HomeMy WebLinkAboutRFP - P1117 CONSULTING ENGINEERING SERVICES FUTURE WATER WW SW FACILITIES CAPITAL IMPROVEMENTS (4)Request for Proposal
For
Fort Collins Utilities
For
Consulting Engineering Services
For
Future Water, Wastewater, and Stormwater Facilities
Capital Improvements
RFP P1117
Opening Date: 3:00 P.M. (Our Clock ) April 25, 2008
rev 01/08
Purchasing
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
REQUEST FOR PROPOSAL
P1117 Consulting Engineering Services
for
Future Water, Wastewater, and Stormwater facilities Capital Improvements
The City of Fort Collins is soliciting proposals from qualified consultants for design and
construction management services for water, wastewater, and stormwater capital improvement
projects.
Written proposals, eight (8) will be received at the City of Fort Collins' Purchasing Division, 215
North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will be received before
3:00 p.m. (our clock), April 25, 2008. Proposal No. P1117. If delivered, they are to be sent to
215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O.
Box 580, Fort Collins, 80522-0580.
Questions concerning the scope of the project should be directed to Project Managers Sue
Paquette P.E. (970) 224-6068 or Jay Rose (970) 224-6106.
Questions regarding proposals submittal or process should be directed to Opal F. Dick, CPPO,
Senior Buyer (970) 221-6778.
A copy of the Proposal may be obtained as follows:
1. Download the Proposal/Bid from the BuySpeed Webpage,
www.fcgov.com/eprocurement
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request
a copy of the Bid.
The City of Fort Collins is subject to public information laws, which permit access to most
records and documents. Proprietary information in your response must be clearly identified and
will be protected to the extent legally permissible. Proposals may not be marked ‘Proprietary’ in
their entirety. Information considered proprietary is limited to material treated as confidential in
the normal conduct of business, trade secrets, discount information, and individual product or
service pricing. Summary price information may not be designated as proprietary as such
information may be carried forward into other public documents. All provisions of any contract
resulting from this request for proposal will be public information.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision-
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be
rejected and reported to authorities as such. Your authorized signature of this proposal assures
t hat such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
ir regularities or informalities.
Sincerely,
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
rev 01/08
RFP P1117
Consulting Engineering Services for
Future Water, Wastewater, and Stormwater Facilities
Capital Improvements
I. Purpose
The City of Fort Collins is soliciting proposals from qualified consultants for design and
construction management services for water, wastewater, and stormwater capital
improvement projects. It is anticipated that the primary use of these engineering
services will be in the areas of water distribution and transmission infrastructure
improvements and system rehabilitation as well as wastewater collection infrastructure
improvements and system rehabilitation. Future projects will be managed by The City of
Fort Collins Utilities and may involve a cooperative effort between other City
Departments. The selected Consultant will participate in the City of Fort Collins Utilities
Alternative Product Delivery System (APDS) during the design and construction phases
of future projects. The contract generated from this Request for Proposal may be
renewed annually for up to five years.
II. Scope of Services
A. General Description
The intent of the City of Fort Collins Utilities is to award a contract to a qualified
consultant for engineering consultation services during the design and construction
phases of water, wastewater, and stormwater infrastructure improvement and
rehabilitation projects.
The selected consultant may be retained by the City of Fort Collins Utilities annually for
up to five years to provide studies, system modeling, engineering design, bidding
services, surveying and construction management services for projects as they are
required. Projects may be related to water pipelines, stormwater and sanitary sewer
pipelines, drainage channels, detention ponds, improvements at the City’s Water
Treatment Facility and Water Reclamation Facilities, and development and modification
of water distribution and wastewater collection systems models.
The City of Fort Collins Utilities envisions an increasing need for innovative engineering
solutions for the rehabilitation of ageing underground water, wastewater, and stormwater
systems. Project designs will seek to minimize the impacts to neighborhoods and the
environment by fully utilizing trenchless technologies and sustainability strategies.
Projects will be managed using the Alternative Product Delivery System (APDS). The
selected consultant will be part of a project team consisting of City of Fort Collins Utility
staff, project construction company staff, and the engineering consultant staff. All team
members will participate in the project from project conception, through the design
phase, and during construction. Participation by all team members throughout the
project is expected to encourage innovation and enhance project quality and value.
