Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 6079 CISCO SMARTNET HARDWARE AND SOFTWARE MAINTENANCE SERVICES CONTRACTORWORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND GTRI DATED: 6114/2012 Work Order Number:OPP-37034 Purchase Order Number: 9123490 Project Title: CiscoWorks Upgrade Commencement Date: 6/14/2012 Completion Date: 12131/2012 Maximum Fee: (time and reimbursable direct costs): SOW T&M $ 26,476 Project Description: GTRI Professional Services for CiscoWorks Upgrade Scope of Services:: Minimum discount of45%on purchase order< $100K list price. Minimum discount of 48% on purchase order = > $100 K list price. Each site specific project requires a work order authorized by the project manager and Purchasing agent for release of funds. Invoices to reflect specific work order number and PO number. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Work Order Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Work Order Services Agreement and this work order (including the attached forms) the Work Order Services Agreement shall control. The attached forms OPP-37034 CiscoWorks LMS Upgrade consisting 10 pages of are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service Provider: By: (' Date: S Submitted By: Bob Singleton Network Administration Manager (Project Manager) Date: 6/14/2012 Approved by: Paul Folger IT Infrastructure Director Date: 6/14/2012 Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: CiscoWorks LMS Upgrade 4 Assumptions This section of the statement of work covers the assumptions that are made as part of this project. These assumptions include tasks that the Client will agree to perform as part ofthis project. These assumptions will also include what items are in scope and out of scope for this project. General Assumptions • Client will provide GTRI with a single point of contact or key staff necessary for completion of the project. • All communications for project details including scheduling, planning and work changes must be communicated from the client point of contact to the GTRI primary point of contact. • Client will provide GTRI information about their currently deployed IT infrastructure as applicable to this project. The Client will provide information to GTRI about sites of operation, WAN circuits, Network topology, IP Telephony system information, and all IT computing systems. • , Client will work with GTRI to gather all data necessary for the work to begin on the first day of the project. • Client will ensure all appropriate power/environmental requirements are provided to the specific project needs and environmental standards are being met prior to start date. This includes rack space, power and cooling. • Client wil I verify all cabling requirements are completed prior to the beginning of the project. Project Assum ptions • The client will provide server hardware that meets or exceeds Cisco Prime 1.1 requirements • The new features that are included in Cisco Prime 1.1 that aren't currently utilized in LMS maybe included in a separate project. This will be determined during -the planning phase of the project. If additional features are desired, the hour estimates may need to be adj ust ed. OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 6 CiscoWorks LMS Upgrade 5 Fees and Charges This is a Time and Materials engagement with a minimum commitment of four hours for each occurrence of on -site services performed by Gf PJ. Client agrees that requirements and completion metrics cannot be clearly defined at this time and that GI'RI will be performing work on a best -effort basis. Gf RI will complete as much of the requested work requirements as possible using appropriate resources, but does not guarantee completion under any fixed amount of time. If Gf RI completesthe work in less time than stated in this agreement, GTRI shall only bill actual time accrued. If Client requires additional time to continue work, that time shall be requested by Client in writing. Start date will be determined by availability of the GfRI resources and readiness of the Client. if requested, GfRI will attempt to provide the appropriate resources as quickly as possible; however, GfRI requires a two week time period scheduling the resources from the date of this signed agreement and from each subsequent request for resources. -.- GTR1 Resource Rate CsttitiatedTuiie - _ Cost Network Engineer Level 4 SV-NE4 $ l80 25 $ 4,500 Network Engineer Level SV-NE3 $148 115 $ 17,020 Project Manager Level 3 S V-PM3 $152 18 $2,736 One way travel costs (10 Trips) $148 15 $2,220 Total Services Cost: $ 26,476 Engineering time used outside of normal business hours, Monday through Friday, 8am - 5pm, will be billed at the followingrates: • Non -Business Hours and Weekends: 150% of applicable rate • Holidays: 200% (Dependent on availability) All prices are quoted in U.S dollars. Prices do not include tax, freight, or customs charges. The services pricing for this agreement is good for 90 days from the date it is issued. if the proposed start date for the project is greater than 90 days from the creation of this document then