HomeMy WebLinkAboutWORK ORDER - RFP - 7175 BRIDGE INSPECTION MAINTENANCE REPAIR AND REPLACEMENT PROGRAM (6)EXHIBIT "All
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF TORT COLLINS
and
Michael Baker, Jr. Inc.
DATED: December 28, 2012
Work OrderNumber: 11-254902400-12
Project Title: Bridge Inspection Maintenance, Repair & Replacement Program
2012 Minor Bridge Inspection
Commencement Date: November 16, 2012
Completion Date: April 15, 2013 (See Deliverable Schedule at end of scope of Service)
Maximum Fee: (time and reimbursable directs costs): not to exceed $34,281.06
ProjectDeseription: See attached scope of service.
Scope of Services: See attached scope of service,
Service Provider agrees to perform the services
Identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Services' Agreement
between the parties. In the event of a conflict
between or ambiguity in the terms of tine
Services Agreement and this work order
(including the attached forms), the Services
Agreement shall control.
Service Provider
By:
Date: December28.2012
Approved By:
Purchasing Agent over $60,000
The attached forms consisting of six (6) pages are
hereby accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
City of Port Collins
Date: December28.2012
Exhibit "B"
Task Order 6 Fee Summary
for
Michael Baker Jr., Inc.
City of Fort Collins
Bridge Inspection, Maintenance, Repair and Replacement Program
Description:
2012 minor structure bridge inspections (Inspected between October 2012.and April 2013).
PRIMARY DESIGN TASK ELEMENTS• •
LABOR,
Project Administration & Meetings
40
$5,664.30
Inspections
$28,132.01
Subtotal[
$33,796.31
REIMBURSABLE EXPENSES:,(Approximate) - ._
-
Copies & Plotting (B&W) (4,000 x $0.05)
$200.00
Copies & Plotting (Color) (400 x $0.50)
$200.00
Mileage (1 trips x 150 mi x $0.565 / mi 1 meetings only)
$84.15
Postage & Deliveries
$0.00
Subtotall
$484.75
sUBCQNSULTANTS
NSA 01 $0.00
Subtotal 0 0.00
• • • Fee
$34,281.06
121312012 1 of 2
Task Order 6 Fee Schedule
for
Michael Baker Jr., Ina
my of Fort Colllhs
Bridge Inspection; Maintenance, Repair and Replacement Program
oeaadptbm
2012 minor structure bridge Inspections (InsDeded between October 2012 and And 2013).
Irem'
- -
Stiticlun Number.
Last ins ttlori
SufiihrNY
'-Pall-
Inip_dfan
Idterial.
.-.
Ner2m Ex(iUT
ConMed:
-S cei
MATII
IWOR
,EzL+HN PIb Is
_.Avalhbk7�
II
Ealrtine l
3plahs7,2._.
I!Wdlon
Cash.
3
R•tl 5,
1�f -
thcost
•.Ratio[
�.Nours _l
10
'Tarred cont.
At
Total Noun
1
80RD-l"i
'1/9/20o8
92.6 1
60
Re lnapenion
No
No.
No
$523
Verillcation
$581
040
$Sgll
5.21
2
CANr-MULTI-F
V25/2012
55.1
24
Re-Inspeelicn
Yes
Yes
No
$741
Veriflution -
$So
0.50
$798
6.95
3
CANY S-MULE
1/25/2012
36.299999
12
Re-IngoItlon
Yea
Yes
No
$741
Verification
$58
0.50
$798
6.95
4
CEMT-MTN
1/11/2009
93
60
Re.Incpedion
No
No
No
$523
Vedfiution
$58
0.5
$581
S.21
5
EMT -ARCS
11Ilf200S
89
to
Re-Insp<[tlon
No
No
No
$523
Verification
- $53
05
$Sal
5.21
6
CHRY411NT
1125/2012
69.6
60
Relnapettlon
Yes _.
Yes
No
$741
Vaelficatlen
,$58
01c,
$798
6.95
7
CHRY SYCM-A
1/26/2012
46.7999"
36
Re-lriapedien
Yes
Yes
No
$741
VerifUon
$So
05
--'$798
5.95
8
CIPP-DART
1/11/2005
90.199997
60
aednzpettlen
me
No
No
$523
Vedition
,$53
0.5
$581
5.21
9
CRST-COOK
1/10/2008
86
E0
Re -Inspection
No
No -
No
$523
VeriOouNRI :
$58
05
,$Sal
5.21
30
CTM-SFW-i
N/A -
N/A
N/A
Newlnnsvai4n
No
Nil
No
$657Vftoel
Patina ..
