HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9126194Additional Items for VOIP Upgrade
T&M Scope of Work
Prepared for:
City of Fort Collins
215 N Mason St
Fort Collins, CO 80524-4408
Bob Singleton
bsingleton@fcgov.com
(970) 227-6789
Prepared by:
Global Technology Resources, Inc.
990 S. Broadway, Suite 400
Denver CO 80209-4010
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012 i
Table of Contents
1 PROJECT OVERVIEW ..................................................................................... 1
1.1 Project Requirements ................................................................................................... 1
2 DEPLOYMENT SERVICES .............................................................................. 2
2.1.1 Right Fax Upgrade and Configuration Services ......................................................... 2
2.1.2 IP Celerate Upgrade and Configuration Services ....................................................... 2
2.1.3 Meeting Place Express Upgrade and Configuration Services .................................... 2
2.1.4 Deployment Deliverables ............................................................................................ 2
3 ASSUMPTIONS ................................................................................................ 3
4 FEES AND CHARGES ..................................................................................... 4
5 SIGNATURE PAGE .......................................................................................... 5
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012
1
1 Project Overview
City of Fort Collins has requested that GTRI perform professional services to assist with 3
additional areas in conjunction with Voice upgrade project. 1. Right Fax upgrade and
integration configuration assistance. 2. IP Celerate upgrade and configuration assistance. 3.
Meeting Place Express upgrade and configuration assistance.
This Statement of Work serves as written documentation and the basis of understanding for
technical integration services to be performed by Global Technology Resources, Inc.
(hereinafter GTRI) for City of Fort Collins (hereinafter Client). The terms and conditions
outlined in the Master Services Agreement, signed by both parties, govern the work
contained herein.
1.1 Project Requirements
Based on discussions and documentation provided by City of Fort Collins, the following
requirements were outlined to GTRI.
For Each – Right Fax, IP Celerate, and Meeting Place Express:
Define plan, acquire updated software and confirm compatibility requirements.
Update Version of Application for Compatibility with new Cisco Call Manager Version
Provide documentation with testing results
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012
2
2 Deployment Services
This section identifies the work that will be performed as part of this project. The project
will follow the order of the activities as they are shown below.
2.1.1 Right Fax Upgrade and Configuration Services
Below are the tasks GTRI will provide as part of the Right Fax Upgrade:
Coordination and Planning with Satori to perform update
o Verify version compatibility and requirements.
Assist with developing test plan and successful validation criteria.
Make configuration changes on Call Manager as required.
o Actual changes will need to be made after business hours or on the weekend.
2.1.2 IP Celerate Upgrade and Configuration Services
Below are the tasks GTRI will provide as part of the IP Celerate Upgrade:
Planning- verify version compatibility and requirements.
Develop test plan and successful validation criteria.
Install update to application to required vision.
Make configuration changes as required.
Test and verify functionality according to validation criteria.
2.1.3 Meeting Place Express Upgrade and Configuration Services
Below are the tasks GTRI will provide as part of the Meeting Place Express Upgrade:
Planning- verify version compatibility and requirements.
Develop test plan and successful validation criteria.
Install update to application to required vision.
Make configuration changes as required.
Test and verify functionality according to validation criteria.
2.1.4 Deployment Deliverables
Below are the deliverables GTRI will provide as part of the deployment.
GTRI to provide documentation on configuration and testing results.
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012
3
3 Assumptions
This section of the statement of work covers the assumptions that are made as part of this
project. These assumptions include tasks that the Client will agree to perform as part of this
project. These assumptions will also include what items are in scope and out of scope for
this project.
General Assumptions
Client will provide GTRI with a single point of contact or key staff necessary for
completion of the project.
All communications for project details including scheduling, planning and work changes
must be communicated from the client point of contact to the GTRI primary point of
contact.
Client will provide GTRI will information about their currently deployed IT
infrastructure as applicable to this project. The Client will provide information to GTRI
about sites of operation, WAN circuits, Network topology, IP Telephony system
information, and all IT computing systems.
Client will work with GTRI to gather all data necessary for the work to begin on the first
day of the project.
Client will provide appropriate authentication and authorization credentials to complete
work.
Client will ensure all appropriate power/environmental requirements are provided to the
specific project needs and environmental standards are being met prior to start date. This
includes rack space, power and cooling.
Client will verify all cabling requirements are completed prior to the beginning of the
project.
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012
4
4 Fees and Charges
This is a Time and Materials engagement with a minimum commitment of four hours for
each occurrence of on-site services performed by GTRI. Client agrees that requirements and
completion metrics cannot be clearly defined at this time and that GTRI will be performing
work on a best-effort basis. GTRI will complete as much of the requested work requirements
as possible using appropriate resources, but does not guarantee completion under any fixed
amount of time. If GTRI completes the work in less time than stated in this agreement, GTRI
shall only bill actual time accrued. If Client requires additional time to continue work, that
time shall be requested by Client in writing.
Start date will be determined by availability of the GTRI resources and readiness of the
Client. If requested, GTRI will attempt to provide the appropriate resources as quickly as
possible; however, GTRI requires a two week time period scheduling the resources from the
date of this signed agreement and from each subsequent request for resources.
GTRI Resource Rate Estimated Time Cost
IP Telephony Engineer Level 3
SV-IPT3 - Right Fax (2.2.1)
$ 148 16 $ 2,368.00
IP Telephony Engineer Level 3
SV-IPT3 - Right Fax (2.2.1)
Non-Business Hours and Weekend work
$ 222 4 $ 888.00
IP Telephony Engineer Level 4
SV-IPT3 IP Celerate (2.2.2)
$148 40 $ 5,920.00
IP Telephony Engineer Level 4
SV-IPT3 – Meeting Place Express (2.2.3)
$ 148 40 $ 5,920.00
One Way Travel Time
(10 on-site trips)
$ 120 10 $ 1,200.00
Total Services Cost: $ 16,296.00
Engineering time used outside of normal business hours, Monday through Friday, 8am -
5pm, will be billed at the following rates:
Non-Business Hours and Weekends: 150% of applicable rate
Holidays: 200% (Dependent on availability)
All prices are quoted in U.S dollars. Prices do not include tax, freight, or customs charges.
The services pricing for this agreement is good for 90 days from the date it is issued. If the
proposed start date for the project is greater than 90 days from the creation of this document
then this document will potentially need to be revised.
Additional Items for VOIP Upgrade
OPP-49431
Additional Items for VOIP Upgrade
10/22/2012
5
5 Signature Page
GTRI and Client agree that we have read this Statement of Work, its associated Master
Services Agreement, understand them, and agree to be bound by their terms and conditions.
Execution of this agreement requires a signed Master Services Agreement. Additionally,
GTRI and Client mutually agree that a photocopy of this document shall be treated as if it
were an original.
Requested Project Start Date: ________________________
Agreed to:
City of Fort Collins
________________________________ ________________________________
Signature Title
________________________________ ________________________________
Printed Name Date
� ����� � ������ ���������� ��������� ����
�� ���������� ��������
���� ������� ��� ��� �������� ������� �� ��� ���� �� ���� ������� �� ������ ���� ����������� �������� ��
����� ���������� ��������� ���������� ��������� ������ ���� ������� ��� �������� ��� ��������
��� ����������� ��������� �� ���� �������� ��� ���������� ������������
������ ������������ �����
���������� ����� �����
���� �� ���� �������
���� �������� ����
����� ����������� �����
���� �� ���� �������
��� ����
����
��������� � ���� ������ ���������� ��������� ����
������ ������������
������� ����� �������
���� ��