Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7382 MAX BRT SOUTH TRANSIT CENTERChange Order No. 1 PROJECT TITLE: South Transit Center CONTRACTOR: Growling Bear Inc. BID NUMBER: 7382 DESCRIPTION: 1. Reason for change: Incorporation of various Change Order Proposals into the Contract. 2. Description of change: COP#1 - Arborist to remove trees from the site - $12,712.00; COP#4 - Removal of the unforseen septic tank and leachfield - $2,677.47; COP#6 - Relocation of two Art Objects along the trail - $4,655.10. 3. Change in contract costs: $20,044.57 4. Change in contract time: 0 Days ORIGINAL CONTRACT COST $4,356,565.70 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $20,044.57 TOTAL % OF THIS CHANGE ORDER 0.46% TOTAL C.O. % OF ORIGINAL CONTRACT 0.46% ADJUSTED CONTRACT COST $4,376,610.27 REVIEWED BY: ACCEPTED BY: Contractors REVIEWED BY: APPROVED BY: Manager NER'S REPRESENTATIVE cc: Contractor Purchasing Project File DATE: Z DATE: DATE: DATE: Growling Bear Construction Inc. PROPOSED CHANGE ORDER No. 00001 2330 4th Ave Phone: 970-353-6964 Greeley, CO 80631 Fax: 970-353-6974 TITLE: Additional Services - Arborist DATE: 9/12/2012 PROJECT: FC South Transit JOB: TO: Attn: Ron Kechter CONTRACT NO: Fort Collins South Transit Center 4915 Fossil Blvd Fort Collins, CO 80525 RE: To: From: Number: DESCRIPTION OF PROPOSAL Additional Services - Arborist (Swingle Lawn, Tree and Landscape Care) to remove trees from the Transit Center Site Unit Cost: Unit Tax: Lump Sum: Lump Tax: Total: APPROVAL: By: By: Gene Leach Date: 7— Date: $0.00 $0.00 $125712.00 $0.00 $12,712.00 Ron Kechter esineusateo jeer *,Wguiaw Denver FortCollinsI ,JINGLE CasifeRockleaulder I Monument LovefandlGreeley Greeley Longmont , f 303.337.6200 i 719.302.5117 I 970.221,1287 720.204.1846 1 ' Fax; 303.337.0107 I Fax: 303.337.0157 Fax: 970.221.4822 Fax: 970.221.4822 M www.myswingle.com City of Fort Collins Max BRT/South Bus Transit Center Fort Collins, CO 80525 Ron Kechter 970-221-6805 rkechter(cDfcrlov.com September 11, 2012 Remove to 2 to 3 foot stumps all trees within the project area 2 inches in diameter and larger. All trees to remain are marked with yellow tagging or are staked. Trees to removed are not marked. All debris under 16 inches in diameter will be chipped and hauled to a recycling facility. All large wood and downed dead debris will be piled and left. All dead, downed debris will be left on site. Total cost $12,712.00 Please feel free to contact me with questions or concerns, and to schedule. I look forward to working with you. Respectfully, Eric Shaub Landscape Care Consultant Swingle Lawn, Tree and Landscape Care 970-566-2981 Cell eshau b(a)swinaletree.com 1 B 4 7- 2.00 7 � a a ecasb�.eu�ex 19at.tt wail:'dtl G6ECf0 fMerlyaM b yw� «m ymo Ivat w � ercsbunn Growling Bear Construction Inc. PROPOSED CHANGE ORDER No. 00004 2330 4th Ave Phone: 970-353-6964 Greeley, CO 80631 Fax: 970-353-6974 TITLE: Septic System Removal PROJECT: FC South Transit TO: Attn: Ron Kechter Fort Collins South Transit Center 4915 Fossil Blvd Fort Collins, CO 80525 RE: To: DESCRIP.TIONOF.'PROP.OSAL" ::; • ",= DATE:11/2/2012 JOB: CONTRACT NO: From: Number: Additional Costs Incurred by the General Contractor for unforeseen site conditions - the presence of a septic tank and leachfield not shown on the contract documents. Actual Cost, Duran Excavating: $1885.40 Septic Tank Pumping, Apex: $280.00 0 GBI Mark - subcontractors: S 108.27 Superintendent, 4 hours: $200.00 Project Manager, 2 hours: S120.0 4— GBI Mark-up - prime: $48.00 G` Additional bond & insurance: $35.80 Unit Cost: $0.00 Unit Tax: $0.00 Lump Sum: $2,677.47 Lump Tax: $0.00 0 Y, Q APPROVAL: By: - L �0� By: Gene Leach Date: {ee,,2rs 12,'11 r //� Date: Eiptlivw b Total: $25677.47 Ron Kechter 12/11/2012 Septic Tank and Leach field removal Duran Excavating Invoice $1,895.40 Apex - Pump out Septic Tank $280.00 $2,165.40 GBI Mark up: $108.27 Subtotal: $2,273.67 GBI Costs: Superintendent: 4 $50.00 $200.00 Project Manager 2 $60.00 $120.00 $320.00 GBI Mark-up $48.00 GBI Sub -total: $368.00 Subtotal: $2,641.67 Additional Bond: 1% $26.42 Additional Insurance: 3.55 $9.38 Total Costs: $2,677.47 r;1 /S% 0' 11kran ®:eavating Inp October 26, 2012 Growling Bear Company Inc. Attn: Gene Leach 2330 4te Avenue Greeley, CO 80631 RE: Job # 385 Ft. Collins South Transit Center -Removal of Septic Tank Dear Gene, The following is a cost breakdown to remove the septic tank and leach field. If you have any questions please give me a call. r�i �S Excavator K 300 �� �s(oT� 3.5 hr X $160.00 = $560.00 Packer 2.0 hr Xr. $120.00 = $240.00 Trucking EndDumpz.