Work will be on an as needed basis with the scope of work to be defined and a work
order negotiated prior to the time the work on each project is commenced. Since
January 1, 2007, the utility has expended approximately $400,000 under the prior work
order contract. This amount is provided as an indicator of work, but should not be
interrupted as a guarantee of future work.
Interested firms are encouraged to visit with the above named project manager(s) to
better understand the RFP and associated future work.
B. Project Requirements
1. A description of water, wastewater, and storm water projects your firm and
design team has worked on in the past 5 years that utilized innovative design
concepts and trenchless technology, i.e, boring tools which include pipe
pulling, pipe ramming, pipe bursting, sliplining and directional boring
equipment; tunneling; liners; etc.
2. The City of Fort Collins Utilities has undertaken and completed an infiltration
study of the ageing NW Sanitary Sewer Trunk Line. The study indicated that
the portion of the trunk line between Shields Street and the town of Laporte,
Colorado, which is served by the trunk line, is experiencing significant
infiltration. This infiltration results in undesirable treatment cost increases at
the sewage treatment facility.
Describe how your firm would proceed to establish the source and causes of
the infiltration in the North West Trunk Line. Provide details as to potential
innovative and cost effective solutions your firm may recommend to address
the problem. Include a description of any types of trenchless technology that
your firm has experience with that may offer innovative and desireable
results, and enhance project quality and value.
C. General Information For Future Work
• Consultant should have experience with H2OMap Sewer and Water,
model produced by MWHSoft. The SELECTED CONSULTANT will be
expected to purchase (or already have) the specified modeling software
for their own use. Thus, hydraulic modeling for sanitary and water
projects will be prepared using H2OMap Sewer and/or Water, produced
by MWHSoft, Inc. Documentation in both hard copy and disk format will
be required at the working and complete model levels.
• Hydraulic modeling for stormwater projects will be prepared using HEC-
RAS. Frequencies analyzed shall be the same as provided for in the
Master Plan. Documentation will be provided in both hard copy and disk
format will be required at the Preliminary design level. Residual flood
plains will be documented on “as-constructed” drawings.
• Drawings will be AutoCAD (Version 2008) generated, ink on mylar. "As-
Constructed drawings" will be provided to the City on CD’s or DVD’s at
the completion of each project. Provide "As-Constructed" stamped,
original mylars at the completion of the project to become the property of
the City of Fort Collins Utility.
• Prepare construction contract documents and specifications using CSI
format and City of Fort Collins modified EJCDC General Conditions,
standard front end and Utility Technical Specifications with modifications.
• Identify all easements or properties required for project construction and
prepare all legal descriptions and exhibits needed by City staff in
acquiring these easements and/or properties.
• All known existing utilities and structures will be identified, located and
shown horizontally and vertically, if possible, in relationship to proposed
improvements.
• All applications for permits will be prepared by the consultant.
• Provide construction administration, submittal review and continuous full
time field inspection of the project. Resident Project Representative
duties must be performed with experienced and qualified personnel
approved by the Utility.
• Provide all surveying required for the design of the project and baseline
control for contractor use during construction.
• Provide all geotechnical services required for the design process and for
testing during construction projects.
• Provide detailed written monthly progress reports throughout the duration
of the design and construction of all work. The progress reports will be
part of the billing submitted monthly.
• Provide detailed estimate of construction cost at the 50% and 90% levels
of design.
III. Instructions to Consultants
A. Submittal Requirements
Qualified consultants interested in performing the work described in this request for
proposals should submit the following information to the City.
1. Qualifications of your firm and staff proposed to perform the work on City of
Fort Collins Utilities Department projects. This should include resumes of
staff and any recommendation/commendation letters received for past
projects.
2. Provide a scope of work and engineering cost estimate for the analysis and
potential innovation solutions for the infiltration problems associated with the
Northwest trunk line. Include a spread sheet of hourly rates for personnel
and any sub consultants proposed to perform work under this contract.
