HomeMy WebLinkAboutBID - 7004 WEST HARMONY ROAD IMPROVEMENTS (3)SPECIFICATIONS AND CONTRACT DOCUMENTS FOR West Harmony Road Improvements BID NO. 7004 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS January 30, 2009 – 3:00 P.M. (OUR CLOCK) Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Rev 10/20/07 Section 00020 Page 2 CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 Rev 10/20/07 Section 00020 Page 3 SECTION 00020 INVITATION TO BID Rev 10/20/07 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: January 5, 2009 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on January 30, 2009, for the West Harmony Road Improvements; BID NO. 7004. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of Bid 7004 West Harmony Road Improvements. The contract documents provide for: 1. Reconstruction and widening of approximately 1-mile of arterial roadway. 2. Signal work, signing and striping, traffic control, and surveying are by City forces. 3. Installation of approximately 1,300 LF of reinforced concrete pipe storm sewer line ranging in size from 36” to 15”. 4. Full roadway reconstruction (asphalt) with section of mill and inlay. Total asphalt quantity is approximately 15,600 TONS. 5. Approximately 3000 SY of Concrete Paving (10.5 inch and 11 inch thick). All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available Monday, January 6th, 2009. A prebid conference and job walk with representatives of prospective Bidders will be held at 1:00 p.m., on Friday, January 16th, 2009, at 215 N. Mason, 1st Floor, Community Room, Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. The Contract Documents and Construction Drawings may be examined online at: • City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp Bids will be received as set forth in the Bidding Documents. Rev 10/20/07 Section 00020 Page 2 The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing & Risk Management Director SECTION 00100 INSTRUCTIONS TO BIDDERS Rev 10/20/07 Section 00100 Page 1 SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. Rev 10/20/07 Section 00100 Page 2 3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Rev 10/20/07 Section 00100 Page 3 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. Rev 10/20/07 Section 00100 Page 4 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. Rev 10/20/07 Section 00100 Page 5 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and Rev 10/20/07 Section 00100 Page 6 date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non-responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Rev 10/20/07 Section 00100 Page 7 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each Rev 10/20/07 Section 00100 Page 8 counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self- addressed, self-stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION SECTION 00300 BID FORM Rev 10/20/07 Section 00300 Page 1 SECTION 00300 BID FORM PROJECT: Place Date 1. In compliance with your Invitation to Bid dated __, 20__ and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ______________________________________________________ ($ ___) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: _________________________________________________________. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. _______through . Rev 10/20/07 Section 00300 Page 1 8. BID SCHEDULE (Base Bid) Rev 10/20/07 Section 00300 Page 2 Rev 10/20/07 Section 00300 Page 3 Rev 10/20/07 Section 00300 Page 4 Rev 10/20/07 Section 00300 Page 5 Rev 10/20/07 Section 00300 Page 6 Rev 10/20/07 Section 00300 Page 7 Rev 10/20/07 Section 00300 Page 8 Rev 10/20/07 Section 00300 Page 9 Rev 10/20/07 Section 00300 Page 10 Rev 10/20/07 Section 00300 Page 1 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: _______________________________________ CONTRACTOR BY:___________________________________ ________________________________ __________________ Signature Date ________________________________ Title ________________________________ License Number (If Applicable) (Seal - if Bid is by corporation) Attest:___________________________ Address _____________________________________ _____________________________________ Telephone _____________________________________ Email _____________________________________ Rev 10/20/07 Section 00410 Page 1 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors Rev 10/20/07 Section 00410 Page 2 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned _ as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 7004 West Harmony Road Improvements. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. Rev 10/20/07 Section 00410 Page 3 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20__, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name:_____________________________ __________________________________ Address:__________________________ __________________________________ __________________________________ __________________________________ By:_______________________________ By: ______________________________ Title: ___________________________ Title:____________________________ ATTEST: By:_______________________________ (SEAL) (SEAL) Rev 10/20/07 Section 00420 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: _________________________________________________ 2. Permanent main office address: __________________________________ 3. When organized: _________________________________________________ 4. If a corporation, where incorporated: ___________________________ 5. How many years have you been engaged in the contracting business under your present firm or trade name?