions existing or better than existing at the time the
work was begun. This will include providing labor, equipment and materials for cleaning, repairing and
replacing facilities damaged or soiled during construction. The Engineer will be the judge of the degree of
restoration required.
1.2 PROJECT RECORD DOCUMENTS
A. Maintain on the job site, and make available to the Engineer and/or Project Engineer upon request records,
photographs and written descriptions of said work as may be required by the Project Engineer and they
shall be submitted prior to project acceptance.
END OF SECTION
00
L
General Requirements - Page 14 of 15
SECTION 01800
METHOD OF MEASUREMENT AND BASIS OF PAYMENT
9 1.1 DEFECTIVE WORK
A. Owner will not pay for defective work and will not pay for repair or additional work required to bring the
project to a point of acceptance including traffic control.
1.2 BID PRICE
A. The Total Bid Price covers all Work required by the Contract Documents. All work not specifically set
forth as a pay item in the Bid Form shall be considered a subsidiary obligation of Contractor and all costs in
connection therewith shall be included in the prices bid for the various items of Work.
B. Prices shall include all costs in connection with the proper and successful completion of the Work,
including furnishing all materials, equipment, tools, and traffic control personnel and equipment; and
performing all labor and supervision to fully complete the work.
C. Unit prices shall govern over extensions of sums. Refer to Revision of Section 408 to define payment
items.
D. Unit prices shall not be subject to re -negotiation.
1.3 ESTIMATED QUANTITIES
A. All quantities stipulated in the Bid Form at unit prices are approximate and are to be used only as a basis
for estimating the probable cost of the Work and for the purpose of comparing the bids submitted to the
Work. The basis of payment shall be the actual amount of materials furnished and Work done.
B. Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise on account of
any difference between the amount of Work actually performed and materials actually furnished and the
estimated amount therefor.
END OF SECTION
General Requirements - Page 15 of 15
SECTION 02000
PROJECT SPECIFICATIONS
The Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" (latest
revision), and the current Larimer County "Urban Area Street Standards", (hereafter referred to as the "Standard
Specifications" or "LCUASS") are made a part of this Contract by this reference, except as revised herein, and are
hereby adopted as the minimum Standard Specifications of Compliance for this project. In those instances where
the Standard Specifications conflict with any of the provisions of the preceding Sections, the preceding Sections
shall govern.
INDEX OF REVISIONS
SECTION
104
Traffic and Parking Control
105
Control of Work
108
Prosecution and Progress
208
Erosion Control
408
Crack Sealant & Crack Filler
627
Pavement Marking
630
Construction Zone Traffic Control
0
0
Project Specifications- Page I of22
0
REVISION OF SECTION 104
TRAFFIC AND PARKING CONTROL
Section 104 of the Standard Specifications is hereby revised as follows:
MAINTAINING TRAFFIC
Subsection 104.04 shall be revised to include the following.
It shall be the Contractor's responsibility to clear parking from the streets when such parking will interfere with the
work. Prior to work that requires the street(s) to be closed to parking and/or traffic; the street(s) shall be posted for
"NO PARKING". "NO PARKING" Signs shall be placed at a minimum of 100 foot intervals. The placement of
these signs shall take place at least 24 hours prior to the commencement of work and shall clearly state the type of
work, date and times that the sign is in effect. (For example, if a street is to be crack sealed on Wednesday,
September 6, the street shall be posted no later than Tuesday, September 5, by 7:00 a.m. with a sign that reads
similar to "NO PARKING, WEDNESDAY, JULY 2, 7:00 A.M. TO 6:00 P.M., CRACK SEALING.) See sample
"NO PARKING" sign. "NO PARKING" signs shall remain in place until the street is opened to traffic after all
clean-up operations have been completed.
All information on the "NO PARKING" signs, with the exception of the type of work, date and times shall be in
block letters permanently affixed to the sign. Any information added to a sign, such as dates, shall be clearly legible
and written in block style letters. The "NO PARKING" signs shall be in effect for one or two days only.
In the event the Contractor deems it necessary to remove a vehicle that has not adhered to the "NO PARKING"
notification, the Contractor shall first make every reasonable effort to locate and contact the owner. of the vehicle.
Should the Contractor be unable to locate the owner of the vehicle, the Contractor should notify the Engineer to
arrange for any required towing. If the "NO PARKING" sign has been in place for a minimum of 24 hours, the City
will make every reasonable effort to remove the offending vehicle within four (4) hours of notification by the
Contractor. The Contractor shall not be entitled to any additional compensation for delays associated with the
towing of illegally parked vehicles.
The Contractor shall have an approved Traffic Control Plan on site at all times. Traffic control signage on the
construction site shall be set up in accordance with the approved traffic control plan and in accordance with the
specifications.
Work performed by the Contractor without an approved traffic control plan or when "No Parking" signs have not
been placed as required by the specifications shall not be paid.
The Contractor shall also be subject to a pay deduction of up to $1,000.00 per occurrence per day for traffic control
not in compliance with referenced specifications or requirements contained herein. Issues subject to deductions may
include but are not limited to:
Traffic Control Supervisor not on the project site at all times (unless pre -approved by the Engineer)
An approved traffic control plan not on site
Traffic control device set up by flagging personnel unless assisting the Traffic Control Supervisor
Traffic control signage not set up in accordance with the approved traffic control plans
Inadequate flagging and/or flagging equipment
The Engineer shall issue a written warning to the Contractor, subcontractor, and/or Traffic Control Supervisor
documenting the type of violation and the Engineer shall determine the deduction amount based on the Engineers'
opinion of the infraction severity and the number of previous infractions. Upon issuance of the third violation, the
Engineer may request removal from the project of the subcontractor providing traffic control and/or the Contractors
Traffic Control Supervisor and flagging personnel. Removal from the project in which the violations were issued
shall be in effect for the remainder of the year. The contractor shall find a replacement Traffic Control
subcontractor within two weeks of the third notice without a price adjustment or the Contract may be terminated and
rebid.
Project Specifications- Page 2 of 22
REVISION OF SECTION 104
TRAFFIC AND PARKING CONTROL
At or near the end of each work day, a representative of the Contractor (the Traffic Control Supervisor) and the
Engineer will meet to discuss the progress of the work and the placement of upcoming traffic control devices
including "NO PARKING" signs. The quantity of traffic control devices used that day and for the next day shall be
agreed upon by the Contractor and the Engineer. Any necessary adjustments shall be made. At this time the
Contractor shall also review with the Engineer the proposed means of handling parking and traffic control for the
upcoming work.
It is the responsibility of the Contractor to minimize any inconvenience to the public as a result of their work.
The Contractor shall maintain access at all times to all businesses within the project and shall communicate their
schedule 48 hours prior to work, to all businesses and residents effected by their work.
Any changes in the traffic control as directed by the Engineer, including additional signs, barricades, and/or flaggers
needed in the field shall be immediately implemented.
Traffic Control costs including but not limited to furnishing devices/equipment, set up/removal/modification,
TCS and Flagging personnel, vehicles, phones, notification delivery, hand signs, communication devices,
sandbags, and all related incidental items required for traffic control under this contract shall be considered
a subsidiary obligation of the Contractor in connection with the various items of the Work. No measurement
or payment shall be made separately for traffic control related items as specified in the specifications or as
directed by the Engineer excluding Variable Message Boards, Advance Warning Panel, and Additional
Flagging Personnel. See Revision of Section 630.
0
Project Specifications- Page 3 of22
•
REVISION OF SECTION 104
TRAFFIC AND PARKING CONTROL
NO
PARKING
Wed SEPT 6
7:00AM-6:00PM
CRACK
SEALING
END OF SECTION
Project Specifications- Page 4 of 22
•
OWNER: CITY OF FORT COLLINS
(j By:
-44- JAMES B. 0 , 'NEILL II, CPPO, FNIGP
A-17 DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Title:
Date:
Attes
Address for giving notices:
P. O. Box 580
Fort Collins, CO 80522
roved as to F
Assist wkt City Attorney
CONTRACTOR: Vogel Concrete Inc.
By: -
c/c t5� )`td66 a.rali
PRINTED
Title:
for giving notices:
re-t- a//" s 0, moo. -)
License No.:
REVISION OF SECTION 105
CONTROL OF WORK
Section 105 of the Standard Specifications is hereby revised as follows:
PLANS, SHOP DRAWINGS, WORKING DRAWINGS, OTHER SUBMITTALS, AND CONSTRUCTION
DRAWINGS
Subsection 105.02 shall be revised to include the following:
The Contractor shall furnish the required submittals in TABLE 105-1 before the commencement of work. Three (3)
copies shall be furnished to the Engineer, two (2) copies will be returned to the Contractor upon approval.
Submittals shall not be measured and paid for separately but shall be included in the work.
TABLE 105-1
SUMMARY OF CONTRACTOR SUBMITTALS
Section
No.
Description
Approval
Needed
Reoccurring
108.03
Schedule of Work
Yes
Yes
208.06
Spill Kit: List of items included
Yes
No
408.02
Crack Sealant/Crack Filler Certificate of Compliance
Yes
No
408.02
MSDS Sheets
Yes
No
408.04
Crack Sealant/Crack Filler Measurement Plan
Yes
No
630.10
Traffic Control Plan
Yes
Yes
630.11
TCS Qualifications (reoccurs when TCS and flaggers change)
Yes
No
630.11
Resident Notification Letter
Yes
Yes
COOPERATION BY CONTRACTOR
Subsection 105.10 shall be revised to include the following:
The City's commitment to our Environmental Management System (EMS) requires that vehicles on City
projects shall comply with the adoption of a "Limitation on Engine Idling" policy designed to reduce
environmental impacts related to construction. Please comply with turning off vehicles instead of idling
for long periods of time (more than three minutes, as a general rule).
COOPERATION BETWEEN CONTRACTORS
Subsection 105.12 shall be revised to include the following:
City Utilities, Parks, Traffic, Streets, concrete and utility contractors may perform work related to the project
within or near the limits of the projects. The Contractor shall conduct the Work without interfering or hindering
the progress or completion of the work being performed by other contractors. The Contractor shall coordinate
extensively with these entities to minimize traffic control and scheduling conflicts, and ensure timely
completion of all the work.
INSPECTION AND TESTING OF WORK
Subsection 105.16 shall be revised to include the following:
The Contractor shall keep the Engineer informed of his future construction operations to facilitate scheduling of
required inspection, measuring for pay quantities, and sampling. The Contractor shall notify the Engineer a
minimum of 24 hours in advance of starting any construction operation that will require inspection, measuring
for pay quantities, or sampling. Failure of the Contractor to provide such notice will relieve the Owner and the
Engineer from any responsibility for additional costs or delays caused by such failure.
0
Project Specifications- Page 5 of 22
0
REVISION OF SECTION 105
CONTROL OF WORK
Inspection of the work or materials shall not relieve the Contractor of any of his obligations to fulfill his
contract as prescribed. Work and materials not meeting specifications shall be corrected and unsuitable work or
materials may be rejected, notwithstanding that such work or materials have been previously inspected by the
Engineer or that payment therefore has been included in the progress estimate.
MAINTENANCE DURING CONSTRUCTION
Subsection 105.19 shall be revised to include the following:
Concrete areas, including curb, gutter, driveways, and sidewalk adjacent to and through the construction area
shall be cleaned of debris generated by the Contractor at the earliest opportunity, but in no case shall the area
not be cleaned after the completion of the day's work. Large debris (greater than one (I) inch) shall be picked
up and disposed of offsite. Smaller particulate debris shall be blown from the sidewalks, driveways, curb, and
gutter into the street where it can be picked up by the sweeper without transmitting debri back on sidewalk
areas. It shall be the Contractors responsibility to provide the necessary manpower and equipment to
satisfactorily clean the roadway area at no extra cost.
The Contractor shall utilize a combination of pick-up brooms, side brooms and/or other equipment as needed to
clean the streets before leaving a project area and at least once a week prior to the weekend. The requirement
to sweep the streets shall be suspended during the leaf fall period between September 12`h and November 121h
unless directed by the Engineer for areas with minimal leaf fall. All sweeping and clean up equipment shall be
approved by the Engineer prior to the commencement of work.
The Contractor shall maintain the streets during the construction process as prescribed above.
• If a street requires additional sweeping by City forces, the Owner shall deduct from compensation due the
Contractor, sufficient funds to cover the Owner's cost to provide said service.
0
All cost of maintaining the work during construction and before the project is accepted shall not be paid for
separately, but shall be included in the work including all required traffic control devices, personnel, and related
traffic control incidentals.
END OF SECTION
Project Specifications- Page 6 of 22
REVISION OF SECTION 108
PROSECUTION AND PROGRESS
Section 108 of the Standard Specifications is hereby revised as follows:
SCHEDULE
Subsection 108.03 shall be revised to include the following:
A schedule ojwork must be submitted prior to starting work and shall contain the number of working days per
area to complete all unit work items covered by the contract. Vicinity maps of the areas are included in Section
03500, Project Maps. The schedule should take any priorities into consideration. The schedule should also
include projected start and end dates.
Prior to award, mutually acceptable milestones shall be determined by the Contractor and the City based on the
schedule of working days discussed above.
LIMITATION OF OPERATIONS
Subsection 108.05 shall be revised to include the following:
The work shall be completed within the following calendar months:
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC
DETERMINATION AND EXTENSION OF TIME
Subsection 108.08 shall be revised to include the following:
Residential and Collector work hours shall be 7:00 a.m. to 6:00 p.m., Monday through Friday, or as approved
by the Engineer. Arterial road work hours shall be restricted from 8:30 a.m. to 3:30 p.m., or as approved by the
Engineer.
Preparatory work such as heating equipment and material, cleaning equipment and tools, and/or incidental
preparation for the days work shall be done at the Contractors yard/shop, the Streets Department yard/shop, or
in a private area the Contractor has pre -arranged for use as approved by the Engineer.
Contract working days shall be one hundred sixty (160) days after work commences. The City of Fort Collins
reserves the right to add or delete work as necessary. The City will prioritize the order in which the work will be
completed.
The Contractor shall mobilize to the area within ten (10) working days of Notice to Proceed or after
receiving notification of accessibility of work area.
FAILURE TO COMPLETE WORK ON TIME
Subsection 108.09 shall be revised to include the following:
Failure to meet the agreed upon milestones, mobilize to an area within the days specified in Section 108, or
fully complete the project within one hundred sixty (160) working days, shall result in liquidated damages
assessed against the Contractor.
At the City's option, liquidated damages in the amount of $1,000.00 per day may be retained from any monies
due die Contractor, or the City may retain an additional contractor(s) to complete the work, or portion thereof,
and retain any costs incurred above and beyond the bid prices of the Contractor from any monies due the
Contractor in lieu of liquidated damages.
END OF SECTION
Project Specifications- Page 7 of 22
0
•
REVISION OF SECTION 208
EROSION CONTROL
• Section 208 of the Standard Specifications is hereby revised as follows:
DESCRIPTION
Subsection 208.01 shall be revised to include the following:
This work shall consist of providing appropriate and adequate spill prevention measures during the installation
of the crack sealant and crack filler materials. Work shall be in accordance with the latest revisions of the City
of Fort Collins Urban Drainage and Flood Control District Urban Drainage Criteria Manual, the City of Fort
Collins Environmental Standard Operating Procedures contained herein (Section 04000), and the Colorado
Department of Transportation Standard Specifications for Road and Bridge Construction.
Any loss of time or materials due to spill related events shall be the sole responsibility of the Contractor. Any
damage to surrounding properties or facilities during a spill event, either on site or off site, which occurs during
the course of the project, shall be the sole responsibility of the Contractor.
CONSTRUCTION REQUIREMENTS
Subsection 208.03 shall be revised to include the following:
It shall be the Contractors responsibility to ensure that all sidewalks, driveways, curbs, and gutters adjacent to
the project shall be clean of construction debris at the end of each working day.
Upon leaving the project site(s) the Contractor shall sweep the streets and pick up debris blown into the streets.
Contractor shall monitor sweeping operations to ensure that brooms are not kicking debris back onto the,
sidewalks, driveways, curbs, and gutters.
• Subsection 208.06 shall be revised to include the following:
0
An appropriate Spill Kit shall be on site with each piece of equipment at all times during the installation of the
work. The Contractor shall submit a description of the items contained in each Spill Kit and items shall be
approved by the Engineer.
METHOD OF MEASUREMENT
Subsection 208.11 shall be revised to include the following:
All costs associated with materials, cleanup, and spill protection shall not be measured or paid for separately,
but shall be considered incidental to the Work.
BASIS OF PAYMENT
Subsection 208.12 shall be revised to include the following:
All related costs shall be considered a subsidiary obligation of the Contractor in connection with the various
items of the Work and no measurement or payment shall be made separately for material, cleanup, personnel,
and related incidental items as specified in these specifications, and as directed by the Engineer.
END OF SECTION
Project Specifications- Page 8 of 22
REVISION OF SECTION 408
CRACK SEALANT & CRACK FILLER
Section 408 of the Standard Specifications is hereby revised as follows:
DESCRIPTION
Subsection 408.01 shall be revised to include the following:
This work shall include furnishing and placing an approved hot poured joint or crack sealant in properly
prepared cracks in asphalt pavement. The work shall conform to the latest revisions of the Colorado Department
of Transportation Standard Specifications for Road and Bridge Construction, the City of Fort Collins Work
Area Traffic Control Handbook, and the Larimer County Urban Area Street Standards (LCUASS).
MATERIALS
Subsection 408.02 shall be revised to include the following:
Crack Sealant: material shall be NUVO CS- B hot poured, polymer modified asphalt crack and concrete joint
sealant, or a similar approved equivalent, and shall conform to the following requirements:
NUVO CS- B
Cone Penetration: @ 77' F(25°C), ASTM D5
30-50
Flow: @ 140°F (600C), ASTM D 5329
3 min max.
Resilience: @ 77°F(25°C), ASTM D 5329
40 - 55%
Softening Point: ASTM D36
205°F min.
Flexibility: 2 Sec. I" Mandrel
-10°F no cracks
Ductility: 77°F (25°C), ASTM D5329
50 cm min.
A certificate of compliance shall be submitted prior to construction
Crack Filler: material shall be NUVO GAP- B hot -applied polymer modified asphalt mixed with engineered
aggregate or a similar approved equivalent, and shall conform to the following requirements:
NUVO GAP- B
Binder Specification:
Flexibility: 2 Sec. I" Mandrel
-15 min. (-6.1-C)
Resilience: @ 77`F (26"C). ASTM D5329
35% min.
Tensile Adhesion: ASTM D5329
500% min.
Aggregate Specification:
Specific Gravity
1.5
Porosity
Minimum 10% pores
Sheer Strength
I Minimum 30%
A certificate of compliance shall be submitted prior to construction
•
0
Project Specifications- Page 9 of 22
REVISION OF SECTION 408
CRACK SEALANT & CRACK FILLER
• CONSTRUCTION REQUIREMENTS
Subsection 408.03 shall be revised to include the following:
The Contractor shall submit the necessary Material Safety and Data Sheets (MSDS) per Table 105-1, Summary
of Contractor Submittals, when providing material for the project, prior to commencement of work.
In general, cracks that range from greater than 1/8" to I" wide shall be sealed with crack sealant (NUVO CS-
B); cracks greater than 1" and/or cupped, as determined by Engineer, shall be filled with crack filler (NUVO
GAP- B). The Engineer shall determine and mark the locations for the type of product installed at each location.
A hot compressed air lance shall be used at all times. Crack widths of greater than 1/8" or larger shall be
thoroughly cleaned to a depth of approximately twice the crack width. Direct flame dryers shall not be allowed.
Drying and heating prior to installation of the crack seal material shall be completed in such a manner not to
damage the existing bituminous surface. Care shall be taken to protect vehicles, pedestrians, and all property
which may become damaged from the cleaning and installation process.
Joints between the asphalt roadway and concrete curbs, gutters, cross pans, aprons and drainage structures shall
be sealed.
Air and pavement temperatures shall be at least 20 °F and rising but no more than 75 'F, or as directed by
Engineer. The Contactor may be restricted from installation on arterial and collector roads due to the presence
of salts on the road.
Sealant shall be heated and applied per the manufacturer's recommendations. Using a mixture of different
brands and types of sealant is prohibited. When melted and properly applied (not exceeding manufacturers
• recommended temperature restrictions) the crack sealant will form a resilient and adhesive compound which
will effectively seal cracks in asphalt pavements. Any material that ravels or can be pulled out by hand after
placement shall not be accepted.
The sealant shall be leveled off and brought flush with the surface of the existing roadway by squeegee, wand
shoe, or approved alternate equipment. The material shall be centered over the crack and typically, the band
width of the crack seal installation shall not exceed three inches in width. The Contractor shall be responsible
for their quality control to ensure that all crack sealing material is flush with the existing surface before
leaving the site. In the event that the crack sealing material sinks into the crack after the first application, the
Contractor shall re -apply additional material to make flush with existing surface.
Each days work shall be scheduled to allow all open joints and cracks to be sealed before the end of the
workday. Should inclement weather preclude this effort, joints and cracks shall be re -cleaned before sealing.
The Contractor shall blow clean and sweep all sidewalks, driveways, gutters, and streets adjacent to the work
area after completion of installation. See Revision of Section 105, Maintenance Daring Construction.
Noise Control: See section 01560 or as directed by the Engineer.
METHOD OF MEASUREMENT
Subsection 408.04 shall be revised to include the following:
The accepted quantities of crack sealant and crack filler shall be paid for at the contract unit price per pound
under Bid Schedule 1 or the Alternate Bid Schedule 2.
POUNDS PLACED SHALL BE DETERMINED BASED ON WEIGHT STICKERS FROM THE
PALLETS OF CRACK SEALANT OR CRACK FILL MATERIAL PLACED. The Contractor shall
collect these stickers and return them to the Engineer. The City will conduct random checks of
application rate in projects to confirm applied quantities. If the equipment is scheduled to leave the City
site, the Contractor shall provide daily quantities which both parties shall agree to on a daily basis.
Project Specifications- Page 10 of 22
REVISION OF SECTION 408
CRACK SEALANT & CRACK FILLER •
The City reserves the right to use the Alternate Bid Schedule 2 which excludes the crack sealant and crack filler
material. The Contractor shall arrange to pick up the material from the Fort Collins Streets Department, 625
Ninth Street. The Engineer shall be present at the time of material pick up. The Contractor shall be responsible
for notifying the Engineer when re -ordering material is required.
The City of Fort Collins may provide an enclosed equipment and material storage area for the duration of the
Work to facilitate completion of the project under Bid Schedule 1.
Traffic control shall be a subsidiary obligation to the Work under Bid Schedule 1 and the Alternate Bid
Schedule 2 and shall not be paid for separately, excluding Variable Message Boards, Advance Warning Panel,
and Additional Flagging Personnel. The Contractor shall provide adequate pedestrian and traffic control devices
during the work to protect the public. The Contractor shall include any and all devices, flagging, signs, and
incidentals as part of the line item unit pricing.
BASIS OF PAYMENT
Subsection 408.05 shall be revised to include the following:
Payment shall be made under:
Pav Item
Unit
408.01
NUVO CS- B Crack Sealant (Arterial)
LBS
408.02
NUVO CS- B Crack Sealant (Collector)
LBS
408.03
NUVO CS- B Crack Sealant (Residential)
LBS •
408.04
NUVO GAP- B Crack Filler (Arterial)
LBS
408.05
NUVO GAP- B Crack Filler (Collector)
LBS
408.06
NUVO GAP- B Crack Filler (Residential)
LBS
The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment,
and all required traffic control devices, personnel and related traffic control incidentals and for all the Work
involved in installing crack sealant and crack filler, as specified in these specifications, and as directed by the
Engineer.
Prices and payments made under Alternate Bid Schedule 2 shall include full compensation for furnishing all labor,
tools, equipment, and all required traffic control devices, personnel and related traffic control incidentals and for all
the Work involved in installing crack sealant and crack filler, as specified in these specifications, and as directed by
the Engineer. CRACK SEAL AND CRACK FILL MATERIAL SHALL BE EXCLUDED FROM
ALTERNATE BID SCHEDULE 2 AND SHALL BE SUPPLIED BY THE CITY.
END OF SECTION
0
Project Specifications- Page I 1 of 22
REVISION OF SECTION 627
PAVEMENT MARKING
Subsection 627 shall be revised to include the following:
DESCRIPTION
Subsection 627.01 shall be revised to include the following:
This work shall consist of furnishing, installing, and removing temporary pavement markings in accordance
with the latest revisions of the City of Fort Collins Traffic Operations Manual, City of Fort Collins Work Area
Traffic Control Handbook, Larimer County Urban Area Street Standards (LCUASS), Colorado Department of
Transportation Standard Specifications for Road and Bridge Construction, and The Manual on Uniform Traffic
Control Devices for Streets and Highways (MUTCD) and in.conformity to. the lines, dimensions, locations, and
details shown on the plans or as established by the Engineer.
CONSTRUCTION REQUIREMENTS
Subsection 627.03 shall be revised to include the following:
Permanent pavement markings shall be installed by the City of Fort Collins.
Temporary pavement markings/delineation of lanes may include temporary tape, tabs, or vertical panels as
required by the Engineer and shall be installed by the Contractor.
PAVEMENT MARKINGS/DELINEATION OF LANES
Subsection 627.10 shall be revised to include the following:
Temporary pavement markings shall be suitable for use on asphalt cement or portland cement concrete
pavements, shall be installed and removed by the Contractor, and shall conform as follows:
I. The surface shall be clean, dry, and free of dirt, oils, and grease. The tape/tab shall be pressed down
until it adheres properly and conforms to the surface.
2. All roads shall have temporary pavement markings before they are opened to traffic unless the City
Stripping Crew has been scheduled to install permanent pavement markings prior to opening the road to
traffic.
3 Markings applied to the final surface shall not leave a scar that may conflict with permanent markings.
4. Temporary markings shall be installed in such a way that the markings adequately follow the desired
alignment.
5. Temporary pavement marking tape/delineation of lanes shall be required for all lane lines.
a. Lane lines shall be "tapped" intermittently with a 2' long by 4" wide reflective temporary
strip at 50' intervals.
b. Stop bars shall be "tapped" to a minimum width of 12". Stop bars shall NOT be required at
signalized intersections. Contractor may be required to provide additional signage (i.e. Stop
Sign Ahead, Stop Here On Red, etc.); `Stop Here On Red" signs SHALL be required at
signalized intersections.
c. It is the Contractor's responsibility to notify the Engineer prior to completion of work to allow
scheduling of the permanent pavement markings to be installed by City crews.
6. Removable pavement markings shall be installed in accordance with the manufacturer's
recommendations and maintained by the Contractor until permanent pavement markings are installed by
City crews.
Project Specifications- Page 12 of 22
REVISION OF SECTION 627
PAVEMENT MARKING
7. Temporary edge lines are not typically required when curb and gutter is adjacent to the road. Temporary
edge lines shall be required when there is no curb and gutter adjacent to the road.
8. All tape/delineation shall be removed by the Contractor after permanent markings have been completed
by City Crews.
METHOD OF MEASUREMENT
Subsection 627.12 shall be revised to include the following:
All costs associated for materials, installation, removal, and maintenance of temporary pavement
marking/delineation will not be measured or paid for separately, but shall be considered incidental to the Work.
BASIS OF PAYMENT
Subsection 627.13 shall be revised to include the following:
All costs for installing and removing temporary stripping/delineation of lanes shall be considered a subsidiary
obligation of the Contractor in connection with the various items of the Work and no measurement or payment
shall be made separately for the material, installation, removal, and maintenance of temporary
stripping/delineation of lanes including all required traffic control devices, personnel, and related traffic control
incidentals, as specified in these specifications, and as directed by the Engineer.
END OF SECTION
0
Project Specifications- Page 13 of 22
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
Section 630 of the Standard Specifications is hereby revised as follows:
DESCRIPTION
Subsection 630.01 shall be revised to include the following:
This work shall consist of furnishing, installing, moving, maintaining, and removing temporary construction
traffic control devices including but not limited to signs, advance warning arrow boards, variable message
boards, barricades, channelizing devices, and delineators as required by the latest revisions of the City of Fort
Collins Work Area Traffic Control Handbook, the Manual on Uniform Traffic Control Devices for Streets and
Highways (MUTCD), the Larimer County Urban Area Street Standards (LCUASS), and the Colorado
Department of Transportation Standard Specifications for Road and Bridge Construction.
In the event of a conflict hetrveen the MUTCD and the Citv's criteria, the Cih, of Fort Collins specifications
shall govern.
MATERIALS
Subsection 630.02 shall be revised to include the following:
All traffic control devices placed for the project must meet or exceed the minimum standards set forth in The
City of Fort Collins Work Area Traffic Control Handbook and the MUTCD. All traffic control devices shall be
clean and in good operating condition when delivered and shall be maintained in that manner on a daily basis.
All traffic control devices shall be clearly marked and free of crossed out information or any other form of
defacement that detracts from the purpose for which they are intended (i.e. crossed out information, information
written in long -hand style, etc.)
. Additionally, any sign blank with sign faces on both sides must have the back sign face covered when in use to
avoid confusion to motorists traveling in the opposite direction and other potentially affected parties, such as
residents affected by information the sign may present.
CONSTRUCTION REQUIREMENTS
Subsection 630.10 shall be revised to include the following:
CONTRACTOR RESPONSIBILITY
The Contractor shall be responsible for ensuring safe passage through the work zone for vehicles, pedestrians
and bicycles.
The Contractor may be.required to use Variable Message Boards to advise road users about upcoming work on
arterial streets as required by Traffic Operations through the approved traffic control plan. When required, the
Engineer will issue direction for the number of boards, general locations for placement, and message verbiage.
I. Two-way traffic shall be maintained at all times unless approved by the Engineer. Lane width shall be
maintained at a minimum of ten (10) feet.
2. The Contractor will provide 24 hour minimum notice to the City of Fort Collins Traffic Department when
project operations will be near a signalized intersection.
TRAFFIC CONTROL PLAN - GENERAL
HAND DRAWN PLANS SHALL NOT BE ACCEPTED.
0 Traffic control through the construction area is the responsibility of the Contractor.
Project Specifications- Page 14 of 22
SECTION 00530
NOTICE TO PROCEED
Description of Work: 7290 Crack Seal & Fill Project — 2013 Renewal
To: Vogel Concrete Inc.
This notice is to advise you:
That the contract covering the above described Work has been fully executed by the
CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond ti�ave been
received by the OWNER.
That the OWNER has approved the said Contract Documents
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from receipt of this
notice as required by the Agreement.
Dated this day of , 20
The dates for Substantial Completion and Final Acceptance shall be 20_
and , 20, respectively.
City of Fort Collins
OWNER
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of
, 20
CONTRACTOR: Vogel Concrete Inc.
By:
Title:
0
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL .
When a device is not in use, the Contractor shall remove it from the project for the period it is not needed.
Devices temporarily not in use shall, at a minimum, be removed from the area. Moving will include devices
removed from the project and later returned to use.
Traffic control devices may be placed and/or stored in the City right-of-way in such a manner that minimizes
the hazards to pedestrians, bicyclists and vehicles.
Traffic control devices shall be removed from the site immediately upon completion of the work for any
street(s).
In the event there is a safety issue, the Engineer may issue a "Stop Work Order" until the issue(s) is corrected.
