Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7405 TURNBERRY ROAD IMPROVEMENTS PROJECT (4)City0f Fort Col -in's ndiheerfn Planning, Development & Transportation EVneoving 261 NwtKCQ.ftPAvenue P.O. Box 58o For Colbs,C0805MOND 97022ima 970.221.5378 -:fax Change Order Form PROJECT TITLE, Turnbprry Rd. Improvements PROJECT NUMBER: 4100901718 (Bid 0,7405) CONTRACTOR: Connell 116soupia, Inc, (PO #9124395) Rqpfaonfor,c ange. 2. Ddsa*n of change. 3. Chifigi in contract cost 4. Change lh contract time. 1&2. See attached sheet for detail. 3. Th6'6ontrsct cost Will not change. $21,828.23 4. There will be no change in contact time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Ass6rrdng all change orders approved) orders ACCEPTED BY: REVIEWED BY SUBMITTED BY. $2.329,248.20 $W.772.40 $O.GO $21.8203 0.94% 2A7% DATE: 2, L Mile/ zi .DATE: 1 It 3 DATE: 1 -7 j t.— 13 APPROVED BY: k? . 'nL' DATE:, 1- 105, 15 (Department Head) APPROVED BY: 1 DATE: (Purchasing Agent over $60,000) ar Gonwdw Purdmft PmW Fee CHANU ORDER 5 . TumEany Road gapro+nmtnl Propel SUNIA MRYOF WORN Item# loom Quantity Lke slurs Tatd 7 jAddiflonalSiseving for irrigation I LS 4624.1 S 4624.10 2 Tampons ry Erosion Control for wintertmllon of jobafte 1 FA S 13,214.60 S 13,214.60 3 Time and Materials for Xcel Gas main lowering 1 LS 1065.16 1 065.15 4 Time and Materials for Century Link Lowering 1 I LS $ 52020 1 S 52020 5 Time and Materialsfor!�M 2 approaches 1 LS $ 2033.28 $ 2.083.28 6 Time and Materiels for redtn work 1 LS 321.00 1 $ 321.00 TOTAL 321,626.23 REASON FOR CHANoa 1 Additional Sleeves were required for the Irrigation system. See attached for detailed cost break down of additional costa. 2 A force account Item to pay (or Installation of 2.3 acres of hydromulch at $1365/acre and the remainder for erosion control supervlsoraite checks and BMP maintenance. 3 Xcel had a gas line that required lowering. Xcel did not have equipment available to dig the new trench. City directed Connell to dig the trench for Xcel. 4 Century Link had a phone line at Maple HIE that needed to be lowered and was not able to do so In a timely manner. City directed Connell to assist with the lowering. 5 Additional shaping and landscape rock was requred to tie the old Tumberry Road driveway approaches to the new lower roadway grade 6 Additional shaping and tree removal was required to tie the new roadway to the property line at STA 23+00. WHEN POSTED Pododto fty APp#4