3. References from at least three other water, wastewater, or storm water
projects, including MWHSoft H2OMap Sewer and Water modeling
experience, with similar requirements that have been completed within the
past five years and that have involved the staff proposed to work on this
project. As part of the reference check process, the City may choose to visit
one or more of the listed projects and/or request a copy of the plans and
documentation completed.
4. Detail any experience your proposed team has with the design/build process
(working with a selected contractor through the design and construction
phases of a project) or other innovative construction processes.
5. Detail any experience your firm has in using a formal partnering process
(such as the above mentioned APDS Process) on construction projects.
6. Limit the total length of your proposal to a maximum of 30 pages (excluding
covers and dividers). The Director of Purchasing and Risk Management may
reject proposals received that are longer than 30 pages in length.
7. Submit a total of eight (8) copies of your proposal.
8. Proposals must be received no later than 3:00 pm (our clock), April 25, 2008
to:
City of Fort Collins – Purchasing and Risk Management Division
215 N. Mason St., 2nd Floor
P.O. Box 580
Fort Collins, CO 80522
B. Contacts
Questions related to procedures should be directed to:
Opal Dick, CPPO – Senior Buyer
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
Fort Collins, CO 80522
(970) 221-6778
Questions related to the scope of work should be directed to:
Main Contacts:
Sue Paquette, P.E. – Project Manager Jay Rose – Project Manager
City of Fort Collins Utilities City of Fort Collins Utilities
700 Wood Street 700 Wood Street
P.O. Box 580 P.O. Box 580
Fort Collins, CO 80522 Fort Collins, CO 80522
(970) 224-6068 (970) 224-6106
spaquette@fcgov.com jrose@fcgov.com
IV. Selection Criteria and Method
The City of Fort Collins’ Capital Project Management Control System Manual prescribes
the consultant selection criteria and method. This document is available for review at
the Purchasing and Risk Management Office.
V. Award
At the option of the City, a second firm may be chosen to provide described services.
VI. Terms and Conditions
The payment for services, as described under the Scope of Services, shall be based
upon hourly rates as outlined in the submitted cost schedule/estimate. The submitted
cost estimate shall establish a “not to exceed” amount for the contract. Any changes in
scope to the original contract will be treated as a negotiated change order to the
contract.
Utility PSA WO rev06/07
REVIEW AND ASSESSMENT
Professional firms will be evaluated on the following criteria. These criteria will be the basis for
review of the written proposals and interview session.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and
5 being an outstanding rating.
WEIGHTING
FACTOR
QUALIFICATION
STANDARD
2.0
Scope of Proposal
Does the proposal show an understanding of the
project objective, methodology to be used and
results that are desired from the project?
2.0
Assigned Personnel
Do the persons who will be working on the project
have the necessary skills? Are sufficient people of
the requisite skills assigned to the project?
1.0
Availability
Can the work be completed in the necessary time?
Can the target start and completion dates be met?
Are other qualified personnel available to assist in
meeting the project schedule if required? Is the
project team available to attend meetings as
required by the Scope of Work?
1.0
Motivation
Is the firm interested and are they capable of doing
the work in the required time frame?
2.0
Cost and
Work Hours
Do the proposed cost and work hours compare
favorably with the project Manager's estimate? Are
the work hours presented reasonable for the effort
required in each project task or phase?
2.0
Firm Capability
Does the firm have the support capabilities the
assigned personnel require? Has the firm done
previous projects of this type and scope?
Utility PSA WO rev06/07
Reference evaluation (Top Ranked Firm)
The project Manager will check references using the following criteria. The evaluation rankings
will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION
STANDARD
Overall Performance
Would you hire this Professional again? Did
they show the skills required by this project?
Timetable
Was the original Scope of Work completed
within the specified time? Were interim
deadlines met in a timely manner?
Completeness
Was the Professional responsive to client
needs; did the Professional anticipate
problems? Were problems solved quickly and
effectively?
Budget
Was the original Scope of Work completed
within the project budget?
Job Knowledge
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction
contract, was the project functional upon
completion and did it operate properly?
Were problems corrected quickly and
effectively?