The Contractor shall not be entitled to any additional compensation for delays associated with the "Stop Work
Order".
Approved traffic control plans shall be available on site at all times. See Revision of Section 104.
TRAFFIC CONTROL PLAN - PROJECT
Traffic control plans shall be submitted for all work locations prior to commencement of any work. Plans shall
be submitted along with the City of Fort Collins Traffic Approval Forms. Traffic control plans shall be prepared
by a Traffic Control Supervisor certified by the American Traffic Safety Services Association (ATSSA) or a
Worksite Traffic Control Supervisor certified by the Colorado Contractor's Association (CCA). HAND
DRAWN PLANS SHALL NOT BE ACCEPTED.
Typical Traffic Control Plans for work within the right-of-way shall be submitted for approval to the Engineer
as follows:
Typical submittals for scheduled residential work shall be submitted 2 working days prior to
commencement of the work.
Submittals for full closures on residential streets shall be submitted one (1) week prior to the
commencement of work.
Submittals for full closures on arterial and collector streets shall be submitted two (2) weeks prior to
the commencement of work.
All plans shall be delivered to the Engineer, 625 Ninth Street, Fort Collins. Facsimiles of plans shall not be
allowed.
No phase of the construction shall start until the Traffic Control Plan has been approved. Failure to have an
approved Traffic Control Plan shall constitute cause for the City to stop work and the Owner may deduct from
Contractors' compensation $1,000.00 per ocurrence per day for said condition, as well as the Contractor's
forfeiture of payment for all work and materials at that location, with no adjustment in the contract time.
The Traffic Control Plan shall include, as a minimum, the following:
I. A detailed diagram which shows the location of all sign placement, including advance construction signs
and speed limit signs; method, length and time duration for lane closures, and location of flag persons.
Hand drawn plans shall not be accepted.
2. A tabulation of all traffic control devices shown on the detailed diagram including, but not limited to:
construction signs; vertical panel; vertical panel with light; Type I, Type II, and Type III barricades; cones;
drum channelizing devices; advance warning flashing or sequencing arrow panel. Certain traffic control
devices may be used for more than one operation or phase. However, all devices required for any
particular phase must be detailed and tabulated for each phase. is
Project Specifications- Page 15 of 22
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
3. Number of flaggers to be used.
4. Parking Restrictions to be in affect.
Approval of the proposed method of handling traffic does not relieve the Contractor of liability specifically
assigned to him under this contract.
TRAFFIC CONTROL MANAGEMENT
Subsection 630.11 shall be revised as follows:
The Contractor shall designate an individual, other than the superintendent, to be the Traffic Control Supervisor.
Traffic Control Management shall be performed by a Traffic Control Supervisor (TCS). The TCS(s) shalt
possess a current American Traffic Safety Services Association (ATSSA) certification as a Worksite Traffic
Control Supervisor or Colorado Contractor's Association (CCA) certification as a Traffic Control Supervisor.
Proof of certification for each TCS utilized on the project(s) shall be provided to the City Traffic Control
Department and the Engineer.
The TCS shall have a minimum of one year experience as a certified TCS. Qualifications shall be submitted
to the Engineer for approval a minimum of one (1) week prior to commencement of the work. The TCS
shall be required to be on site at all limes during construction. It is the intent of the specifications that the TCS
be the same throughout the year.
The TCS shall be equipped with a cellular phone.
If, in the opinion of the Engineer, any traffic control individual does not perform their duties at or to the
• minimum industry standard, the Contractor will be required to replace that individual.
The TCS duties shall include, but shall not be limited to:
I. Supervise and direct project flaggers.
2. Prepare, revise, and submit Traffic Control Plans as required.
3. Coordinate all traffic control related operations, including those of the Subcontractor and supplier.
4. Coordinate project activities with appropriate police and fire control agencies, Transfort, school
districts and other affected agencies and parties prior to construction.
5. Notify residents and businesses at least 48 hours prior to construction.
a. Notifications may be accomplished by a representative of the TCS such as a flagger and shall be
hand typed and hand delivered to all businesses and residents.
6. Inspect traffic control devices on a calendar day basis for the duration of the project to ensure devices
are functioning properly.
7. Oversee all requirements covered by the plans and specifications which contribute to the convenience,
safety, and orderly movement of traffic.
8. Flagging breaks for short periods of no more than 15 minutes over a 60 minute period.
9. Traffic control device set up and removal
10. Maintain a project traffic control diary which shall become part of the City's project records. This
diary/log shall be submitted to the Engineer daily and shall include the following information as a
minimum
a. Date
b. For Traffic Control Inspection, the time of the inspections
c. Project description and location
d. Traffic Control Supervisor's name
e. Types and quantities of traffic control devices used per approved MFIT
f. List of flaggers used, including start time, stop time and number of flagging hour breaks
. g. Traffic control problems (traffic accidents; damaged, missing or dirty devices, etc.) and
corrective action taken
Project Specifications- Page 16 of 22
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
Notification of residents and businesses shall be the responsibility of the TCS or TCS Representative and shall is
consist of distributing notifications indicating the nature of the work to be completed, any special instructions to
the residents (i.e. limits on lawn watering during the Work), the dates and times of the work, and the parking
and access restrictions that shall apply.
Sample notifications shall be submitted to the Engineer for review prior to starting the project. Notification
letters or door hangers shall include a local phone number residents with questions may use to contact the
Contractor and a link to the City of Fort Collins Street Department where citizens may find additional
information and project updates at "www.fcaov.com/streets". Only approved notifications shall be distributed a
minimum of 48 hours prior to the commencement of each phase of the Work.
Traffic Control plans shall be submitted for approval prior to commencement of any work. Traffic control
conditions vary significantly in the field and the Contractor is responsible for submitting traffic control plans for
each work location. Minimum traffic control requirements for Arterial, Collector, and Residential streets are
contained herein.
Traffic control management shall be maintained on a 24 hour per day basis. The Contractor shall make
arrangements so that the Traffic Control Supervisor or their approved representative will be available on every
working day, "on call" at all times, and available upon request of the Engineer during non- working hours. A
24-hour telephone number shall be provided to the Engineer.
All traffic control devices and traffic control management shall be placed under the supervision of a Traffic
Control Supervisor.
The Traffic Control Supervisor shall have current copies of the City of Fort Collins' "Work Area Traffic Control
Handbook", and Part VI of the MUTCD, pertaining to traffic control for street and highway construction,
available at all times.
METHOD OF MEASUREMENT
Subsection 630.15 shall be revised as follows:
The Traffic Control Supervisor, Flaggers necessary for the road classification, control of cross traffic, and the
Contractor's daily work activities, including hand signs such as Stop/Slow paddles, and all devices/equipment,
vehicles, and other associated traffic control items shall not be measured and paid for separately and shall be
included in the line item unit price for the Work except as noted herein.
"Variable Message Board" and "Advance Warning Panel" shall be paid per each per day as required by the
specifications or as requested by the Engineer.
"Additional Flagging Personnel" shall be measured and paid per hour only when requested by the Engineer for
special circumstances not already included under another item. Hours of non -flagging work in excess of those
authorized shall not be measured and paid for separately but shall be at the Contractor's expense.
"The City of Fort Collins Master Street Plan" map depicting the street classifications (Arterial, Collector, and
Residential) can be found at the following link:
htti)://citydocs.fcgov.com/?dt=Master+Street+P Ian+Map&dn=GIS+MAPS&vid= l 92&cmd=showdt
All costs associated with the Traffic Control Plan review shall not be measured or paid for separately, but shall
be considered incidental to the Work. Review fees shall not be measured or paid for separately and shall be
included in the line item unit price for the Work.
The City may deduct from compensation due the Contractor $10.00 per day for each traffic control device not
removed from the site immediately upon completion of the work or as directed by the Engineer.
The flagger(s) shall be provided with electronic communication devices when required. These devices shall not •
be measured and paid for separately and shall be included in the line item unit price for the Work.
Project Specifications- Page 17 of 22
0
•
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
The cost of batteries, electricity and/or fuel for all lighting or warning devices will not be paid for separately but
shall be considered subsidiary to the item.
Sand bags and Caution tape will not be measured and paid for separately but shall be included in the line item
unit price.
The Contractor may provide larger construction traffic signs than those typically used in accordance with the
City of Fort Collins Work Area Traffic Control Handbook and the WTCD, if approved by the Engineer,
however, no payment will be made for the additional panel size.
Business signs, neighborhood traffic only signs and detour placard street names are NOT considered Specialty
Signs and will not be measured or paid for separately and shall be included in the unit price for the Work.
The City of Foil Collins shall not be responsible for any losses or damage due to theft or vandalism. The City
of Fort Collins will not be responsible for any damages to public or private property caused by the Contractor's
construction activities. Private or public property which is damaged by the Contractor's installation, equipment,
or employees will be the sole responsibility of the Contractor.
Project Specifications- Page 18 of 22
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
The following figures indicate the minimum required traffic control for each street classification:
FIGURE 630-1 TYPICAL ARTERIAL TRAFFIC CONTROL PLAN
OWNER
CONTRACTOR TRAFFIC CONTROL
TYPICAL LEFT LANE
NOT DRAWN TO SCALE
v
.y
mom
DEVICE
2 ROAD WORK AHEAD
-2 LEFT LANE CLOSED AHEAD
- 2-TRANSITION(L), _
40 i 28'-TRAFFIC CONES
COMPANY
CAN7ACT NAME
---- DATE i
PHONE p
TCS CERTb
SHEETb
•
ARTERIAL STREETS -Shall include Flagging Personnel required for the road classification, control of cross
traffic, and the Contractor's daily work activities in addition to the minimum signage required by the
specifications.
Approved Variable Message Boards may be required for arterial streets and shall be paid for separately under
"Variable Message Board".
"Advance
Warning Arrow Boards" or `Additional Flagging Personnel" may be requested by the Engineer and
shall be paid for separately under "Advance Warning Arrow Boards" or "Additional Flagging Personnel".
•
Project Specifications- Page 19 of 22
•
0
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
FIGURE 630-2 TYPICAL COLLECTOR TRAFFIC CONTROL PLAN
OWNER
NOT DRAWN TO'SCALE
"� •un
x
- ---
'REY�,CETA
2-ROAD WORK AHEAD
2- ONE LANE ROAD AHEAD
2-FLAGGER AHEAD
20-28'TRAFFIC CONES .
TRAFFIC CONTROL
CONTRACTOR
COMPANY
CANTACT NAME
DATE
PHONE#
TCS CERT #
,SHEET #
COLLECTOR STREETS -Shall include Flagging Personnel required for the road classification, control of
cross traffic, and the Contractor's daily work activities in addition to the minimum signage required by the
specifications.
Approved Variable Message Boards may be required for collector streets and shall be paid for separately under
"Variable Message Board".
"
Advance Warning Arrow Boards" or `Additional Flagging Personnel" may be requested by the Engineer and
shall be paid for separately under "Advance Warning AI70W Boards" or "Additional Flagging Personnel".
Project Specifications- Page 20 of 22
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
FIGURE 630-3 TYPICAL RESIDENTIAL TRAFFIC CONTROL PLAN •
OWNER
NOT DRAWN TO SCALE
v
x 0
IIOM. �•- J�
- G
GE TABU O "
QEYL
2 - ROAD WORK AHEAD
2 -D A . ONE LANE ROAD
2 - FLAGGER AHEAD
20 - 28'-TRAFFIC CONES
TRAFFIC CONTROL
CONTRACTOR
:COMPANY
CANTACT NAME
'DATE
PHONE#
TCS CERT #
'SHEET#
RESIDENTIAL STREETS -Shall include Flagging Personnel required for the road classification, control of
cross traffic, and the Contractor's daily work activities in addition to the minimum signage required by the
specifications.
Approved Variable Message Boards shall not be required for residential streets.
"Advance Warning Arrow Boards" or `Additional Flagging Personnel" may be requested by.the Engineer and
shall be paid for separately under "Advance Warning Arrow Boards" or "Additional Flagging Personnel".
•
Project Specifications- Page 21 of 22
•
•
REVISION OF SECTION 630
CONSTRUCTION ZONE TRAFFIC CONTROL
BASIS OF PAYMENT
Subsection 630.16 shall be revised as follows:
Pay Item
630.01 Variable Message Board
630.02 Advance Warning Arrow Board
630.03 Additional Flagging Personnel
Unit
Per each per day
Per each per day
Hour
All traffic control costs including but not limited to furnishing equipment, equipment set
up/removal/modification, TCS and flagging personnel including required break times, vehicles, phones,
notification delivery, hand signs, communication devices, sandbags, and all related incidentals required for
traffic control shall be considered a subsidiary obligation of the Contractor in connection with the various items
of the Work per the Typical Minimum Standards contained herein (Figures 630-1, 630-2, 630-3).
Payment shall be made for "Additional Flagging Personnel" only when requested by the Engineer and when
additional to the minimum flagging personnel requirements noted herein.
SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLLECTORS
NOTE: CROSS STREET TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS AUTHORIZED BY
THE ENGINEER IN WRITING.
NOTE: FULL CLOSURES ON ARTERIALS AND COLLECTORS WILL BE ALLOWED UNDER EXTREME
CIRCUMSTANCES AND ONLY UPON APPROVAL OF THE ENGINEER. PLANS SHALL BE
APPROVED A MINIMUM OF TWO' WEEKS PRIOR TO THE COMMENCEMENT OF WORK
AND/OR THE TIME REQUIRED TO ADEQUATELY NOTIFY THE PUBLIC THROUGH THE
MEDIA.
NOTE: CONSTRUCTION OR REPAIR WORK WILL NOT BE PERMITTED AT OR IN THE VICINITY OF A
SIGNALIZED INTERSECTION OR ANY ARTERIAL AND COLLECTOR STREETS THAT HAVE
MAJOR TRAFFIC VOLUMES BETWEEN THE HOURS OF 7:00 A.M. TO 8:30 A.M. OR 3:30 P.M. TO
6:30 P.M. (EXCEPT IN THE CASE OF AN EMERGENCY).
EXCEPTIONS MAY BE MADE FOR CONSTRUCTION OR REPAIR WORK ON
ARTERIALS AND COLLECTORS BETWEEN THE HOURS OF 7:00 A.M. TO 6:00 P.M.,
MONDAY THROUGH FRIDAY EXCLUDING HOLIDAYS, WHEN ALL EQUIPMENT,
LABOR, TRAFFIC CONTROL DEVICES AND CONSTRUCTION ARE NOT IN THE
VICINITY OF AN INTERSECTION. THE ENGINEER WILL AUTHORIZE SUCH WORK
AND SPECIFY THE REQUIRED DISTANCE FROM THE INTERSECTION.
NOTE: TIME RESTRICTIONS ON S.H. 287 (COLLEGE AVENUE AND HIGHWAY 14 MULBERRY
STREET (EAST OF LEMAY AVENUE) WILL NORMALLY BE RESTRICTED FROM 9:00 AM TO
3:00 PM.
SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS
NOTE: FULL CLOSURES ON RESIDENTIAL STREETS SHALL BE ALLOWED AS SHOWN ON THE
TRAFFIC CONTROL PLANS.
END OF SECTION
Project Specifications- Page 22 of 22
C)
T
N 0
H
U to
w3
)Cl)
O ,-
w o
a�
J �
O
w Z
0) U)
Y
Qa
U
u
•
L�
0
M
0 3
N C
w '3
n VJ
Q 4—
Of O
a�
• o
w in
fn N
Y W
U �
QQ
U
E
0
s
e�
iT
s
0
rc �S
0
LH WH3
Say
O V
L S
O
i 1008 m
CREEK DR
N
SILV
110
T
3y
10 NO l
� OP
E
Y OT
O
co
N
Lpf
e�
s�
E
E�
�8
NO ONIW
15
OS YW S
B�
P
3"
g
1
a
a
�
a
w
w
o
Z
Z a
o
0 SECTION 00600
BONDS AND CERTIFICATES
00610
Performance Bond
00615
Payment Bond
00630
Certificate of Insurance
00635
Certificate of Substantial Completion
00640
Certificate of Final Acceptance
00650
Lien Waiver Release (CONTRACTOR)
00660
Consent of Surety
00670
Application for Exemption Certificate
.0
0
SECTION 00610
PERFORMANCE BOND
Bond No. CSB0010363
KNOW ALL MEN BY THESE PRESENTS: that
Vogel Concrete Inc.
6330 S. College Ave., Fort Collins, CO 80525
(a Corporation), hereinafter referred to as the "Principal" and
(Firm) Contractors Bonding and Insurance Company
(Address) 5300 DTC Parkway, Greenwood Village, CO 80111
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
Laporte Ave, Fort Collins. Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of Four Hundred Twenty -Eight Thousand Six Hundred
Thirty -Eight Dollars and Two Cents ($428,638.02)in lawful money of the United States, for
the payment of which sum well and truly to be made, we bind ourselves, successors and
assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the 18th day of January, 2013, a copy of which is
hereto attached and made a part hereof for the performance of The City of Fort Collins Project,
7290 Crack Seal & Fill Project — 2013 Renewal.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Agreement during the
original term thereof, and any extensions thereof which may be granted by the OWNER, with or
without Notice to the Surety and during the life of the guaranty period, and if the Principal shall
satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and
save harmless the OWNER from all cost and damages which it may suffer by reason of failure
to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER
may incur in making good any default then this obligation shall be void; otherwise to remain in
full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
•
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of
which shall be deemed an original, this 29th day of January 2013.
IN PRESENCE OF:
1RMi" Y
(Surety Seal)
Principal
Vogel Concrete Inc.
Via
(Title)
6330 S. College Ave.
Fort Collins, CO 80525
(Address)
Other Partners
0
Surety Contractors Bonding and Insurance Company
5300 DTC
(Address)
Ste 330, Greeriwo6d•Vill6geyC0 80� i i
O
tizzZ- L
70
�.u' .� I ..... _
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
SECTION 00615
PAYMENT BOND
Bond No. CSB00010363
KNOW ALL MEN BY THESE PRESENTS: that
Vogel Concrete,lnp,,
6330 S..f ogkge Ave -:.fort Collins, CO 80525
(a Corporation); hereinafter referred to as the "Principal' and
(Firm) Contractors Bonding and Insurance Company
(Ad -dress) 5300 DTC Parkway, Ste 330, Greenwood Village, CO 80111
hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins,
300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to
as "the OWNER", in the penal sum of Four Hundred Twenty -Eight Thousand Six Hundred
Thirty -Eight Dollars and Two Cents ($428,638.02) in lawful money of the United States, for
the payment of which sum well and truly to be made, we bind ourselves, successors and
assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the 18th day of January, 2013, a copy of which is
hereto attached and made a part hereof for the performance of The City of Fort Collins project,
7290 Crack Seal & Fill Project — 2013 Renewal.
• NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Agreement and any authorized extension or modification thereof, including
all amounts due for materials, lubricants, repairs on machinery, equipment and tools,
consumed, rented or used in connection with the construction of such Work, and all insurance
premiums on said Work, and for all labor, performed in such Work whether by subcontractor or
otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
0
0
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this 29th day of January 2013,
IN PRESENCE OF:
(Title) 0eu, IN
(Corpote al
• ( 0iPOR�
EA
IN P,REAEN S
(Surety Seal)
Principal
Vogel Concrete Inc.
(Title)
6330 S. College Ave., Fort Collins, CO 80525
(Address)
Other Partners
M
Surety Contractors Bonding and Insurance Company
By:—N�U
5300 DTC Pa
(Address)
Ste 330, Greenwood_9ilt6ge,.CO,801;11 ,
OLAL
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
i�
CHIC actors Bonding and Insurance Company
3101
3101 Western Ave.,
Ave., Suite 300
Seattle, WA 98121
an 1u CamMO
•
Know All Men by These Presents:
POWER OF ATTORNEY
Contractors Bonding and Insurance Company
That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the
approving officer if desired.
That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint:
W.R. Withrow, Tyler Withrow, Megan A. Brown, gointly or severally
in the City of Denver . State of Colorado its true and lawful Agent and Attorney in Fact, with full
power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described
bond.
Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100
Dollars (_ $10,000,000.00 1 for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had
been executed and acknowledged by the regularly elected officers of this Company.
The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution
adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit:
l"All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the
orporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by
such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant
Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or
undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies,
undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate
seal may be printed by facsimile or other electronic image."
IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice
President with its corporate seal affixed this 30th day of November , 2012
�J)�rtl6�Np 9ry
Contractors Bonding and Insurance Company
s0,•, .SL;�
State of Washin ton l ° -•:'1 ttX9 ,_ Roy C. Die Vice President
g )} SS '7 L,� �4SHING?�
County of King
CERTIFICATE
On this 30th day of November 2012, I, the undersigned officer of Contractors Bonding and Insurance
before me, a Notary Public, personally appeared Roy C. Die , who Company, a stock corporation of the State of Washington, do hereby
being by me duly swom, acknowledged that he signed the above Power of certify that the attached Power of Attorney is in full force and effect
Attorney as the aforesaid officer of the Contractors Bonding and and is irrevocable; and furthermore, that the Resolution of the
Insurance Company and acknowledged said instrument to be the voluntary Company as set forth in the Power of Attorney, is now in force. In
act and deed of said corporation. testimony whereof, I have hereunto set my hand and the seal of the
Contractors Bonding and Insurance Company this 2,9th day
yr� of ,Tanuary 3
�� Contractors Bonding and Insurance Company
seph B. Iler Notary Public
Notary Pablic —�•-
State of Washington Roy C. Die Vice President
JOSEPH B. MULLER
MY COMMISSION EXPIRES
March 29, 2016
0575578032912 A0059511
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
0
0
0
CONTRACT DOCUMENTS TABLE OF CONTENTS
BID INFORMATION
00300 Bid Form
CONTRACT DOCUMENTS
00500 Agreement Forms
00520 Agreement
00530 Notice to Proceed
00600 Bonds and Certificates
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (Contractor)
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate
CONDITIONS OF THE CONTRACT
00700 General Conditions
Exhibit GC -A GC -Al - GC-A2
00800 Supplementary Conditions
00900 Addenda, Modifications, and Payment
00950 Contract Change Order
00960 Application for Payment
SPECIFICATIONS
Section Pages
00300-1 - 00300-3
00500-1
00520-1 - 00520-6
00530-1
00600-1
00610-1 - 00610-2
00615-1 - 00615-2
00630-1
00635-1
00640-1
00650-1 - 00650-2
00670-1 - 00670-2
00700-1 - 00700-34
00800-1 - 00800-2
00900-1
00950-1 - 00950-2
00960-1 - 00960-4
s►s. , CERTIFICATE OF LIABILITY INSURANCE
`-�
DATE (MM/00/YYYYI
1/16/2013
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER,
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
One, Inc. dba Peak 360
1600 Emerson St.
Denver CO 80218
CONTACT
NAME. Gary Friedman, CPCU, MSIS, RPLU, ARM, AAI
PHONE (303)534-7325 FAC No: X (303)623-7325
Euo eS: gf riedman@ peak 360. com
INSURERS AFFORDING COVERAGE
NAIC N
INSURERAAUtO Owners
2700
INSURED
VGL, INC., DBA: VOGEL CONCRETE
6330 S. COLLEGE AVENUE
FORT COLLINS CO 80525
INSURER BOwners Ins. Co.
32700
INSURER C:
INSURER D:
INSURER E
INSURER F:
LUVCKA1wt5 UtK I IYIGA I t NUMLitH'U1,1.S11 BUD B4D RFVI.CInN NI IMRFR-
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
WVDPOLICY
NUMBER
POLICY EFF
MMIODNYYY)
POLICY EXP
IMMIDONYYYI
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
g 1,000,000
A
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE OCCUR
74037316
1/17/2013
1/17/2014
PREMISES Ea occurrence
$ 300,000
MED EXP(My one person)
$ 10,000
PERSONAL$ ADV INJURY
$ 1,000,000
GENERAL AGGREGATE
$ 2,0001000
GEN'L AGGREGATE
LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
$ 2,000,000
X POLICY
PRO LOD
$
AUTOMOBILE
LIABILITY
COEa aacnl deDISINGLE LIMIT
1,000,000
BODI LY I NJURY(Per person)
$
B
ANY AUTO
ALL OWNED X SCHEDULED
AUTOS AUTOS
4709905202
1/17/2013
1/17/2014
BODILY INJURY Per accident
I I
$
HIRED AUTOS NON -OWNED
AUTOS
PROPERTY DPNIAGE
Peraccidenl
$
Medical a meets
$ 10,000
X
UMBRELLA LIAB
X
OCCUR
EACH OCCURRENCE
$ 1,000,000
AGGREGATE
$ 1,000,000
A
EXCESS LIAR
CLAIMS -MADE
X I
DED I I RETENTION$ 10,00
$
97-099052-03
1/17/2013
1/17/2014
WORKERS COMPENSATION
WC STATU- OTH-
ANO EMPLOYERS' LIABILITY Y I N
ANY PROPRIEORIPARTNEWEXECUTIVE
OFFICERIMEMBER EXCLUDED? ❑
NIA
E. L. EACH ACCIDENT
$
E.L DISEASE - EA EMPLOYE
$
(Mandatory in NH)
If yes, describe under
E.L. DISEASE - POLICY LIMIT
S
DESCRIPTION OF OPERATIONS below
DESCRIPTION OF OPERATIONS/ LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, h mare space is required)
The City of Fort Collins is an additional insured under the General Liability policy and on going
operations in accordance with all the terms, conditions, and limitations of the policy and then only for
liability caused by the negligent acts of the named insured as required by written contract or agreement.
CERTIFICATE HOLDER CANCELLATION
jstephen@fcgov.com SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
CITY OF FORT COLLINS ACCORDANCE WITH THE POLICY PROVISIONS.
PURCHASING
PO BOX 580 AUTHORIZED REPRESENTATIVE
FORT COLLINS, CO 80522
(Gary Friedman/GARY �crty�'� I
ACORD 25 (2010/05) 01988-2010 ACORD CORPORATION. All rights reserved.
INRn2F nntnn5rm Thu ArnRn nam- and Inns cm ranicfurod manic nF arnDn -
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER)
DATE OF SUBSTANTIAL COMPLETION
PROJECT OR SPECIFIED PART SHALL
INCLUDE:
PROJECT TITLE: 7290 Crack Seal &
Fill Project 2013 Renewal
LOCATION: Fort Collins, Colorado
OWNER: City of Fort Collins
MOT 1196TIT04—mrim
CONTRACT DATE: January 18, 2013
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project or
specified part of the project, as indicated above) is hereby declared to be substantially
completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may
not be exhaustive, and the failure to include an item on it does not alter the
. responsibility of the CONTRACTOR to complete all the Work in accordance with the
Contract Documents.
ENGINEER AUTHORIZED REPRESENTATIVE
DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time indicated.
CONTRACTOR AUTHORIZED REPRESENTATIVE
DATE
The OWNER accepts the project or specified area of the project as substantially
complete and will assume full possession of the project or specified area of the project
at 12:01 a.m., on . The responsibility for heat, utilities,
security, and insurance under the Contract Documents shall be as set forth under
"Remarks" below.
CITY OF FORT COLLINS, COLORADO
OWNER
REMARKS:
By:
AUTHORIZED REPRESENTATIVE
DATE
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
20_
TO: Vogel Concrete Inc.
Gentlemen:
You are hereby notified that on the day of 20_, the City of
Fort Collins, Colorado, has accepted the Work completed by Vogel Concrete Inc. for the
City of Fort Collins project, 7290 Crack Seal & Fill Project - 2013 Renewal.
A check is attached hereto in the amount of $ as Final
Payment for all Work done, subject to the terms of the Contract Documents which are
dated January 18, 2013.
In conformance with the Contract Documents for this project, your obligations and
guarantees will continue for the specified time from the following date:
20
Sincerely,
OWNER: City of Fort Collins •
By:
Title:
ATTEST:
Title:
• SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Vogel Concrete Inc. (CONTRACTOR)
PROJECT: 7290 Crack Seal & Fill Proiect — 2013 Renewal
1. The CONTRACTOR acknowledges having received payment, except retainage from
the OWNER for all work, labor, skill and material furnished, delivered and performed by
the CONTRACTOR for the OWNER or for anyone in the construction, design,
improvement, alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the
receipt and adequacy of which are hereby acknowledged, the CONTRACTOR
voluntarily waives all rights, claims and liens, including but not limited to, mechanic's
liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor
and material bond rights which the CONTRACTOR may now or may afterward have,
claim or assert for all and any work, labor, skill or materials furnished, delivered or
performed for the construction, design, improvement, alteration, addition or repair of the
• above described project, against the OWNER or its officers, agents, employees or
assigns, against any fund of or in the possession or control of the OWNER, against the
project or against all land and the buildings on and appurtenances to the land improved
by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair
of the project were furnished, delivered or performed by the CONTRACTOR or its
agents, employees, and servants, or by and through the CONTRACTOR by various
Subcontractors or materialmen or their agents, employees and servants and further
affirms the same have been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project or any funds in
the OWNER'S possession or control concerning the project or against the OWNER or
its officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or
assigns against the project or -against the OWNER or its officers, employees, agents or
assigns arising out of the project for all loss, damage and costs, including reasonable
attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes
. and adequate description of the property and improvements to which this Lien Waiver
Release pertains. It is further acknowledged that this Lien Waiver Release is for the •
benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any
labor and material bonds for the project.
Signed this day of
ATTEST:
Secretary
20_
CONTRACTOR: Vogel Concrete Inc.
Title:
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this
Witness my hand and official seal.
My Commission Expires:
day of
Notary Public
20_, by _ .
0
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR: Vogel Concrete Inc.
PROJECT: 7290 Crack Seal & Fill Project — 2013 Renewal
CONTRACT DATE: January 18, 2013
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicated above, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of 20
i
(Surety Company)
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
L�
DR 0172 (12/98)
COLORADO DEPARTMENT OF REVENUE
DENVER CO 80261
(303)232-2416
CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Pursuant to Statute
Section 39-26.114(1)(a)(XIX)
0
0
DO NOT WRITE IN THIS SPACE
The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials
for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and
materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road,
street, or other public works owned and used by the exempt organization.
Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by
law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department_ of Revenue. It is the responsibility of the prime contractor
to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
Registration/Account No. (to be assigned by DOR)
Period
0170-750 (999) $0.00
89 -
CONTRACTOR -INFORMATION
Trade name/DBA:
Owner, partner, or corporate name:
Mailing address (City, State, Zip):
Contact Person
E-Mail address:
Federal Employer's Identification Number:
Bid amount for your contract:
$
Fax Number:
Business telephone number:
Colorado withholding lax account number:
Copies of contract or agreement pages (1) identifying the contracting parties `
EXEMPTION INFORMATION and (2) containing signatures.of'contracting parties must,& attached
Name of exempt organization (as shown on contract):
Exempt organization's number:
98 -
Address of exempt organization (City, Slate, Zip):
Principal contact at exempt organization:
Principal contact's telephone number:
Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located)
Scheduled Month Day Year
Estimated Month Day Year
construction start date:
completion date:
I declare under penalty of perjury in the second degree that the statements made in this application are
true and complete to the best of my knowledge.