this document will potentially need to be revised. OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 VA CiscoWorks LMS Upgrade 6 Signature Page GTRI and Client agree that we have read this Statement of Work, its associated Master Services Agreement, understand them, and agree to be bound by their terms and conditions. Execution of this agreement requires a signed Master Services Agreement. Additionally, GTRI and Client mutually agree that a photocopy of this document shall be treated as if it were an original. Requested Project Start Date: E't' cE, Agreed to: City of Fort Collins Signature a4ze Sr-I.,l'J' Printed Name OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 Title Date 8 WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND GTRI DATED: 6/14/2012 Work Order Number:OPP-37034 Purchase Order Number: Project Title: CiscoWorks Upgrade Commencement Date: 6/14/2012 Completion Date: 12/31/2012 Maximum Fee: (time and reimbursable direct costs): SOW T&M $ 26,476 Project Description: GTRI Professional Services for CiscoWorks Upgrade Scope of Services:: Minimum discount of 45% on purchase order < $100K list price. Minimum discount of 48% on purchase order = > $100 K list price. Each site specific project requires a work order authorized by the project manager and Purchasing agent for release of funds. Invoices to reflect specific work order number and PO number. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Work Order Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Work Order Services Agreement and this work order (including ,the attached forms) the Work Order Services Agreement shall control. The attached forms OPP-37034 CiscoWorks LMS Upgrade consisting 10 pages of are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service Provider : By: Date: Submitted By: Bob Singleton Network Administration Manager (Project Manager) Date: 6/14/2012 Approved by: Paul Folger IT Infrastructure Director Date: 6/14/2012 Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: Cisooworks L S upgrade Prepared for: City of Fort Collins 215 N. Mason Street Fort Collins, CO 80522 Bob Singleton bsingleton@fcgov.com 970-221-6789 Prepared by: Global Technology Resources, Inc. 990 S. Broadway, Suite 400 Denver CO 80209-4010 GLOBAL TECHNOLOGY RESOURCES INC. CiscoWorks LMS Upgrade Table of Contents 1 PROJECT OVERVIBN...........................................................................1 1.1 Project Requirements........................................................................................................1 2 PROJECT MANAGEMENT.....................................................................2 2.1 Project Initiation. 2 ................................................................................................................ 2.2 Project Planning.................................................................................................................2 2.3 Project &ecution................................................................................................................2 2.4 Project Control...................................................................................................................2 2.5 Project Close-out ................................................................................................................2 3 DESIGN AND DEPLOYMENT SERVICES.................................................4 3.1 Planning & Design. ...................................................................................... I ....................... 4 3.1.1 Planning Tasks.................................................................................................................4 ).1.2 Planning & Design Deliverables.....................................................................................4 3.2 Deployment..........................................................................................................................4 3.2.1 Deployment Tasks............................................................................................................4 3.2.2 Deployment Deliverables................................................................................................5 4 ASSU IVIPTIONS.....................................................................................6 5 FEES AND CHARGES...........................................................................7 6 SIGNATURE PAGE...............................................................................8 OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 CiscoWorks LMS Upgrade 1 Project Overview The City of Fort Collins has requested that GTRI assist with the upgrade of Cisco Works LAN Management Solution (LMS), upgradingfrom version 3.0.1 to Cisco Prime I.I. This Statement of Work serves as written documentation andthe basis of understanding for techhical integration services to be performed by Global Technology Resources, Inc. (hereinafter GTRI) for City of Fort Collins (hereinafter Client). The terms and conditions outlined in the Master Services Agreement, signed by both parties, govern the work contained herein. 