Utility PSA WO rev06/07
PROFESSIONAL SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and , [insert either a corporation, a partnership or an individual,
doing business as , hereinafter referred to as "Professional".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance
with any project Work Orders for (RFP or project name), issued by the City. A blank sample of a
work order is attached hereto as Exhibit "A", consisting of one (1) page and is incorporated
herein by this reference. No Work Order shall exceed $ . The City reserves the right to
independently bid any project rather than issuing a Work Order to the Professional for the same
pursuant to this Agreement.
2. The Work Schedule. The services to be performed pursuant to this Agreement
shall be performed in accordance with the Work Schedule stated on each Work Order.
3. Time of Commencement and Completion of Services. The services to be
performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time
is of the essence. Any extensions of any time limit must be agreed upon in writing by the
parties hereto.
4. Contract Period. This Agreement shall commence upon the date of execution
shown on the signature page of this Agreement and shall continue in full force and effect for one
(1) year, unless sooner terminated as herein provided. In addition, at the option of the City, the
Utility PSA WO rev06/07
Agreement may be extended for an additional period of one (1) year at the rates provided with
written notice to the professional mailed no later than ninety (90) days prior to contract end.
4. Contract Period. [Option 1] This Agreement shall commence , 200 ,
and shall continue in full force and effect until , 200 , unless sooner terminated as
herein provided. In addition, at the option of the City, the Agreement may be extended for
additional one year periods not to exceed ( ) additional one year periods. Renewals
and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder
Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a
guide. Written notice of renewal shall be provided to the Service Provider and mailed no later
than ninety (90) days prior to contract end.
5. Early Termination by City/Notice. Notwithstanding the time periods contained
herein, the City may terminate this Agreement at any time without cause by providing written
notice of termination to the Professional. Such notice shall be delivered at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this agreement shall be effective when mailed, postage
prepaid and sent to the following address:
Professional:
City
With copy to
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole
right and remedy for such termination.
Utility PSA WO rev06/07
6. Design, Project Insurance and Insurance Responsibility. The Professional shall
be responsible for the professional quality, technical accuracy, timely completion and the
coordination of all services rendered by the Professional, including but not limited to designs,
plans, reports, specifications, and drawings and shall, without additional compensation,
promptly remedy and correct any errors, omissions, or other deficiencies. The Professional
shall indemnify, save and hold harmless the City its officers and employees, in accordance with
Colorado law, from all damages whatsoever claimed by third parties against the City and for the
City's costs and reasonable attorneys fees arising directly or indirectly out of the Professional's
negligent performance of any of the services furnished under this Agreement. The Professional
shall maintain commercial general liability insurance in the amount of $500,000 combined single
limits, and errors and omissions insurance in the amount of .
7. Compensation. In consideration of services to be performed pursuant to this
Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis
designated in Exhibit "B", consisting of ( ) page(s), attached hereto and incorporated
herein by this reference. At the election of the City, each Work Order may contain a maximum
fee, which shall be negotiated by the parties hereto for each such Work Order. Monthly partial
payments based upon the Professional's billings and itemized statements are permissible. The
amounts of all such partial payments shall be based upon the Professional's City-verified
progress in completing the services to be performed pursuant to the Work Order and upon
approval of the Professional's direct reimbursable expenses. Final payment shall be made
following acceptance of the work by the City. Upon final payment, all designs, plans, reports,
specifications, drawings, and other services rendered by the Professional shall become the sole
property of the City.
8. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
Utility PSA WO rev06/07
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
9. Project Drawings. Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing accurate
information on the project as constructed. Drawings shall be of archival, prepared on stable
mylar base material using a non-fading process to provide for long storage and high quality
reproduction. "CD" disc of the as-built drawings shall also be submitted to the owner in and
AutoCAD version no older then the established city standard.
10. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on
any Work Order and every thirty days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Work Order,
Work Schedule and other material information. Failure to provide any required monthly report
may, at the option of the City, suspend the processing of any partial payment request.