Signature of owner, partner or corporate officer:
Title of corporate officer:
Date:
DO NOT WRITE BELOW THIS LINE
J
0
Special Notice
Contractors who have completed this application in the past, please note the following
changes in procedure:
The Department will no longer issue individual Certificates of exemption to
subcontractors. Only prime contractors will receive a Contractor's Exemption Certificate
on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each
subcontractor involved in the project and complete it by filling in the subcontractor's
name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all
Certificates that the prime contractor issued to subcontractors should be kept at the
prime contractor's place of business for a minimum of three years and be available for
inspection in the event of an audit.
Once an 89# has been assigned to you, please use the next five numbers following it
for any applications submitted for future projects. This should be your permanent
number. For instance, if you were assigned 89-12345-0001, every application
• submitted thereafter should contain 89-12345 on the application. The succeeding
numbers will be issued by the Department of Revenue. DO NOT enter what you
believe to be the next in sequence as this may delay processing of your application.
SECTION 00700
GENERAL CONDITIONS -
•
0
GENERAL CON MONS
,OF THE
CONSTRUCTIONS CONTRACT
These 6ENERAUCON�JTION'hnte heen clzyeloped tnv,usind the
4 :STANDARD r-ft AUCONDITIONS CiF TIE 'CO' NISTRtiCTIC1N'
CONTR[�GT preputcd Uy tlu Engn�crs 7oulfACO.nUaoxlboctUuen-m.
'C�mmittce, Fi1CIX_ N6.. ISkI1t•$ '�1USlli hdili(n), as a liasc. Ci.Anta to
+that document-4e shown,hy ulidcilining text that has,becn side 1 an t.
sinking through text that has peen de'leled'.
•
3JCDC GENERAi. CONDITION& 191*0=8
0
SECTION 00300
BID FORM
TABL;r OP,CON'PI-NI=S.Or G,T,M;RAL.,COND'ITIONS,
4rticle or'Paragripk
Page
Article or Ptragiarh',
Numlx},iYTitle
Nunihcr
NuribcrS-'I'iile
NumGcr
L DEFINITIONS.,.:
... ......... ......
. - ;j,
2, PRELlM[N`ARY•MATTERS 3
L(
AdJinda ......... _.
2;1
Delivery of Bonds ............................
1,`_
Aarccmcnt _
..;,;..„1;
l_
2
Gopicso(Documenis
13
Applicatinn'for Pa}ment' --,. ,.„
._..„l
2:3
Cnmmenceiner t,ot'Contact
14
Acbcs[os... ............ . .... .....
... ....1
Ttmes�Noti& to'Pr&:eed 3
I
2,4
Starting the Norio ,3
1CG
L;tddm`Di�cunents:-
lt'
2;5-?.7
before StirttneGonSCruotion
Li
bidding Requirement%
1.
CONTRACTOR's Respgnsibilify
L8
Bnnds;,,,
;1:t
'to Rcport, Preliminary Schciiiles;
1;9
Change bider :
l;.
D�htcry, of Czrtificatcs of
l.RY
t ontractDocumenls_
Insurance 4
ct
ContrscPPrite, ,-, , ;_.
„h
,-,.F-.
2.8
Precpnstruction Conference 4 .
1.12'
Contract Tmles :,
1`
2:9
Initially Acceptable schedules .., 4,
1e13:
coN RACIOR;..
;; , 1;
„ -•
1_l4
rie(ectii:e, ,,_,
J,
3. 'COA''fRt\Cf h&"uMEEiv`TS:. INTENT,
1 15-
DmWings _ ..
b
AML•ND1Nd mush'. „ q
1i6
Ff%ciive,Dawofthe_Agncment," ..,_.'-
3'13:2
Intent ..,,._ ,,,,,_ 4.
1:17.
ENOLNEER
t.
3:3
Referenea toStandar-&-anJ Spect-_
1.18-
CNG .NEERs Consultant
-
„I
'licattons of Techmcal:Soctetit_s
I[I9
AeIJ,Oriler „� .-___
_
,1',
ILeportmg'.niiJResoh•irigDis=
1:2Q
General Rcgwrymeiit-s
?;4-5
Ill
1-laiardous Wactc;,... , ,_ ,,;
, , ,.„2
•3A
Intent of C6tain Tcrms or-
L 22 a
1 fiWi nd Regulations 1 a- or
AdjecUtcs
1 1i
Regulations
Legal Itohdal5
2
2
3;S,
3.8
Am riding Contract Docu»enis 5-
Si pplumentinE Contract
•
i2i
Liens..... .........
......
Dbcurnents_ .............. 5 ,
1.214
estone ........
?
17
ReuseotDoci
125
Ndticc of 4aard:__„
126.
Notice to-,Prncccd,,,,,, - -
4: AVAILAAII:ITYOF-1.A1r17S;>
1 27;
` "VIER _ ........ ,,,,,
;;
?SUBSURI ACE AND PHYSICAL�CONDITIONS.
12S
Partiil Utatzation...... ...:..:......:.;2
RUERENCE POINT) ::....; 1 ............. .,. 5.
1.29
PCIIsE,:. :.:.. ...,.:. 2.
4.1
Availabdiry of Lanils -: 5-6
13U
Petroleum ...... ,.,
2
42
Subsurfacz and Physical
1 31
Projeci,... ...... ....................
Conditions.'...... ,:: .: ......._::::...6.
lAid
RidioactitcMaterial.
4.".1
Reports and _Dratungg....... ,h
1 3° 6
Regulef 11'orLmgAours
, 2'
4;2.2
Limited Reliance by CON'I RAC .
1:33;
Rzsident Project Reprzsenlalivz.;
;r
TOR Authorized; Technical
Samples:
llata ......: „•.6
1.35
Shop 136Ai in
?
4 2.3,
Notice,of Differing Sii6, 'face
_
1.36
Spec] leations ..:.:.
,.
or Physical Conditions.:
1 37
Subconvoctor
3
42a
FNGiNF.ER'slRcvicw....... ,,,, _G
133.
Substantial Completion ,,,,,;,,,
•,,,,,j
4m'_5
Possible Contract l7ocuiiients'.`�
1.39.
Su-pplemen[ary-'Coodttsons .....:..
.......
Change , .... ........ :....... ..............
1.40
Supplier,
`3
4 27:ti
Passible Price enJ T i_nes
141
Underground Facilities
o-3
Adjustments {=7
1.42
Pit 'Pricc lVnrh ....
43
Physirti,C?ndi" Bons lJndgrgrounii
1.43
work...... ;.... :.........:...5
F�cihucs::... ..: 7
144
WorkGtiangeDirec[rvc ,,,_::_
i
423.1
Sliaµnoilndicatcd .__..._ _„_.7
1:45
Written AmeriJment
}
43.3,
Nut'Shuwn orInJtcileil7
-
4.4
Reference -Points ,,,;7
,ii
-- -
ti.tcticucetui,(tcaw.�ino�s:i§tas�tvv_otiSniotvj
n�i ll. TY Gf-tGRT Ca�1a.:1N5.�10DIF1CAT0�5 RiEV 9L9�»-
n
LJ
'Article or Paragraph'
Page
Article,or Paragraph
NO
Nutnhcr Title,
"Numlxr
.NUmherRTidl t'
Number
4.5
ea besws PCRs Mitiole_u_in, .
6,25
Submnhil Proceedure"s; CON—
Hazardous Wastebr
TRACTORsRetretrPrior s
Radioactive Material t
. ,7-8;
tolShbp Drsiving or Sdinple
Sutren i tt� l
l t
$ONDS:ANI)INSl/RAN(h
S
6.2G
Shop _Drawirig KSample'Siilamn
:YerCormancc`Payigent`,imdOther
talsl2eviewby6NUWb1iR;,,,,,1617
_.
Rem .',... ,,..,:.,
...;$ -
6?T.
y
Respansihihly for, Vun•itions.
.
+S,
I icensed and Instaers;
From Contiact Documents;; ,.,
...,17
_Burettes
( eruttcotes of Insurer cr&`
G_.28
Related Work Performed Prior
5.9
(ONTR4GCOR's liability`
'to hNIGINFFR's Rcvicw atid_
Insurance,: ,..... ........,,,:9
=i4pproval of Rcquircq
5.5
01�NER'sL,abilityInsurance„_,,,_;
i
5ulimritals
-5.6'
property Insurance ... ,
; .9-10
�629'''
Continuing the 1Vcirk
5:T
....
Boiler and Machinery orAddi-
.:,
6:30,
.. .
CONTRAc:TORs General
uonal IRoperiy Insurance
,10
•Wtsranty and Guarantee
;17
5.8
NouceofCancellation'Prottsion
_ , 1(i
o3l-03
'lndeainiti6n
17=18
t
TOR s Rcs gnsthiht}
G:i4
Survival df Ohligal ons, ... ;:......LS
for a ibic Amount
t
li'
Othwslt cialInsuranceOT"I�tWORk;;;;;
......
IS
5.11
\Vaiter 6ERights
1 l'
7 1=7.3
Related W6r6 at site
„18
5A2-,5,13;
"'Receipt and pp icalibn of
7A
-coordination.,.
Insurance: Procecds .... .......;
locl l :
=5,1.
Acccptance6 Btntls and Insu- '
: S O\VNER S RFSPONSMTLITTES ..........
R
ante, Option to Repitioc
Id"
B,I.
Communicauods'to
5.15,
PartiafUtilization--Pr erty
TRACTOR
Insurance,;
ondPavP
S'I
3.
Furnish Dat
furnish Data andP.. Promptly
omp
•
6: (()yTRAEfOR S RhSPONSIBil 1'1 'IFS
I
When Dui
18
G 1 0 2 `
Svpervision and Supenritendenq
. I1
S.
Lands and Eascmcnts 'Rcports
6 3.6 5,
labor. Materials and Equipmcnq,,`l,1-12`
andt Ccstc,,,,,,,,;
15-19
6.6-
Progress Schedule...... ....
..,12`
0
In'surand
19
6>7,
cSubtitutrs and 'orEijual Items
S,6
Change OrtYrs ;;;
9
( b4liACTOR's Expense,'
S.;T
inspe`ctions',Tests and
Substitute; ( onstruction
Approvals
49
c`s,
MethMsorProccdtir,.
$;fi
Stop or Susp ntllNorF
hNGINFER's Evaluation'
Terminate CO1'fRAC'MR's
;Concerning Subcontractors,
Sentees
1')
Suppliers and Qthcrsz.
5.9,
Limitation un OWNERS'
Wmver.ufRtbhts „r;
::13-14-.-
Respons&Iities
G 12`
Patent Fees and Royalties
14
S.IO:
Asbestns PCBs; PeVnicum,
6,13
Pumas,,,,_,_
Hazardous Waste a
:6,14-
_„,.,,i4
1 avvs and Re Wattons;
„19.
iliadioacuvc'.Mat�nal
,,;ly
-;6:15-
laces .,14-I5
5:11
.EvulenceoCFinaiical'-
=16
ti6617
UseoCPrrarises
ls'
Airangemenls.}
„lh
Site Cleanli
om
Safe Structural Lcodirig. ..,,
15
9 ENGINEER'S STATLTS:DURING
6.19
Record Documents ,,;; , ,,, , ,
; ;15
CONSTRUCTION,.
�l9
6.�0'
Safct}'andProtcctiod,;
15,1h-
9.1
OWNERsReprescntativc
d9
621
SaCeh RrprSsrntauie ..
16
9.2
Visits to site!`,
1,5
:6 22+
Hazard Communication Program",,
,,.16
9.3
project Representative .....,19.21
6. il,
En ergericirs I
16,
l.4
Glarilications anil Intcrprz=
6.24
_;,,„
Shop IAaw ngs and Sempte;
;,, ;;16
Cations
?l
9.5;
Authorized Variations in 1Wk
21
fii
RJC'IJC GiiNER1L C0NDrHbr4s 191a 8 U990
ON)
-
[DtIT
-^ ryI CTTY 0F:FORT COLTINg M011mCA, IONS (RF�'.9/991_
•
Ariicl&clr Pairag'fifill
Page''
Arficle,orParnjihph
Iva&
Number T-41b
Nuruhvr
N;rx-&r '&-ritic
Alan lxc,
9:6
Rej'icfing'Pafeqivv Wo k_
It
13 SA19
finE(;veri6g-:W6rk.ipE-N-Gl=
.0.7-0.9
Shop raj�mp,,Cltangc Orders
IqM- ER! q!ffst ......... .............
27-28
ani ;n1 nl§.. ..................
�2 F
9.10
Wwrl6inaticn,_ for Unit:. faces-_.
13.11
Corrmicin clitReniov"'ll oC
'9.1-1'-0-12
liecjsiofts'on Digtute,'%.o6l-
.28
NEER as Initial Int6roraq .............
;,2 2
13.12
CI-1 cetion - Pefi od.. ......
... .... 28
9. I.j
ENG'
Lhin'hitions on'. � INEERs
IJ: I
A�cefil6n vb'offieji�iiv�:%Vor .........
?81
Airifior'ity andRes pon.iibiliIies_,,2
2 723
13,14,
- �' to D -r�
OWNER Mary (,.orr�qt L� eclive--
CMANGFS1NTHP
vpRK.,, ... ; .......
I
ik's'drdefcd Gimrige
WNE '7t:' _ .........
-3
:1
I
4 fA--��4F.N'rs.i,o'(�C)I%rl'RA(.'I*OR AND
- � . .
1
.2
'Ctai't t, ' di
in
;21
, ._ 1
J71614;7 0'; .. _� 1,
1VorL.Not RequiralbyConLro-6t*'
'..-
4`1
Sche'dii-le t!'t !� Values........
Doeuments, .... ........... . ......
2 3
142
4pii&ition rorr'prc>Ffess
.10.4
Charlie Order ........
23
p ............
..29
fot;Notification
of Su'rctK.,.,
23
14,3
CON'I'RACTOR's Aftfanty of
Title
........... ..........
14 4'.14,7
R , a vi c i of Applications for
.1.11-11.3
.1 1
-.'ProgressP,l Hyrnenta� .......
AdjusLinenti Value of,
14.&M9
SAstainiiiii,cornplairin 1 :-.1
.... :30:
tiieliiv!�-QJ
......
.�23LN
14�� 1,0
roll ' . ,
tin 'It lZat........
1
11.4
iz:(iii- or the Vroik ....... ......
)4-i5
14-:11'
Final lnspcdibrj,_ ........... .............
3i
1115.
14.12
Final App idattorCar Nyn
... 34
11.6
coi�rNAcTOWS 'ce
.,�_.:25
141h_14.14
Yinal'Pa rrri6t fm�lciAcceptaiice:',.
• '31
Cost Ras
......
-32'
sh
Pr ........
...... 24,
�
l5: SUSPENSIONOI NV,0RK.AND
TERIMIN
....................... ....... ..........
-,3
CHANGE OF CONTRACT TWES.,.
26
15:1
..
CAVNER�Mq Suspend'Work .........
32
12 1
0,
'faint for.A�djust*nt.�_
26, ,
1
�-AVNER may:rcrmlnalc.2.� ......
..... :..31
12.2
Tirneof the Essence. ..........................
)0-
15.5
CONTRACTOR May 9L'op133 ;
Delays Beyond CONTkNCTOR
i'
Ws' r -k ,or crmLnmt5,__,,,
2&27
la cdid201VJ�E�la -ah d
TYC S_ qy
I 6,� DlqPUTERFsbi.UTl0Nr, ........ ....... ......
;'33
C TTRACTORs Control;,,;,,;;,,,
17. MISCFLLANFOUS
... 33
TEM AND INSPECTIONS: CORRECTION:,171
Git mg Nottye
33
440'VAL OR ACCEPTANCE.01:
17:2
C , arnputation 6f,Times ....................
DEWEC77ME WORK ........
-�7
173
N.crice'ol C iim.%...
qFM &S .............
'7'
1'�A'
CumulativeRefivedic .......
3'
13:2
Acce - ss t6 the Work
; essio hit Fees and'Court,
�;j-
14
Test-1,and lfisp-c&ions;
. Costs
c6stk ...........
1_1111
j3
7
(3iJNTRACTOR:s Cooperation
)7
7,6
Apoliu-b1c �tkti La" ....
�?J-34
13.4
'OkVNER's Responsibiilhcs_;�
35
�j_
Flillependent. Testing
13-5,
CO1,FRACTOXs
EXMMIT GC -A:
(Option-,M)
Responsiblties_ ........
_�7
Dispute R�solution Agreement ...........
GC -A]
dovering IiVilrk prior to 'Jnsprcc-
4
16..1716,6
Ar. it.ra..tion ........ . ........
Lion Tesun� or ;Approval I'z
.,17
-
16;7
Mediation
n .....
1kktk,- CUNISRACCOMA TONS 1910:8 0940 Ibi n(jr4)
%V77 dty OF r01iLTt-6l.I.tNS 4bbIFICA1i0NS (REV 9/")-
. . I r -1 1 � — 4. 1 1 "
0
0
•
•
TNb` Ex NS
;City of Fon;Collins in odificauons to:tlie General Conditions or I, c Construcnon;ConUact dre no(3howtt'.in thi's:index
Article br-Pttrugrxp}i
Nuti l r
Atttclt'i Porigraph
:Acceptance. of- -
Number
Bonds and1nsuranac c 14
;dzfecrive Work -•.._.,,,,, .......... ; 10.4.1, 13 13.13
OWNER responctbdny(or ,.,,,,,.,
_,,,, 1, S 1U...
final pappcht 9 12i 1405 ,
possiblc pnci6,nnd d nes change;
4'S 2
insurance .... ..... ,; ,....... S 14
Authorized Variations in Wort
3 G G 25. 6;27 9.5
;other \ Voil,'by'CONTRACTOR:.:.... ......`...73
42adabthtyofLan'ds,:..
4.LS.4
Substuittes,unJ Or l yuttl Item$ ¢;7, I
At+aid Notice of —,defined
1 5
dVork.by OIVNFR :.,.. �, 5, 6.30, C>.34
L.
1 bee Strking Constructtoq ,,<
, i_ , e ^-2:5,
Access to thq=- "`
.
Bid —definition nf.,,.. ,;,, 1 (1 1, 1 IO; 2 3, 3':3;
, _.
I nds. 6WN1'R amd(nN I RA( 10R
_.
4 2 6:4:
,
6 13,-11.4.3, 119: ,
respon3ibthhes, ,-_; ,, i!. 4'1
iBtddt6 Documents definit16i
'
site, related Work 72
of
Work, .. 13.2, 13.1 , 949
73iddins Itequlrcmenls' dclmdtan
; cts or Omissions Acts and Om issions
of
„1 7 (Li' 4,2.6.2)
CON I RAGI'OR 16 9 1; 91:3.3
:..,...
Bonds-
'EN(�tNFfR
-OWNER .................. 6`76 O, S.9'
additional bon sj
10.5l,il
.Addenda definitmnpeof(also"see
Cost of the Wor k..... ...........
.... ; l 5 a
.. ..
tieGnnton of 5 ctG z yvns} ,,,,{I.6 ,1 10, 6:19); II
do�rmtion of
1:S
AddinonalPropcity Insu nncgg ,,, ,,,,, , ,,, ,,,, , ;;,•$,7
delivery' of ....
`Adjustments=
final Application t'or.PaymtenC;:,.
14;1�-14.1a
Conct 'r-ke ar(ontrtct
tra
ra
genel
Tunes 15 35.41 43245:2;
+)13'IO,S
4 5 3, 9,4 9 S 10. ItJ'4.
„' -14.7.E
Perfvrmtmce Payment and Other
progress sctie,dule ,.. �v G
_.
Builders
4grcemcnt=
"Cancellai
dctmition,of .......... -. - -. ............... .,; 12'
....
Gash'All
All -Risk Insurance, policy 'Corm --;, .....5:6.2
Cernfical
4mending c untract Dot:utn35 enty , „ , , .
Certifcal
Ani endni ant;' V✓r ittcn==
Certi fecal
"imgcncral,;., 'flit 145-3.5, 1l1 513;E6;2'
......: ..... 6 S �, G l9 10 1, 10;4; 1 I :
Change i
h1,13.12:2,147.2
C h
appeal, OW^,WER or COITMCTOR
claim
'intent to..................... ?:IU, 9.11 In 4 16.2, 16 5'
ai
_...
1pplicanondor Payment '
definition 6f 13
FNCr&,F s' Rtslwnsilithty 9.1.
CON'
Finn payment 9 13`4; Y. 13 5 14.12-14.15
Cost "<
in general,,,, .......^ b, 2A 5 6 4 910; 15:5-
...
gi
pragress.payTnent ,,,,. 14.114;7'
E
tetletvoC-::_: ,1441`�43'
Cost
16:1 16;6
in gci
lsbcstos—
bimp
clatmspursuant thereto_, 4 ^.', 4.5;3
Notifi
CONTRACTOR autho izcd io stop -Work 4.5 2
Scope
defriitionof,; ,.................. ..,♦.... .........IA
Testir
U
,v
nsurance =m general .....
.......................
all risk"`policy f�rtit,;
S 6:2
10 rovtstons; Insurance_;
5 4 115 S, 5115
ances .....
........... ..11.8
if Substantial �plchon ,,,,,;1
38; b 3U 2:3.
,,,
14S 14I0
of Inspection. ,, ,,,;; 9
13 4;.13 5, 14.12
of InstirAncc ., �17 5 3 'S_4;11 �.4,,13:
� 6 �-.5l8 5
14, 9.13.4, 1412
36ntrncCPrice--
r,price
stmenl 4.1, 4.2:6 4 5 5.15;.6 S,2, 2}4
959:11,102
105i1,12;13:9:
.. 13 13 1314
14 7 U 1 15.5
A( TORS fee
....
he' \Fork
,11G
rat ................. :
........ A-11.7
ustons lo:.:..... r.,:
11.5
ords' ,, ......
11.7
al ..., J'19 1.44;'9,1I 1O
4:2jt)4:3,'11
,in Prtcng'::.
17 3
ion of Sury-ty' •.-,-:.;-
and Inspection,
werinc3he Work- _ _ -
___ 13.9
EJCDC,GENIRAL CONDITIONS, 19108.t19Jo EU7;n0NJ
a/(1TP.OF..FORT Ci?I.t.ItVS MQn1FlCrtTION5 (RF.V 9/49') .
cc
Article or, Paragraph
uc of Workk
.......... ......... ........ 11.3
in Contract Times
iiwfdr tim , 'es, a dju% in ic n I: ....... :4�
.1;416 4,15"5,15'.
6.S_0� 'J'1`95 '9 lh,-10,7=iIU;5' 12.1.
_,,,13.9J3.I3, I 3.14,t]4:11,1151, 151,5i
2.3
0 WKFR's'and
..........
,e, ... .............
....... ;10.-3-10.4
6�f�mlv Work;....
3 :13,
it r act Docuffichts'ces,
...............................
ivaii!. ................
itracrXimes
12
............ ....... ..............
.
16-1 V.7
IET
........ ....
-E.NG,INE- ERS�r6jpionstbility ........ 9.8. 10.4. II'ZAII
,c5ic&inion ..........
'Indem ni ri cti on., ............
�.'6:112, 6.16;'6.31�6.33
Sir "I'll- 11 1 11:1
7o�686,Bondsifn`d. � .. ......
- .- -
.... 5,A0 � 131,1,0.5
- , 7:. ,
...............
...... )5.2-15,4
.,$.6. 10.4
Physical Conditions-
'
submrfacc,and
............ 42,
...........
R68&rj._DoMT i i-6fits .................................
6A 9
-11 .,
........... .. 10.3-1(C4
Substitutes ....................... .................
7:3. 6.8.2
1Unit Nice Work ... .............
!"q
_' I t
valuc'of Work; covered b
�y ... .......
o ....... ............ ,
113ana
ih� �'9rk
.......
cation of
1Sftoti ,jV,5
....................
.......... .
1. 1 - 3 C6thRACTORs OWNERs -an
Tescnsibilities� ... ..... .........
IUA
_jjoght tp4 0 n 114ju,siment., _, .....
.....................
Sccpi of chan&: .................. ...........................
1.03-10.4.
againit 60�rmR ....... ..........................
,Change of Con (race , Pii6e ...........
'-CO,NTP-ACTOR!q..,_.,:-.--,4...,7.1. 9:4.'9.j
............... J L_z 1 i.9, 111
............... ; .......................
commAci,ows Fcc,:
Article ei- Paragraph
'&uAb6r�
..............................
elution ...... .. ..... ; ... ;.. J6.1
)juii m- ixgTeun-ent,
:as initial inteipre ot:'911
..... 1.7,3
9.4.;.. 59:11; Ib. li-O .11.4
to
...........................
ie..............
...............
;.... _.: .... I 2
cna
yuirements ................
- qj I, 12.1
11.9.3
......................... ............
of -ainliritii f Ny"nichiC -
-14.-141-14.15
haiigiDir . ep I
7' -
o
rui and 1 �p etiijr. 'jis
" :., .6! ' 3,'9: r 4; 9 A I
.......... .........
...............
�chnica I Society, rganizatioti
................
mcntofCo'nt'ract- inic
3,
Cornrn� lcatw,4 P
J-1
pplication,for ,N),nucrit
14.12:
pect!on-_. .. .................
...............
................... 1:-3 8;
6.8-6; 11
:ptaW 9cliMules
.............................. * 2.8
X,rkijtlity, b iscrep, an,cy'-,
'OR'ta kcpoH, .... 2.5, 3.3, 2
I !'-% ............
, o6t i '. i .: ..... :,.,. - 12.1 C inuing,the'Work, :., ........... ...... 10.4
'I 1, 10.21 Contract Doc'ujrfehts"
.3A) Amending ....... ............... ....... I ....................... 3.5
15.5; 17:3' Bonds ............... JA
............ ......
L) , CLIC 6LNERAL C01-11111`OM 1-910:8 (1990:EDITIO
w iTy
0
0
0
•
•
'Cash-A]lowanccs ....... :....... ...
....:.:11:8.
Stop Work rcquircments ........ ... -:.
_4;5:4
lrtmle or Paragraph
u r?Taber '
Article or Aaii;raph
-
:I�utii6er
;t hangc of:.Conlrnet:Pricc
,;:;;.!„ la
:;;;,,
'ChangaofContracrltincs ,-
1?'
CBmpcnsaUon
,
IL1=112
hangcs in the �4ort,
1t1_a IQ 5'
Continuing Ohhgation
14:15
sheet andvenb ,,;
„?5
U�%rb(ireWort 96.13)013:19
.:.,
Clardicatjons'arid
Duly, lei` orrect e/ettnt l4urk;;;
13:11
Interpretations . ,; ^ 36 94 9;11
DwytoRgpr17-
?delmltton of
�,10
Changes h the Wod, caused b�
hNGt)`T.FK as Initial`intcrprctcr of „ „ „
;, ;y;11
Emergency., „ ...
6r?3
F.NGINHI R 35 OWNEWs icpre-sell iativ�
- .9:1
Defects m R'ork ofOthcrs,-
genera 3
.._....
Pifierog condition;
4,2.3 ,
[nsurance: ....
Discrepancy.in.Documents 2.5, 332
614,2
Intent ,;;, ......... ,,,•;;
„ 3 1-3.4
Clndcrgreu Tacdrties h6vindiaited
43.2
tumor variations tn.the W6ik :
3.6,
Cmergencres ,,:
¢ 23
OWNER's responsibility to furnish'dam
b:3
<.
F quipmcnt and Machmcry Rental Cast
91AINER's,responsibility to make`
of ti c 1Vtxk... .::... ... .::
114:5 3
prompt psyanent,...... D a, 1A
4;`.1-0:'13
Fee Plas - ;,. ......,;;I L4.5.6,117
51 11:16
precedence,: ,,;, ,,,,-„
1 3 3.1_
befidal Warranty*and Gparentzr
¢ 3f1
Record'Documents
6'19
IlaeardCommunicuiimprograms
622
ReferoncetoStandanis,andS.! cilicah`ons
•Indemnification,-, •,,; ¢lZ 6.16G;l6:33
ofTechnoal Socielicg ..... ....3..A..
........33
lnsputim ofthc Wptl
7;3, 13:4
Related Wtirk
7.2'
I ahnr, NlatenIfs and Fgwpmeri}
p 3 ¢S
'Reporting and Resolding�lhscrepancies, ..
,?5 3 3
I sus•antl Regulations C.ompliancc by .....
— ,6 14'1,
R'euseuC _
3,7
Lmbiliiylnsurancr; -
5.4
;Supplementing ,,.,, ......................
„ ; .6
Notice Of Intent,to Ai prat ,
Termination otBNCINCGRs) mployment
8.2
abligahon to perform and complete
'uhit Pncc; Worl ...::... .... ::.
.11.9,
thc,%Vort
.0.30
van„ations ,;-,;; ........... 3 G
623' 6:27-.
Patent Fees and Royalties; paid,for by
„G.12
Visits to ShN itc,-G1NEFRs
...:... 9..i:
IPcrformance and Other Hogds, ,
......: 1,
tract Price—
Permits; obtained and paid for by ... . .....
. ....¢ 13
sdjustmeni yf .,. 3 5 4 L 9.4, l U 3;1L2-11
3
Prowess Schedule : 24 23. � 9.`6:6,
'Changeof
6-2'1Q 4 1.10:1.
Decis n ori'Disputes
o;3 ....
„ ;.911
Request'for formal decisionomdisput s .,.;,,
,-, 911
kde ..
iti6nTimes- :..;:
R�aCntanglest
.'
i
in lfic-Nark .. .5,: ..9
adytutmenl of 3 5: 4 1 �.4,:Ib,3,;1?
C6ocemmg,Subcontractyrs, Suppliers
;Change of ,: .. ...... .......1:.1-1
_.3
and Others'.: :.
6 t Gal_
.........
Ccimmencament or,..... ..... .....
•: ,,, 23
Conimumb Ihel�Wod ;;,;,,,,,;py¢29,10A..
definition of . ... .
(112
CONTRAC'TOR'sespense....
dTRAGTOR-.
-
CONTRACTOR'S Gcncral;Warran_ty'
Acceptance of Insurance
, ; .5 14
and Guarantee ..............
,, -,,,,,
.1m unieagons - .,,,, ,,,,,,, ,, ,,,,,,fi71.
6,9.2.'',
CONTRACTOR'S review priorto Shop
-
-Continue'Worl. ..,, ......,,,629
10.4
1)rauingpr;5amplesubmIItal ,•;:;:_
6,2:
�coortluinlionnndschaduhng ,
2-
Cotndmatonof\'Port.
6.9.2
-deGninon'Of :.......,
{1;13
Etnerg nm ....
G23
.
�Limited.Reliance on Technical .
-
L'NGIb.TGLR's ePaluotion. Suhstitutes
4.2.2
or "Or -Equal" Items
'e;7;3
May Stop'\Vark or Termmatr;,.
15.5
For Aus and Onussioris
proti ide site necks 1 others ,;,;;,,;
Nil
teal...:. ..........G?5' Indcmmfication.`. 631 G, 33
aeCDC G> NLRPLL'CONDITIONS 1910 s {19w t:ulTION)
ivl CITY DFFC�RT CQt.F.tN3 MOD1FIGd;rfONS (RF.V 9159_�.
Labor„Nlatcrials and Rquipmcnt
o 3-bi5
CUNrRM-n* )RS-•othcr
7
i aids and:Rcgulations , ,.::
. ,.6.19
Contractual I tahilit • Insurance;.;
.!alii 1tv, ldsurance _..