1.1 Project Requirements Based on discussions and documentation provided, the followin- requirements were outlined to GTRI. • Upgrade. Ci scoWorks LAN Management Solution from 3.0.1 to Cisco Prime I.I. This will be in a virtualized environment (server provided by City of Fort Collins). • Configure and Optimize Cisco Prime 1.1 Protocols and Features OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 CiscoWorks LMS Upgrade 2 Project Management 2.1 P roje ct I nitia tion Project IGck-off: GTRI will conduct a project kick-off meeting prior to work commencing to review the project scope, project requirements and objectives, technical approach, communication plan and project schedule. This meeting will be lead by the GTRI Project Manager or BU Practice Leader, and include the Client, ProjectTeam, and other stakeholders. 2.2 Project Planning Schedule: GTRI Project Management will provide a project schedule to outline the tasks and timelines required to accomplish the scope. This can be included on the format of MS Project, MS Word, MS Excel or simplified email format. 2.3 Project Execution Resource Management: GTRI Project Management will be responsible for coordinating and directing the project team and resources. 2.4 Project Control Project Status: GTRI Project Manager will provide a project status to the project team and stakeholders during the duration of the project. Depending on the type and duration of the project, this can be conducted at milestone points or regular intervals during the duration of the project (per the project communications plan). This will be in the format of an audio call or physical site meeting and/or a status report. Change Management: GTRI Project Management will control any required changes to the project scope in the format of a Change Agreement. If such requirement is identified, a Change Agreement form will be created to outline the changes in scope and cost prior to commencement of work and approved by client. 2.5 Project Close-out GTRI will conduct a project closure to review all completed tasks and components of the project scope. This will include reviewing any project checklists and or punch lists, testing results and deliverance and review of any included project deliverable documentation as per this SOW. OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 2 CiscoWorks LMS Upgrade Upon completion ofthe close-out, GTRI will present the project close and acceptance form to the client for acceptance and hand off the project to GTRI Managed Services if purchased This meeting will be lead by the GTRI Project Manager or BU Practice Leader, and include the Client POC, Project Team, and other stakeholders. OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 CiscoWorks LMS Upgrade 3 Design and Deployment Services This section identifies the work that will be performed as part of this project. The project will follow the order ofthe activities as they are shown below. 3.1 Planning & Design This portion of the project is a detailed planning and design phase that incorporates both a discovery and a design component. During this process all elements that potentially impact project success are examined. Once complete, detailed design recommendations and a project implementation schedule are created that will ensure the proposed solution meets the Client's requirements. 3.1.1 Planning Tasks • Discuss Cisco Prime 1.1 Features and Options • Determine purpose of Cisco Prime 1.1 in client's environment • Determine which features are critical to the success of the project and should be implemented in the deployment phase 3.1.2 Planning & Design Deliverables Below are the deliverables GTRI will provide as part ofthe planning & design. • GTRI will provide documentation as defined in the planning and design tasks • GTRI will create a project schedule and any associated change management approvals for project deployment 3.2 Deployment This section of the Statement of Work covers the work that will be performed during the deployment phase of this project. This covers all phases of the deployment of the solution. 3.2.1 Deployment Tasks • Upgrade LMS Server to Cisco Prime 1.1 • Configure / Optimize the following features (as requested by the client) o Configure Protocols • CDP, Tehtet/SSH, SNMP o Cisco Prime Features • Device Configuration • Device Management • User Management CiscoWorks LMS Upgrade 6/6/2012 4 CiscoWorks LMS Upgrade • Software Updates ■ Inventory Management ■ Report Generation • Documentation and Training as requested 3.2.2 Deployment Deliverables Below are the deliverables GTRI will provide as part of the deployment. • GTRI will implement the solution as identified in the statement of work • GTRI will provide documentation as defined in the deployment tasks • GTRI will provide final as -built documentation of the implemented solution • GTRI will provide information regarding the verification tests run on the installed components that are a pact of the project and the results of those tests • GTRI will provide training as outlined in this statement of work OPP-37034 CiscoWorks LMS Upgrade 6/6/2012 5 4