�_a,,� 2.0 br X+cr� $97.00 = $194.00 Scraper: 1.0 ]rr X $200.00 m $200.00 Water Truck 1.0 hr X 120.00 $120.00 Dump Fees 1.0 ea X $260.00 = $260.00 Labor 3.5 hr X $40.00 = $140.00 Subtotal $1,714.00 Mark up S171.40 Grand Total $1,885.40 Sin el Duran P ject Coordinator uran Excavating, Inc. 418 N 9rh Avenue • Greeley, Colorado 80631 (970) 351-0192 M APEX Rooter & Plumbing Services, Inc. 339 N Hollywood ttecelved Fort Collins, CO 80521 OCT 09 2012 Bin To Gmuap sear CO (Inc.) Growling Beer construction Pat Sherin 2330 4th Ave. Greeley, CO 80631 Invoice Date Invoice # 10r3t2012 181962 Job location (other than bill to address) Terms Due Data 4915 Fossil Blvd. Due upon receipt 10/3/2012 Description Rate Quantity Amount Pump Septic Tank 1000 Gallons 280.00 280.00 South Transit Center Job # 2224 ` Sj321 �ta���LLJdV d inirial date Manager f-Yojxt Superintendent KevinS.°a/tt aa��c Total $280.00 Phone# Fax# E-mail Payinents/Credifis $0.00 970-221-1274 970-416.1072 apaaooterandplumbing@hobnati.com Balance Due: $280.00 Thank you for your business! Request for Information Growling Bear Co., Inc. Project: Fort Collins South Transit Center No.: 5 Date: 9/26/2012 Location: 4915 Fossil Blvd From: Gene Leach PM: Gene Leach Phone No.: 970 353-6964, 970 301-3847 Fax No.: To: Matt Newman Action Requested: Clarification Aller-Lingle-Massey Architects X Direction Approval Reference: Drawing No: C1.1 Detail No: None Spec: Information Needed: In the deconstruction of the house on the site we found no utility connections except the electric service. It is our understanding after talking to the water service provider that this service line was shut off. They have no record of sanitary sewer service and are convinced that the house had a septic system. A 4" waste line did exit underneath the footing in a SSW direction. They are 99% sure that there was a septic system in place. If that is the case we don't have stable soils in that area. How should we proceed? Submitted By: Gene Leach Recommendation: Per previous direction on site, please remove the pipes that comprised the leach field, and per LCDHE the septic tank shall be pumped out until it is clean and the tank and pipes can be diposed of in the landfill. Since this is an unforseen condition, costs for this shall be reimbursed on a Time and Materials basis, as discussed in the field. Ron Kechter By 10/9/2012 Date Growling Bear Construction Inc. 2330 4th Ave Phone: 970-353-6964 Greeley, CO 80631 Fax: 970-353-6974 PROPOSED CHANGE ORDER No. 00006 TITLE: Move Artwork along Bike Trail DATE:12/3/2012 PROJECT: FC South Transit JOB: TO: Attn: Ron Kechter CONTRACT NO: Fort Collins South Transit Center 4915 Fossil Blvd Fort Collins, CO 80525 RE: To: From: Number: DESCRIPTION OF PROPOSAL Move Art Work along the Bike Trail Proposal from DaVinci Signs: $2,900 Direct Costs for new pole bases, including mobilization, use of skid -steer, operator, 2' dia. auger, anchor bolts, sonatube, re -bar, and concrete materials:$841.96 GBI Direct Labor Costs: $545.75 GBI Mark-up: $305.16 Additonal Bond & Insurance:$62.23 Unit Cost: Unit Tax: Lump Sum: Lump Tax: Total: APPROVAL: /� By: Poz By: Gene Leach Date: mot- ea /Z (///Z Date: Ezpcdilim w $0.00 $0.00 $42655.10 $0.00 $4,655.10 Ron Kechter 12/11/2012 Move Artwork next to Trail DaVinci Signs proposal: $2,900.00 GBI Mark up: $145.00 $3,045.00 GBI Costs: Delivery/pick-up and set-up - Skid Steer 4 $60.00 $240.00 Skid Steer Operator (with burden) 2 $45.15 $90.30 Anchor Bolts 8 $8.67 $69.36 24" dia. Sonatube x 10' 10 $5.03 $50.30 Concrete 2 $86.00 $172.00 Place concrete 2 $45.15 $90.30 Min. Charges, fuel surcharges 1 $50.00 $50.00 Re -bar 1 $120.00 $120.00 Re -bar tie and placement 3 $45.15 $135.45 Misc. tools and Materials 1 $50.00 $50.00 $1,067.71 GBI Mark-up $160.16 Superintendent time: 4 $50.00 $200.00 Project Manager time: 2 $60.00 $120.00 GBI Sub -total $1,547.87 Total Costs: $4,592.87 Additional Bond: 1% $45.93 Additional Insurance: 3.55 $16.30 Total Costs: $4,655.10 From: Mike Lono To: Gene Leach Subject: Removal and Reinstall quote -ARTWORK Date: Thursday, November 29, 2012 11:16:13 AM Attachments: imaae003.ono Gene: $2900.00 to move (2) pieces of artwork. Thank you. MIKE --------- _0 ********************* SIGN SYSTEMS, INC. Mike Long Soles Consultant Look for your sign on Facebook C Phone: (970) 203-9292 Fax: (970)203.9293 406 Bents Dr. Windsor, Colorado 80524 s Denver Metro: (303) 573.7446 aI t E-mail: mike@davincisign.com l'-Ild}inFR uruirnouq ........ ,�..�> www.davincisign.cam System for Award Management Page 1 of 1 Search Results Current Search Terms: growling* BEAR* INC* No records found for current search. SAM I Srrtem for Award lft.g.n a 1.0 IBM v1.513.20121222-2220, i ��. Note to all Users: This is a Federal Government computer system. Use of this lJgov, system constitutes mnsent to monitoring at all times. „ or https://www. sam.gov/portal/public/SAM/?portal:componentId=66fdb602-77f6-4ba0-914a-... 1 / 11 /2013 Title: Growling Bear Change order 1 Date: 1-11-13 CONTRACT CHECKLIST FOR NON-COMPETITIVE PROPOSALS (SOLE SOURCE) Checklist Item Contract File Comments Location 7) Independent Cost Estimate The City made and documented an YES independent cost estimate before receipt of proposals. 10) Unnecessary Experience and Excessive Bonding Unnecessary experience and excessive NO bonding requirements were not included in this solicitation or contract documents. 11) Organizational Conflict of Interest (OCI) If there is an apparent or potential OCI the solicitation contains provisions to eliminate or mitigate the conflict (e.g. by inserting a clause NO that prohibits the contractor from competing for the follow-on contract to the current design or research contact) and OCI Certification is submitted by the contractor. 12) Arbitrary Action There was no arbitrary action in the procurement process. (An example of arbitrary action is when award is made to NO other than the contractor who most satisfied all the City requirements as specified in the solicitation and as evaluated by staff. 13) Brand Name Restrictions Brand Name or Equal. When it is impractical or uneconomical to provide a clear and accurate description of the technical requirements of the property to be acquired, a "brand name or equal" description may be used to define the performance or other salient characteristics of a specific type of property. The City must identify the salient characteristics of the named brand that NO offerors must provide. When using a "brand name" specification, the City does not need to reverse -engineer a complicated part to identify precise measurements or specifications in order to describe its salient characteristics. FT A's "Best Practices Procurement Manual," (BPPM) contains additional information on preparation of specifications including examples with specific language. 14) Geographic Preferences The solicitation contains no in -State or local NO geographic preference except where Federal statutes mandate or encourage them. 15) Contract Term Limitation The contract period of performance for rolling stock and replacement parts does not exceed five (5) years inclusive of options without prior NA written FTA approval. For all other types of contracts, the procurement file contains evidence that the contract term is based on sound business judgment. 18) Award to Responsible. Contractor The City made a determination that it was awarding to a responsible contractor considering such matters as contractor integrity, compliance with public policy, record 1. Y of past performance, and financial and technical resources. 2. Y 1. Appropriate Financial, equipment, facility 3. Y and personnel. (Y/N) 4.Y 2. Ability to meet delivery schedule. (Y/N) 5. Y 3. Satisfactory period of performance. (Y/N) 4. Satisfactory record of integrity, not on declined or suspended listings. (Y/N) 5. Receipt of all necessary data from vendor. (Y/N) 19) Sound and Complete Agreement This contract is a sound and complete agreement. In addition, it includes remedies YES CHANGE ORDER for breach of contract and provisions covering termination for cause and convenience. 