_.. 5.4
Contractual Time Limns
_ _
Article
or-:Parabrholi
Article or Paragraph
13timlicr
I�timbcr
`Notice of.v'arl3tidn From: Gantract
Coordination-,,
Documents... .........
... ..627
CQNIRACTQR'sresp6dsibihty,
....:... 69?
-Pa(cnt Fees'and Royalpas:.::_
...:.:.... ....F 13
C(ipies pf Dix;umeriis ..;
- :.,....: ,,,,, ,"''2,
Permits.-_. ..._.. _.:.. ...
::... . .6.13,
L-4rection Period.,;.
Progress. Schedule ,,,
_--„G.G.
Correction, Removal or Acceptance-
Rccoid poeutiicnts ._, ._ . ,,. „ .
„ ; .,,. 6`-0
;._
of nefecthw lvork=-
tclatcd kV6rk,perfomcd priprlo
in genuAl ;:, ....:
It14 1 13 10 19 14
ENU[NEFR's approval of reymre l
Acceptance 6-Wl jerhtl V6rA
.. ,13 d':3
:yrredttm
sulmtntals:.... . :.:..
:..
Cor Removal oG
.. . ...
safr struclurel.loading
...628:,
6.IS
DejechredVorlt - -
:;: 6:30, 13:11.
_.-
Safety and Proiecnon ..-
G20, 7.2, 13.'-'
Con coon period
13 72
les "6.24
Ies Ret i ew
6:'26
i5,
'and Frocedu
zu chit Cum:116C
StiPeivlslon
SurvitalafOblig?tlnns ,
Taxes
Tcatq'and lnspcphons
To Report .:.:.. ::.....
right io c_laim a 7 1_ 9.4, 9.5, 9;1.1, 10
71'9-1? 1,43-A 145 15;1..15:
Safely and Frutectirnl 6'f) 6 ?17,
SafglyRepreseraativt. :........ .......{ ..:.
Lutes and "Or-Fqua1", Items
;Eicpense .....:;.. .....67I
6.7.2,
Subc6 itractor& Supphcrs unrl dthery,
..... ,.,6.8-6,11
Supeivistoh and Superinten fence .....;.6
1, 6 ? 6.21
Takes, Payment'by....... .............,�
lti
IJ IS of premises :..,.. -----...
Waraoues and�guarantees
6 5 6;30
1Varranty of.l rtle --
,;,,, ,,,,143
Wiitteq ldouee4Requlred=- ,
CONTRACiCIR�stop 1Voik or terminaC.
Reports of Ditiermg StiWnface
,:and Physical Conditions
3 ^;3
Substantial Completion ......:
14:8
7
n
U
urance, additional
.......11 4.5.9
.a,1.4:.2'
IR's Her
,11,6� ,
erises
1 I.45,1
,. ................11
l:>
5 •
idoverhead cspens�s
. I l_5' -
nages ..
11.4.5-6
equipment ..... ..... ...
1IA,2
Psr.......................................
4 s 5
�n`cFianbc$..:.::
:. 1.1,4:1 .
3u_bcontractors
11:43
stru�uon' cquipnttitt
ncry -
-
r
MI& pennits�and �
s,
I l a 5.5>:
temporary lacdtueg; ........
; ,11 4 52'
Work. .....::....:
...-. a 1
rotary f-acthtlea .,
ours ...
I
13 G
Dtsputcs :.:. 9.11, 9:12'.
inition of lil4
ts_
E)COC oCNEI(AL CONOI'1'IONS )91a-s (199a,t Di-nom
I tcny OPFORT;COII WSMODIFICArONS(REV:91.9-))-
•
•
Gorrectiomor Reriiovel of
11 ltl4 I;
Correction ,,Period ........
J3;13
in general .. - _ ,-
13 14:7;• 14.11
Article or Paragraph
` `Numtier
.Ohscr4ationby6NG1NEFR-=- ....:...
:U
OWNER May Stop Wort
:13.16
•PrcmiptNotic;e of Defects
13:1
Rele.ung>,:,
Ltn!,o ing the Wark,: ,
1-3
Dcfitunoris ...:... -:....
clays ._.
. 4(1 6 29 13 3 12.4 t
Deli�$r} of Banils
, 2C]
Deliver} ofeeriifeaicsoGinsuranee.
,-.
,, 2:7:
Determmations for Unit Pr crs
9:10
Differing Sutxsurrace or Aiyslcal Condhions
,FNGINTF.ER's Rey i6%
4,2,4
,Possible Contraat,Docuinentsthnnge 4;2.5
Possible Priee artil Times Ad3ustnienty
,-,. „ ;,, t41.6: .
�iscrepanuessRrpuruiti-
and Resolving „ ,
' ,
25; 3.3,2. 6,1 2'
]ispute Resolution-=
-Agrecm cnt;
) 6.1-l6.6
Arhttranon
16 1,16.5
&iiersll6
- .: .....
- 16 6.; -.
,. ,Mediation
5isputeResolu,tiortAgregtncnt
IG116`6
)isPutes, Decisions,hyhNC+INF h12,,,;,,,;
�(iCUlllUltS•-
:G apses oF..-::....
'Record'6.19
:....??
Reuse of :,;.
)rawtngs-definihon of
:1
"asentcnts .:..::r .........
-...::-.ra,1
;Ifa Luc date of Agr inept'- d.finttiori
of J, ly'
ancrgcnctcs ..,;.
..,::. ....;:6,23-:
i GINEER==
astntuaPinterpret�:r on disputes
- Q,119A2
�efinmoh.of ...........,,, ,
„1.17
nasIacnr t7,?J cr RcPrescnpnvc ;,
IN'EER'sConsultant---ilefmncon:of,,,;
ix
Work nottcepf
n of Substitute Item,,,;,,;,,;,,;,,;
ork'is Acceptable
ons:.....:..
9. .
OIL+NER's•Rcpicsentauvc:,,-,;;,;
9I,
Paynicrittito the C N` IZAf 1 OR
Responsibility Coy
9.9. 14 '
Recommend nrnn oFPa}ment__
Article or Paragraph
Nuni h r
Respon"sibtLues; L'imdaLonsoti- ,;,:Q
11'9;13
Rcview,6r-R—epaigonDlftering'Subs'urface�
'
aPd,P111'SicalfoPddltlnS::::.. ......,
a7.4
.9 13
...... •.........
p.6'
9.7 9. )
.9.2
and..: ;....................G
3-4:5
W&L,
11.4_St3
upmtnt ...............,
.....6:7
4GIN1;E1t
}.6.1.95
on far Payinenl,;,.,,,;,
,,,,;_ ,14.12
cashallotmnces,,,:.
definition of ),20'
princtpgl roki-enczs to .............
;GtungNotiec _ ..17.1
Guarantee of 1VorF by"CONTRACTOR 6.30 14.12
�munientionPrograms,,,, Ha�erd Coin„ ...,.:.-. .
hazardous Waltz--
definition of ...:::... .............1:21
general .,, J 5-
OWNER'sraapnnsihilrtvfor-,;- „,h1(1
EJCDC GENUtAI. COkbmONS 191UEl DI nOm
W nW bF.FORT 661,1273 rfocimcdmx% (REV ?i¢q)
0
Indcmmftcation 6l� oIG,431633,
Insurance
53'
"InittaII% AcecptablcSchedules
q
Precedence
31 333
Inspection -
R6crence to _
14 12'
Safety and Piotec ion , ;, „
620, 1312.
I nal .., ......,
..,i4't_1,
ubcontractnrs; Suppliers and Othepi ....
.,6:8-6.17
Alfiele of'Paragraph
Article
or Parapapli
Nan&`r
Number
4Special; regtlirtd bkEXbiNGGIZ,..............
„9 6
.. :Tests and inspeetivm.................. -
Tests;andAppigval�.:.,:: i8;7,;13.3;:13,
uscdPremrs s„ ;.-.:... ....::...
.....4a4
`Insurance-- -
Visits to Site
Acceptance of; by; l)WA'FR..,,.;
... 5.14
1la8il4lrisurancc7,
Additional •required by changes
CON'I RA( TOR's
tri the wor1,.,:.,....
11A.5;y
(J1VNhR ...
5 5.
_.
Before starting the�Norl ,..
:
27
Licensed Sureties end Insurer$_.
,,.._ .. . .
"Bonds and --in general -. ,,,,,;,, ,;;,
...........
-,;;;;,5
Liens -=.-
Cancellation Provisions
5,8_
e pplicauon for ProgressTaymeni
14.2,
Genificates of . , ,. 7 5, 5.3, 5.4a1. 5.4.13'
C3nN'! RACTOR's Warranty of Tit
14.3.
?615,3;8514;19_134
1412
Finnl.Appliaitianfoil''Pa icnt ........
.....1 ?,
completed operations :. .. ,..:
::..... .' 4.13
def nition of ::.: ... ....
. . .. l 23
CONTRACTOR s L' iabihty
5 3
1Vatwi- oC Uaims
14 12
CONTRACTORS objection to coverage-..
5 14'
Lim tau son CNCINCT,R's authority and
,
Contractkal Liability .. , , ......
,•: I0
responsibilities- :
:_ . ;9 13
,
deduclihtic amoums, ONTRACfURs
LimQ- Reliance by C'6h'ft"CTOR
Iresponsibib9..... ..;,.. ..............?.9
Authixtnd
9' o
Final-Apphcaoon for Yayaiient,_,
0
14.1_
Maintenance and Cfizraung Manuals
Licensed insurers,,_,
s'3'
Filial APohciiltion Cor )aa 7nent
14 h
Notice requirements, materiel changes
5 $ 10.5
Manuals:(of others)-
Option to Replace
14
Precedence .............
3 3 3 1
•
other special insurances
,,,,,, 5.iS1,
Reference to m (2on4act Ut mine it},,....`,
OWNER-ns flduciary•Car insureds
..........
5 125.13
Materials and equipment--
I tali lily„
5:5
Famished by:GUNTR C>fOR ....-„ ; ..
..........6
OLVNER's Res =ibililY ::......
$ -`_:
not incorporated in Worl ...................................
a l
Partial Utdtzatiun}•Propety`Insurance
;,,,;. , .,_ 15
Materials or equipment eejuii6lcnl .. ...::.
. ......4 7
Propzrry_ „_
,; S.G-5lU
Mzdatimi(Opuonal)
167'
Rzccipiand Applicanun of insurance
Milestones definition of ... _
1;°q'
-
Proceeds ............................
....; 12 4.13;
1 isccllancous-
Special (nsurancc_,-.
,. G';l U.
ComPu[aticm'of l Imes ........................
17�?
Waver'oCRights..... ............ ..
...:. .. S`li'
CumulalntRzmeches
17. '
Intent of Lontracl_IJocument4 ,_„ „•,,
, , "3.1, 3:4
Giving Notice,,,•, _,
6iterprelations and Clarifications
3 6 3 9'4
NulicesorClaup,,
17.3
g
fcssional Fccs and Coourt Costs Included 17 5
�Labot.Mat�nlsrmdl ui mends,
9 P
y....4 36,5
Multi-lSrimecontracts
}
Lands--
-
Not Slio Fri or Indicated
and Easements
i:g
Notice of
4v atlali ihty of :...........
4 1 8.4
Acceptability of Project ...... .,
Re ris:andTests:,,-
..
_b4
." do
Au�urd. definition of ,,,,,.,.; •
,.. ; 125
Laws diiil ReguMt[oils-=Laos 4rRegulaiiAs'-
Clabn , ,, , ; ;,; .......
?.7 3
Bonds ... ... .
S.}'-{r2
Detects.13.1
Changes in the 14ori
li}A
I�iffenng SuhsurCace or 1;hvsical Conditions ,,._, 4,23
Cdrtract Documents. -,,.:,-
Giving
: 17i1
'CONfRA4TCIR's'hespnnstblities
61a,
`
Corrcy lion Penoil,de(echv e R'orl
13 13
Tests and Inspections.. ,:
l3 3'
Cost of the lforly iaees ,,,... „
, l l 4:5:4
Vatiatioq Shop,Dmvvmg and Sample.,,,,
627
definilionof -...:. _ ....:_
la?
Notice_ to Proceed:=
gencrslG l4 ,
definition o[
176;
..........
3icaa.............633;
..:.
plying o
...... ,.. ...
3Ind
s
COMITI
ON)
"-
vrr CITY OF FORt COI I W MODIFICATIONS
(REV 9/49)
11
•
'Notificationto$ur&t ;.
". 1f1:5
Otiseitiapnns, 6y 6NGINFBR
Occupancy of the WoFk -,
5 15 6.30.2.4. 4.110
Orb isticpns or, acts by CONTRA" CTOR,;,,: ,t59,-,9.13
Open Peril polipy form, Insurance .......
S 6.2
-Option,to Replaee
5']4
'
rlttcelc nr Paragragli
Number.
°Or Equal` ..........................
. 6.7
Other work 7
Oi•eritmelNork-Prohtbtiiono[
;:,,C,�3'.
CriVIJER--
•,
Acccptance ofdcfecOri_ Nbrl
aippotnt'an'FNGIIQEER;
bs flddEary
.....................
Availabilityof Lanch.,responsibilitg........... ,, 4;1
definition of
):27
da4i; Cornish
;6.3
4a" orrCCI, efcctneiVorl
15;i4 :.
A4ay refuse to mal-a"pa}munt
.:: .... 14;7"
..
h4ay 3taf lhg A'orl :...
. _
....-. 13:10
`_May Suspend tfiuk
Terim nie
$$ 13IU. 15:1=15,4
E'ayment male prompt,;
3 1d.q,'14i13
perforinana of ot6er,worh
71
1:9
ton J'11
5,'5 .
'gnsttuction • '
' 9t1
arrangements
:,.:�>1�1,,..
, BS
.,8.4
...................x
a
_
TOR`§ .
t site ...... :::.:.::.'
tecttng; tndependcnt 13`4'
ucc,or,occupancy,
of the %fork..,,,.. ..... 15- 6._30.1,4 13 14:
whuen`consent or approval
reyuved ...:: _. ......9.1,
71
UKW. G NM%LCONDITIONS1s1q 804901:01-noM"
ry/CITY OF. FORT Col,lilNfi hTOPIFIGATIONS,(RFV 7%99)
O
O
00
z0
U m
w
CO
K
•n
'vim
.aJ
'i3.
.V,
oo
a
. ma
N
w��
n
;n
''u
iN.b.''n
1.'
a
1
j
a
�
9
v
t
e
E.
0�
O
Iw
I
m
«O.
cc
C
Tj
�
VI
�
m
N
N
Y
'O
O
N
v
Q
a
v
Al
0
0
O
.AAi6le -or
'iI6ritteri fibitic, squired
7 1 9.4; 9 11
.......................
PCBs.-
definition of,,., . . . . f. t . . . . . . . . t7
t- 7 . . . . ...).29
........... ...........
.... ..4.5
lipps'. I ity or..: .....
.. ..... ;Alf)
Partial Utifizalion
definition of
......
Tenern 1 6_30.2.4,f 4:1
............... .........
altics................................
iymerus, Rtcorfirfiendation of
144-i1tl.7! 14:43
ryrnents Lo.CONTP.ACTOR and Completion.-M -
Applicaticin for ProgrimPayments
.. ...............
14.2
.cow fity- o'rl'itic
RAGTOR's,XV=- 'a �
14.3
,
f�nal ' Xpplicatiin fi 5r
�j ; 4 2
Final ns peet, 16', n�
I..........14.11 . 1
11 1 .....................................I
,Fifial N_Irncnt and Accd 6epiance..
, I
14. 13-'l 4.14:
I
.gencrzl_. ..................
.......
'Partial
......... 14,10
.
...........................................
.
.......... 14—
ev cIii of Applications for
Proggess Paympnts.:, ..... ....
_11 4,4-,14.-7
prompt ...... : ..........
Schedule'f I
V� ties's ........
,
sulsta6tial Completion ..........................
1*8- 1,4'.'9'-
!14.1.5
when payments due .......... ............
la A, 11
withholding fiaymeivk ............... ...............
:rformance,136ids .................................
...... -5:2
:rmils
,defihiti6if of
- general ....... ............
....... 4.1
Co l iysi6anditlbn
, , - �-
I I .
-
FNGTNFFR's rcvic;N I. .....I:.:........
emsting sIructurcs_
_general a,2,1.2 ....... .
...........
Noticeof i4f(ih�p Subsurfaicc;or .............. ........
I L'. - . - —
PO-s-sible Contract `DocuincntiXhangq, ... 4
........... ; ..................
4.21
.................. , I
. ........... . . I . . .. ...
of. ..... 1, 6:20
Article rl'i"Para'graph
Number
4:31
4.22
V I I I A%
............ I ............
Utilization', ---`-- -----
--- -- ---
;:5.15. 14.10.2
-
;� and appfcaition-of pro*ds.,-.,,
....... 5: 12`5. 13
132
.... �J_4.
in of�, ........... .... ............
............. ....
.
45,
R"Fls 6 it*-rk_;_, ...
1a;ion of� ent;
14-4 14.5; 14,13
Anicrits ....
............. & 191 14111,
......
... 4:4
33
........ .......... ..... ;_6J4
9.6
............ ; .................. -7.3
i1nu .........
replitcenient of.ENGLNELR.6y OWNER:
....... :; :2
Reporting and'Resolving
Nsere,p'nei cg,., ...... ......
3.3.2,16.14;2
Rapbrts—
aod Dr,,ving . ............ .................
and TestsI'.01VNER's iesocitikbility
...... .8.4
Reside& and Project Rcpr&qentatwe.--
tefintticin ..................................
J. -33,
provision for .......... ................ . . ..... : ........
0
0
Article or, Paragi I h:.
Num t
Art icl e
dr l aragraPh
Nurriber
Resident Superigtendenl, CONtTRACI ORg C2;
Responsibilities--
submittal7eymred ;,;. .......
624'.I
CONTRACTOR's-in jencral ,,....
`6
Sub-littal Proccilures
„ 6 25
_,,...
ua to,approvc suhstituhons,.„_,;
¢;7-3
Shoi6n or Indicated
14:3.1
kNG1NEER's-in gerierel .... , ; ...
,,,,,,,,;,, ,;9
Site Access ..... ,,
7.4 13 2
Limitations rm........ .....
,, ;;,,,, -,9?13
`"Site Cleanliness - , , , ,,; ;
....... 6 1T.
0WNER's-in l cneral , ;,
, $.
sht ; Visits o-
e Retama
g
1d:2
'byENGiNCER
92�13.2
Actik of Docwient ..,...::.
;1;7
b'y c'them,_ ...
Rcviea by CCIM RA&OR: Shop Drawings -
°gpccial causes of loss"spolicy form', :
- -
and Samples Prior to SubmulaC .:....
_:;6 25
insurance
Rzt iets of Applications for
definition of ,
C36
ProgressPaymcnts ,,,;,;,
14 4' 14.7
Spici Ications—
Rj ght to an adjustment.........
10?,
detnition of _•
l 36:'
Rights of l4'ay-,
a,l
of'I'ecfimcal Si eictiet. referee c to
Ro}alhc4 Patent Fccs and ;;,
¢.12'
prcceHcncc _
_ .„•.�,3 3•'
.Safi:i5truciural..�l.oadmg.;
;; ;';¢,'1.8
Standards and Specificauoris -.
`
':Sa_fety—
of Teclvncal 5itcietie5 ......:, -.
3
and Protection
a 3 6.16 6.18,
Starting Construction: _neforz ...
620621
72132
°Startingthe'\,V&k
general
G °U' 6 23
Stop or Suspend Work,-
,;
R�presentatn c, CONTRACTOR 5 .:;:
...;k:21
hY CONTRACTOR
15.5
Samples,-
hyO1\NEE ... hti;;l31f?,I5:1'
dl rmition of.
1:34
Storagz of igatermI an d equipmzn(
4.1, 7 2
general ........................
.424428 28
Structural Loading Safety
o IS
Rzvtew,bJ CONTRACTOR
6 25'
Subcontractor
•Rcvicw by liNGINFFR„ ,
(�6,'G 27
Concerning
M ate, Work
¢.28
„
definition of ,,,,,,
j 37
suhmittal.of ; ....:.:. :..: ..:.
_.
. . ..::..^6 24:2
Idelays............
: h 3
subntMal ,procedures ,;;,; ,,,,,
,, ......-5.
waiver, ofnghts
•SZ:IQtilcbCprvarrsi- .,,.;
�5.?:9766;
Subcuntniclws ingencra! ,;, ,_,;;;,.:6.5-6..11.
•-;-„�6
G�9 1_Q3,15311'
Subcontracts--reyuiredprovlsion;,_„ ,5.11,6.11
11'4.3
Schcdul� of Shop Drak mg and Sample;
Suhm hills
Submittals:,;, 6 ' 8 2 9 6 2 -6.-28
Applicauons for Pa}intent
........ 14 2 .
.Sche=-
6?.S3.9,1i
rnan vaalsf r
la'12
St hedules;=
Procedtuzs
¢ 25
Adherence to,
j 5 �. 1
1 rogrpss Scl eduI"
6 9-
Ad usun :.
J 6...::
.. 6,
k'
Samples
624-6.25
Change of Contract Tinier, ..... ,,;:
10.4
Schedule of \'nlucs,-
2 6 .14:1' `
liitunlleAcccptablc _,.;.
'.8 2;9,
SchcdulcofShoplhilwingsand Samples
,..,-;
Preltmma"
ry,_;;
-..-2.¢
_ Submissions ...:
�.6 ' S 2:9..
Scope o(',CFianges ...::: ....... :..
.... 10 3' IO.a -
Shop^Drawings .:;. .... ... ,. .......,;;6.24-6.2$
-
Subsiafa`ceCondiuons ............
4:2.13
Substantial Completion--
Shop Drawings --
cenif atlon of ¢ 30.2.'3, 14.R-14:9
and Samples, genera► :. ....
, ,,,, G 24 6.28
definition of „: ,,;;
J 3$
Orders k Applications fo_ r
Substitute Conetnwuon Methods or Procedures;; ,,, y 7 7
_Change
Payments, and
9:9 9.9
Suhstitutcsand "Or lrqual Items ._.,
6.7 .
ilefmitionp[-
1:3S
CONUI2 TRACT's Expense,,,.;;,7.1.3`
.
ENGMER's approval of
3 63,
ENGINEER s 6yalustion ......
6,73
L`N61NG 's respon'sibility
"Or-) yual"
0.7.1.1
for review ... ....
9 7 +6:34 b.28
Substitutz Ccnstructtor Methods'
related Work,
�8
.rcvlew pfocedures
R 6 16 oK.
Ejc6c r N' c7 L co6D1TIONS 1919.Sit99a EDITION)
wlCITY OF FORT C0J.1JNS AfODIFICiTi6N5'(RF V 91W)
TcmpniarycwnsiructionfaciIIlics..
_;_,,,_,
Arliclrot
_Paragraph
A tick or Paragraph
Number
'ISumlzc
orPrbUdures
67.2
Teimintition--
...
suhsritutc ltents '-- r
6 7.1.2
((�NI RAC'I )R
'-
t i 5 -
Sulc9urfaceandPhysicalCondmons=
tyOWNER .:.. ...;.
&S 151154'
Dretvmgs of to or relaing 19,,,,,..............
2:1 ,2`
of BNGINFsERs employment
,,,,,;;; , „ „ , b �,.
EtiG!i�ELR's Rcvien
,.......
.:...4 :4
Sts7 edsion oC Woik-in general
.... ....:(5
general;, ......
4.2,
Terms and Atllcclive$ ...;:.: ..:.:...
S.a
_
Limited Relinrtce by CONTRACTOR-
Tests.and Inspecuo»s-w, -
Atithonzcd --
........ - :4 2 1
Access to the................,13;'_:
....:: .....
Npti c•of Differing Suhsurfa x ar
CON fRA ORs resPonstl hhis ,,,;,, li:5
Ph}5tca1 Condthons
4 2.3
cost of 13.4
.,
Physical Conditions:;
4 2.L2 �
covering \York prior tq ,-,;, „
, , , , , ,13 6 13.7
Possible_CcmtraccDocumtntsChanga, ,
,...,; „A 3:S
Liiwsand Regulations (or) ;,
„ ;, , „43.5'
Possible Prue nndTimes Adjustiuznts
4;2.G
Noticeof Defects
13:1
"_"
Reports 'and Drawings -
A:^_ 1
O\41y1'R May Stop 1Vork
Subsurfacpnnn ;,, ,,. ,, ,;, ,,,
,,, ; , ; a.'?
OWNER vindcpcndent lcshng
...... ..... l 4'
, ,
subsurface Conditions at thz Site-
, �; ,4,2 1-I '
special regwied b} I:.NGINP.6R
;, ,; -9.6
TechnicaGData,, :.:;......
}.
tiiirely notice rcguued
.,:..
,,,,-::„
Superttsion-=
UneotennglheWurl..atENGINCCR'sl _ -
COI�TRACT,UR's'responslblhty:_>
C•,I
request, ,,
)3 S 1.9
O\VNhRishail not sujtcrvts�
h 9
Times--.
ENGINEER shall not"supervise........
, 9 2 q 13
Adjashne ...:.::. ... ...........
.... ..... G6
Superintend rice. ,. -:..:
-.-:,., .., �:',
Change oC C-ontract
12,
Superintendent, COXTTRACTORs resident
62
6nipulauon of; ............
172
;Supplemental costs
11 4;5.
ContractNimes- definition of
1.12
Supplementary Conditions:=
day'- - .
17.2•=_
definition'nf ::.
_ ,:.,1.39
MilcstanLc -..._ .......,
._.-.
............ ,12
prmcipnl rcfcrcnas to
- .:...�.
7•
Rcqutrcmcnts<-: -
4 4 3 ,5J11 S 3,.5
9; 5.65.9;
spgcals .'- ... .. :.:.:.:.
......91(Ir'16,
S I 1 6 S, $ 13, 7:4, 8.11,`93;
9.10
clarifications,
Supplrmentina'ConlruclDo uments,
3:6
chiiins.anddisputc3-
911' 11:2,`12'
Supplier-
:Commencement of Contract
Tine¢., �2:3
definition of.; -. .::::. :::.: ::...
;::1;4Q
Precanstruetion Conference......
,. - ....r R -
principal nfcrynccs'ib ,.3 7 G S
S G I1. G27,
seh.dules ....4-1
G, 2,9,,6:6
- -_.. --. ----------- ................ °4.
9:13, 14.12
Starting thc'Work.....................
...- ^4:4
Warver0 Rights-,:,:;
6:PI
Title,;llarr'tyof,._",
143;
Surety - -
Uncovering 1Vork;,,,,:::;
13 5-13'9
-
consenl_rto Cmal payment ;;, :,.,,14:1'_',
44.1.4
Underground Facilities Physical Conchtiens=
ENGIN PR -has no duty to ..;... ,............
..9,13
definitwn of:...
...,. ....3 41
Notification of :.-_:: ;10.:1;•
R'3 15?
Not;Shown ci Inducted ,.::.
:r=x _4;3,'
qualtlication of,•,,:-. .....:. ....:.... ...:
: ,-.. ? 1;5.3
prptecdnn of;, , -
....;.:::...• .. 4 3 6:.2(i .
Su ival of06hgatrons,,,
Sti"wn or lndicated .,,,:.,,:
..... .::: ..:..4,33
Suspend Work 01VN) R lav :_
13' 10 13 1
Unit Price Nark
'Suspension pf LVorknntl-Termmatlon
::..:........� :j>
claims _. ,,,,.,-; ,
_ _,:_........... ,t.l 93-
CONTRACTOR May Stop Work,
dcfmtuon of .........................
................. , , , l♦42
orTeimmaiz;. .;:_.-. ...,.:...
:15:5
generall1.9. 1d.L 14.5
OWNEItk6V§' i-mcnd Work __-
„_ I :l
Unit l?rices•-
014RvErih4ay Tara irate _,.:
15 � l5 4
ge6eral11.33
TaRes- _Payment b}' CONT R'wMR
:... ;�;15'
Determination 'for
9' 0
Techni ail Data--
Use,ofPremts�s
6 16 `6 IS b 30.2.4
LmiiIHReliancebyCONTRACTOR
9'_3
Utilityottmers
6?Q 71,73 13:2
Possible Prtcrand Titnzs Adjusilnent@
Utilization. Partial 1 �S:
5.1>,6 30 2.4, 141U
Rcj)6n:.of Ddlenng Subsurlace and
Value o(thc Work
-11:3
Ph}sicul Corid irons ;
4 2 3
Values, Schedule of
„? 6 2.8 11I. I 1,
hr
lslcnccanvrni cowmo�si9to-s(iv9
ruin
vu OTY of FORT,Cmu.im.MOt)IRMIO 'S (RU 9
I]
I*
,SIa-ri ati on.-v i n'Work---.Minor
Authotize-d..,
Aft icle w Paragraph'
Num tier
Vlsits to Sit64), ENGDME .......................
:,,92
cr,
' �Vaiv ofdlairvis'-on-Fifialt n.
14,13
%Nfai6u of,];ijhts 1y insured f'),a'rtic-s
Warrant} anJGuarantbe.'General by
coNTRAc-r61z .... ........ v ...........
- ............. 0�30
Warranty:of Title,
to
13-2
....................... .......................
...........
s7lii .....
..... — ... .- -
....10,
ling ........
.... ...... 5.29
I of
...........
by
OX*ER'hik
(MVERWv-Suspend-Nork-, ..... 7�13. I' 15-1
'Related Work 61.9ite
�.O.
T 1-7.3
Starting ........
. .14
Siopping
stopping by OWNER
...... I ..........
ation and dOviltt;on authctriud��t�irlo
,NarrIV .... 3.6
61aims pursuant to
........................ ; .........
dcfini . tiaT . 16 a f
.........................
...............
principal references to,;,,
3.5,3 10:1-10.2
'Written ' Am endmenl--
definition of,
1.45
pp,ncjpnI re.fCTenCLI tq.._
... ........ 149.3,5, 5.10,154.1
...
(S.6-2,'45.8.2,619,
..........
Alritten Clan L%tions and
Interpretations.......
-t5,1 9.4. 9-.d11
Wrifw n Notice- Re—quiired-
- I
by CONTRAdbg_;,,.
.... 9,1().9,11,
.............. ................
10,4, 1 L2. 1 2'1
,6, OWNER:., ...... .........
9,10-9) 1, 1(",
�Ej NLRAL CONDITIONS
- WOW OF, FORT COLTINS MODIFICATIONS (Rf Y 9N91.
0
P
`('f liis pagcdctt blank intenbonally).
0
aciic cc�w�a:•co�nnbvsipi o-a �)ysii uimom•
Nvi t-JTY OF'FORT C'O1.I.MS'MOD1FICA-ROH (REV 9 99)
•
•
0
GENERAL CONDITIONS
ARTICLEl-bEM- TQOjNS'
Wfieievei'usedih these,GrrierihConditioits.o to the'oiher
Conned Document's the 'fol6v—inb 'temis have the
meanings, indicated `%Ouch' are' upphrable ata both the',
sT !arand.plurml the '
1 1. slit iida=ltritten .oF.gmphic 'instrumerim ,issued
,pnoIr to, the opening,of Bids'. which clarify, correct 'or
change the Kidding Req iireman' L' or the Cttntrnct
3)ocumcitts.. - .