$58
030
$714
63a
11
DRK.MDL
1/10/ZOOS
95300003
60
Re Ini,scucnn
No -
No
No
$523
Verification
$so
050
'$Sal
5.21
12
ELM-W-5hW
2/8/2005
97.0
24-
Re-lnspesthsh
No
No
No
$523
Verification
558
0.50
$551
5.23
13
HRMY-S-SVRG
1/10/2008
84.2
6D
Re inspection
No
No
No
$523
Verification
$581
050
$Sol
5.21
14
HRMY-W-CLGE
119/2008
815-
60
Re-lntPettbn
No
No
No
$523
Veriffrelm
$58
0.50
$sal
511
15
HRMY-W-RGNC
]/lo/}008
96.1
60
Re hrr, lion
No
No
No
$523
Verification
$so
Os
-$Sal
511
As
HTH-FLT
1/8/2008
919
6D
Re4nspenion
No
No
No
$523
VddficaUon
$58 03
.$Sal
511
17
LAKE-W{ R
2/8/2005
99.7 -
24
Re4nspedbn
No
NO
No
$523
Venflotion
$58 050
$582
511
- 18
IAl'i
1/13/2012
65.0
60 -
Re-InspectionVe
No
Yes
No
$476
rification
.$58 0.50
$534
4.71
19
LW -CON
1/9/2008
96.1
60
Re-lnapecsion
No
No
No
$523
Verificanen
$58 0.50
$581
5.22
201.0(
NP
1/25/2012
69.8
60
Re-Ir,onioh
Yea
Yes
No
$741
Vnificathnt
::$$a 0.50
$798
635
21
LOOM -MAP -A
2/10/2012
47.8- -.
36-:
Re -inspection
Yes
Yes
No
$741
Verifiutlon
$so 0.5
.$798
- 6.95
22
LPL-MLD
I/29/2
"Is .8
-0
ae-Inspection
Yes
No
No
$788
Verification
$58 0.5
$846
7.45
;23
LRL MYRT-A'
1/Z6/2012
60.8 -1
12 -
Re-Inapenlon
Yes
Yes --
No - -
--$741
Verification
$5o DEC$798
6.95
24
MAP-WHTNI-A
2/10/2012 .
".a
36 -
Re-Impenlon
Yes
Yes
No
$741
Verifiulion
$58 0.5
$79S
6.95
25
ML1Y M-A
N/A
N/A
N/A
Niie Inspection
Yes
No
No
$7W
Wsual tells,
I ssal 0.s
:$m
7A5
26
MTN W-WHTM
2/10/2012
36.9
24-
Ro-invpe[tion
Yes
Yea
No
S741
Vedfiution'
$58 0
$798
635
27
MTV-W-TM.B
1/18/2012
63.5
24
re -Inspection
No
Yea
No
$476
Verification -
$58 0
'$534
4.72
28
WITT-W-SHUT,
D
1/25/2012
37.7
24
Re-Irspection
Yes'
yea
No
$741
Verification '
$58 OS
$798
ISSS
29
OAK-WHTM
ln6/2012
55.1
60
Fo4e,penion
Yes
Yes
No
$741
VnHf.1kn,
$58 050-
iS798
6.95
30
OLN-W-LOOM ..
1/26/2012
37.8
24 _
Re-Iralcuoo
Yea ...
Yes.
No
$741
Verification
$53 DS
$798
6.95
-31
PORT-SW-TRIIL-F
'1/10/20oa
84.5
60
Re-Inspectlon.
No
No
No
$523
Vedfiution
$58 a50
$Sol
5.21
32
PFSTAV{TRE
3/11/2011
783
24
Re -Inspection
Yes '.
Yes:
No
- $741
Verition
fin
$so 0.50
'$798
- 635
33
PAST W-HRT
N/A
MIA
N/A
New inspection
No
No
No
$657
Wsual Rating
$Sat o30
.5714
638
34SHUDS-Plff
1 1/10/2003 -
- 95.0
60 -
Re-Irupenlon-
No
IN.
No
$523
Vedither.
558 050
'5581
511
35
STOV.DART
2/7/2006
_ 97.0
1 24
Re-Invpenion
No
No.