___________________________ 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ 7. General character of Work performed by your company: _________________________________________________________________ _________________________________________________________________ 8. Have you ever failed to complete any Work awarded to you?________ If so, where and why?____________________________________________ _________________________________________________________________ 9. Have your ever defaulted on a contract?__________________________ If so, where and why?____________________________________________ _________________________________________________________________ 10. Are you debarred by any government agency? ______________________ If yes list agency name._________________________________________ Rev 10/20/07 Section 00420 Page 2 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 12. List your major equipment available for this contract. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 13. Experience in construction Work similar in importance to this project: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 14. Background and experience of the principal members of your organization, including officers: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 15. Credit available: $______________________________________________________ 16. Bank reference:__________________________________________________________ 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? _________________________________________________________________________ 18. Are you licensed as a General CONTRACTOR?________________________________ If yes, in what city, county and state? __________________________What class, license and numbers?______________________________________________ 19. Do you anticipate subcontracting Work under this Contract?_________________ If yes, what percent of total contract?__________________________________ and to whom?_____________________________________________________________ 20. Are any lawsuits pending against you or your firm at this time?__________ IF yes, DETAIL___________________________________________________________ _________________________________________________________________________ Rev 10/20/07 Section 00420 Page 3 21. What are the limits of your public liability? DETAIL _________________________________________________________________________ What company?____________________________________________________________ 22. What are your company's bonding limitations?_____________________________ _________________________________________________________________________ 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ________________ this ______ day of __________________, 20__. _____________________________________________ Name of Bidder By:__________________________________________ Title:_______________________________________ State of________________________ ) County of_______________________ ___________________________________being duly sworn deposes and says that he is ______________________of_____________________________ and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _______ day of____________, 20__. ___________________________________ Notary Public ___________________________________ ___________________________________ My commission expires _____________________________. Section 00430 Page 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ SECTION 00500 AGREEMENT FORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed Section 00510 Page 1 SECTION 00510 NOTICE OF AWARD Date: TO: PROJECT: 7004 West Harmony Road Improvements OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated , 20 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 7004 West Harmony Road Improvements. The Price of your Agreement is . Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by , 20 . 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By:________________________________________ James B. O’Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management Section 00520 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the day of in the year of 20 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 7004 West Harmony Road Improvements. ARTICLE 2. ENGINEER The Project has been designed by Interwest Consulting Group, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Completed by July 20, 2009, the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions, on August 14, 2009. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. Section 00520 Page 2 1) Substantial Completion: Two Thousand Three Hundred Sixty Three Dollars ($2,363.00) for each calendar day or fraction thereof that expires after July 20, 2009 for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, Five Hundred Dollars ($500.00) for each calendar day or fraction thereof that expires after August 14, 2009 for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($ ), $ Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application for payment. Section 00520 Page 3 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. Section 00520 Page 4 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment Section 00520 Page 5 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Section 00520 Page 6 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers to , inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. Section 00520 Page 7 OWNER: CITY OF FORT COLLINS CONTRACTOR: By: ____________________________ By:_______________________________ JAMES B. O’NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING __________________________________ AND RISK MANAGEMENT Title:____________________________ Date:___________________________ Date:_____________________________ (CORPORATE SEAL) Attest: ________________________ Attest:___________________________ City Clerk Address for giving