11. Independent Contractor. The services to be performed by Professional are those
of an independent contractor and not of an employee of the City of Fort Collins. The City shall
not be responsible for withholding any portion of Professional's compensation hereunder for the
payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
12. Personal Services. It is understood that the City enters into this Agreement
based on the special abilities of the Professional and that this Agreement shall be considered as
an agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
13. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The
Utility PSA WO rev06/07
City's approval or acceptance of, or payment for, any of the services shall not be construed to
operate as a waiver of any rights or benefits provided to the City under this Agreement.
14. Default. Each and every term and condition hereof shall be deemed to be a
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default.
15. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees
and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the
entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representatives, successors and assigns of said parties.
17. Law/Severability. The laws of the State of Colorado shall govern the
construction, interpretation, execution and enforcement of this Agreement. In the event any
provision of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this
Agreement.
18. Prohibition Against Employing Illegal Aliens. This paragraph shall apply to all
Contractors whose performance of work under this Agreement does not involve the delivery of a
Utility PSA WO rev06/07
specific end product other than reports that are merely incidental to the performance of said
work. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Contractor represents and agrees that:
a. As of the date of this Agreement:
1. Contractor does not knowingly employ or contract with an illegal alien;
and
2. Contractor has participated or attempted to participate in the basic pilot
employment verification program created in Public Law 208, 104th Congress, as
amended, and expanded in Public Law 156, 108th Congress, as amended,
administered by the United States Department of Homeland Security (the “Basic
Pilot Program”) in order to confirm the employment eligibility of all newly hired
employees.
b. Contractor shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
c. Contractor shall continue to apply to participate in the Basic Pilot Program and
shall in writing verify same every three (3) calendar months thereafter, until Contractor is
accepted or the public contract for services has been completed, whichever is earlier.
The requirements of this section shall not be required or effective if the Basic Pilot
Program is discontinued.
d. Contractor is prohibited from using Basic Pilot Program procedures to undertake
pre-employment screening of job applicants while this Agreement is being performed.
e. If Contractor obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Contractor
shall:
Utility PSA WO rev06/07
1. Notify such subcontractor and the City within three days that Contractor
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Contractor shall
not terminate the contract with the subcontractor if during such three days the
subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
f. Contractor shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the “Department”) made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
g. If Contractor violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Agreement is so terminated, Contractor shall be liable for actual and consequential
damages to the City arising out of Contractor’s violation of Subsection 8-17.5-102,
C.R.S.
h. The City will notify the Office of the Secretary of State if Contractor violates this
provision of this Agreement and the City terminates the Agreement for such breach.
19. Special Provisions. Special provisions or conditions relating to the services to
be performed pursuant to this Agreement are set forth in Exhibit "C", consisting of ( )
page(s), attached hereto and incorporated herein by this reference.
Utility PSA WO rev06/07
THE CITY OF FORT COLLINS, COLORADO
By: _________________________________
Darin Atteberry
City Manager
By: _________________________________
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
Date: ______________________________
ATTEST:
_________________________________
City Clerk
APPROVED AS TO FORM:
________________________________
Assistant City Attorney
[Insert Professional's name] or
[Insert Partnership Name] or
[Insert individual's name]
Doing business as ____ [insert name of business]
By: _________________________________
Title: _______________________________
CORPORATE PRESIDENT OR VICE PRESIDENT
Date: _______________________________
ATTEST:
_________________________________ (Corporate Seal)
Corporate Secretary
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
DATED:
Work Order Number:
Purchase Order Number:
Project Title:
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
____________________________________________________________________________________
Scope of Services:
____________________________________________________________________________________
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement
and this work order (including the attached
forms) the Professional Services Agreement
shall control.
The attached forms consisting of Exhibits _, _, _,
consisting of ___ (_) pages are hereby accepted
and incorporated herein, by this reference, and
Notice to Proceed is hereby given.
cc: Purchasing
Professional:
By: ___________________________________
Date: __________________________________
City of Fort Collins
Submitted By: ___________________________
Project Manager
Date: ___________________________
Reviewed by: ___________________________
Senior Utility Engineer
Date: ___________________________
Approved by: ___________________________
Utilities General Manager
Date: ___________________________
Approved by: ___________________________
Director of Purchasing & Risk Management
(if over $30,000.)