No
$523
Vedfutim
$58 . OS
5581
511
,36
TMa-S HRMY'
3/11/2011
65.9
I8
Re-hapedket
No
Yes
No
$476
Vedficatlon
$58 03
$5ul
4.71
.37
TRIL-W03-WY
N/A -
A
N/A
New lnapecibn
No
No -
No --
$657
Watel Rating
$581 05
$714
638
38
TAIL-W-PORT
1/10/2W8
313
60
Re -Inspection
No
No -
No
$523
Verification
558 OS
$581
5.21
39
WHTM-MW-A
10/1/2009
96.0
36 -
R.4nspectipn
Yes' .
No
No
$789
Verification
$so 0.50
$946
7.45
40
WHTM-S-LAPT-A
2/10/2012
47.8
- -36
11e4napedion'
Yes
Yes
No
$741
Vedfiution
$58 050
$798
635
41
WOODS-SYCM
1/25/2012
47.1
36
Re-lntptdion
Yes .. ...
Yet"-..
No
$741
Verlfelen
$58 0,50
$798
6.95
42
-
$0
$0 0.00
$0
43
$0
$o 0.00
$o
aol
44
$0
$0 0.00
'50
0.00
45
-
- -
-
$0
Sol am
$o
0.00
• My visual or load nUnv dumednacasaryduo to aching4 of conditions dlsmvered during the verifwNot jot, udural der[., or clowiaraabn)will not be R'v-^i Fae zx:Mars
Incbded with this work order. In this case, Baker will coordinate with the City to ammend the work order as retests, _$Z8,332 248.44
OCeas highlighted Nyellow mW re4uire Mplu ent on Nefre4uenry meof Inspections. This adjustment is Informational only, and does not have any inroads on scope, fee,ade Ntrablis.
lwvxl2 PoPe242
Exhibit "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
MICHAEL BAKER JR., INC.
DATED: November 16, 2012
Work Order No.
Purchase Order No.
Project title: Bridge Inspection, Maintenance, Repair and Replacement Program
2012 Minor Bridge Inspections
Commencement Date: November 16, 2012
Completion Date: April 15, 2013 (See Deliverables Schedule at end of scope of services)
Maximum Fee: $34,281.06
PROJECT DESCRIPTION:
This scope of work is for bridge inspection and related services of minor structures for the 2012 inspection
cycle (structures inspected between October 2012 and April 2013). This work order is performed under the
master agreement for the City's Bridge Inspection, Maintenance, Repair, and Replacement Program. Work
elements include project administration, field inspections and reporting, and structure ratings. A detailed
description of each anticipated service is described below.
Minor structures range in length from 4 feet to 20 feet with types that include, but are not limited to;
bridges, box culverts, pipe culverts, multi -plate arches, and rigid frames. Each structure shall be inspected
at a frequency not to exceed four years (or more frequently if determined by the City). The majority of the
City's minor structures have previously been inspected and load rated. However, there are a number of
structures that are either new or have not previously been included in the inspection program. Some
structures may have limited access (confined space) and shall be considered separately from other
structures.
SCOPE OF SERVICES:
Baker will inspect a total of 41 structures. The breakdown of structures is: 37 re -inspections and 4 new
inspections. There are 18 confined space structures (17 re -inspections, 1 new). Baker will provide all
information collected from the field inspections to the City for record keeping, including report output in an
excel format consistent with the City's asset management program (see below for more information).
Existing structures will be evaluated to compare current conditions to the conditions documented from the
previous inspection. Structures rated for the first time, as well as those structures where the inspection
reveals significant changes from previous inspections, will required either a visual or load rating. It is
anticipated that 0 load ratings, 4 visual ratings, and 37 rating verifications will be performed.
Exhibit A - Work Order Form
Bridge Inspection, Mointenonce, Repair and Replacement program-2011 Minor Bridge nsp
ions
Any variations to the number of the anticipated inspect
documented.work ord es as necessaryfro, that sted above will be
documented. Baker will coordinate with the City to modify
I. Project Administration
Uadministration duties throughout the length of the
Upon notice to proceed, Baker will perform project
contract.
A. Invoices will be for
rfo m dCity
o ng the current bill nly basis g pe iod and projecll include a t lto dat ing mmary and a
progress report f P
B. All documents will receive a quality assurance and quality control (QA/QC) review, in accordance
with the Baker Way, prior to submittal.