] ?. .�l�rrrmetrr-'fhc vtnttert contract lxttrecn OWNIK.
end CONfRACTOR,ouverirtg tlic Work,td be perfytiiQ;
other,{ gntract Doc`umMyg n'`re'stinched',io:th_c'AgrMin int
and muffle a part thereof as prof Ode l therein,.'
1.1 . 4pifiedlgn„40r AYNnanl-'I he furor .4 t tc�d !by:
8N61Npj,R which'is to be used,hy, (.ONll?ACrOR in
requesting pr,Wcgs'or final payments andiAwliich is ic'.hc
i ccotupanicd by such supporling i3ocurachtation as is.
rcquired,b'yihc Contract Documents. "
] 4: ilsb6f&-Any matcrnl f6m contains"more dctn one
pereent ashestos and is fnabli ur is rileasingiashestcxs fibers'
,into the air atmve'currentaction"levels established bpth"e
Ili6letl States nccupntionalr Safet}' and 'Health
_AdtiirdstrSUon: -• - --
1 Bid Tlx offer or prolviial of the bidder vutunutcd
on dig piesinbed_ I, satti g ford[ the pncx'for the Work
lobe pertbrntcd: `
16 Bidding Dociamp'ls -the ii&eitisemenl of
ion invitatto Bier, utstructions'`to bidders,'thi'Bid fonn,'an l
the; ropaeed f ontract l�ocunients (includiig allAddend
lssuedprio"rtoieceip(ofBidl): "
17, Blddarg Rzqutrem?ntt-The afi•ertisement or
invitation ;to 131d,instrurti6ms io biddersand the Did form,
1 8. .Bonds`=Perforntitnce'aiid.PaynletfVb6nds and -other
trisir_umenlscifseciirity,.
1.9. ,,Change, Outer A ,document :recommended iby
1TTGINEEM, which;'is sigaed.by,CC TRACTQR'end
OSVYER e xl eu h razes an s l J lidm deletion or revisim in
IFie tVork; of an adjustrueW in'the Cunuact Price or flit
Connect Times, issued onur ufter,ihe Effiiaivc 17ate ofthe
Agrrtmert '
"I:1Q,:, Cantrncl'.D6crnrun6=The Agrecmenl, Addenda
(which pertain' %to ;the' Contract * `Documents);
(.ONTRACfOR's 'Bid (relating ' documentation
aicompaiiyiril, the ISM and;any"past Did-a6tiirnentation
submitted.prior to;t}ie Notice: gf Award} wheg attached as`
an wdtihit to thc.Agrcertiany the; Nnficc to ,f?rocccd: the
Bands;' these _Gcneisl Conditions.. the; Supplemei tary;
Conditions, the Stec fieatt ns and. tha Drawing's as the
t• 0X QENExM-,CONUlal Oil W a-8.(im Edtiail;
iV! ❑v OF FORT C&Llf'S 41OUtl iCAT1ON5 (M ' d20a0).
'fA ('a»bnLt P+ite=The mpnct� paytiblg .by
'b%vigER to CONJ'RAC'rbR for wmplttion of the Work•
iii acc.q nag ckilh•ihe (:<intiact- Doauinents as'staied in,
,the Ar,,reement (subject tu_'dhe provisions, of
jziragrapli,l 1 9.1 iri the aise'af Unit I'rice'Work),. � ---
L12. Canliucl lines=Thn numbors of, days; 6i, tie
iiitcs statcif in the Agreement (i) to aahiete Substantial'
Cginplenom' and (u) ci complete thq ;(York to that it, is
ready for final fxty'Tic ;as cvtdcnccd'••hy hN(iINBHR's:
written recitmmen, ation'or final payment m acobh1uner
Grith pirragrapli'14; l 3:
i,1_3COAr&44.76R—The personrfimi or�corpomtiow
ith whoni,'WNEk.fias entered into:Agi'cemmt..'
1a .Di-aii�ii;gs—The dratvtngs which show the Is.c e
extent,and character oI the Wort. to'.be ,furnished ind
pe.i6rined by CONTRACTOR ivd which Itave`.b� i3
pmp<red•or nppioved,by'UNG1NFiER.rind arereferred to'
in the Cuntran Documetu Sfiop, drnwings. Hrz'rio
Drewatgs a's so deftned..
I IG, tki&Ye Dab: of the Agrveaieni=The 'date
indicated in the i&eeiri'en%on which it'betomes eCfechve
beat if no such date is indidated tt ntea s,ihe dale.on v# hich'
ibii'Agm reeenl,"is signed'and ddivered In the_ Iasi_`of the:
two parttei,to sips and ilZfiYer, -
1.17 EAUME, CR Thc', Nrscm, fr ml or corpiratiun"
rained as such in the'Aweem 01L '
1.18, 'EAUlAtERS : Ca» sirllma-A.:person, .:fait or,.
i orfwmtiun'h'aving iieoritraL,t.withT?NGINETR lo.firmish
serJrcis as it NGTNCER's urdeptndenl prole •swiii (
utiY>ciate,or consultant with {esp'acl tee 11W�Pr(lect arld who'
ts'identified as such in ii e,Supplementary Gcmditions.,
AA .Fi"1ld i)ixlar-A written miler issued by
ENGINEER Mitch orders mator char>ees m the-Wor6 iq
accordance, ith paragrtph:y hu[ n'hiah does noLmv ve_
a change in Ile CanntractPrtce or the Conlcact Time3;
A,20. of.
hz .peci ications:
131. H6za,doi&H-'6sre—The'[dTdrtinidoUs WAste, "H
fiavi,1 ih' 5' * jrwig -pr- ' �`o.vin' ided. i" � Settion"1004. or the Soli
1mc�,,
1 ''1a. Laos and Roulatiofu,, Lu
r6gulutittim ordinances,-.
�ccidcs •phd cirdes:of any trail. yll'�gtWe equal bail ea;
-an
Fen 'gjurisuichon.,
K;tlie Cirv,-nf Fdrt Collim
Lieny-Livis. charges, Ly', initircsts or
.6cumb7anc-cs u ron real P.rOpC,rty 9F persoriil pmperty-
1,24. Alilovom--A -principal event sp&ifled in ihc:
Cbritrit'&,Doauiv'ents' ieliltU'lL L' ' - " ' ' ' 'I
plate- _ 9 an Internicilike'66olp " '
etloh
or`,time ppbr'to- StihstM.fial t&iplelij-On _64 Al lh'e.
work.
i kot .
io
ng, l'upon c, lhe`upM6cnVsuL6es.qru) bidder *Wi tha " Liinpfiah6.6
C jj�. 'tjte' 11-11 bidder With th coMiti6risr
apparcht �.succcss u , id,
enumerated . icrein, Nv n ulle q-wdirlc�
- �l - . � ��.. -1., ithi qfi� t.
prm
5
16 Pro pezlL-A Nviium, notice R-w-Fen.,,by
Lwig, the 616 -on which �ilk Contract Time's"_ ivill'
,opyrimcnee IZ)run at on which'( ()Al RAC l'hR shall. earl
to perform 4CONTRACTOlk'S --itbli6tionsi !under the
Contract .Cont.rdqi D&uffi.ehts.
-1.27.' C tiods. T .6 tho ty, ororpaa�7Tjiet li L u ri
with wharn
_association,'
l lon., ral Cu Per
COXT,�'AC Fail
R, :CntcrM'into the Agrecmentpn&fm
.1lai
whonvlbN!drlk is tc_N' "dd. pr,ovl.e
128: NtiMl UtifizatiohLU&i K O\kqqER of 'a
fwirt. of tbc 'Ndrk'{6r. the perjxoic
'for WN16h_ itisinten&d,(ciri related •fiirpox) P riarl
compjzticn of all.thd Word
1.29. PC-Bs-Polvcftkiffiizitcd brhenyls.
fraction.1hereof which 'is'lkjijid`aAwnaaid cOfidiiicirls of
lZnip_e'niik�r'elend p'n' - (GO dearees �Fahrenheii
.-and'
14.7 pounds tief square inch abs-61tite), such as tit4pevoleim [tie] oiLoil sludge; oil'refusc gasoline. kerosine
'6il 'mtxeil and ails , With uther.pon-Ilazardous.Hasd6 tes and I LTu
t0l: Prciject-Thetbial'cbrmtrLic6dicif'%vhich'ihc'Wciiki
babe proy ihe'CcrndMt ]DOcuracrits may be;the'
N,%O,e� ridicate L " Ila
seiv -
here 'in,i - e Uirinct
_Dctciii
enls
1,324. 'Rd&d6i7five Alateiiuhsoufcc's`peCial huclear; or
-fiypj4� d f 'jiiierial as'definiid-bitfiii Atrilrifc Rrierj&A& of
LUMMODIPICAMNS( W4n000Y
0
1 9 54 02 1ISC'$Cctio I n,2( A I I et I so AS am
,iimedn time;
lJib: ;Regrilrijt
aie .defih' l_ as -1:00prit to &GOrim �iuiless.-illigmse
si
cifl6d in the Greneriil.Requiraients
andother' OLher 'data or.-iIfbhiia6on_
Which are fiy'�or'for*
CQNrrRAGT6R'.-and subniitipd by.] CoNrr%4(ftOR .to-
J",61 `SpCCifleqfions—`I'h6se pnrtionm of the C;ritriict
unicns i6c eot consisting of %;7iticn technical ddscriptinns':Of
�
systems,
' ' ' '�at
''materials, equ - "'cro ma- — ,applied i.- the` \VorNVstnl
.%,vork"fi_,Nrup as 6 Liv� cL liciihicili itarniA&rd 'tallsW L*ta
PP
1,37. S I ubcmiMk$or4,-M indiviLfil, firm or corporation"
li;vi6gg a clir6ro6rftrattwith CULNTPAC I*OR,4vv , ith in
other, Suhcctfi tm'dor or, the In
1t3R Sr fistannal Complefiqwjhc Work' (oil . a •
r—ifecil'piin'.theieof has; ;p , rotgess ad to thielpoint i�-Nere,
7elbe- �ofiiAi dfi VINRMNHPK' as ividcinizd t*
LWGMEMM defiriiiive certificate,. of _' Sabitiirmtul
Cohipleton. it Is siifficienlly complete, in accordance With
the 1V6r1
Cali be, ulilizzd fOr: t*_purposes -,brw 0h: it -ii,
--- -
attended; _ Or if iio'such' 6crtiacate when the;
\VL . A is �cojiipkle.,zind ready for. as
evidenced � by' FINCITNTURs' �Ucn, F-Ccra - niendationof'
firml pnyaieiit iin,accorilnnce with 'parop't-'ap'li 14.*13' The
tterms siihslaritia6 complete' and "sulxclpnunlly .
ujs_ilppiiid lo,ijll or ficul 'of the kv ' ciik're wlto-,
Substantial CornfileCim�AherelbIC
Conti , aii t Ductarienis Which Hmend% stjppjeinents;,�ese,
General :cn tiOns
falmcator . sqpN p_ .cT;
clistribuiLi'.-m'iiteriahn-'amanufacturer,n'or'vendor, having, a direct contract-
wilh`-_CQlNI*P_AL'T6R* 'oi A�ith, iiiiy sU§��&9r to
FL"iish i6thciials-0-r�-e- en t - to be. incorpo - hilvd.in the ` 1Vci,k'by C quipm
0NTRkTbPZ or any,5uboontractor:
pipelines, -dutew . c4blci'Wims; manholes -vaults6nL- ' , tuimels{br
other _s d-61ilacilind dfmta'6nicnli-iind any etl�'Efifs
o�Riiinirg, . stich fticiliti . 6, 'which' -list been instilledu I oderir-Ciqld'i . p.-furnish I aany y of the fonowiti-L services, or
0
0
0
0
nntennl$` electricity, east,.-4,,stzam 'hgUid, petnilcitin-
l:i luuls;, telephoneor-,other,Wmmunic Boris.. cable
television, sewage and dminagc ietnoceL•: traffic or other
wntrols}�slemsgr.Water.
1 42 V40 Piice'tYori WorVto he Mid'foron tha:Nsis
of iuiit, pricxs
143 ;Ij!or6 The' entue.completed cgnstructibn or the
tanoas,sepamtely idenuGeble�pp� its [hereofieyuued'tgbe"
furrusheil under the _ontract Lhcuments. Wor6 induiles
end is'll a result of perCornt rig or Cumishing I ibor;er d
furnishing end incnrpomhr� materatls ai d,eq cpmem into
'!he constnrcuon, soil perfomurig.:or furtushine semces laid
furnishing decicinen�c all as required by •the Contract
1 4�: ;tt'ntlen,Antaiiidrrer>G -A kr'ttten enicndmcnt,nf the_
Contract' Documents, signed.' by .MVNFR and
CONTRACTOR 'on -ar rttter !lie ifhdive Trite of the
Agreement and norniall� dcaling,tvcth the poengnacrin'g
or nontech iol mtlier than strictly .coiistniction•reluted„
aspectsoftheContractDo ume-nts:
^ARTICLEZ—PRELMUNAR1 MATTERS;
D¢liveq•nfigodo
] When,. CONTRACTOR. "d'livers, rthd executed .
Agreements w owi\T6R. COufRAC•T.C512, shall also
deliver ta.011 1ER such Dcitcis as GOivTRAC70R
he.requiredtofunpsh`.ihaccordadheWith paragraph•>:I_ -
CopiesofDocurirents:;.
=O�NNCR sball'funush toCONTRACT(>R up iti ten
co p'es ,.(unless uthriwist specified m they Supplementary.•.
Conddt�ns) of;the Conlrncl,Ducitmen�s us;nrg rcasrmably:-
ncc mnry for llu"rxeciift`on of the Work' Additional copies: -
irill be f rrnishcd upon requist ut the cast of rcpioduction:
CwnniencenreN ofCon6act Timex Notice to hwcee&
3 The Contract Tunes will commence'to run bn the
thirtictlr'ilsy nfterthz"Effective Fete aftlic Agreemens•;or,
FX.UCGE'NFXAI: CON1NTfONS.I91uS.([99f11cAnnii.
NI UTY OF roar OOLLIM NtOD FICAFION5 (REv IRUOa)
it t Notice to Proceed is'gitizn. on the dnv 6dicoted in thi 1
Notice Io Proceed ,A•Notice,to Proceed me}' begib'eq.at
grip imc"withinthirtydaysafter,the EffectiveDateof.the
�.ca ..al-this--6�rHaei-.-Ftmcs.
fxttmerwe-le iprrlat Aee die flay
of-I3 d ripening-er-the-thirFieth day afterthg FRmnv_ e
of-the-r\grrem`mk•whriheve dale iseerlizr: � _
`Starlrnx, th e, j{rork;.
2.d. CONGT TR.�OR sh ll start : t6lvrform„the Wd,rk
on:<the d tte tthen the G�rtract T memenee•torun.-
hilt nit 1NGW shill he done ai the site pris;comor to the date on,
which the CoriraceTimes commehce to Nit.
'Refnre .Stn"rtoig Cnristrudiou:
] �. LL'ithtn, ten c4ayys rifler dtc EffecuvclDate" of the`
Ag c6cnt (unlccs othcnvisc ,specified m thc+G net it
Rcgwrctrtents), CONTRACTOR. •shall •'submit .to
GNG@lEGR•forregt�iJ; � _
a, pre] tmmail;-progress schedule iridicating.
the Umes;(ritunbcrs oI` dap;or, dales) for darting and'
oomplct rig the van,ous'snigcs orthe LLrarl, uicludatg.
anyl`tilestones sprcdied in; the Comma �o wticnt
16.2. a j'reluriImag, wUi6 of Shop Diadiing and
4mnplc`; sulnninals which will" list each recluircO
submittal arxldte times for subs iiing reviewing and
-prncessutgsuchsuhmihsil. --
?,¢: 1. In noTcase' Will' a sc,Kedide, s e}
acciplable whicfi ellrnts less than N `calendar
days for.each raviea by En6iecr_
cenihcat s of u>sttni cti (and :other evrden ce'ot ti7si nee
x et�ee4 requested. b OWNER) which
CONTRACTA�ORtsxl_�aly-aim is required
to ' purchase and 'maimmn m' :eceor lance what
parnrntphs 5 i fi end-5b"7: ...
Pti consiruition Coriference;-
Oeuia11p4cceptaDleSrl�etlu%sr'
.ARTICLE •3=CO rR,ACT 1301 A MN7fS: ENITEI)T;
xmEE wNc: RrusC
.Intent
3'I. The Contract pocume-nB. comp n%e the, entire
agreement belwe,en 'OWTNERrand " i CbwTRAGTOR
Wncciiiiik the ,Work I'he:Contntct. DkCuments .are.
cotnplemeruary; what is aII l eb by one is tis biiidan,as'if
callyd';Cor. by all. ' Tliie, iConinia b6uunicnts.:wilf-lie
wrtzhved m accorda_ncctvtth'Ihc I-aw ofIhc pl.Cc-nf,tlic
Project.
32: It s, the` intent ,of the ,Cof"ct. Dacumentc_;to
a -EJC(Kr.7ENM,jL(,'ONI.N'nom 11 M.;
I V?;(19',VV Ea,1,: .
u, C17Y OF 170RT CULLI.NS 412000)'
dds6dbe a functlon'1Iiy,,Poniplete Pivject (Av part thereof)
to be conswated in accordance %•ith 'Ihe Contract
33 ,Reference to .SmiiAardv and Specifimrionc (if
'Technical .Soeic/ies( R.Oo—tig anti Re W ing.
'fNsci'epaiiciev - - .
3 3:3. Except as otherwise spet k6il}' stated in the
Conuact'IClucumen ` a as may .ba provided by
amendment or supplement thereto issued by one of the
methods":,m I ittecl im p rupapi_3 S 'or, 3.6, the
pru� Astons: er the ,con"ei bocuments shall take
prec,ttlmt:e'rn revoh'iii m} Conllicl error anibtguity
or'dlscrepancy"between th-e provtstons oCthe�Gon[ract
[)ocwnenis and'
3 33`L the provisions of .any such 'standard,
spccilication manual code e)i instruction (xyhcth8r,
or not,s jeically'iiicorporatcd b} reCercnce.tn tbi
t`�ritreot Documerits);�or -
0
0
3,112- 1 the Irovimon-5 of any such Laws,, -Or_
R;;gillatldm,<appli4ble to the 'erC
Wlark-. (unl86, (unless' in erp1.e
ii
W __ iSidrl - S43f the Coninict DOL _!Um 0- Rel nIS;wUUId result
:p viciiiii n- 66;�ich L CT, dati, L
0
AMini'fing and SapptwitentiiigEontracJDociiineiits:
3.5. The Cohtrucl Docturieftts may be uniiin&d .Ici
prnvdle - Ic , i6,i�joris iii the Work
or bdiryAl-ic in c,or
lonsj*,r5�6(",
more,
H,fpnus[AVriltm Arnn#nen _
A. 'ach&Lgebi, lci'(Oihsu
iiA ,to pm
or
,&/aW61; Fokicciai�s �4061FICAnDNS fRffil-16000)
I - _ - - � - � - - I - - 1 1
0
13 53, a -Work r.'kitige '61rective, oursain'l to'
in:-addai6il. the �reqlt6cm&iif�',of'ifie Con"cl
D ' '. - .- . �.l supplemental - L. - -1 -,. m. I .
-and minur,vanations
acid devistions,in the Wort y
more Ofdie?Fbll 'ingwhys:
,36.1.A Field Cird" 1*16pit, Erii �r �Ouan
-36,2:
34J.
ARTItLEI- AVAILMIILITY OFXXNDS,��
StOw"O(FAC,14, AND 'P'HA-N*CAU: r(jNbMdNs;,
RErFRFvcF P(jimfs•
SECTION 00500
AGREEMENTFORMS
00520 Agreement
00530 Notice to Proceed
CONTRACTOR.sli3111>-&i z for aliadditioird lands and
access 5hereto that may be required, Yoe Temp it mS
construction facilities "on. sto_rtge pf.-.igalenals :and._
eyuiptnent
J �.: ;.Sttbrusfdce'airdYbj pelt' ��rfinnir¢f
4.21. RepoAs'arrdOrrlitiogs Reference is maiic'io
'Ihc Supplementary' ConJitions for identiliama' of:
4.3 l I Snba76f4Cc C6h&d6ns Those reportg o•f-
e;�plorauons'nnd tests uf'subsurf¢ce,cimJtuons at ter
cnnngvous ;io gha ane..d of hnve, t>?en uulr7 d+by`'
1:NG1\°EER in preparing,the+Conlract'llocuments,
arid. '
4.2 I Yhj:�icul r oiii6riwra I htae_dratvines of
TtFSystcal cnridihons m or -relating to,o.rstmg SUr6CC
orssubsurftrce'structures at br contiguous to the siie
('esccpi-Undcrgromtd, FacJmcsl that- have Ix:cn
utih[ed b}'. EINUINEEP.' n pt>±paring the Contniet
;1)ucuinents .-
4complctiiness of nick'; reportt arid,
dravvi igs for ' CONTRACTOR'S purpme'_S'
incluft but not limited to anj'aspects of the:
means, mcthnds, techroqucs, °sequences and
procedures,,of,a -nswction to,lie ehtployed try'
CONTRACTOR and' ;safety zprecauponf% ,,ant
programs hicidcnt iherero_or'
other dau'L intetpretatiops opinions
Ad tniomtalion conta tied in such reports or,Wci vh
tndicrted m such drawings; or; '
4" 3._. tiny, CONTRACTOR mtetpretation of
,or cundusien drown -from any'"tectinicul data or
any such `.;data., interprelalions, opinions. or
�intomi"anon;
4�3, Nohc>? n%;;L)�enng •Jtrbarrrfac•e -gr flns7ciil
C'ondiriora IC CON'IRAUTOK believe, dtat, any
subsuifacc or physical mnthtrorr-at or c.mtiguous to the'site
Thal rs.uncovereloi•'revealed eitltci.
4? 3 1 -is ofsuch'a nature as'to.estsblish that
ring trchni�l da4a-on ;t5•hrch•CONT•RrtCTORis:
emitted to rcly ass provided m lrataiaaphs,4 �_L arid.
'4.^ " `is materially mac:ctiiete. or'
4, .! is of such a nature-as';to_ reyun_e a.
changc:in thcCnntract I�oiumonts•or
.4 ^ 33, -differs materially from that shoivri or
--.6ICbCGENMA COI)ITIONS IA Q-X(I V'IV Maul),
NVII CITY 6(rCORT(OL[.1N5!\tOl)117 CAlll)\J IRLI?a r200rn'
indicatod m.tl;t C.atu�ctl�tx umants'ar.
4?3:4. is:oC-anunusu .rmture; and differs
miter all}' Ggm ccndilmns ordinarily rncuunlered,
'anJ genernlly iecoerttad as'in}trrent 'n",,work'.o
the' character prottdedl for m the Conuac
Iioc-uments;
4'.4. I:A%C'rlNl:'�RS 12eriz+r: f;NGirltl;ER...,will: ,
promptly, rcviet the pertincnt condidbhs=detcrtninc the
neixyirq of OliT1EK's'obtstttmi,tidtlitionaleeplora�ionor
te'sls with respect theretq;and ad\ise'Ol\NMK tn;ii�riting
(%6th a aiji}' to t6NI'.RAC;I'ol2). of kiNCiINEF.R's'-
findings and -conclusi'gns, -
4.25 Focvibie 6rirriwt Doetuxelirr C77ange; Ir'.'
KNGIivrFFR'concl des•that a gFvarc rn the Contract
Ik c uncnts'is r quircd as d re ult of a,condition & needs'
one or mom ot;the c tfegones In�tragiaph 4 2:3.•a �Vork
Change Dire.iive or a Change()rdcr,will he-4Issuedo.%
1 rcmided to Article lei to reflect end' document-': ther
conscqucners'gfsuch change.
4.Z6 YI&I;Ole Yirce, need 7rmiu .41tusMtents. An
cqutlahle.:i4 s¢ncnt in the C'onnact Pncc .or'!in! 6e,
Contmet Trineors both•'will be alloi-%0' to the ektent that
tlic cxistcnce: nfiSuch,indnvercd or devealed;c'ondition;
causes�an increase ordicrease;in CONTRACTOR's cost
,of: ,or ante rdyGired Ibr perfurm•tnc•e uklhe Work subjcel;,
limy t•crto nc'followirtg:'
4.2'&I. such condition'rausi.meet arivone or
more of ttie , ciao egnes` dcscribetl :i t
PalaSPhs4' 3,1:dvc4 2;d 4 trnlu9ce;
4 0 a ch;mee to the_'Contract pocuments
purSu_ant to rparagraph 42.5_ loll not".be A'ai
:aulomalic anithorizatrbrr ur nur it _condition
precedent to entidernenl lti anj•such adjustriierit{
4 iG;3" wish respect li+ \Merl. that is pid for,
on e,, rut }'tier 13[ism any, udjustment,tn.Contr'_act';
Price will be subject .to. ,they provisiori's ''of
'paraEraphs 9:10 and 1 her and
16.4. EONTR.4CTOR sh5ll not be entideil
to any adiustmeat-in the C&itmU Pr&'_ iu Tlnirs
iC
42.6AA., CONTRACTOR . knew, of
the eCisteof 'such wndttigns a_t the
Oat CnctiUN *pACr(�K midi- a. `final
contmilriitnl to. OWNER in respect •.of
.Contract I'nce,and Cror tmct'I'ime,s.by'the
s
0
9
�mcttcant
Ile L
OMrk.46:01Z, 'Hied ib
ivid
pus re ukx l 1X paragraph 4.2.3.
311. dl'�RER-,�md ENIGQtl�t ih'll i not ho
- 4611.4k, Cyr
such'ir&ulniati6n - 4"' and
iilay oil-.OkicoLLINS MODIFICATIONS (1kh' V.P2000)
f
'ARTY I:� �-:'130\'pS'a.1�1,1nS[3R1t�Cl;
P,*rniuriee.iPajv, ent'utif101her.BontGi
5:2 .11', ;tlie uiret}. gn any, <boix1 Wriii1tw ;Dy
-CTAMKACF['Ok ,is' declaicJ :a lwW— pt or: I)cconis
insolvent of -.its nQht to.do busmeais;termmatedln`any
state tvhaic ari part of thc'1'ralect_is IocatcJ or -it ceaSca to'
m.a.the.'rrqutrxmcnts,aT,parapfapli5:1 CONTRACTOR:
shall wnlvn;tcn ays tlicrilaftcr suba he };nntl;
atiJ sur�4y =txilh oCttilutli moat he nccc itaniablcler<r QMRNF[t;
5:3 I icensed'Surelieiunt7 Insurers Ceit�cafes of.
Insurance:
54� The —v'sie's of_ Ta9oY r.t'=
nUt-in _ —aim,
-Eicumc 1q tmcoownom191Q-8(1YVGemuail,
W cirroi4.oxrcui ins'ntupir7tArio�� wi•.andoiii
[�J
I*
CUATIt ICTOR'c.Liabifiry Instdniice
SA.7. ulauns wilder isorF.er3',aompensation. disability:
bencfits and oilior similarcr iplityce bcncf t i w
i4? claims for damages Iccnusc pi'bndtl utlurv;
oe upational sicl.rtess' or ' thsease ` or �eath of.
(Ate"I'RAG'f,<)R's emplo}gees,
� 4 3, claims,for` damiageq,because of t dcly inlur},
sickness,or disease, or death•nf'any persnn othcrahan
CCtb°TRA(TQR's e.n,i o g
3:4i9 alaiins;-fors-daniagcs-msurad-.byg cvstamary.
pdtsana4-e±jury-lia9t3tty-ei�verege-whiahire-austa'uieil:
'(+}�y-eqv-perseri-awHesulk oFtur.�ffcits�+-dlreat
Indi- ', . t}-r2}atau-tom-the-enilili>yment�if' suaH-perStia-f>y,::
SA:S_ claims. roe, damage other than to the' LVofk
itsYl 6acatGse,of mlurysto:or destruction of tangible
prOpert} wlttrcVer` itwatcd, lncludmg,'lass+oC',usg
•resulting owdrom and
5.44. claims for damages because of bodll} 11%juy or
dzalti of nn} persoli tt.proiiem dimage arlsu out of
the_ btmcrsh. �mainlrnantY �ot; use of an} motor.
vehicle:
,The policlrs of insurance �>tquired by tlus.pamgraph 5:4
to b> purchaied sail malmained,s}vilL• - -
5A.1}_ rnclude; the specific! coverages unit be Hniten
for, pat less I}iait the limits of, Icabila}rpru' Ided tn'the
Sipp}ememary Corstdroru, or reyured' b} Laws -or`'
�Itegulanons,�shichevcrtcgrrater,
5.4.9, irtchid� completed oper&ticros iiisviailc
MJ(UCGEN!•7t�1L COIJUITIO[vj•I9,ItFS ii9�(1 k;d1[IPJiI
al C1yYQFFOtt7,COLLIh5A10U1FIC.1TION5i,1t6V.,1/10110) •.,
5 1?. rcnam'in,effect at least until Unal.,payroent
and at all imas thereat cr}vhcn (:UN I Rt1( 'I'C)R may
be c,orrecttrq removing or repluoi a defc (ne'Woli,
to accordancewith rAragraph 19 125 and_
OWAER'sLiabiGq! Insurance:
5.5 To addition provided"
b;,� CQMR:�C74R; wider pilmgraph 5 a QWl`1CI'� �at
p11N! Rs 6p(i , may zpillrchase, ;and f maintain at,
'pyVNIIts,e�ipetue OWIdLR's oivn,UablUty.insurance ns
will protect O WNLR against clauns ivtuch mdy,Hnsa from
operauons updir th6 Cozii6,d C)acurnents
!'reperh' InTrpnce
S:G Llnl c othartuisa ggavtded=in;illc Sul plei :crony
Gondutons OWNCL. st all ptrrchese nr miiinta n
pieparty-vasuretnc�wpan-thtWerlfu�.z�,.,a,s_�:suiit
�f,t3iz full�izpinceniant--ctzst tharaoT>'(svblau ie-i'uali'
cleiluctihla-�itimounts»-ns-moy-xba---}atn•ided-=irt—the
Supplementary'=Conditiairs=or reyuuzel by-Luws-tail
RegulattorTs).=:1'Ins-irtsuranca shall..
S614 include" I e=mlersts�of OWNEk;
_...
C("T A��12=-Sabesn.
eritnie.s;idantified-in-tho Supplementary-6orklitions-
gash-of ivfitxn•is daamtd !u havri:n ucsurable-interest
and eha If la listed%stinmsurexl oFciiiddron`al=in§irad..
56?-6iryvnllen tiri=u••}3wklefs-ttr3k-=ell-rill:—�ex
. ` - its-fartu-the#
shall�l=ksst-mt}udatnsvrartE�--feil�lwsiecil=less-ee
-s#rall--rasuw:e-agaatst-=eE-{ee54, '.
Ehe-fellow+n�e—peril:=f"ar :•ter
cgvereee ,Nfz .-'ViA lism=and m¢Flcious tntscht Jc;
lottyuakre!{a�x.=ikbiis-ramtrvtil-dettiialitien
EGkB-SleHl"Ivv�j��'n
S'�l',Hi�ib�-iCylfiftd'i3}-til��!}f3�kHiiBq�lf j'�lli1d1t2(3F3:+:
5.G3-irleludt-e�cptnses-iiu:urted iitrtht+rr�ttir�tri '
repliiikmeat of-eny tnwted-propertw(utcluslu�g•btihiiiii, -
1sniitrc4-te�e:Ft :'' ;;tars-at+E!
