Change Order Form
PROJECT TITLE, Turnbprry Rd. Improvements
PROJECT NUMBER: 4100901718 (Bid 0,7405)
CONTRACTOR: Connell 116soupia, Inc, (PO #9124395)
Rqpfaonfor,c ange. 2. Ddsa*n of change.
3. Chifigi in contract cost 4. Change lh contract time.
1&2. See attached sheet for detail.
3. Th6'6ontrsct cost Will not change. $21,828.23
4. There will be no change in contact time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Ass6rrdng all change orders approved)
orders
ACCEPTED BY:
REVIEWED BY
SUBMITTED BY.
$2.329,248.20
$W.772.40
$O.GO
$21.8203
0.94%
2A7%
DATE: 2, L
Mile/ zi
.DATE:
1 It 3
DATE: 1 -7 j t.— 13
APPROVED BY: k? . 'nL' DATE:, 1- 105, 15
(Department Head)
APPROVED BY: 1 DATE:
(Purchasing Agent over $60,000)
ar Gonwdw
Purdmft
PmW Fee
CHANU ORDER 5 .
TumEany Road gapro+nmtnl Propel
SUNIA MRYOF WORN
Item# loom Quantity Lke slurs Tatd
7
jAddiflonalSiseving for irrigation
I
LS
4624.1
S 4624.10
2
Tampons ry Erosion Control for wintertmllon of jobafte
1
FA
S 13,214.60
S 13,214.60
3
Time and Materials for Xcel Gas main lowering
1
LS
1065.16
1 065.15
4
Time and Materials for Century Link Lowering
1
I LS
$ 52020 1
S 52020
5
Time and Materialsfor!�M 2 approaches
1
LS
$ 2033.28
$ 2.083.28
6
Time and Materiels for redtn work
1
LS
321.00
1 $ 321.00
TOTAL
321,626.23
REASON FOR CHANoa
1
Additional Sleeves were required for the Irrigation system. See attached for detailed cost break down of additional costa.
2
A force account Item to pay (or Installation of 2.3 acres of hydromulch at $1365/acre and the remainder for erosion control
supervlsoraite checks and BMP maintenance.
3
Xcel had a gas line that required lowering. Xcel did not have equipment available to dig the new trench. City directed
Connell to dig the trench for Xcel.
4
Century Link had a phone line at Maple HIE that needed to be lowered and was not able to do so In a timely manner. City
directed Connell to assist with the lowering.
5
Additional shaping and landscape rock was requred to tie the old Tumberry Road driveway approaches to the new lower
roadway grade
6
Additional shaping and tree removal was required to tie the new roadway to the property line at STA 23+00.
WHEN POSTED
Pododto fty APp#4