Date: __________________________________
ADDENDUM No. 1
P1117 Consulting Engineering Services Future Water, Wastewater and Stormwater
Facilities Capital Improvements
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP: P1117 Consulting Engineering Services Future Water, Wastewater
and Stormwater Facilities Capital Improvements
OPENING DATE: 3:00 P.M. (Our Clock) May 2, 2008
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
AMEND: Opening Date: May 2, 2008 3:00 p.m.
AMEND: II. Scope of Services, B. Project Requirements Item 2
2. The City of Fort Collins Utilities has undertaken and completed an
infiltration study of the ageing NW Sanitary Sewer Trunk Line. The study
indicated that the portion of the trunk line between Shields Street and the
town of Laporte, Colorado, which is served by the trunk line, is
experiencing significant infiltration. This infiltration results in undesirable
treatment cost increases at the sewage treatment facility.
Describe how your firm would proceed to establish the source and causes
of the infiltration in the North West Trunk Line. Provide details as to
potential innovative and cost effective solutions your firm may
recommend to address the problem. Include a description of any types of
trenchless technology that your firm has experience with that may offer
innovative and desirable results, and enhance project quality and value.
ADD: II. Scope of Services, B. Project Requirement, paragraphs 3 and 4:
Suppose that your investigation of the NW sanitary sewer trunk line
indicates that 2000 feet of 20 inch clay tile pipe is responsible for the
majority of the infiltration into the sewer. Half of this reach lies within an
arterial street with a perpendicular railroad crossing. The other half lies
within a dedicated easement in undeveloped land. This portion of the
sewer also passes under the Poudre River. There is also another 500
foot branch of 8 inch cast iron sewer tributary to the 20 inch clay tile trunk.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
This 8 inch branch also appears to contribute a significant amount of
infiltration.
Prepare a spread sheet that shows the design tasks you propose, the
assigned personnel to work on the project, and the design time with
corresponding costs that you firm would propose to prepare a set of
construction drawings and specifications to address the infiltration
problem.
Please contact Opal F. Dick, CPPO, Senior Buyer at (970) 221-6778 with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
rev 01/08
Request for Proposal
For
Fort Collins Utilities
For
Consulting Engineering Services
For
Future Water, Wastewater, and Stormwater Facilities
Capital Improvements
RFP P1117
Opening Date: 3:00 P.M. (Our Clock ) April 25, 2008
Purchasing
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
REQUEST FOR PROPOSAL
P1117 Consulting Engineering Services
for
Future Water, Wastewater, and Stormwater facilities Capital Improvements
The City of Fort Collins is soliciting proposals from qualified consultants for design and
construction management services for water, wastewater, and stormwater capital improvement
projects.
Written proposals, eight (8) will be received at the City of Fort Collins' Purchasing Division, 215
North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will be received before
3:00 p.m. (our clock), April 25, 2008. Proposal No. P1117. If delivered, they are to be sent to
215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O.
Box 580, Fort Collins, 80522-0580.
Questions concerning the scope of the project should be directed to Project Managers Sue
Paquette P.E. (970) 224-6068 or Jay Rose (970) 224-6106.
Questions regarding proposals submittal or process should be directed to Opal F. Dick, CPPO,
Senior Buyer (970) 221-6778.
A copy of the Proposal may be obtained as follows:
1. Download the Proposal/Bid from the BuySpeed Webpage,
www.fcgov.com/eprocurement
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request
a copy of the Bid.
The City of Fort Collins is subject to public information laws, which permit access to most
records and documents. Proprietary information in your response must be clearly identified and
will be protected to the extent legally permissible. Proposals may not be marked ‘Proprietary’ in
their entirety. Information considered proprietary is limited to material treated as confidential in
the normal conduct of business, trade secrets, discount information, and individual product or
service pricing. Summary price information may not be designated as proprietary as such
information may be carried forward into other public documents. All provisions of any contract
resulting from this request for proposal will be public information.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision-
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
rev 01/08
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be
rejected and reported to authorities as such. Your authorized signature of this proposal assures
that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities.
Sincerely,
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management