:t+rcJiitrety)c
s als+ittd-e�}utgmra6sti�red ak dttrsitr
a-a"rinthe-r-loestim —that—was agezd-ta,-irt wntin
�1FAtii( 'd-4hff! .SFIEh-fn9kPFifli:-find-eEttfipmeFl1-haitif2an
tMiik2�t�iTi-ltil-:�(�1tZatinR-ftiFp8i•ffi2id-1'�L'Ja1fnBFidC� -
P�6{s'�i 1Sf]11:-9fY�
SF. be-ieFiintairted a-ei7eel until fait! pavnxnt is
magi-unl,.- ttrsst ::, R:d- i,:�„4„ m• °
ntl�� r,�rrn
:ihtrti�-'lays--ts�titien-naiii;e-te-eaek-eili�additxx�al'.
iisur�--of>-whip"rt:-e-�it: ;eats-nl'=inse�nae-hits-tjern
issued:
tt1[f f0NT12�C1_UR reg Tests urwiili that other
�•- - �-�tt�erly-rmuruneg.
�altbtes=prat Ided-under-}lare�?gks
Sj18}i—t{-�045ivic—iFil�vvvr�uc east
d3efee�4-tis1!-��targrd't ��'.T��Q'9"'n �"�i-°Ppr�te
Qintrittnctment-nt-iha-lt`orl, of the.sitr ©WNTslt=shall=in`
.1Vf1 filATOR whot
11,. n11TTrR
• -fsrwaai. z _ - _
}
!k3ir 7D'afvrwf-IirKlrEx=
Hui-
—CONTR1E�.Ten^R�'''—�_��--�tiS�t�tbavittactas:-
..L�i�V-tirLZR�CvrV TLGRTCOILfII[[USltj�mIDl'.-Qlli-
nlGcris;-�dir«mrs;-amnloyzes end-agetiis-uf-ony-ot
'thtmE•t�n';;
- �f=�nsa' or-other�.mluzyuintiel laa e-tzndirr�..
BRIE dtric4-e�tvstatf-loss-- ��mogt:-to'
eii.�ii� eut of cx'isu{tuig-Crum-!!ro a'�tfit-fir � a -
wFitlhtror-noi�tiisztrniLFq•:G�w1'IIII-en51:
lll; 61COC ctfix AI CONLHTIONS 1,9104(190B um)
'w CITY OI. RTWLLINS .AfOOttICAT10NS112L•1'A)2a001'
Ai}-tasi+ranet�-peFtrry-rtteutittirted�-9u'�3C32�vrane
t�i�4-lt3st�-d�in�uetWel-less=referred-te-rrr-lhrs':
n �r�rnierisaatheiAreEt#�at*
4lRi-'i—p@1�#etil-e sue
aET.
feh5&'jkttni3fi,{-�ifSS-�itiSktrH •r.—.:...—.l i_M��C:.
•
s
10
�J
zreccivSulworuiuctors
' . � tent�tin�tha-et�sas;.
dvecFtpS{tttple}eestindagerttse(ilav oFklKwi,
"Rlceipfand LpplicationajlmumluePwceel, -.
0
Portia%: Uhb�tron=Praperq• Lisurance:
515: , 'i! ONnTEP�_Cuu�s it necessary to.b`c'cgp'y ar =,,a,
portion, or portions' of the Work, prior to SuWaiit all
)
t•X:oGc;SNex.v. ConutnOt�q 14,1 u� p 99n bciridl
a/ C1tY 017 fQR i C01.—UNS NIOUthICATIONS (Rk%''11.1;I r20a0)
0
AK! 1Cl* 4!tOk'I' WCTOlt'S'.
RESf'O\'STBILII'[ES � '
:Super Oman and S7�periiit4irdence;'
Labor Dlateriala rmrl,Eggipnenl:;
-60�-Unless -otherwi!;a qk6ific& in the Giiicrnl
Requirements �.'Cb1\rrR-ACT Olt -shal I !fuksh 'Isnil :asime
.. .full responsibility. for all mate—riais equip.ment, labor.
transportation; corstmcttonequipmenPand, machinery;
powe[. light heat:
telephone water
sanitary faiiilhim. temp'cim-ry ,Iacilitiis ',hM 611 'nt�r
f - M., I
facilities and ii-kidenials j�icessiiry`lbi- 'the Jurn tng�
perforniaice sassing; start-up and comptetictn of the \?i`orl:.'
A
ccrov of the resolutions art niWalik F6r revi6w. inthe
offices of the ':Purchasing and Risk Ninfingnimt
-Divisicm or-theCitv Clerk's office. z .
6-4.2, Cement tRariaiofii, Citd 6f Tort= C611ini
'Resolution 91-12 F rrquires'ftt supplicis and produbtrs,
of cement cwtro cLi cordainirw:cmcnt to UrtiN that
the -eeinent tvas not mode in ceinent'kilns .that burn
bai,4diaiswaste 'asa fuel,
,.Pragre� 3:Aieddle:
COITMAC.-I :OR 'shiill fidiefe to the pib&CSS
With pamIr aph'4.9
fnav'lbe adjusted
6k:], CONITR1WTOR.-Shall stibini1w ENGMER
f to,' - -pir acceptance thi r� 'indtL%' eel in
aingr ph 1 9) e s in l5rd�osc 6u, the
0,adjusmiihs in 1W rogrvss,
sclicdo h"' 1 6 the Contm& Times (or
nc-)
16' the pnig�.�
will' 6091ply with tn} privisions of 'the, . n) I
R qulr,
thfiirwill 'c6nge Lhe'Ciinunict Tirfies(or Mileston6s)
shall bc' submitted in with the rvquircments
of'fxmagraph-12-1t Such-adg'u'stmenLs may iihl)', be�.
;m4ti,by,a Chaiiiiie Orde'r'of'Writicn Axficiiiilmcnt in
actur , dance with -AxUlc 11
Isk6ified-or desennball in flie'Cmitru�ei,DiScurfiiints by.
- ustrie'the'nafficlofs pr6pri-etary item or the name ;of a,
parueular Supplier the specification
iritaid6d to. establi thetypeUnction and qUH ty'
r iid Unliss the specification -
ec[uj pei; cation, or. � description
� i06
I � 0(��
6N20i' ,
coWins-or is feilloWed, by w6r4- reads ng-that no like.
ecluieulent ' or, or -equal .item or now _titutfon,is;
Perruitte,L], ii&r, items of fiiatcrial,eeq-tiiprnint or
material other jSU'- - fi be
Pp MILIMAY
accepted; by. W GfNEEW "er"L,thc " -following
ciieumstances: I
is
0
•
•
bt the' host lttng c}u ige' all, of,•telueh will
L;.T%i ered:,hy, E?dc [NEAR', in evtiluabitig the
proposed, ssubsututeIN ' ,.ENGEER' inayrceqyutre
CON"[RACTOR to fumuh additional data; about,
iHe propgw substitule.
6.7 1 3 EG�N7RA'C'M R:i E. pensd All data to lit
pwided by :CONTRAGTUR tiu Support .of -tiny
proposed ;a SubstiuiW item �Wtli beget,
WNI'RAGTQRBc4cme '
6ti.. Conce)iruig: .Sribcontme6m, Sxjipliers. and
Oth®rs •'
FJc'UC GE[JF7tAL (:OIJUIT16N5 t 9111�' f I Mtt Etitiai},
ov cirr`iirrottt;coCcin�s naoguic -Voris lit>;v ldioobj
C9:
CONTRACTOR shill oerf&ia - riot . Ies6 tliitit .2Q
percent of the WmLmith.its.oivn foice3`ft}at'is,:
without " ubcontractinel. The 20 percent reauirt ment
shall.be undersloW it) refer to the:Work the. Value of
which totals not'less than !0 percent of the'Gontiiict .
Price
13
b' 10. The Jti isions end sei tiutu of the JpeciCtcutions and
the. identifications of. any brawinp fll ,nnt control!
CONTRACTOR in dt6ing this Norl eniang
Suhconiractors or -Suppliers or dellrteanngrhr \Vork• in he
perhirnicd by any specific trade;
': Prirenr Fees end.Rgwlries=
•lilC[X.t3£NF,'RAI COIJIH.'rl G7dS l�lU-l1PIU rcLtiail;
14 w L17Y OF ROItTC OLLI 54fOGn7CA'r10\J IRLI'Aha 111
•
Peruiirtr
G:Id Lan�e•and/irgiclatniu�
6IA.1_ CFJNPR4CI:OK -' mll;Eive all nott%es'and
comply With n-1 Laws'gnud Regulo, appli6bkc tq
furmslvng and perfoimance'of the Work. _fitapi
µhere dtlint�s ee,exp'ressly required• t), gpj hcalile
laµ ,arid. Regulations; ,ncidler. •OWNER nor.
PNO114145K shall` bh respoiis�blc for monitoring
( ONI RAC:fOR's :compliatxc tigth 9fi• Laws ;m
nulati�, , r ' -
C 14.2,'If CONTR \"TOR perbniii any 'Wcirl
UO,NVing;or h'tvlrt ret son to'kriow that tt-is No-n nary
'to 1,aws'ar Regulntion; COWRA( I ORsi1311'1 •ne'
all cltdms costs,. tosses end damages` caused 6y
snsing obf of or rcsulhng therefrcini,IhcAWcf, it shall
n6l be CO\TfR.AC.TI�Rs prtntary nspo --ibility•�.to'
msLc mnatn that the .Spcc.IFicatio ns and ckiUings arO •
in ncwrdana with i}aµs and Regulnuan ,hut this
shall "rirn reheve "CONTRACTOR of
CciN'1'RACI.ORs`obligatinns`un erparagrapfi3:3
Taxes:
C IS CONTRAC'TO.R.,,Wl py H'stles: consumer,
use .anJ oilier s miler ti es reyuireJ 'to` be jraiJ ;by`
'COMFIVC-TOR m accords ce 'wtlli the L- V;hnd
Regulatinris:.'of tlx. plan: of the a ;icjicl -arc
applicahlr during the performancr.orthe Work.
�615:1.. ONV-NTR is -exempt fn5oi-C610rado.§iiitc nrnl'
locil 'sales and- uvw- taxes: onmaterials' to ;be"
permanentl} incorporated irtn-tlle:pro�ect._Sattl tapes
shall not be included in the.Contma Price.
:Golori idd Delia iinenl ofRcyet u
State Genital An ice:
Ili
•
1375 Shenntin Street
C3er F er: Golorado,.S0261
Sales and' Use Taxes for the State of Cobra^dci ,
•Reuiorial TtenspaitatiunDisirict"(RTD)-and•certain
=Colorado ;countie- :ere` -collected "bif the- State. of
Colorado:and'-i ir6;includcd:;infthe Cenificatiod.of
G,emotion:,
All'uonGcable:Seles'and'Use la�ts:(itielucLni:'�St3ic:
Coll
utxts);-on am 'ttem"s other lhan�onstniuion
and buildirdi materials ph%,sicalh• inctirik rated into the.
,proieet-areao.-he paid. h}'_CONT'RACTOR and 'are .to
be incltided in aooraoriate'.bid items:.' ...
(!ce of Prentim
b 18 CONTRAGTOR,shsll obt load nun peimil^anj^,part,
oC uh)l di4c to -be lua ckd; iri tmy ;niar cr that will'
endanger the suucitire, nor,tlwll'C©NTRAGTOR subjeit'
any'parl:bf•the Work or adj@cent propeA, t'o stresses.or
, tresihat_t�itl:etida,icc .t.
Reeaid Documenir-
wtw1 GENF]t tl: CONDItOM 19 IM(1999lidtionl,
nv CITY OF FORT CoLCt[S AtOOII.16dTRII4S (Rhv.1fluti t)
•
:Safer} and Prorecdon.
6,20CONT`RACTOR gall be rcV6mibiefur.
tnitnurtg, _'maintaining an super mm till fsafity
ponsrccuuuand pragrams.m cunnectton wdh,the lVnk.'
t.G(t"Idtr�C"1'OR thalltakc'all t>Lcrss.�ry,prtaaution ?fcyl
the safety of sml shall provide the n tiessaryprotection to:
prevent damage, mryry nran tp,:
6 itl I• ,sll^,persons on the %Vork-site of who:inay be
afkchd[hy thy: Works
626,2, all Lhe Work`and materiak'.aid ttju
tliipitipnt_to;
Ix mcorptanted crc(n, whether in'stotage on or on.
fhestte;arid-
0 2Cr 3 gt}iar property -at ttie site�o adjacent dteratn„
tncludtrig trees shrub- law.m_ivall.s' pavements;-
roadways ,stuctures,` utrltucs and 11ndirground
hactlitlea'not,dc'dignatc' for removal, rclo'ation=or,
replacement in the'course of construct on:
15
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the 18'h day of January in the year of 2013 and shall
be effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
Vogel Concrete Inc. (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
1.1 Renewal. This Agreement is a renewal of the Agreement entered into
between the parties on the 12th day of December, 2012, entitled Specifications
and Contract Documents for 7290 Crack Seal and Fill Project 2011 City of Fort
Collins (hereinafter called The 2011 CONTRACT)and all portions interpreted as if
the same were attached hereto. This renewal is authorized pursuant to Article
3.1. Contract Period, of the 2012 CONTRACT. This Agreement shall be effective
on the date this Agreement is signed by the City.
• 1.2 CONTRACTOR shall complete all Work as specified or indicated in the
Contract Documents. The Project for which the Work under the Contract
Documents may be the whole or only a part is defined as the construction of the
7290 Crack Seal & Fill Project — 2013 Renewal and is generally described in
Section 01010.
ARTICLE 2. ENGINEER
The Project has been designed by City of Fort Collins Streets Department, who is
hereinafter called ENGINEER and who will assume all duties and responsibilities
and will have the rights and authority assigned to ENGINEER in the Contract
Documents in connection with completion of the Work in accordance with the
Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 This is a one year agreement but, at the option of the City, the Agreement
may be extended for additional one year periods not to exceed three (3)
additional one year periods. Pricing changes shall be negotiated by and agreed
to by both parties and may use the Denver - Boulder CPI-U as published by the
Colorado State Planning and Budget Office as a guide.
• 3.2 The Work shall be Substantially Complete within ninety (90) calendar days
after the date when the Contract Times commence to run as provided in the
notice • to•�OWNERparni ,C.OTT17RA&OR, in accordance
tvith`paragraph 14.13,ihat the 1Vorl, is eca�j 41C (e%4t ax
otherwise expressly prb6ded in connection with
Subsiatitisl, Cocnplet on)
6.2t. SajejDiRepre,-seninnde'
1-O�IT.it%UlbR. :shall destcnate n, cliial&d .nnd
«p�tenced safety epresenletive:at the site- ihase'(Uies
imd re Puiisibihu(s shall be the Prevention of uh idents tnJ
,the mauiutinin'g"agil supzrt isaig of.suCgly'pre x utions and
prtt�titis:
Hn;iirr! G'ommuniixrtiwt Programs"
6,22 k0')N` KAC T()R :shall_ ' be rnsj nnsihlc ,(.x_
ooarJinatingeiiefrar>ct of mjitenal saftli•, data shecis ur.
other hazard,atn oorniiiunio.•ihnn-information 'required t6"he
made '6vmIii1a to or egchatied between or, amopg
oiitploycrsat the sit' in _accordance' %6rh 1 awit In"r'
.Regulations, '
6.24: :Shop Drnp�ings amdSnniplev
6442' CONTRAC(OR sliiill llw1. suliinit Samples?tk;
fNGINEER'for review and approval' m accordance.
t'td said accepted schedule of Shnp'llrawmgs,'ar id
Ssmple submiitnls. Each Sample; will.'bz iJznlUieJ
dearly as to `niatermh catalog numbSupplier -pertinent data such .iis
ers and-thc'usc for which;miefi&d•and
;otherwise as ENGINEER may iryu re tq eir561z
'b�1t+MF;}iR to`review•'Jie subnuttiil for thejJiotiteil
slcuC rt„-yF'k al. crotuxntirs uiy� 54�u t:ditiml,
1 - w CIwb'F-i;iixTCULLINS- ifC-01•7CA770uJ(kLv a n06(h,
puil zs reyulred by pangraphi ,26 Th�'qu_lttbbp
oreach'Samplz to be submitted tw81 be as specified in
the 5*ificatiom.
`6.25. 'Subminnl Procedures:
62S:I; IIeCurt sub i itting.,eatF Shop Drxiiir* or
S unple, �CONTRACCOR s) nll have Jrttrn i tzd and
Vtrifedi . .. .
625 H, all • field rywasurements-.. yuanunts:'
dimensions spri:iGed-pc'iCormance criteria',
in,tellritmh rrcluirements-. 'materials, 'c'amloti
nurrtbcrs and similar informattan w•il}i'respect'
thereto,
6.25.1.2. uWniatenalsirith mspwt to -in- ton —dud
use,. ibhneation, -'shtppmg, ,liandlins, staragc-
esscmbly arnl inslptla66.6 pertaining 1to the:
per fonnancc of the' Worh, and; `
6''iJ13. all,information, rehtive to,
CONTIZAMI'OR's sx)1c tespormbilntes in reli ct
of menns ;methods' techniques secj eneg and
pr6ccdurds,of construction and'_safcty prccnuiions::
anJ lirogranis incident thcmm," •
ti, YrRr\GT6R "shall also: have re'vieNVed :arid;
-coordinated each Shop Dmivirtg ui_Santple with other
Shop Umwir.W --and Samples Land ;with. the-
wrequtrements of •the•: Work• 'anJ the =Cintract.
Ooeumcnts;
6252. }iachfsubaiittal will bcar.a stamp or.spccife
writen•vidcation•ti t,CONTRAC TOR has stiiAkd
C ONTRACTOR's--obhgauons: `un er the Contract
bmq u-nients,tvith rc-spect to 009MACTC)R's ievtei6.
turd epgroval of thin subin ittal.
•
•
0
9
U
0
62R, .Where-a'Shop Dmwirig"oOSnmple is requircd.liy,,
thb'Cohti:act 1Jac nets or I kfiedule of Shop Ilraw[ng.
°and Sample stibmiisrons accepted •b}' ENGINFER fis
rred,by pamgmph�.9.,atiy.related Worl pertbrncd
pnorzqutto k N(rlNfiFiR's review and apprdval,ofthe p rtinent
suhmit)al.wnll tie"ei the sole. ezjiense;and respoittrh[hry• of
('OMl'RAC l Oft.
'Gnnffriu rig16e'Wow.-,
6?9 -CONTRACTOR shaU carry ch.sthe Work;ancl.
adhcrr'.;[o [he pmgiesss schWdle',during all. disputt*e,iri'
dtsagreements.wtth.O%Vi TER. No W6rk shallbe del:lyed gin•
postpopetl penil rig resolualcm, of any' ,:disputes or
disWeements, except.asI pernuned by pttrngnph 15 3, or as.
O)VNER'and CC] !1 RACTORi inay oil enw,ise acme in
st•ritii>s.
630: • GOrV!'RIITOR's; _ General Nfarraritp 'and
Guarantee:' -
636i1 C41VTR rtbR .tvannnts. acid guarantees to
t0\VNER, CNGINCGR ruidii"NGIIQ�GR'sConsullarits'
-04riill 11 ork,lvill be. i i "acuo_r'dance,with lhe,Contract
Documents' .W µ•ill not be Lwectivi -
-C Ni7RAC.TOR's tvurratity FindP. Eutua'mce herctmder,.
-e;iuludcs defects;w dattiuge.u�i I W by'�.: ..
630I 1 .abuse jmodificalion 'or, anpivperi
matntemru;e-'tn oper�rtiyn by pdrs6 . other-Ahin •.
CONTRACTOR Su)ic oritraetnrs'orSuppliar ' or
630;1-J. .normal wear 'Hod 'War. under normal'.
-
0 30.2 CONTRACTOR's obligation +toi perform sad
mrfiplctc the \York m accortlanuc with Ahe Contra--ct
Documents shall lx absolute: 'Nana of the fellawuig
%hll"mnsr n te:en a�ceptinca-of \\or} 'thtt s not. in
EI('UC C1hTJF74\L c.ONuFt70}d{.t91 wtf I rl7t! L'dliaf;
`ata•rroFroarcot:"tinsntotnFICA, s ltyv Ingno)
2iccord:vee K•tth't}te Contt:tct Documentst5r a raleAae
of,CON rRAt TOR's obligtititiri to perftmm the .\Volk,
to uecordttitce'iviih the'Contra(•L nowmeols'
00:2, l observepons,: -ENGLNEER
6.302:' rewrhrhenilstion'of tiny' rbigess of
:faial'payment,Iry,II�'GINEER:
6.30.23, the issuancieof.iu ruertirAle of
.Subs 'iniiul 'CtniipkIidn or` an} payment by
GWINTER to CONACTOR under, the Co TRnttxbl
l]ocuments;,.., _.
6 30,14 useioYoccuparicy; ofthe Work or any
j ait thereof bys)11!NEK;
6 3Ci;?.i ahy, acccptanrc:_liy. OSVNER.or,any.
.1'ailrrie�to'do s�;,
630?6, anq review;and upproval ofa:,S}wp'
Dmyvne or Sample submittal.or the'isSsuence of a
nouca"af acceptaGihty M` l•:NC}INhi?K purma it
[u,partigraph la 13;
6 30,1 any' inspection; test or'approvtel +hy
othc't�or - .
63O.'i8 Fifty corrcctron or lecn,e Work l'y
otVN6R., - _ .
laih»wificatitin:;
. `6.32, . Iric any, and all- .vlaims -against (SWRER.
GN
G}NEUR or;any o(their r4octlre consult&ds;Agents
ofGtrrs, directo ti or employees by an)'.`emplo)'ee (or the
survivor dr lxrsonal represeittaute of such employee) of
COl�1 RACTQR any Subcontredor. any Supplier: any
ptson or organi�at on drrectl}"or irtciirectl) empin}'ed f?y.
17
aty,.ivC tlnm to pzrCotm or furnish anv of=the Work- or
anvone'�fyr v�hose,n%ys any of their may lie liable, the
inilemri firahon'nblieation under panmgraph6:31 shall riot
be -limited inariy: �vay by-anv limnaticui an+the amount of
type-oftUamages, ccirnptnsiuyn of henetils';{myable 6j' or
forC \3'PAC_'I,O( ,pranysuctt'Subconmtetni• Supplrar�r
othor.persan or orgemmtion,unier workers' compensation
44
cts; disabdtty txiiefit as or outer employee benefit acts:
,6.33. The •.iridemni iceUon obligations of:
[ 01:ITRACTOR under parti&ph631 sWl,riot extcnd,to
the liability of ENG[ IEER"bind Eh'GINEEF'`s'Curuuliinis
nrfncam.airectors emplowevor agents'mused by the
professional negligence,.errors cvommsionsoriny of them.
:SVAq%,'al irj(ahliguri(iii3:'
6.34: All rcpicscnuuons _indcmnihcationi Ivairrantids
and gt aruntees rna lo'm reyuiri U:bv or gr4en is accor J aice
with Ihe'. C onnact'I3oamerim ni well is. all oonnnuirig
obligations indicaiteU m the ,'q nisei Da umenis y4ill
survii'e final rx y meth wmplaii it ,and ii �ptnnce q(fh'
Work -'and termination 6rco'mpletioh bf thcAgro6nientc
ART.fCCLF 7-0THER NVORK
Rrinted tVnrlt ar'Site:-
I ExW (;4-wkA1 4'ON01-n um 1 `J 14)-s t1 Y4a 6d�tiap
I - a ClTYOFFO TCOLLMSMODiricAIIONS(RLV4noon)'
iprovislons for.tha, lxnefit. of C,O�TTRACTOR-itisaid
..
ifirect contniciv between &&*ER grid such utilityxw'nem
and otherccininictors.
C.`onrrhnation:
7A, 4f OWNER contracts with •otlicrs, for' 'the
performance or other Wort on the Prviect,at,the site
'.fiillalvina will:he stab forili'in Supplementary• (:orxiitianc"y'
7 4 1 "t}ie peJsan;'firm or coipajstion who will have'
authoritv':vid respnttsihdit, for coordinaticm-.or thr
,activities among,thc vannus prime" contractors':wilwl ,:
td.nttficd;'
the spccific..matters* to 6e covered %%such
outhoiity',and respilrt"sitiUtry t�•UI b'e itemized: arid.
7 4 gone e5tent. .of such . authority `and.
rLspon-mliiliiics wit l,be'.prngiUed.
,UnICss •otherivisc provided in the Supplcmct q1y,
Conditions, Ci1VAIFR shall have ;sole authority, -and
irypnnsibilityy, n "i ecy if,sucfi i&rduv?tion:
ARTICLL 8 A\ViV"II2'S RrSI'O\SIIIILITIES..
$ l Except as othervise provided in theseyGerieial
Conditions;.-O,hITTER'_slmll issia:,all -communications tn',
COWI.AGTbR ihnxigh'MJGTNTLM.
R:�., OI�SiTCRs dude"s'tm,respecl of providing lin3
aril casement and proVidut engncrring'sur�cys`fo
establish466f rdnce.,points are set Corth m.ptinigaphs,4.1
rind 4.4.. P@ral roph 42 refers to'OWNER's identifying„
and t makirg'alitlahlc. to CIJNTRAC l (JR cop es of
rr"ports of:erploraU`o'ns"tinU tests of aii6staCace conilttiotu�
at ifie site and dmtviita of physical "ca ditions in exiaing
P
0
stnictive5at or ci itiguaus to dtd'site thm Itava lien utiti�ed, .
b� RNTTGINEER-vi prepaiing-the Contrac' iti Lumanis.
$ tNtie3an respacl-ef purbhasit.
and-aiuitatrun ' �--.�.-Q'.��rt}�=tasttrtwtti�iici:sut_
torUtiri•Iinrxgrnphs�5-through` 11t=
8.6. CNTIER is obligated to e ; cute Chanee,Otders:as
uttliwlcilinpitregaapf 10.4.
S 7x 01UNCRs r spON!b n), -in-respe'ci mor Ucrlp n'
speotions, tests land ,approvals- :is set foih ;in..
Psmgrt pF 114,
S S In connection crih (awial }i s right to stop Wnrk or
suspcnd``1{tork,I sec Inzigraphsl3,li1 ;and 'Ii'l
.Ihire.gm -152 tksls=tuth O\y'Nhlis nght,to terminate:
servi es oP(O ! l'R �C_TOIt•utide urtain c raumstahces.
S-l�l�..rca-�-a,cz.Tcmv�.-m�ms-egst'2d-te-htfftisA' `
itrrangemants Imvi=been-mode.-to satisfy-0�-Elt's
eHhgatieris-ttnde t}�-6tinleaet-Aeemm�riF5-C3WNE{2-s'.
respunsbtLty ,ut aspect dteraciµill tx.nssei-forth=in=the
Supplzmentarw Goriiiitinns,.
ARTICLE 9-FNGWFER'S' *STATUS DUR*G'
',CONSTRUCTION
UWTE'R'S Represeilarii�e
9 L UNGE 'tall ,be ;O1*vNLRs repraseraoui•e
during . :the cons4iicuan penixt ' The '.duucs' 'arid
reap mWines .tie l Ihe' limitations of authority cif
E�IGIISE A as `O�VP7ER's Co*representative "luring
tx`mstruciion tae:seiifcMh in the ntrast Da um"rniti quid
sh�ll'n x 6e•e`fended without w itten'co ueni of OWNER
arrcI�CNGRu�IR.".. _ .
'd•iaiti toSile:---
9' 'ENu1N-,ER-tell male dads to lesitc at mtervnL -
aPPpropnat� to thc; ,4anous stages of eonsi uction, as
ENGINEER deems fiecessary,m',order to oLserve as an
,cm-ene ced arid "qualified design prof' sstonAthe prnoiess;.
FJL.'OC fihNUM CONDlnONq^i911i-8:i1�'JU E�Atiin}
alaTy 6F•FORTCOLLiNSNtOUtFICh170I?a 1RliV lzz01)D)
I*
9.3:1. ahii Representative's dcalinas in mgtcii.
pertai6w to the ten-site;ivtvk wi1L i t Qeneraljie'm ith'
'the MN,GINEER and CONTRACTOR- BuL the
--_-Re esenwtit•e.'wilt keeo :the: OWNER�rll'
adiised.aliout,such matteis_Th-__e Reluesciitstive's
dealingsmth sulvontractors will'6W be thrtiuph.'or'
tvtth tRAGrll kndtvlzdee ary�oval oP the
C'Oh'3!RAGCOIi
9�?•..T]`uursandiRrsoiiiuibilitiesf Represeniative-
93.2tj:Sehedules• - Revictc the _•on*iess;
'kh&Jtiic- ajnd otifer � s6gdul� prtpdrfd Aw "thc�
'CONARRACTOR the
ENOME R concaTtiria acceptability.
973ji 'Confffigiices and •Nk:tirnr_ Attend
intatine � vithm-,the"CONTRACTOR :such - as
momaruction cbft1;irenco;.
.LogeZ ILS
iitid-.dgier-.ibb-.-cQrlterencc.ST,nnd-Orepare and
Serve hs,LNG'INMRS liaison'
with CONTRACTOR -'working principally.
undcrsfibidjrip
3.2:3�2 ni— btainim fi�brn'OWNE
additional ! � q-
dm.�. or ,AnfornfafiaK when
.requireii'-fort*bfCC.e.XCtLitic)nofthe. Work.,
ilie' ENCIINHER, wid
CONITRACTOR, of the commencement bf
:inC-Work, r&cmirim - a 'Shoo` or.
'shmpl& 6binission iFthc:r.6bmi&%ibWhis,not
bmi an ... Wd by thc.ENGLNFER.
4 _e'Vl' of W-k- 'ofi_of DKe4ivel.
k- ctionsafidl'6m�-
_tit �m. pip - to assist flic ENDINEER
at c A
4ocordance i%iffilbe Contfact Docurnenti.
reorm-n-tinia nublie.Wrother apencics.havinp
jMsdialon-over the Projgcy record theresults
_
,of-, thew insoccudn's_ and 'report, to ' -the..
ENTG n%TaR
9.32.5 Int . e . et itiow .of •C onimct
-Documents:.3R\MR mwh6i
clafifkitio ns; mdo inlcr elafibns• of'theCantfkt
jQLxLqMcntk ah: j!ge'ded ;and "hanit :10'
7CONTRACTOR cl� - nfimtion ndin gtcWctfition
o[Ahe Coanict. DoctanefiL% as-Assued.'by the,
ENGINEER'
93'.2.6: Madificmti6hs.. C_dmider 2ifid
&RIlLiter CONURAcrms =g 6stiork , foT
^0
. Lt I Inq2thse recdifirpendatiofts_to ENIGMER,
Amumtellk,bun transmit ,�o_..CONTRACTOR
bg C
dec-POW RquA.
$' 1 7.ReCorrjs.