notices: Address for giving notices: P. O. Box 580 __________________________________ Fort Collins, CO 80522 __________________________________ LICENSE NO.:______________________ Approved as to Form _______________________________ Assistant City Attorney Section 00530 Page 1 SECTION 00530 NOTICE TO PROCEED Description of Work: 7004 West Harmony Road Improvements To: This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20__. The dates for Substantial Completion and Final Acceptance shall be _____ _____, 20_ and , 20__, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20__. CONTRACTOR: By: Title: SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Rev 10/20/07 Section 00610 Page 1 SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ____________ in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of __________, 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project,7004 West Harmony Road Improvements. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. Rev 10/20/07 Section 00610 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this __ day of _________, 20__. IN PRESENCE OF: Principal ______________________________ ________________________________________ ______________________________ ________________________________________ (Title) ________________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Rev 10/20/07 Section 00615 Page 1 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 7004 West Harmony Road Improvements. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. Rev 10/20/07 Section 00615 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this __ day of , 20__. IN PRESENCE OF: Principal ______________________________ By:___________________________________ ______________________________ ______________________________________ (Title) ______________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners ______________________________ ______________________________________ ______________________________ ______________________________________ IN PRESENCE OF: Surety ______________________________ By:___________________________________ ______________________________ By:___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Rev 10/20/07 Section 00630 Page 1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. Rev 10/20/07 Section 00635 Page 1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 7004 West Harmony Road Improvements PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins ____________________________ ____________________________ CONTRACTOR: ______________________________ ____________________________ CONTRACT DATE:____________________________ The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _________________________________ ________________________________________ ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. ________________________________ By: ________________________________________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: ________________________________________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: Rev 10/20/07 Section 00640 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 20__ TO: Gentlemen: You are hereby notified that on the day of , 20__, the City of Fort Collins, Colorado, has accepted the Work completed by for the City of Fort Collins project, 7004 West Harmony Road Improvements. A check is attached hereto in the amount of $_______________________________ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated _____________ __, 20__. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date:____________ __, 20__. Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: Rev 10/20/07 Section 00650 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT:7004 West Harmony Road Improvements 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. Rev 10/20/07 Section 00650 Page 2 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20__. CONTRACTOR By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20__, by Witness my hand and official seal. My Commission Expires: . Notary Public Rev 10/20/07 Section 00660 Page 1 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR:_________________________________ PROJECT: 7004 West Harmony Road Improvements CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , ____ . (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in- Fact. SECTION 00670 DR 0172 (12/98) COLORADO DEPARTMENT OF REVENUE DENVER CO 80261 (303) 232-2416 DO NOT WRITE IN THIS SPACE The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side). FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. Registration/Account No. (to be assigned by DOR) 89 - Period 0170-750 (999) $0.00 CONTRACTOR INFORMATION Trade name/DBA: Owner, partner, or corporate name: Mailing address (City, State, Zip): Contact Person E-Mail address: Federal Employer’s Identification Number: Bid amount for your contract: $ Fax Number: ( ) Business telephone number: ( ) Colorado withholding tax account number: EXEMPTION INFORMATION Copies of contract or agreement pages (1) identifying the contracting parties and (2) containing signatures of contracting parties must be attached. Name of exempt organization (as shown on contract): Exempt organization’s number: 98 - Address of exempt organization (City, State, Zip): Principal contact at exempt organization: Principal contact’s telephone number: Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located) Scheduled construction start date: Month Day Year Estimated completion date: Month Day Year I declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge. Signature of owner, partner or corporate officer: Title of corporate officer: Date: DO NOT WRITE BELOW THIS LINE CONTRACTOR APPLICATION FOR EXEMPTION