24) Clear, Accurate, and Complete .Specification A complete, adequate, and realistic specification or purchased description was YES available and included any specifications and pertinent attachments which define the items or services sought in order for the bidder to properly respond. 38) Sole Source if other Award is Infeasible The contract file contains documentation that award of a contract was infeasible under small purchase procedures, sealed bids, or competitive proposals and at least one of the following circumstances applies: (1) The item was available only from a single source. (Verify prices are no higher than price CHANGE ORDER for such item by likely customers.) (2) Public exigency for the requirement did CONTRACTOR IS GROWLING not permit a delay resulting from a BEAR competitive solicitation. (3) An emergency for the requirement did not permit a delay resulting from a competitive solicitation. (4) The FT A authorized noncompetitive negotiations. (5) Competition was determined inadequate after solicitation of a number of sources. 39) Cost Analysis Required Cost analysis and profit negations were performed (initial award and modifications) And documented for price reasonableness YES was established on the basis of a catalog or market price of a commercial product sold in substantial quantities to the general public or on the basis of prices set by law or regulation. 40) Evaluation of Options The option quantities or periods contained in the contractor's bid or offer were evaluated in order to determine contract award. (To be NA eligible for Federal funding, options must be evaluated as part of the price evaluation of offers, or must be treated as sole source awards. 42) Written Record of Procurement History The file contains records detailing the history of this procurement. At a minimum, these YES ORIGINALLY SELECTED records include: BY BID PROCESS (1) the rationale for the method of CONTRACTOR HAS BEEN procurement, (2) Selection of contract type, RESPONSIVE (3) reasons for contractor selection or rejection, and 4 the basis for the contract price. 43) Exercise of Options The grantee exercised an option on this contract adhering to the terms and conditions of the option stated in the contract and determined that the option price was better NO than prices available in the market or that the option was a more advantageous offer at the time the option was exercised. If an option was not exercised under this contract, check NA. 44) Out of Scope Changes The grantee amended this contract outside the scope of the original contract. The YES, THE WORK IS OUTSIDE amendment was treated as a sole source THE ORIGINAL AGREEMENT procurement (complying with the FTA requirements for a justification, cost analysis and profit negotiation). 45) Advance Payment Provisions The contractor did not receive an advance payment utilizing FTA funds and the contract NO does not contain advance payment provisions or, if it did, prior written concurrence was obtained from FTA. 46) Progress Payment Provisions The contract contains progress payments based on costs incurred (as opposed to percent of completion) and the contract contains a provision giving the grantee title to YES property (materials, work in progress, and finished goods) for which progress payments are made. The contract may contain other security in lieu of obtaining title. 47) Time and Materials Contracts This is a time and materials contract; the grantee determined that no other type of NO contract is suitable; and the contract specifies a ceiling rice. 48) Cost Plus Percentage of Cost This is not a cost plus a percentage of cost NO type contract. 49) Liquidated Damages Provisions This contract contains liquidated damages provisions and the assessment for damages NO is specified in the contract at a specific rate per day for each day of overrun in contract time. 50) Piggybacking 1) The file contains: Assignability provisions. NO 2) The procurement file contains: Price reasonableness determination. 