HomeMy WebLinkAboutCHANGE ORDER - BID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTSCHANGE ORDER NO.1 PROJECT TITLE: Reservoir Ridge Natural Area Improvements CONTRACTOR: J2 O ?0 GIla-rj7(oLl PROJECT NUMBER: bid #74343 o DS9 PURCHASE ORDER NO.: DESCRIPTION: Field adjustments and submittal changes to gate system 1. Reason for change: Field adjustments 2. Description of Change: Please see attached change In work reqest 1, dated 12/270013. 3. Change In Contract Cost: $3,075.50 4. 'Change in ConlractTime: none ORIGINAL CONTRACT COST $239,360.05 TOTAL APPROVED CHANGE ORDER $0.00 TOTAL' PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER . $3,075:50. TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 128% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 1:2895 ADJUSTED CONTRACT COST 242; 5.55 (Assuming all change orders approved) ACCEPTED BY: Contractors Repi alive ACCEPTED BY: ` Project Manager REVIEWED BY: Title: Landscape hi c'� t - APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,00D rc City Clark Architect Contractor Engineer Project File Purchasing DATE: oZ Z o 3 DATE: 1 Z Ao 13 DATE: f 2 DATE: DATE: CHANGE 1N WORK REQUEST "I" Initiation Date: IM712012 Project Reservoir Ridge Natural Area Owner: City of Fort Collins To: J-2 Contracting Co. Requested by: Matt Day Authorized by: Matt Day Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is recaived. LWry of f ore will be made to incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount 1) Paving Prep Items Including Raise One Water Valve Box and Excavate and Ball Phone Pedestal $428.00 2) Additional Natural Area Fence to West Extent of Asphalt Apron (80 LF Q $8.50ILF) $520.00 3) Addition of Programmable Time Clock to Apollo Gate $253.00 4) Addition of4 k4 AIT square tube powdercoated post forSolar Panel Mounting Including 20 Watt Solar Panel, Tamper Resistant Mounting Hardware and Seal TlghlCondult $1,404.00 5) Excavation of Causeways -Volvo EC88& Operator (4.5 hours ® $105Au) $472.50 TOTAL $3,076.60 s-2 contrastbra m , agrees to change the work described above for the change in price shown betoW. t have attached a breakdown which lists ell costs of labor, materiels, lazes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor Indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be no change by 0 Days. No change in Contract Sum (Initial if no ebanse) ADD to the Contract Sum $ 3,075.50 DEDUCT from the Contract Sum This information shall be valid for thirty (30) calendar days from the date of signature bellow. CONTRACTOR'S SIGNATURE DATE: 12/2V2012 Coruraclorihell ntaln one JJ) copyand mum OalOINAL in amir APPROVED BY OIVNER: Accepted change in work request will be Included in a future formal change order. DO NOT bill far this change until a formal change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the oivrrer and the contractor.