C. The following meetings are anticipated:
• Two Progress Meetings (Assume phone meetings only)
• One Project Delivery Meeting
and telephone conversations and provide them to the
D. Baker will prepare documentation of meetings
City for review and recording keeping.
II. Field Inspections and ReportingND
Baker shall perform all inspections and reporting in accordance with the GUIDELINES es that will be performed underth
REFERENCES as described below. There are a variety of inspection typ
work order: re -inspection (unconfined space), new inspection (unconfined space), re -inspection (confined
space), and new inspection (confined space). In all cases, the ge` neral work activities include:
• Inspection Preparation. At the outset of the project, all inspection information will be
compiled and organized. The project team will determine the preferred inspection order
and schedule. The anticipated schedule will also be provided to the City.
• Obtain Average Daily Traffic Count (ADT). Baker will use traffic counting devices to
take a 24-hour traffic count at each location, unless recent traffic count information is
provided by the City.
• Field Inspection. Baker will perform structural inspections at each location specified by
the City. Inspectors will evaluate and assess the structural condition of appropriate
elements, take or update field measurements,
take new a visual ratingphotos, (aassessbloveand
rall
performance including scour (if applicable), perform
document recommended maintenance/repair activities.
Documentation and Sketches. If available, previous documentation and sketches will
be revised as necessary. If no existing information is available, new documentation and
sketches will be prepared. —CADD drawings will be prepared in Microstation or
AutoCad.
• Report Production. Field inspection data will be input into PONTIS 4.1.1, or an
ses of
inspectionr d data. Specific ase report output shaare program, for lubeoprepared recording asrequestedby the City,
including six (6) excel output files.
• Inspection and Report QC. All inspection and reporting data will be reviewed for
verification of quality control procedures and data accuracy.
• Submittal. All deliverables will be submitted to the City at the end of the project. See
DELIVERABLES below for more information. 2 of
January 6, 2012
Exhibit - Work Order Form
Bridge Inspection, Maintenance, Repair and Replacement Program —2011 Minor Bridge Inspections
Any emergency inspections shall not be included with this work order, but shall be considered as part of a
separate work order. General work activities for emergency inspections shall follow those listed above, but
may also require additional activities, as determined on a case -by -case basis.
III. Structure Ratings and Verification
The work activities for this effort fall into one of three categories: verification of the existing rating,
preparation of a new visual rating, or preparation of a new load rating. The following chart defines when
each of the activities is required.
Determination of Existing Plans Existing Plans
Rating Type Available Not Available
:i; rs e,�•ya
Re -Inspection ELisi, 4�aT@ s�JrARWI W?Z
New Inspection `• • e 1
A. Verification of Existing Rating
All existing structures should already have a rating assigned through previous inspections. In this
case, Baker will verify that the element conditions defined with the existing rating have not changed
significantly. If conditions have changed such that further investigation is warranted, Baker may
perform a new rating (load or visual) if directed by the City. Such work will be considered out -of -
scope and not included with this work order.
B. Visual Rating
When applicable, Baker will prepare a visual rating for the inspected structure. The visual rating
shall be based on the condition of the structure at the time of the inspection and prepared in
accordance with the GUIDESAND REFERENCES as defined below.
C. Load Rating
When applicable, Baker will prepare a load rating for the inspected structure. The load rating shall
be based on the structure as originally constructed (if possible) and include such effects such as new
rehabilitation elements, deterioration or damage. The load rating shall be performed using Load
Factor Design methodology with the HS-20 design vehicle. All load ratings shall be prepared using
hand calculations, AASHTOWare VIRTIS® software, and/or other applicable software. Quality
Control for the calculations and report shall be prepared in accordance with CDOT policy.
GUIDELINES AND REFERENCES
All inspections will be conducted in accordance with current NBIS standards and supervised by personnel
meeting the requirements outlined in the Code of Federal Regulations, 23 CFR 650.307. Applicable
inspection standards include:
• CDOT PONTIS Bridge Inspection Coding Guide
• Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation's
Bridges (Report No. FHWA-PD-96-001)
• Bridge Inspector's Reference Manual (Publication No. FHWA NHI 12-049)
• AASHTO Manual for Bridge Evaluation, 2"d Ed., 2011
• CDOT Bridge Rating Manual
January 6, 2012 3 of 4