11_322 -
A;
re _rta g fztjuirm , of lhg_jDfpgr6m_of the"
lWort:: find of the 2CONITPACTORS.
edle'of.'s}ton Draitme grid sample`
_f4GR?_U-R in,
Adwtnce-of scheduling mu7jqr
iiiijilrns or —statt ofirnponant pfmcs or the
9.3.24.3. . bjAvrooi delmrgeOrders'
`Find Wgk DjL&,uvqChange IAining
��k nnjLcpa� rjtthe CONTRACTOR
"ne, I o)m;E WGIN I=- _ChmjW :Ordem Woik- DirectiveTWnucs'gfid--fiel
'orders.
2 R ciri meW Ao
-A'- — Z OWNTIR, ,ENLG nd the &curraux bf
,.On atzidmL
-Phyrnent Rqfiucst:;. - kqicw-ppplicatioris,
,.Forp mcnt)6th CONTfRAGrqR6rcoMDl - tan : ,,, ythy. I 6swbhshcd t 'drocedurc' ,for iffiei
submission and-fonv.4rd with mdorfinienclation to
LJ
0
I NGI T ER- notine::uahicula'riv Uia relatiottsliipof
11 a bammi ret ested!to+the s hedule of value.
work- completed '-and ;malenals_ant.
ilefivered -at thc-situ:but,noL-incorporaied dj, � die'
..,. -.... ,.�,
{9.3i2a U:. Cum oletiiitfs.
9��?? IWl Before ,INC lli) Eli issos en;
Cedt('icate of�5ut>StiutualComlile[ion'sulim'it
WCONTRACTOR 'a -list of obscrved:itiatis
rrcouirine correclioii orcoiiiplction•
9:3�'10.2. Conduct finaliiiistxctionin'tlie
mmimii�r.ofthz'ENGINFEl2::OWNHR•-and
CON'TRACTOR end preparcm final list of
items tb bir correclul or oonitileted
9zj3U.3. Observe that all,'items on'llie
fihal IL t hiyc.bccri corrected er'&aiolctcd and
mince . recoinmcndauoe, ` 0-'.ENTTG1NEER
• concernine iicceptaitce
9.33.--16iwiiori of Authonrv> '" The Repm�ehtsUve'-shall
913:1.: :.Authnnzer 4fiy deviations ffo n. <tl c;
_Contract:-Documents•-or-Acce�it'•.-any sit}islitute
dnatenats ir.e�uipiuen ',i &t s autlior�god 'bvthb
EN effilsior _
9338.. _:Excci: '-Timitatinns of::FNGINClEIYS
audtonro:asset orthin eContiact�Documciits.
93 3 •IJndcri anv of the resportstbilitics
of the :CONTRACTOR Sutramtmctors -dr-
gD�d7_ J�A7�r S s¢rmte�t;
.9.33 4. - Ad&e-on or issuudirect�:relntivc
-lo•�r>s5iinte mntibliot er t�,_uspccl oC^Ihe'
mentts. intcthods techmt7q!�Ssequgnces :or
e urts of �cctio u I
RSPB_ __fi _
tt�c
_�tch'.
specifiiallv catlzct'forinthe ContntctUucumentsr
9_3.3.5: Ad_� viw «t. or ' csiic: dircctioris;
i'emirdi-P 'entl'Rro mmsin�utronnecaer'siiCtty
- pr
'orl. - P Pa — lions wtith"tlie.
9j., .6, -Accept :Shog Draw' ilas_oiTsa
submittals= 'from . anrone'other: than :the
CONTRACTOR
913 7._..;Aut}iona_. ,OWNER lto!tx.cuoy_'th .
Work in t'vltiole or in nail.
:Participate . in . si tciulizeil' field +or
=hbomtdiy Ir is of. insrechons'agunducted by otlidis,
excel ss: specifically atilhiirircci . by a,,,e_the
ENGINEER,
Cltinficatmua oriit Lirerpretatiuns:
9A"ENGLNEERwtllissuemilhreasixiabW{irbmptnes;,
Stich tvntteri clanfieations or''' interpietiitiore of -the
tJCUGtiENk7thll_COIJLit710[3ti I91VS,t197uEt6tiail
w/vtY'oF'rMCOI_LihSnfOU117CaTk) Sntly�Ir1bi10)
P
.441hon.eAtanahonsin.li�ork- -
'Rejecting Defegti a Wgn4u.
;ghop Drmvwgs Change'OrdersatmlPaymeiirs
9.7. in cynrtection,ivitfi E1VGINLGRs eillhOritj "tis.;to.
ShbpDraiti%isand'Samples seeptirntnphst24lluoup
_fi?b Inclusive,
9.5. In connernon with EATGR-=— 7 s author' to,
Chure Orders see Arli'clis I U 1 l:anil^l �'
SO., In 6onh6aion,wilh EIVC3IN1 ERs a tthoritj'as to'
:Apphcations`for Paymen4`see iir(icle�14 -
D1dernnnations fitr Unil PriaeS -
9;111 ENGINEER will.'dettaritme;,the actual iq iaptilies
tinil tilassiGtvtiuns �oC,Uriit Price :Wlirk F �nerfivmed�by
EONTR4CT4R FNG_INFER will teti5ti ivith
COMRAf.'IOR the'. NGINFsFlts rrclimtnary
ile nnmatto u;on such matters Wfoic_rendenrta a:wntten
decision thereon (by rcconimertdaiion'ohan ,AhplicetiolC
.21
Dielfions oil plqdles:
22 WCDCGh,%RALC_
de6isioll, itnlz.%othenkis-a'OT 'in "irituj M-._'CAAWER
ttniizbbTRAcrm
OAS. -Lin&dl!Om-..vA LW(�MiXks AuMvn"6, aird'
mommil . blarl PC.,
13 1 bidlNEER will not be* resp
onsible for -the
in ' ions of -CONTRACTOM. W of 4
P�ls, or -R. 1�§_ - ny
Sub�dfitruct6r,afiy VT
ipg� or the
Avork;.
The lifiiimfioni upori. autfiority, wid
0
9
0
0
9
i.,n'. 1115p'9
13�sHall also
t
s ConsurtCga derit:Priije6,
i
n S.,
AR TIC'J'A, VIORK
11Z. lf� OWNER -and-CONTRACTOR ere unable •to
--i" '-'- ' d* ` - 4' ' a ' s !f ',q�y.� a f-,nna,q4qmcnt-Jq th _e,
Conuact Prim or adjusufient.ofthe CA)h"cl Tirnmthu
shhu ld he allowed as a result of a Work I 'Chdng� Dircc6i;,
4 � c I a i m , m'-a'y he rn2 d-c. therefor -as provided is Article 11 or
1l03,CONTRACTOR not 1w66i]cd:loan.'
increase
'
WOfar(j\iete16nOfItij COntItcJtines ,ivithxesliect tii any AN'brk- pcifornicd that is not rectw'ired In,
ffie - Contra'd, Docum ents' as ' emended, I'modiried .and
nipPluncrtad as provided to
- fangaphs,3..5an 3.6 cxcpl
4i thecaseas provided inlxrgmI
i)h 6:33'
or in ffic-ca.� of*mverinWork' aspr6vided in
,pam-,im: owfck•'and mN'TRACTOR
*e�bpriiikCluuige Oidiri,r&oliftn6nded ENGINTEER
0,4. I. , changes in lite-, )rk* whichwe (i) otdered
t im3 0 VNE R, p, , I- �Y!
bmusc� . aflao'Ceptin6e of d"reelive Wo&" under
parfigritlh 13 or -om qcting " ai iqqt!' *)v., Work 'ur'der
f
paraemph , I 1kcir'(iii) agreed to by tiv; tics-'
Ru r
10 111 C�Zftes ih
:%vhi6 iire dtieedi'qtij the parties sand,*
10 es in ih6'ConlraciPrice ort<inuncl
Tunes which Ciubody-Lhe-sub'
fit to
i5vslon, rendered §y.. E14jlNLLR;,pursw
Paragraph 9.1 r.
-provided dint. iWlieh of execuling anp�Zuch.Chungebrdei.
an PPPL—%I- 'Pay, A , �e I likiin' 'rrom,.,fi�ly. �vi4cn uecmm :In
5- , - f the Uintraict Dqdan�ntg
prqvlslq�s 0 during ; , rrl
rni� a14;lkkble Laws and Regu6lidi�sl*bUt'durulg anpuch'
_nEI ODNTRr1OTOR-AaiU carry on , the''Work tind,
X'e. -to 'LN.' '.5iW61P -as'. �pAwi,d,cd' in
parovxph 629.
10.. IC notice ng-the general scope
U(MCCEATA' CONDJTIOiQS 141" 600 6160t)
% v1 cai-Y Or FORT' COLLIM MODIJ;icmiai4S Mk�,.vzboo)
1 .1 . -1-1 1 .— - 1.
Times, is,reguiaAbj IK�
6
Y inilit
tgiven to a•surety L. sp by
11 be adjusted
applic
]'),I - T'.1fr Contr I act Nick' obftstitWs ffc,- total
romi , xn I sit i - on 5 (subject ' in, i u t h- mr-i md _`u dj L istr n _ c at . s) paya I ble
to, OOT�TRACTOR fbe;jVaonrolnlfi '; e,W&kl lei ,
respotiiihilitics nnd,obligntfonsiassi&id wbi.undertalcen,
'4q n th
e lie Cont act F rim.
' Change
Order or'. or any claim, Conan a Uustmerd Ln-thcolnitac:
Price NMI
113:1. where Ahc NVark involved,ii'co%�ered b{-unit
applICaIii
W of such'
items' invoked _(Su��5 .f- to, .. .the f•
— - , - - , proy!slpns, .0
.1
-23
Oroyaphs 11 4 l through 11;9 3 utclusive)
11.3.2, -Where the Wa& involved. is riot cowered by
unit ,pntxs contained in the. Cori&icl Liicumeiii 6y'a
lhoixlidl aJpireJ`,palm`cnt;hasls, mcludingJuulp`sutn
(which,may n clude'an 4116iAdde for, otenc�id and
profit not 'necessarily, ;in uccordAn.cIe ;with'
par* ruph I e.&2);
11.3 3 where the Work inmielveld is not coveA by,uriiti
prices..cgntinnq,,Ln ._q, ontntct Ciocurnents and
agreement ki: a lump stun Is'not reacheJ under
parn�aPh' 11.3 =,- on the basis of the C(si-of the %Volk.
,(determuted as provided In"paragruphs I.fA anclll:?)'
plus'A GONTRAC OR's fee for overhead and profit
60cr7nm6d as Prov Idcd in paragraph I l ,b}`
=Cbvi ojilre:lVn`rk:
I I:A: -`Che tern» Cost of the Work mcarts.the suns, nGall
costs necessarily Incurred HiW i ld by CONTRACTOR in
the proper perfotniance;or the Whit Feeejdt is otherwise
[nay 6c agreed io in µciting 6y'OWNER, such e(xsts shall'
6c. to -amounts 'no; higher than those pimiline, in the
lodcality- of the Project, shall ii0udc only_thc following
ae,ns:and s1-11 not,ihclude An' )',-of A& costs' demtied in
paraagpph 113':
1,1.4,3 'ltaymciits madc. b- CQN I R.-WTOR to the
SulQgacla;s for WorCzpe forme) or; Cum sFieJsbv
.56contiaiors If required by 'OWi Eft.
'FJCC�Ch'Y}:Et.V (.ONLH'IIONS lll1/�(i9'iU rtLiiml,
'^a a, CITY OFI'OkT(DUAM AfOblF]CA770\S (k1:1�A7!aliU1'
114 4 Costs of special consulinnts,(iAcluding but
"nn[ `Ilniited to' :engtncerc archtta.tw, testing
la6ntutorir surve�vr ,aflouneys„and accountants)
cmpkiyyd=for- scn•icix spc4i1 ten ly rclatcd �tn'rthe:
Work.
1 l 4 5... Supp}einental'tosts mclutli� the.Colloicing
11.455.1 Ilia tmportioh. of , hccessagy,
trio- ortaugn, traveand "suhsisten e enses or,
co, 11 RAC fp "s- ern yecs. "inc u red ' in'
discharge of duucs`conntxtuf H'IIII die Work;
I i-A.5.^ . Cost, ;_including uansportiition and
tnauttenance: �of,_ all tilatertals, .Applies,.
e1.quipment, machinery, appliances office and
temporary tlicdtfiees at the`site and hand tools -not.
ow led by the w•orl cps. w hied _arc inns imcd rt the
pivrformancc of°ihz-Work, uttl civs]"'Jess nirlc't
value,of such!itcros used Eut,not consumcd'which
remai rithc prat= rtJ, of C(�A*T1Zr\GTQR.'
11.45:4 Soles consuni$r, rue or Similar faces
related to;',the, Work, and irpr: which
CONTRACTOR i9 hahle,'iiup seJ by`C'ayis'and
Reguhiltens:"
11.4.53. aotisits 16sl'.for causc:i,&her than
neeln;ence 'or' CONTRACTOR, inn••
J'uTx ttelOr or :an}one .=directly or indirectly
employed 6y unpbf them m-1-66whose acts tiny:
of fher,t ma} be l a61c,'sn l royalty payments
,fees lorprmuls and liixnses;
II.i,5.6. Losses and duinabes (and `related
`e'�ctscs)fcauscdhy damage to the Woil, noC
compensated by" insurance orgU erwtsc sustai ed
by CONI'kAC1tU[t' in-.mnnectiOn with the
rI
u
9
i
S
�11 4 5 7. . tfhe eoa of utiliti.ps, (ucl and sanitary'
fart7ilies ai lhrsit'e. "'
1,14 iSr' • Minor er;lieises such as telegrams;,
Itn� dtsmnceaelephone raps .telephone serrtce.nt
the stk, cepressage and similar petip m-h dcros4n
oonncc4onwith'thc�lVork.' .. _ ..
11.4.5.9.
Cost of piciniums fnr add tional Dnnd'
Arid uts_it_tiiicz iequued bzciuso ,cJtangts in
Work,
l l S:" 1'hc ttmt (nst;uCthe \�aik shall'nnt in@luda any,of<•'
the follow i4: ' .
1.1,5;?, Czpenses of;COVTRAC Ol)'s pimcipal;and
bunch offices other than.CONTRACT_6Rs o'fGa.`ui
lhestle.
115i3, Any, pail of, CONTRACTORS cupitel
rrprrta�eS- including - interest 6n CONTRACTOR'S!
capital empltiy6d 3 for the Work and I haazges againstCONTRTCTORYordeliraluentN r_n
1I:5.4, Cho oflpremrurns,for all 861rls,:and for t11'
ins uati a"whgt} ar err
not GCJI�nI R1CP,OR' ut required„
by ,the vict Uoctanemti,iu punc se and maintain
the samCone (eee�-�pt for the oost6 prcntiuma: aOtcred'ty
subpantgraph l l.'4.5 9 abirvc) .
FJ(UC4ENt]ttL• CONUIT70[A1 t Jl tF8' U 97n httitiaiil,
wta'ri�ottoa�cot:uisnto¢u•tcnoNsntiid;rrzuuo) ;
) 5 S:.Gpi 5 due, !Sub
tli0•, neeltgeitct '01'
CON TR:11 ay Sub&intpictor or .an};itnc
threcdy or.ii�J %ily empluved:by":any of the
m'or for
whose acis any of them m iy be` liable iricludrng but
not ltmite l t0. the 'conecnon of rlefertn'e W6rk.
ds' - oftnatenals:' eg tprnent,wrongly:suppliM
and inking gaud ariy tl inagr to pr iperty.
11 56 Qthrr overhead or general e�ptrtse-costs'0.f.
any kinJ and the.aost's'of any ttetn not speciGaihy, and:
expassly :included to jiii�,egntph' 11:�;;
Id:6 7 t e , 'CON 11C4G'I OR's fee allowed _ id.
COATFACTOF• Ccu overhead and, profit'ihalt ;be
detemtined'as' 'follows: V
11.6:1; a mutuaIN, .acceptable f xtd'.fee>or
I1 6.2, if, it fvZ6d lee is not+agueci Upou,•Ihen;a fee'
I-ised on the tollowing percentages of .ihc variouit
pprltons of the Cnst of the Wurk-
116.11., for, ctistsr incurred; :uridu
parag�nphs 71 •a 7 and 11,4 2, •the
( ON 1'}iACfOR's fee shall be fifi cn percent:
116?fi' for . Eosis iruaaTcd, : ihdcf,
paIr gr iph l I4:3, the CONTRf1CTOR`s'fcc.slrall
be Eye'per Y11Y•
11 G.2f1. no6lce shall'bz.ptfyable on the. basis
af.'cosls ttrmiw' under paragraphs 114 a, 14.451
and 11;5;
I L.62 5 the aing"! o(,creda to he ,allowed
by CON I RAf (`OR to UW NH12 rci any<cha igga,
kOl ich r sults m abet decreasu cdst'tt911 e i(ie'the
am'ou it oC the actual net tfeerease m co_st'P1usAa
deduction in'CO ]TRAGTOR'a fee hj an amount_
eyual,tq fit e pm nt oCsueh net deagasc: ant)
11.6:3.6 ,when both addtiions anJ creilits.art�
mvnlYod m any`; nr change; Ihr adjrstmenl,in,
CONTRAMiS fee.shall be vbmputcJ,on the
basin of the net., change u it a.cxda ee",with'
paragraphs 316'2.1'thrintgh:11.675 tnclusiic.
11:0. Whenever the"cost of• ally Akrork is to ihg
;25,
General Conditions and completed and ready for Final Payment and Acceptance
in accordance with the General Conditions within five (5) calendar days after the
date when the Contract Times commence to run.
3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving in a
legal preceding the actual loss suffered by OWNER if the Work is not completed
on time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as Liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion:
One Thousand Dollars ($1,000.00) for each calendar day or
fraction thereof that expires after the ninety (90) calendar day
period for Substantial Completion of the Work until the Work is
Substantially Complete.
• 2) Final Acceptance:
After Substantial Completion, Five Hundred Dollars ($500.00) for
each calendar day or fraction thereof that expires after the five (5)
calendar day period for Final Payment and Acceptance until the
Work is ready for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows: Four
Hundred Twenty -Eight Thousand Six Hundred Thirty -Eight Dollars and Two
Cents ($428,638.02) attached and incorporated herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on
account of the Contract Price on the basis of CONTRACTOR's Application for
Payment as recommended by ENGINEER, once each month during construction
as provided below. All progress payments will be on the basis of the progress of
• the Work measured by the schedule of values established in paragraph 2.6 of the
deterinined piirsuant to p 'ml+saph3'1.1A and i 15;
C.ONTRACTUR wilt esiablish" anti imaintam records
'thereof in accordance utth geiierally acceptedsaeeounting
praUices and submit•in form aci:epiable to L TCiNECR in
Item&d cost breakdcnvn toga} er wuh suppiiriaig data;
'Cash Allorrnnces:-'
•Il rs understutid ihat'CONCRAOTOR has mclu&d
m the Comiaci Price all allowarires si;i, nzmcd mllbe
Gorttraet'DotumenCs;and shetl'cguse the Work so covertil.
to-Wfurnished- and .performe ,flue such sums as may DC
ecxptablein (AMUR end'ENGINHEk. CO I RAC'TO ,
agiees that:. .
11;$a, the r:allowanecs - include 'the cdst, .to
_CON l RAC I OR (less any. upp6oable trade discounts)
of,matrnals' andcgtApnient required by the allotvanc'cs'
to b,cUehviwd et the site: and all ui;Acable lases: and
11 S' CONTR_ACTOR's ;costs for unlo'adtng and
}iai`tilltng on ihesite, labor,:insrallaaon,ciis'1.� ot'erFieircl_,
piuGt. and other cal ci scs'-,contemplated for .the'
`allo«t+ncas h_3ye'been mcltided in,the.(' ontmet`11rice
and not 7n the allowances .and no -;demand ,foe
additional pay .lent nn accait t of any of the rgrcgoing
ivill'hc valid.
Prior to final pajtneni, an.appiophi'le Gheingz Order MH 6e
Assucd ssnx:ommandcd by HNGIINWER toinlcct -'actual
amnunt3,due CON'I'I(AC.I'OKnn'account af.}Vork covered
M allowances, :grin l ,:( i3ntract Price shall ;lie'
co apondinghy^ adjusted:
,t 1:9 : Unii PrFee'IV ork
11,t9.'_ Each unit pncu"gill tie deemcd:to include nn
•wiiour c�iderctl by'CONT'RACTOR'to be rideyuate'
to cover. CONCRACTOR's overhead :nnl profrCiroi
.,eni:h separately identiLed item., .
179-3 O Wll' or CON TRACTOR'may mal.y'_til
claim for. an adjustment. in the :Coninict Price .in
acFAnlance YitFi Ariicle,l i iC:;
1193.1. the quentitv'of any item. of Umt Price.
14oik perforncd CONIKQCIOR dfli�
matenall} Hnd sA�raicantly. from the aestinAtcd
�'giiantin• ofsuch rain indreatedimdieA�eentent;
2
6. �filC[Kt b;Ul:RAt 4'ONUCIIQI1S 141U(1iV hrhtiml,
W CITY 6F'IORT GULWb7S�ArOUlA7CA770N5 (RL•1_5:1at11i1`
and
1 ! 4:3�?` there:is nu cdrresptindmg ailjtttinent
AnIbrzspecbto any' other item pC kW k.an f'
1J.t.>:3.3. if :CON1;1 Acrok Ixhetes: thfit
CONTRACTOR 'is entitle l 10 an increase = in
Contract Price as' a, restllto of haNIngsinctured
.additional t4qise or, ,OlkWE beticJes`_ that
QIWNFA is entiiladto a decrcaav m Contract Yriec.
and' fli 11- . - unable; tti ages ris to tie
nmt tint of any; suchi'rncrease or,clei-rettse.
I l.`33.4: CC1i\`7'RACTOR: ackiAuwleilars_tliai
theCMNI ER has`tharir=_hftoaddordelete 'iteakin'
the' Bill or 'at•ON'NRR'S� sole
d scaelion'withbut alTect e the'Contnid Price'61
any n mamma: item ui :Ir n mi the, deletion or
addition dues no[' exci:eil'.uventy five cerccnt* c-
t} co einartotal ContracrPricc.
AR 1 ICI.F. J2-•(iHA�IGF. OF CON'.I't2A(_ L`'T.IAIES
12.2. M time limits stated in the,ContractDocintents
we of the essence of the A"
0
91
9
0
0
willih Ole c0*1 'pf,j Sy*ntradbr-o.iSuppliershfill. be
deemedto be.deNp,within the control, cif CONTRACTOR:
AR11ca"Y' 13—TESTS -AND INSPECTIONS;,
OR'ACCP.VTANCJK OF
.
iktim''pt. npv,ee.cf all v'R;M
NNGINEW fiA,6,utual I&Medge Will �bcknen
be rcl&IM,,
corrected or accepted as g i4M in Ar,
AOC*Oo,W�rk,
.,R,43a n 4 In spictionx-I
.133: com.rRACTOR, sJiali gi4 LN' Nltk iinn'cty
ticitice. orfi%diness of (he Work for fill rellbired ffispWif:;
11 � '-
tests or, approwils; - - , _ __ , , .. , , � , , , M",
Anil
�le_slinjpeisoriirieuu r,6_ifiI-atc`req'uue.d inspectionsior tests:
13A 01.0413R,s�fill �mpltfy and ffay' fi�. . ,the ser'ees of
an.lfxn� ent testing a ora!6r)to ,perform g!Iy
mspe
Documents eneepl;;
,13 % All, Or
by Lug
13.4Z Mist ciostsalcuried "in connectionw-illulests
,dr inspections conduct, i ' pursuant to renfgraph-13, 40
iv-1 61-lr Or-YORT COL , LISS I MOD . MCA . TI - 0 41UN-11201) . 0)
.bolojv* "stafl, 4jje, jiiid as; :iiiovjded in" said:
'o"ise, 'speo ca]lly :prpv_tded in tfil
11'any Vqfk(ort.he_vorkWcth(is) tiiit'is to be"
in.qxcted_ , .tested -: or, (approvcd is covered! by
,C0NTT,izAIdTO;z- lwiisout -virfidml , c9nc-unitencc, of
F.NGl1\TFR;jVMiI!il, I 't' cstcdlh�, HN(IFNEER be.
,TCqIl
weaver d.fni`olncrvatwn::
13.7, Unooverir* Work as Ifrovi ed in'para �'p paragraph 13 -6
shall, Beni "tCj,
,�7,'ONN'RA(:TOR has Sivci"F. IldINEHR timely imofi,qc,of
.CONTRACTOR's intention �to cover .01C."SaIlle. 'and
1 11-1
13N. wi ressOnADIC promptrim in acted ith-
rc,wnse to sucRnotict,
iigif any Work, lvcovervd cont t6itife: witen
regttesf of Tmqkst�& 6yi 1
ING T�T-L*R,'be'uriciiver'eid for EN01"N'i7 13-Ek's observotiOn
ar,1rePlaced at
COxrr RACTOks eipenw.;
_ -t
it) tit) ' inspection otiotasting,:
repjacienienf,, d f6c b 'cii i'lna, 'if i' 'e" putties :are
W_ to a 'me , as to the inoul -, or extent of;
may-m, mat claim- re . as provide- l in,
U Ic "-I r d 12:
QIJIAERIqjj'Sto fh. Riork,
'6rmcdqn pi Removal iqfl�q '
11 1.11 i., reefive
- 6:12. earri&ioh Perip.d.-
i3.12-Jjn
item of ril is placed sin continuous service
before
'C;"cr date if -so prof ided'in the ' 5iwiCifi6itio br�.bv_
Xvrittcri'krrfcndn'iinf
23:-4Xliae Akroik!,(itnd,dafilhge to pth&.
to 8 0 9w Vdifial I
I 1 1 ON CA s0kLN A12000)
Word iestiltiny thel;&om), has been corrected,
reinov'ed 6i replaced funder ;this pi+tngraph I I'40-1.4hel
Corr e . Ction period hrretifider_%vkh respect to 's*uch'Work I
.iviH ':
fie"etLiiided fior•an iidditi"l-peTiod ofAmeyear-
after- such, and t�kb: j� on
repinim �nt has been?Lceeptleace'ofDrjeclive !York:
0
0
0
damages will itt 16de Nt opt; F limited to�nll &xMts.of-
repair"_or replacement of work' or others destroyed tx
,damaged,' by correction 'remmul or replaaemerit of
CONTRACT'OR'silefaclivi %Wik CO7,"ACTOR
shall'
nut-be'"allowed un.'extenkim of the l_ordract Tlmes.(;v
r�9dest�nesJ heceuse'of anv delay in foefl-n-ce o'f,the
1Vtir attnbt titble iurthe extr asi:tit O.\�NG2 tf OIVNER's
rightsand remedies hereunder.
aRT1CI 1 1•i PAYNff,NTS TO CON-rR ACTOR tl3VD
'COAWI:ETION
SdierLi(e njl!afngs'
14 b. ' The sch'cduld of talucs cuabliihcd a:9 prmui&d jfi
parugrnph'' 9 will .sen a as ttie burrs;ffor pr''Qgress payments
'end will'hc incdtjwrated into;a;olnt of Applicauontfor
Fattrignttrcceptablr;tphNGINEER. Propresspa}Inentstrn
acmuni,of linrt'Nice 1Vorkn'ill te.baud ontbe'riunllxr`6f:
units completed
-tpptieiition for._YiogressYarnierrr�;
CONTR4CTORh' Wanuri it OjTide'
143. .CC)-NTRAC'COR.tNariturts and guumt tees thitf tidz
to "till Work materials xnd;equipment "coverea's :any,
rippheatitm fe1 Riymerrt, 'whether rricorpuraltd in Ih'e;
Prcccu Or nut, will, pass to OWNER no'laterahan the time
of payment Gee aiiifelear of all•Lrens.,
Ret�eicof iyiitrttiliuirs jur Pitigrera PayneenG�:
144. 'ENdflfiF At. withii ten days after i&6e t of
each Apph:ation forTayment, either indicateiin'tenttrig a
bJC't?CyENkR.tI:,CONIN-n'OM vj-iL4(i Op Edtim,
rrla'IY �OI�i0a1 COLCINS n10b11"ICA7lUN571t1iV =12aila)
i4,5, EhiC,iNEI R's recommendauon; tif•Any pa}pr eilt,
requesttxd'in,an Application fur Payment tt ill constitute'a
representnfidn,6y,I; GINNFR.tn'I(.)tVNhR, leased Wr
RN(f dhFRs;on stc;�Fadrvatlorts of ilk c�ccutcd'Work
as itn experienced ancl,quelilrrd drstgri'professronal acid ion
--FNG INf ER's revtett of thi Application for Pay1n."v t'and•
the aecoin*Ying data'anal schedules. it al to,lhe"l esf of .
F.'NGINhhR'.v l-tirnvledgF infnm atioti and bclieL
14 5 1. the, W6fk 'has pra;re ed to; ,the <l oirit
indlcatcd;,' -
14J.3 the conditions ,.precedcm. to`
t,ONTRACTOR's� being entitled to suchL pIpyment 4
appear'tb hate hxn fulfilled ;irtsgfar as li is
' ENGL�'EGR's respori5ibllrtv.to observe ifte W"ork
94,7 F:NGINrEFRmay _rcfiisr.toreciv»mrndthe, %ehple
orµny part of tiny 1iaylnenlif tn•fiNGINEER's opiiiiotL tt
would be. incorrect to make ,tlw frepresentatians tn'
OWNm refened tq_9t par graph 14 5 GNt;1NGiR nay
alsoreruse to recornmend'nny such pa)urent; or, becausz of
subsequently disc&eied evidence, or the results of
subsequent rnspectioris or test's, nullify, ;any such ps)?iicnr
previously recommerrrled, oto :such eUent 'as may Ik,
neca§&�%m` RWiQ*QfFEFZ's pinion to riotect f11Vh?};Jt.
from lossbn:ause:
03Jthe Work is de(r2fi i; or completed Woi!:$ns
' LC'enilama•_e�iegirw>=corrrcttonor'icpla`catncnL
0:73 the ContraU•,Piic'e has 'bezrf redkc d by
' Writien'Amendmzrit'or'Ghsrige Omer.
14,7d OWN has heen requlrad to correct
�df c'fie Work or complete^\Vorl: ih accordance µ`ith -
' peragreph "13.14.. or
141.4_ ItiGiNEblf ha ,actual knowledge or the,
occurrence,. nf;:'anv of the events er"nimtcd' in
pzra�ap}is.]Si?_IahmuEh 15?:� inclusive:
O\VNrit:ma} refuse;tdmakc,prfmt nt.of•ih full amount
recommended by-.RNG.NRIsl:_becauke:
14,75 cfiims }arc ban"made agamst, ,;ONINFR on
account ofC(UN'fItAC:fC)Rsr iominncc;or tumtshiiig
of Ihc'lVark; `
143.6 I_tens,;Navc hceii filed,in iboncbuon,wiih^thca
NVork: Ex, mpr tyhcre LON'rRAM OK liar dzlrvered`a;
sjieeilic Bond,Ssatlsfaclory.to OWNF:K to, secure thesatisfaction aiid'discharge ot'sueh Liens;
14.7:Z, dterc ire other:items'en6tling n\VNF,"R tot set
off:a6tns,t the anick nt relcopunetlieiL,or'
-14.7:5. OjV;`1L"•R has'.;Actual knowledge o!' tliz
occuriencr cff,.un� = o[ ;the &w Ats ;anumauted-:''in.
paragmphs34.7:1 through.1473 orrImingnplis15 t
through 15 ,4:lrlclnsve;
-but- O%VNGR .must `give COYMCTOR imnfediatz
v<ritwn nonce (wyth a oopy 4d ENGINFER) stnting'the
Mascuis for such ocii6i and promptly pav Cc�NTR:ACTOt
the amount so withh6t or ony:adjustnienr thereto'iigres d
toby' O\4NGR. Elul COITRA 'TOR wliri
,,CONTRACTOR "'corr'eiits 16 OWNLR's satisfaction t}
reasims for' silch action
Cubaan8a1 Cnnrple6an;
_s 'UC6 (MNIMAXONUt• OM 1910-H (14/Vh}blloo
31.1 w CYTYOfibRr CULt.iKti M1fO6llll'A710�I�(IiLI"Ahafllll'
0
0
0
•
14;10. No occupancy or scltantc open tion of'p< r '
or;
'ihiiWork wdGbe aaotriphshed pour 1 i comphanc$,
-with the"requirements pf j.itira&ph 5:15,in relioct of
property itstirancc.