CERTIFICATE Pursuant to Statute Section 39-26.114(1)(a)(XIX) 6 Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor’s Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor’s name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. SECTION 00700 GENERAL CONDITIONS SE SECTION 00800 SUPPLEMENTARY CONDITIONS Rev 10/20/07 Section 00800 Page 1 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: Rev 10/20/07 Section 00800 Page 2 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule 20 days lost due to abnormal weather conditions. Rev 10/20/07 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment Rev 10/20/07 Section 00950 Page 1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: __ ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) _ ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: __ Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing Rev 10/20/07 Section 00960 Page 1 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: Section 00960 Page 2 CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 Section 00960 Page 3 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 Section 00960 Page 4 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 i PROJECT AND STANDARD SPECIAL PROVISIONS WEST HARMONY ROAD IMPROVEMENTS Bid No. 7004 W. Harmony Road Improvement Project Project Special Provisions i COLORADO DEPARTMENT OF TRANSPORTATION CITY OF FORT COLINS, COLORADO W. HARMONY ROAD IMPROVEMENT PROJECT PROJECT SPECIAL PROVISIONS The General Conditions of the Construction Contract and the Colorado Department of Transportation’s (CDOT) 2005 Standard Specifications for Road and Bridge Construction control construction of this project. Where there are conflicts between the two, the General Conditions shall control. The following Special Provisions supplement or modify the CDOT Standard Specifications and take precedence over the Standard Specifications and plans. When specifications or special provisions contain both English and metric (SI) units, the English units apply and are the specification requirement. Item Page Index Pages ii Notice to Bidders 5 Commencement and Completion of Work 6 Revision of Section 100 - General Provisions 8 Revision of Section 101 - Definitions of Terms 9 Revision of Section 102 - Project Plans and Other Data 10 Revision of Section 104 - Scope of Work 11 Revision of Section 105 - Control of Work 15 Revision of Section 106 - Control of Material 21 Revision of Section 107 - Environmental Controls 25 Revision of Section 108 - Prosecution and Progress 27 Revision of Section 201 – Clearing and Grubbing 31 Revision of Section 202 - Removal and Trimming of Tree 32 Revision of Section 202 – Removal of Tree Stump 34 Revision of Section 202 – Removal of Inlet 35 Revision of Section 202 - Removal of Concrete Pipe 36 Revision of Section 202- Removal of Sidewalk 37 Revision of Section 202 - Removal of Curb 38 Revision of Section 202 - Removal of Concrete Pavement 39 Revision of Section 202 - Removal of Asphalt Mat 40 Revision of Section 203 - Proof Rolling 41 Revision of Section 207 – Topsoil 42 Revision of Section 207 – Topsoil (Special) – Amended Onsite for Medians and Parkway Area 43 Revision of Section 208 – Erosion Control 46 Revision of Section 209 – Watering 47 Revision of Section 210– Reset Structure – Relocate Gate Gate and Control Box 48 Revision of Section 210 – Reset Irrigation Flume 49 Revision of Section 210– Reset Water Service 50 Revision of Section 210– Reset Fire Hydrant 51 W. Harmony Road Improvement Project Project Special Provisions iii COLORADO DEPARTMENT OF TRANSPORTATION CITY OF FORT COLINS, COLORADO W. HARMONY ROAD IMPROVEMENT PROJECT PROJECT SPECIAL PROVISIONS Item Page Revision of Section 210– Relay Riprap 52 Revision of Section 304 - Aggregate Base Course 53 Revision of Section 403 - Hot Mix Asphalt 54 Revision of Section 412 - Fast Track Portland Cement Concrete Pavement 57 Revision of Section 605 – Median Underdrain 59 Revision of Section 608 – Sidewalks and Bikeways 60 Revision of Section 608 - Concrete Curb Ramp 62 Revision of Section 609 – Curb and Gutter 65 Revision of Section 610– Median Cover 66 Revision of Section 614– Traffic Control Devices 67 Revision of Section 619 – Waterlines – Direction Drilling 10” C-900 Certalock Pace Bells) 68 Revision of Section 619 – Waterline – 1” Irrigation Service 70 Revision of Section 619 – Waterline – Connect to Existing 16” City of Fort Collins Waterline 71 Revision of Section 620 – Field Facilities 72 Revision of Section 625 - Construction Surveying 73 Revision of Section 627 - Pavement Marking 76 Revision of Section 630 – Construction Zone Traffic Control 77 Traffic Control Plan-General 78 Utilities 80 W. Harmony Road Improvement Project Project Special Provisions iv PROJECT SPECIAL PROVISIONS 5 NOTICE TO BIDDERS This project is planned to be constructed in conjunction with the Harmony and Shields Intersection Improvements Project that is shown on the phasing plan included with these construction documents. It is imperative that both projects meet all milestones indicated in the Contract Documents and that coordination between both projects throughout the duration of construction takes place daily. Contractors are invited to submit proposals for both projects. If Contractor is low bid on both the Harmony Road Improvement Project and the Harmony and Shields Intersection Project, then the Contractor will be required to submit to the City, prior to award, documentation of at least 2 completed projects in the last 5 years of project equal to or larger than the combined bid amount for the Harmony Improvement Project and Harmony and Shields Improvement Project. The City will also require a manpower plan and commitment showing