Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7273 N COLLEGE IMPROVEMENTS PROJECT - VINE TO CONIFER (2)Planning, Development & Transportation city Of Fort Collins sae a wNNoMCwll9e Avenue _ - P.O.Box 680 DSII16@ring � FOM1 Ca91tna,C080671.0580 - 070.221.8606 970.221.0378 - faz Change Order Form PROJECT TITLE: N. College Rd. ImpioveMnis PROJECT NUMBER: 40,090390D.6 (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PC 99116026) eNANAO 012DER NUMBER: 18 1. Reason for gnange., c, 3. Chongo in contract cost. 4. 182. See attached sheet for detail. 3. The contract cost will Increase by $9,932.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders apProved) ACCEPTED BY. REVIEWED BY: SUBMITTED BY: 0.16% 2.38% / - 3 - /3 APPROVED BY: APPROVED BY: DATE: (Purchasing Agent over $80,000) ar cmncw Purohniing Project Fee $6,111,000.00 $135,515.77 $0.00 $9,932.00 $6,266,447.77 HANGE ORDE"6'. x North College -Vine to Conifer 't ; OF.WORKq„ Item Quantity Unit $ / Unit Total Add CMU at Urban Design Trees (3) at 1 Vine 3 EA $ 330.00 $ 990.00 Additional PCCP Transverse Joints - 2 Lawson 980 LF $ 8.90 $ 8,722.00 3 Irrigation Master Valve Installation 1 EA $ 220.00 $ 220.00 Total cost $ 9,932.00 s .::.REASON F.:OR CHANGE 1. Class D concrete shown on the plans for stone facing around the urban design structures (3) at Vine Drive was inadequate to achieve minimum reinforcement steel cover. Rather than using Class D and upsizing, the contractor recommended using CMU block, reinforced to build platform for decorative stone facing. No Class D quantity will be paid for the deletion of this work under line Item 601-01040. 2. Total length of 8" concrete transverse joints varied from plan length shown due to changes in jointing plan as directed by the city. 3. Irrigation master valve installation required by City representative Norm Mills but not called out in irrigation plans. WHEiV POSTED, :° Fay Application a r.: Planning, Development & Transportation CI Of Enalnaenng Fort Collins 261NoNr Ca0e0a Avenue . P.O. Bak Sao Engineering Fon Coffins, cp eo522.0580 970.221.6605 979.221.6370-FOX Change Order Form PROJECTTITLE: N. College Rd. Improvements PROJECT NUMBER: 40D903900.6 (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO #9116026) CHANGE ORDER NUMBER: 17 n preparing change orders show in order as separate numbered paregrapne me7011owing 1. Reason for change. 2. Description of Change. 3. Change In contract cost. 4. Change In contract Urne. 1&2. See attached sheet for detail. 3. The contract cost will decrease 4-$145,447.77 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: -2.38% 6.00% $6,111,000.00 $135,615.77 $9,932.00 ($145,447.77) $6,111,000.00 DATE: 7 r 3 DATE: +' / DATE: D�/D33 DATE: l 3' 13 APPROVED BY: DATE: (Purchasing Agent over $60,000) Cr. Contractor Pumhaeln0 Pn>w Fos North College - Vine to Conifer z µx' �%JMMARY=OF WORK;w "'.-.._ ` �P'"" -. '"I 111 .._.(.._ ?v�,�,.b*5 c .._ _.. �;x. _:-;. ..'':,>.>� ;f` .l.. _' ..<I- ._ . Item lQuantity I Unit I S / Unit Total 700-70010 IFIA Minor Contract Revisions 1 LS $ (145, 447.77) $ (145,447.77 ':,{_ ��5�'. .h.l�•* n:w i ii '.� ..,'- - v .. �,,.rrc/r �•,yw 1 S r�r _ :_cs_ ^� YY. Subtracting TO DATE total change order cost from F/A Minor Contract Revisions line item to bring total contract amount back to 6,111,000 WHEN QOSTED Ra A licaton #11