I Lral Inspection:
143 L Upon Nitta riohcc Freai CON 1 wrm '"It the_
entive AVork or tin; agnxd portion t} crebt is c6niplctc -
2140INE-ER wtU iiiinU a.f al,inspection with ,OWNER
and Ca)Nl RAQT.OR and will niiLfy CON'I RAGfOR in
twnting of,a11 pdriiculars in which this inspzgtion regat Ls
fti'thc wnrl, is inciirnplete or kygcJne: COO\ IRAC''1,bk'. .
shall inimcdtaaly tAke su h'ntcasures as,aicneccssary.to
complete such ivoTk nr rcmcdy vuch'deficicncies
Finahrllipinanon jor Pat nients
F�p rtC't?G.Gp•IJFR,IL:ONuiT767J5ytN1uS (t 99tt t" ,.
o! QTY OF Tour'C'COLLlI AfOt)11"I C.t77UN5Itttsl'�12Ui1f1)
0
to furriitlt sttcfi .a `rzlense ,or: r
eceipt pi hiU
C OI�T1.RACTOR' may CurYt sfi, a Bond or.othrr _i�llateral'
salisrsdtory,lo,'01VNERdao indemniCy.UWN .R`isgnirist.
any,LiBn Releases nr.iyarJers oCliens and Ih coiisen oC'
the'suroty io'fmali&-iiaidcni-'air%to.be submitted''on
Coriiis'conforniinkto the ifdmint of the UIVNER'S stanc4•ird
forin'sbound. in'Uie-Project manual;
Firta1 Pnt'nirglwid Qcceytaace:_
i{4uverpfGl6ima: _
14.15 i'he makiiin and ecceptanc&d.Gtutl paynieni-bill
-ccaislitule:� ` -
14,15.1.a:i'TO af6 claim I"-'1VNbR','a�atrist
CONTRlaGTOR >ijxcept claims en_'G'oinr
utuenledl:iens from`tkjecrh'e Work appenrtig<nfter:
a31,
firiil ifii1x0on,:piippjanidto paka, piph 14;11. from
failure to: 6omplywith� (he.,Cq'ntrkdbociuritiks 6r the
Lcm1sof:arrj.;sp&ia1 &aii�nt' "s specified ihercin. or
CONTRACTOR'S CONTRACTOR'S� 6untinuing obhgaliunc und'.r
- C�Contraol - Ducurri , chis - "and,
,1445.2.A iv11_iver.bf_91l.c&hs t v'CONTRACTOR
,
again-t'OW14911, offer than 0apse- -pr'evIously aildc" in
Twiritinti and Still u'risettled:
,ARTICLE 1_,5SUSTFNS'IO-N OF WORK i M,
wr PANI [MvribiN
15:1! ljpr*tfF
following cvcnts.
15;zl,
if--c--0NM'v-T0RI tersistan6j lhil'sto 'reff"orm
thc Work n accordance kithtfeUfircDocuments'
@*lii69_Nt rto%Iubitid
ldi failure- i'oitipph"Wfficiertt
fsljflej workers or -iultubje -or equipment or;
Failure to I ,-- a (Ilicre'lo- the p'togrm i&dulc �66ffiqhccl
under :pr'gnp k - h",() ' d"'_ 661iletirn& to[rilepursuantto
15.12., Jf CONTRACTOR 'd_*Lsrc_pr&q�' Laws or
cW vi" 1. 1.i, 1 -
JZ�4ulfttion�ornfiyju�l,iin rigjur1is.dmon;
1,5.92,4, if
00411 k- idR '6mthc'A%irsc.vio'1Atcs it) ;crV,
substantml",way'mly �ppvof the. 4CA
bacumrnty
15.1. Wherc-COMMAG'rows wrviccs have 60
tam , iruit I ed, by�,OWNJX Lht- t . cr mi I nabonmill mot affect
an}
_ rights`.
igh Ls' or r . remedies , -I 'of Q,WNH'R
cc\1Tpk&bR then c:sting or which may
_
thc-'r,ea_fkttr
aceme'Any' Tetento pay,ment or motleys c_e
.C(,),,rTRAM*0P' by MvN ' Will wnot-
1Y_
15,14.1 Vpoflr scyen days 3W(Uten 'noti 0
CONTRACTrOW PNIC"l
t� iitlioid' rc-c-cludi-t i t,(?r
cc
Aeet tol,cribuillm c(ok, %linif id'-,(,A"1 i
such
atifijil k1-
15.4.1 for c6ftipletW arid ac"PIAW Work executed
(
emnla ' ncc,ivithdie '<)ntmct'J)6cdrncnts prior. t&
thcxlTafivc�(datc 6f',terininaiion,lin-cl-u-d-t-n-g lbirana
rzasolin6le sums fur="oyrrhznJ and prof[ on pitrFt:
15A.1, br. expens6 �,uswilncd prior to the
cbvc
�CIIC7� of ternurintion , in, pciform Lng 'wivices an
by the' Gon'tmU .'in'connection willa
uncompleted Work,-4,plb �'s -1 fair aM'r&ikfiable_s-UJa's.f&,
IS . 143,_ lbi. all [.]aims, ucii '16ssa,and chmages
iricunred, in knwacnf or'l-erniiiife-d
:s6booiiinic16r9, Sdfiplkri,taidbffi 46d
k.r ressonAic expense ,,diqc_Wvl aliri'iibuia.ble
CONTRACTOR shall not be paidl6n accountloss of
. of ,
antiFllaited pro' fit's , 'or 'Ve'huk J& other 6 � o'M ic hiss:
raising otit �oror resultil V'Ioin such tiermi- mi-tion,
comn . mc!O j11uySlep
,15,5:
Work is,.suspende-d �Jbr. a�pentxi of morz;thin'rtinety flays
byr MWM-cir ufider an order,of cL,)uit or offier'Pubfit
W NofmHii"k 671il. authority, r ad 6n niv ArVu,mtion
:f6r N, n% j",dj,�t I , --.a,, r, L ... I - *lti;j '_
yrn "1 3, days ttr%it is submi of,
OWNER 71ililsfb . r . th' I da *-q I P MY I WiTrj�AUORa irty Y q
0
Pi
0
0
0
.AkTlCLF
-ARTICLE 17-MISCELLANEOUS
17.1-, VV'heriever zany provisidn of .,the Cofilmu
bc,Zcumic-nw requires.the gjving' of"whitenj nobve,,it Wilfk
deemed to have been v4li&given if deifiviird._m persloin,fo
,d+e individual or to 8"Memt;er of the firm or, 164th yffiwroC
list busiiessjCddresskn6t to thigiVerof theinohce,
J
�17:2: e6mrs . 4 ta T n v m
. 1
172.1. When .anv.. pCri6d'of: t iinc ia 'racifed to mthe?
.Contract l5ocuiiients by it, b tic ��,j . _ ouTputc to
-e�Iude"Ihc--fifst ' AM ' -indude the last day a[. su'ch
,penod,_ If I - h - c a:
Sat ida} or'd ' 11 1 holti "d
made _ IYI
by the law -a Lhe-so0ficableju'risdictiorL,s�ch,day Will
bnpmittM HO the corri.rii1tatim
urucctNtxiL wc�'rybrFORTO , OL . LIMM - 0 , D . W1 . C I A_n I 64s(RhV-'10000)
.- _111 .1.1 . _. I �
fivin midniOV to the next mtclnigf t u ill .cor&itu'to a
Pr*.O.'onal AitCv'undCduH Cdki iAduded
17.5. 1Vhcnevei rele: , ieiwe is.mude to
lows ilivi &riiagcs'.; it,"lrinclude 'in ench-em' Nf not-
urtbii6},i end yt.h.er`prqfMimals." and-- all court or
#bifiiti6n oro,Ther dispute res6l'u'tio. nrpo . sts,
176, The lalra of flie_St C_4_CSiiwm_do _RPPl!V_!o_qpk
bgpg �ienf.-_�Referg'nde to' I'wo.. rtinem. Coln atk+'st5tutes
..are as'foll
17.6.1 If u-Oqiifi�is filediirouuixed:bv
aaw(CRS-38-26-107) to Yivapavmcnts to CONTRACTOR ,sufficient funds- tto 'insure the
All 61ainis fri'lhbor. matuials, team hire
or other supplies',
used or :con_sumed by CONTRACTOR. or•Ns
33
IrICU4GE±7kRN C:ONUlT101wS 1JIU�l7 y9V kd�(iml;
zq wrclrro�iola-co iicsn�uniricerio��tzL�anaubti
u
0
0
0
0990 Emiao
w/ crry OITFORT COLLINS MODIFICAMT43 jli;:N'411000)
9
• General Conditions and in the case of Unit Price Work based on the number of
units completed, and in accordance with the General Requirements concerning
Unit Price Work.
5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as
contract retainage five percent (5%) of each progress payment, but, in each
case, less the aggregate of payments previously made and less such amounts
as ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions. If, in the sole discretion of Owner, on
recommendation of Engineer, Owner determines that the character and progress
of the Work have been satisfactory to OWNER and ENGINEER, OWNER may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 95% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided
in paragraph 14.2 of the General Conditions) may be included in the application
Section 00520 Page 3 for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of
• the Contract Price, less such amounts as ENGINEER shall determine or
OWNER may withhold in accordance with paragraph 14.7 of the General
Conditions or as provided by law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay
the remainder of the Contract Price as recommended by ENGINEER as provided
in said paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of the
Contract Documents, Work, site, locality, and with all local conditions and Laws
and Regulations that in any manner may affect cost, progress, performance or
furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and tests of
subsurface conditions and drawings of physical conditions which are identified in
the Supplementary Conditions as provided in paragraph 4.2 of the General
Conditions.
KiCDCCE Oo noNsi4io(ij)vEdfiail
.36� WOTYOFFORTCULUh'S._'OO 1-1 ION (RL•l'A120UbY
•
171
n
U
EXHTBTT GC -A totencral Gmdttions
of the` Construction Contract :Bcrircen
OW 1YER, a n )CONTRA CTOR`
DI51'LTE RESOLUTION ACRI.IINENT'
Oxv&vl R -and "CONTRACTOR herobv a Ihet
Article i16 of tht Grnrriil..Gondition's of the'.Cwistraaion
'G> iiga. hchveen' 6vNER, and (ONI`RAQTOR js
ariienclrJ to mcb]ide tte folWvirtg'u�eemeni iif thepaities
I*
16 4 Lnept as' provltk d in n;maraph 16,5 beI6ty
❑n a&-ti6 aris-ing ' out of or relaiing to, the t 3ork n et.
Documentsshsllmoludetty.cunsxliilatitm juirrcleror-in any.
other-',mannerany other, person or, entity' (incldding
ENGINEE ,,ENG1NEER's C!o' uitant'and the ofLceis;
die"ectors ages ts,;emplgyeez or consultants of nay of them)
who is not a"p'arty to this con unless:
.16.4A. •ahe mcl uionuf such other,per.son or'cntity is
neeessury''it complac'rehe[ts to be'afforded'among
those %vb6jarz ulreaily parks to thc_arbiffiidor� aril,
1642 such, other jwwri or entity is .sul stantially
involved in a question of law or fact which'is common
to those tvho are alrzady parties,to the flrhitratioii`and
�ilitcFixilfflnscm:suchproccc�iti�c.aiid
166.. The award reri'dired by the urbitr',tors will he
taut;)udgntentlnay he'entcicd upon Win an)couivbh vinj
jun'' d& ion tltereoC _ r nii it ivdl not. lX subject to
m(xltGcal on 9[ uppe il..
CGAI
-b6AI
-,,7S(RFV.9194)
OFI �91
0
SECTION 00800
SUPPLEMENTARY CONDITIONS
u
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of
Fort Collins modifications) and other provisions of the Contract Documents as indicated
below.
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
•
5.4.3 and 5.4.5 Commercial General Liability policy will have
limits of $1,000,000 combined single limits (CSL). This policy •
will include coverage for Explosion, Collapse, and
Underground coverage unless waived by the Owner.
5.4.6 The Comprehensive Automobile Liability Insurance
policy will have limits of $1,000,000 combined single limits
(CSL).
5.4.9 This policy will include completed operations
coverage/product liability coverage with limits of $1,000,000
combined single limits (CSL).
SC-12.3 Add the following language to the end of paragraph 12.3.
Contractor will include in the project schedule zero (0) days lost due to
abnormal weather conditions.
•
E
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
SECTION 00950
CHANGE ORDER NO.
I
PROJECT TITLE: Crack Seal & Fill Project — 2013 Renewal
CONTRACTOR: Vogel Concrete Inc
PROJECT NUMBER: 7290
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved) •
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
DATE:
DA
W
DATE:
is
0
\
�0
\
0
8
CD
§
®
64
e
3
}
»Wady
-
ezzW
2 0zz
.=z®w=
zoo�z
_�:@§�-
§)§[§M
)EL»~Et
2$±
< .
}
0
co
}.]
\
§
)
2
_
[
z
-
)
z
co
®
cu
�
i
\\
/
& /
k
\
)
§
/
2
t�
\§�
�
_
D�0O
)
®
k(
N===
\*
z
<=
«EOL\
_
e
*
)..
E
)
®°
5)<
a
{
§k
3
°
w
e
{2
mae2
=
e°
»
)
3§
_
`[)
/
)c
0
-
/
[
22
\
CL
)\
2-£a
§
&)
&
\
»
ra,
o
.
{
2
<
/CL \
0z
\/\<
<
�j
_
.
\
/
&
.
/
..
2
!
..
2
..
_
u
=
_
_
z
_OL
_
An
_
(
/
®
=
(
-
-
-
/
7
) ƒ
}
k
\
/
\
}
_
»
0 /
\
(
(
(
\
/
y
<
m
<
3
3
3
o
o
t
/$
2
a
t
(
)
§ k
»
<
<
<
§ (
)
(
[§
\
\ §
cc
w
cc
\
°k�
k
(#o
<
±�ar
)mom
§
CD
k
k
k
g
))
+
a
a
6
z
z
§ /
/
/
/
R
/
]
/ ]
r
U N
O a m
N
W 70
Q W e COO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
a Ho60���e464�6qtqtGU)CG(a���e4Q4e4Q4ul6s6s606q��a www�w�
m
O N
U) N
w O
N
(0 d
C O O O O O O O O O O O O O O O O O O O O O O O o o o o o 0 0 0 (D 0 0
-O Z) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N O O O O O O O O o O O O O O O O O O O O O O O O O O O O O O O O O O O
Q fA Ef-J ER EA 69 fA fA fA EA fR EA (A [f) b9 EH ER Efl fA fA 69 fA EA Efl fH Efi ER CO EA ER 69 EA EA fA fA
>O O_
E
U OSO
a
F- 0
�Oo0000CD, o00o00000000000000000000000
elf
a
OooCD00000000000000000000000000000o
0
LL
O N N
l N p _O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
E eA EA fA fA EA fA w w !fi Efi EA EA EA EA w EH w w w w (H ER fR EA 6, fA EA w EA <6,),EA ER EA EA
F-
Owl
>
O a '"
o `'a
d
U
>.
U
Ci
Q
:a
a
c000000o0000oo00000000000000000CD, 00o
a
Q
a
Z)000000000000000000000oCDo0000000Ooo
O O O o 0 6 6 0 o 0 6 0 0 6 6 6 6 6 0 0 0 0 0 0 6 6 6 0 0 0 0 6 6 6 6
N
E
O U)
UF0
C 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 0 o 0 o o 0 0 0 0 0 o o 0 o o 0 0 o o o o O O 0 0 0 0 0 0 o 0 0 0 0
E O o 0 0 o 0 0 0 o 0 o O O O O o 0 o O O O O o o O O O o 0 o 0 0 o O
Q Efl Efl EA EA fA EA EA (fl EA fR fA fA EA EA EA EA EA fA EA fA EA fA EA 64 EA fA EA EA EA co ER EA ER EA
N
C U
tea`
N
z
O -
� c
Q �
F- 0
U
O J
z <
O m O
`m
9
00 d E
O
z
•
•
•
• V U
N
LL _
O a m
Cl)
W
(D N O O CD O O O CD O O O O O o 0 0 0 0 0 0 0 0 0 0 0 00 0 00 0 0 0 0 0 0 CD O
Q C O- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a o 1 F- 0 o 0 0 0 0 0 o 0 0 0 0 0 o 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hw Se» C)66s6s9e» 6646 64696 Qs 09,0)»UlWWu3e&9,Wfle»u�» 6»e»e»e»eg6-z6q6g6464
a�
O fd
N 0
O
c F N
a
00000000000o000000o000000000o000000
_0 0:300000000000000000000000000000000000
000000000000o00000000000000000000000
F 6q Q, to to 6F) 6,) 6F) 6. 69 6q 6q(j�, 6qE»E»F»F»E»vie»cGwwv)c»vu Elw w wy)q)w61) »e»
Z 0 n
0
> UF-m
Q p O
0-
0 �000o00o00o000000000000oOo0000000000
LL a �000o00o00o00o0o000000000oCDoo0000000
D N N O O O O O O O O O O O O O O O o 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Z Y N p U C 69 &1 Efl fR 69 69 69 69 EA 69 64 64 w EA 69 EA ul w co 69 69 Hi w (a 6) (a ffl fA 69 EA EA 69 69 69 6q
OOa�.o Q
Q30 `'a
U Ua
J 0
d
a
Q (U c0000000000000000o00000000oo00000000
• =300000000000o0o0ooOo0000000o000o0000
N O O O O O O CD.O O O O O O o 0 0 0 o 0 06 0 0 06 0 o o 0 0 0 0 0 0 C., o
0 Qvav>696z6969696'T6A6969E»696969696S696gvgvae»696g64ua64Q4v>64v�uav>6464
0
U s
0 L C
�~� O
C O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o
D o 0 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o 0 0
C O O O O O O O O O O O O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O
Q fA EA EA 69 EA fA 69 fA 69 fA fA fA fA EA 69 fA fA EA el fn fA 69 69 fA fA Efi 6'3 69 ER 64 EA 69 69 Efi Efi
'C U
N U)
W
0
af
U OW
wN Lll Q
Ci Q O
�
o U
J LLl
Z �CL
. �
Q
U a
`m
• m E
E
Z
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or to
supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing of the
Work at the Contract Price, within the Contract Times and in accordance with the
other terms and conditions of the Contract Documents, including specifically the
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the accurate
location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information or data
in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and conditions
of the Contract Documents, including specifically the provision of paragraph 4.3.
is of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General
Conditions, Supplementary Conditions, those items included in the definition of
"Contract Documents" in Article 1.10 of the General Conditions, and such other
items as are referenced in this Article 7, all of which are incorporated herein by
this reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related actions
in carrying out the terms of this Agreement are deemed Contract Documents and
incorporated herein by this reference, and include, but are not limited to, the
following:
0
V
LL c
O-0 o 0
ItN@ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD O O O CD CD O O O CD O O CD CD O O CD
W Coo t U 0 00 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 00 0 0 00 p
fA Uf fH 61) U) Uf 69 Ui Uf 69 61) U) U) Uf Uf U) U! U) 69 to U? U l U! U) to U> U) U) Eq w w w w
a0 cl
0
O
a o
O N U EA
- O
f0 L 'C
N F dC
a
> N O O
O
m~a �
in C
J O N O
Q C 0 :. O
f0 U (6 O
W } 7--> .V ci
QQOo- OL
w
Q
0
W
l
O
H
C
O
CL
N
N
N J
U
O E
7
C z
N
N E
= :3
z
•
•
2013 CRACK SEAL & CRACK FILL PROJECT
GENERAL REQUIREMENTS INDEX
•
SECTION
01010
01040
01310
01340
01410
01510
01560
01700
01800
0
CJ
Summary of Work
Coordination
Construction Schedules
Submittals
Testing
Temporary Utilities
Temporary Controls
Contract Closeout
Method of Measurement and Basis of Payment
PAGE NUMBERS
General Requirements 2-3
General Requirements 4-5
General Requirements 6-7
General Requirements 8-9
General Requirements 10-11
General Requirements 12
General Requirements 13
General Requirements 14
General Requirements 15
SECTION 01010
SUMMARY OF WORK
1.1 DESCRIPTION OF WORK .
A. This work shall consist of cleaning, sealing, and filling all roadway cracks greater than 1/8" wide on
designated streets in the City of Fort Collins. Specific locations are described in Section 3500, Project
Map.
B. Construction Hours
1. Operation shall be in accordance with Section 108.
2. Any work performed by the Contractor outside of the construction hours, whether or not authorized
by the Engineer, shall entitle the Owner to deduct from compensation due to the Contractor
sufficient funds to cover the Owner, s costs in providing field engineering and/or inspection services
because of such work. The cost for field engineering and inspection shall be $50.00 per hour.
1.2 NOTICES TO PRIVATE OWNERS AND AUTHORITIES
A. Notify private owners of adjacent property, utilities, irrigation canal, and affected governmental agencies
when prosecution of the Work may affect them.
B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is
necessary to temporarily deny access or services.
C. Contact utilities at least 48 hours prior excavating near underground utilities.
D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed
scope of work schedule and any items which would affect their daily operation.
E. Darren Moritz/Tom Knostman will be the Program Manager/Project Engineer.
Darren Moritz 970-221-6218 Office 970-556-1495 Cell
Tom Knostman 970-221-6576 Office 970-679-7947 Cell
F. Names and telephone numbers of affected agencies and utilities in the area are listed below for
Contractor's convenience.
General Requirements - Page 2 of 15
SECTION 01010
SUMMARY OF WORK
.
UTILITIES
Water:
City of Fort Collins, Colorado
Utilities 221-6700; Meter Shop 221-6759
Storm Sewer:
City of Fort Collins, Colorado
221-6700
Sanitary Sewer:
City of Fort Collins, Colorado
221-6700
Electrical:
City of Fort Collins, Colorado
221-6700
Gas:
Xcel Energy Emergency 1-800-895-2999
Local Contact:
Pat Kreager 970-566-4416
Telephone:
UNCC/ 1-800-922-1987
Local Contact:
Debbie Kautz 970-689-0635
Traffic Operations:
City of Ft. Collins, Colorado
221-6630
Cable Television:
Comcast
493-7400
•
Utility Notification Center of Colorado (UNCC) - 811
1-800-922-1987
AGENCIES
Safety:
Occupational Safety and Health Administration
(OSHA): 844-3061
Fire:
Poudre Fire Authority
Non -Emergency: 221-65 81
Emergency: 911
Police:
City of Fort Collins Police Department
Non -Emergency: 221-6540
Emergency: 911
Postmaster:
US Postal Service: 225-411 l
Transportation:
Transfort: 221-6620
Traffic Engineering: 221-6630
• END OF SECTION
Latimer County Sheriffs Department:
Non -Emergency: 221-7177
Ambulance:
Poudre Valley Hospital
Non -Emergency: 484-1227
Emergencies: 911
General Requirements - Page 3 of 15
SECTION 01040
COORDINATION
1.1 GENERAL CONTRACTOR RESPONSIBILITIES .
A. Coordinate operations under contract in a manner which will facilitate progress of the Work.
B. Conform to the requirements of public utilities and concerned public agencies in respect to the timing and
manner of performance of operations which affect the service of such utilities, agencies, or public safety.
C.- Coordinate operations under contract with utility work to allow for efficient completion of the Work.
D. Coordinate all operations with the adjoining property owners, business owners, and surrounding
neighborhoods to provide satisfactory access at all times and keep them informed at all times.
1.2 CONFERENCES
A. A Pre -construction Conference will be held prior to the start of construction.
1. Contractor shall participate in the conference accompanied by all major Subcontractors, including the
Traffic Control Supervisor assigned to the project.
2. Contractor shall designate/introduce Superintendent, and major Subcontractors supervisors assigned to
project.
3. The Project Engineer shall invite all utility companies involved.
4. The Utilities will be asked to designate their coordination person, provide utility plans, and their
anticipated schedules.
5. The Project Engineer shall introduce the City Representative(s).
B. Additional project coordination conferences will be held prior to start of construction for coordination of
the Work, refining project schedules, and utility coordination.
C. Project Engineer may hold coordination conferences to be attended by all involved when Contractor's •
operations affects, or is affected by, the work of others.
1. Contractor shall participate in such conferences accompanied by Subcontractors as required by the
Project Engineer.
1.3 PROGRESS MEETINGS
A. Contractor and Project Engineer shall schedule and hold regular progress meetings at least weekly and at
other times as requested by the Project Manager or required by the progress of the Work.
B. Attendance shall include:
1. Contractor and Superintendent.
2. Owner's Representatives.
3. Project Manager, Project Engineer, and City Representative(s).
4. Traffic Control Supervisor.
5. Others as may be requested by Contractor, Owner, or Owner's Representative.
C. Minimum agenda shall include:
I. Review of work progress since last meeting.
2. Identification and discussion of problems affecting progress.
3. Review of any pending change orders.
4. Revision of Construction Schedule as appropriate.
•
General Requirements - Page 4 of 15
SECTION 01040
COORDINATION
• D. The Engineer and Contractor shall agree to weekly quantities at the progress meetings. The weekly
quantity sheets shall be signed by both parties. These quantity sheets, when signed, shall be final and shall
be the basis for the monthly progress estimates. This process ensures accurate monthly project pay
estimates.
•
•
END OF SECTION
General Requirements - Page 5 of 15
SECTION 01310
CONSTRUCTION SCHEDULES
1.1 GENERAL •
A. The Contractor shall prepare a detailed schedule of all construction operations and procurement after
review of tentative schedule by parties attending the pre -construction conference. This schedule will show
how the contractor intends to meet the milestones set forth.
1. No work is to begin at the site until Owner's acceptance of the Construction Progress Schedule and
Report of delivery of equipment and materials.
1.2 FORMAT AND SUBMISSIONS
A. Prepare construction and procure schedules in a graphic format suitable for displaying scheduled and actual
progress.
B. Submit two copies of each schedule to Owner for review.
I. Owner will return one copy to Contractor with revisions suggested or necessary for coordination of the
work with the needs of Owner or others.
C. The schedule must show how the street, landscaping, and various utility work will be coordinated.
1.3 CONTENT
A. Construction Progress Schedule.
1. Show the complete work sequence of construction by activity and location.
2. Show changes to traffic control.
3. Show project milestones
B. Report of delivery of equipment and materials.
1. Show delivery status of critical and major items of equipment and materials.
2. Include a schedule which includes the critical path for Shop Drawings, tests, and other submittal
requirements for equipment and materials, reference Section 01340.
1.4 PROGRESS REVISIONS
A. Submit revised schedules and reports at weekly project coordination meetings when changes are foreseen,
when requested by Owner, and with each application for progress payment.
B. Show changes occurring since previous submission.
1. Actual progress of each item to date.
2. Revised projections of progress and completion.
C. Provide a narrative report as needed to define:
1. Anticipated problems, recommended actions, and their effects on the schedule.
2. The effect of changes on schedules of others.
E
General Requirements - Page 6 of 15
SECTION 01310
CONSTRUCTION SCHEDULES
• 1.5 OWNER'S RESPONSIBILITY
0
•
A. Owner's review is only for the purpose of checking conformity with the Contract Documents and assisting
Contractor in coordinating the Work with the needs of the Project.
It is not to be construed as relieving Contractor from any responsibility to determine the means, methods,
techniques, sequences and procedures of construction as provided in the General Conditions.
END OF SECTION
General Requirements - Page 7 of 15
SECTION 01340
SUBMITTALS
1.1 GENERAL •
A. Submit Shop Drawings, Samples, and other submittals as required by individual specification sections.
1. Project Engineer will not accept submittals from anyone but the Contractor.
B. Schedule: Reference Section 01310, Construction Schedules. Submittals received by Project Engineer prior
to the time set forth in the approved schedule will be reviewed at any time convenient to Project Engineer
before the time required by the schedule.
C. Any need for more than one re -submission, or any other delay in obtaining Project Engineer's review of
submittals, will not entitle Contractor to extension of the Contract Time unless delay of the Work is directly
caused by failure of Project Engineer to return any scheduled submittal within 10 days after receipt in his
office of all information required for review of the submittals or for any other reason which prevents
Project Engineer's timely review. Failure of Contractor to coordinate submittals that must be reviewed
together will not entitle Contractor to an extension of Contract Time or an increase in Contract Price.
D. Resubmit for review a correct submittal if errors are discovered during manufacture or fabrication.
E. Review status designations listed on Project Engineer's submittal review stamp are defined as follows:
1. NO EXCEPTION TAKEN: Signifies material or equipment represented by the submittal conforms
with the design concept, complies with the information given in the Contract Documents and is
acceptable for incorporation in the Work. Contractor is to proceed with fabrication or procurement of
the items and with related work. Copies of the submittal are to be transmitted for final distribution.
2. REVISE AS NOTED
Signifies material or equipment represented by the submittal conforms with the design concept,
complies with the information given in the Contract Documents and is acceptable for incorporation in
the Work in accordance with Project Engineer's notations. Contractor is to proceed with the Work in
accordance with Project Engineer's notations and is to submit a revised submittal responsive to
notations marked on the returned submittal or written in the letter of transmittal.
3. REJECTED
Signifies material or equipment represented by the submittal does not conform with the design concept
or comply with the information given in the Contract Documents and is not acceptable for use in the
Work. Contractor is to submit submittals responsive to the Contract Documents.
4. FOR REFERENCE ONLY
Signifies submittals which are for supplementary information only; pamphlets, general information
sheets; catalog cuts, standard sheets, bulletins and similar data, all of which are useful to Owner in
design, operation, or maintenance, but which by their nature do not constitute a basis for determining
that items represented thereby conform with the design concept or comply with the information given in
the Contract Documents. Engineer reviews such submittals for general information but not for
substance.
1.3 SUBMISSION REQUIREMENTS
A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no
delay in the Work or in the work of any other contractor.
B. Minimum number required:
1. Three (3) copies minimum, two (2) copies which will be retained by Project Engineer.
•
General Requirements - Page 8 of 15
SECTION 01340
SUBMITTALS
0 1.4 RE -SUBMISSION REQUIREMENTS
•
•
A. Make corrections or changes required by Project Engineer and resubmit until accepted.
B. In writing call Project Engineer's attention to deviations that the submittal may have from the Contract
Documents.
C. In writing, call specific attention to revisions other than those called for by Project Engineer on previous
submissions.
END OF SECTION