Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7084 CONSULTING ENGINEERING SERVICES (25)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AYRES ASSOCIATES DATED: Work Order Date: January 24, 2013 Work Order Number: SCP-SR&E-012413 Purchase Order Number: Project Title: Stream Rehabilitation and Enhancement Design Vision for Fossil Creek Commencement Date: January 24, 2013 Completion Date: July 31, 2013 Maximum Fee: (time and reimbursable direct costs): $66,466.00 Project Description: consultant to provide planning, basin vision, and management services to complete the first phase of the Stream Rehabilitation and Enhancement Project Scope of Services: see attached scope and cost Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of two Exhibits 3 pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Service Provider: J� By� 9Gai/l. Title:�r /%i,niGpti� �Minr/)M Date: OWZin CC: Purchasing City of Fort Collins: Submitted By:�.( if Special P` o cts Manager Date: 1'24t 3 Reviewed By: Ltt�v� Chief Engineer Date: /rZy A? Reviewed By: Water Engineering,& Op rations Mgr. Date: Approved By: Approved By: Utilities General Manager January 16, 2013 STREAM REHABILITATION $ ENHANCEMENT DESIGN VISION FOR FOSSIL CREEK PROJECT OBJECTIVE: To develop a design vision for the Fossil Creek Basin. GENERAL The Consultant will provide planning, basin vision, and management services as required to complete Phase I of the Stream Rehabilitation & Enhancement Project. The project team consists -of Ayres Associates, Blue Mountain Consulting, Miller Ecological, Russell+Mills Studios, and Brierley Associates (the Consultants). Team members will be involved on an as needed basis in the design process. The following Scope of Services outlines the tasks required to complete the Design Vision. PHASE I - DESIGN VISION FOR FOSSIL CREEK BASIN 1. Task 1 1.1 Progress Meetings. Weekly team progress meetings shall be held including the Core Team and other team members as needed. These meetings may also include Potentially Affected Individuals (PAIs). Meetings will be held at the City of Fort Collins Utility office or other agreed upon location. A total of 7 progress meetings are included in this scope. At and following the meetings, Ayres will provide the following: • Meeting Agenda • Summary of meeting minutes including action items • Written updates via email at other times as deemed necessary by the Consultants and City staff 1.2 Investigating Irrigation Flows. Irrigation flows imported into Mail Creek and Fossil Creek are a primary cause of stream degradation. They are also the driver of the hydrology for these reaches. Before site rehabilitation proceeds, the Consultant and the City need to determine how these flows will be managed in the future. This task will include meetings with current ditch companies and possibly water users. This task will investigate which of the following future conditions will exist that will guide all downstream rehabilitation work: • Remain as is • Manage flows to benefit stream rehabilitation • Relocate flows out of channel 1.3 Investigate 404 Permitting. Permitting of the rehabilitation work will be an integral part of this project and has the potential to impact how and what is designed. A team meeting with the Corps at the beginning. of this project will. be important for_ establishing guidelines for future design work and for establishing the most efficient permitting process for future work. This task may involve several conversations with a Corps representative and a team meeting on site. January 16, 2013 1.4 Data Collection and Management. There will be a significant amount of data required for this project. A detailed list of specific data needs will be created as well as a schedule for time sensitive data collection. Some information may already be available and other types will need to be collected. This task will cover the organization and management of this data as well as the acquisition of the data that is freely available. A site visit to multiple reaches will be included in this task. 1.5 Vision Charrett. This scope assumes that the Vision Charrett will take 4 hours and will include the entire project team and PAI's to begin formulating the design vision. This task will likely require the creation of exhibits and will require input from the irrigation flows and 404 permitting discussions. This meeting will also help us prepare for the Public Outreach. 1.6 Develop Design Vision. The project team will create a Design Vision document that compiles all of the information pertaining to the irrigation flows, Corps permitting requirements, and the Vision Charrett. This document will define the following items: • Is Fossil Creek Basin the correct place to start • Define what rehabilitation and enhancements for this basin means • Define basin goals such as public access, trails, wildlife corridor, water quality, vegetation, habitat, wetlands, etc. • Determine first site design reach • Determine the next site priority 1.7 Council Work Memo. The Consultants will prepare a project summary memo for the Fort Collins City Council. 1.8 Public Outreach. An open house will be held during Phase I to inform the public about the project and to receive input to help guide the chosen site design. The Consultants will provide exhibits for the open house to help guide the decision making process. An on-line survey system such as Survey Monkey may also be incorporated at the Open House to better tabulate the opinions of those in attendance. Some of the consultants will be in attendance to address questions or concerns. No Text