56) Clauses This contract contains the appropriate FTA YES required clauses. Excluded Parties Search YES EPS run and include in the file. ditesco Independent Cost Estimate Dale of Estimate: 21-Dec-12 Contract Type: Max BRT South Transit Center (hard bid) Existing Contract or PO (Y/N): Y Description of Goods (A) or Services (B): A Scope is to address various Change Order Proposals provided by Growling Bear Inc. 1. PCO#1 - Arborist to remove trees from the site, directed by Ron Kechter with the City of Fort Collins, 2. PCO#4 -Removal and disposal of the unforeseen septic lank and reach field, and 3. PCO#6 - Relocation of two Ad Objects along the bike path near the STC. I have obtained the following estimate from; Published Price List / Past Pricing (date) I GrowlinF Bear Inc. Past Pricing and Quotes Engineering or Technical Estimate (performed by) Independent Third Party Estimate (performed by) Other (specify) Cost Estimate Details: (Estimate calculated in US Dollars) Cost of Standard Itpma DESCRIPTION ITEM # QUANTITY UNIT UNIT PRICE TOTAL Removal of Tree 202-00010 CDOT 2012 64 EA 225. 1 7 14,4 99.84 Removal of Structures and Obstructions 202-00000 CDOT 2012 1 LS _ _2,800.00 $— 2,800.00 Removal of Sign (Special) _ 202-00815 CDOT 2011 2 EA $ 1,467.00 $ 2,994.00 Reset Traffic Pole 210.00840 CDOT 2011 2 EA $ 1,664.00 $ 3,328.00 TOTAL $ 23,481.84 Cost of Services, Repairs, or Nonstandard Items Ilemlfask: r ) Materials or Work Descri Other Direct Labor costs Rate ($) Labor Labor Hours Class Allocated Overhead SG8,A' Profil TOTAL Total �_ '9ellinB. nencrvloM AOmh�isVeSve eapwes Signature of Preparer. — MAX Field Construction Office 3000 South College Ave., Suite 201 Fort Collins, CO 80526 fcgov.com/maxconstruction Delivery by hand December 26, 2012 Ms. Erika Keeton, PE MAX Project Manager City of Fort Collins — Engineering Dept 281 N. College Ave. Fort Collins, CO 80524 RE: South Transit Center Project Independent Cost Estimate — STC C.O. #1 STC Change Order #1 Growling Bear, Inc. (GBI) was directed verbally to remove the trees on site by a certified arborist through a proposal that was obtained by Ron Kechter and discussed with you prior to execution by GBI; COP #1 was provided by GBI for the cost of this work. Additionally, per RFI #5, GBI was directed to remove the septic tank and leach field on a Time & Materials basis; COP #4 was provided by GBI for these costs. Finally, GBI was requested to provide a proposal for moving two of the art objects adjacent to the trail that conflict with the curb & gutter that are a part of the project; COP #6 was provided by GBI. These Change Order Proposals (COP's) were bundled Into Change Order # 1. In reviewing this request, an Independent Cost Estimate (ICE) was prepared for the changed items, using CDOT pricing for comparable items. This ICE is attached and meets my expectations for the costs for these items of work. The estimated cost for these changes is $23,481.84. The documents reviewed included COP #1, Tree Removal and Transplanting Plan MT1.0, COP #4R, RFI #5, COP #6R and Mario Mason Corridor Foundation Plan, Details and Notes for the Art Objects S13.20. find GBI's Contract Change Order Proposals, bundled into Change Order #1, totaling $20,044.57 to be reasonable for the required change in scope. As such, I recommend acceptance of this additional cost to the contract. Keith Meyer, PE Construction Project Manager CH2M HILL Team 970-988-8605 kehh. m everO)ditescoservices.com Cc: job file Change Management Checklist CategoryCompliance ' ate Reviewed Reference Initials Reviewed for compliance with 12/`6/12 Modification to base bid scope of `NM Environmental Assessment work Reviewed for construction/safety impacts 12/26/12 Will require safe processes KM Independent cost estimate prepared 12/21/12 As attached to this memo KM Reviewed for CDOT & PCGA grant 12/26/12 Added to scope under SCC 20.04 KM compliance Reviewed for real estate impacts/needs 12/26/12 Inside Limits of Development KM Reviewed for compliance with design criteria/ADA htto:ltwww.access-board.gov/ada-aba/ada- 12/26/12 Not Applicable KM standards-dot.cfm