how the Contractor plans to complete both projects on schedule. The City of Fort Collins will be providing the Construction Surveying, Construction Zone Traffic Control, and Construction Testing for both the Harmony Improvement Project and the Harmony and Shields Intersection Project to assist in the overall coordination. It is recommended that bidders on this project review the work site and plan details with an authorized City representative during the pre-bid. Prospective bidders shall contact the following listed authorized City representative at least 24 hours in advance of the time they wish to go over the project. Design Project Manager: Dean Klingner, P.E. Phone: (970) 221-6605 Engineering Department Fax: (970) 221-6378 City of Fort Collins 281 North College Avenue Fort Collins, CO 80522-0580 Purchasing Contact: John Stephen, CPPO, CPPB Senior Buyer 970-221-6777 or jstephen@fcgov.com The above referenced individuals are the only representative of the City with authority to provide any information, clarification, or interpretation regarding the plans, specifications, and any other contract documents or requirements. 6 W. Harmony Road Improvement Project Project Special Provisions COMMENCEMENT AND COMPLETION OF WORK – SPECIFIED COMPLETION DATE The Contractor shall commence work under the Contract on or before the 14th day following the date of award unless such time for beginning the work is changed by the City in the “Notice to Proceed”. The Contractor shall complete all work by August 14, 2009 in accordance with the "Notice to Proceed." Stockpiling of materials before the beginning date is subject to the Engineer's approval. If such approval is given, stockpiled material will be paid for in accordance with Sections l09 and 626. Salient features to be shown on the Contractor's progress schedule are: • Mobilization • Construction Surveying (By City Forces) • Construction Traffic Control (By City Forces) • Removals and Adjustments • Roadway Earthwork • Erosion Control • Drainage System • Curb, Gutter and Sidewalk • Asphalt Pavement • Concrete Pavement • Seeding • Landscaping Restoration (By Other Forces) • Signing and Striping (By City Forces) • Traffic Signals Box Reset (By City Forces) • Utility Coordination and Relocations Section 108 of the Standard Specifications is hereby revised for this project as follows: Subsection 108.03 shall include the following: The progress schedule shall consist of a Critical Path Method (CPM) schedule prepared using the Microsoft Project software and submitted in hard and electronic formats. The contractor shall be responsible for planning, scheduling, coordinating, and reporting the progress of the work to be completed by City of Fort Collins Forces. The City of Fort Collins Forces shall be considered as subcontractor for the purposes of scheduling the work. The City will comment on the contractors initial schedule submittal for coordination of the completion of their work items. The Contractor shall complete the following discrete portions of the work (milestones) by the dates specified. A disincentive will be assessed for failure to complete the work for each milestone by the specified completion date. 7 W. Harmony Road Improvement Project Project Special Provisions COMMENCEMENT AND COMPLETION OF WORK – SPECIFIED COMPLETION DATE Substantial Completion is defined by: • All Work requiring lane or shoulder closures or other traffic obstructions is complete • Traffic is following the lane arrangements shown on the plans for finished roadway • All pavement, construction, joint sealing and shoulder construction is complete • Traffic control devices and pavement markings are within their final positions. Final Completion is defined by: • All sidewalks, final grading, seeding, clean up, project record documents shall be turned over to the owner, all punch list items completed, and all processing of change orders. • The work must be ready for final payment and acceptance. W. Harmony Road Improvement Project Project Special Provisions 8 REVISION OF SECTION 100 GENERAL PROVISIONS Section 100 of the Standard Specifications is hereby revised for this project as follows: Subsections 102 and 103 of the Standard Specifications are hereby deleted. See Contract Documents for additional information. W. Harmony Road Improvement Project Project Special Provisions 9 REVISION OF SECTION 101 DEFINITIONS OF TERMS Technical Specifications related to construction materials and methods for the work embraced under this Contract shall consist of the “Colorado Department of Transportation, State of Colorado, Standard Specifications for Road and Bridge Construction” dated 2005. Certain terms utilized in the Specifications referred to in the paragraph above shall be interpreted to have different meanings within the scope of this Contract. A summary of redefinitions follows: Where reference is made in the plans and specifications to Owner, Department, Chief Engineer, Resident Engineer, Project Engineer, Engineer, and Inspection and Testing Agency it is understood to mean the City of Fort Collins, Colorado or the City’s representative. Where reference is made in the plans and specifications to Surveyor and Traffic Control Supervisor it is understood to mean provided by the City of Fort Collins with City of Fort Collins crews, but acting as a subcontractor to the project. The sections shown on the following pages are revisions to the Technical Specifications for this project. 10 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 102 PROJECT PLANS AND OTHER DATA Section 102 of the Standard Specifications is hereby revised for this project as follows: Subsection 102.05 shall include the following: Copies of the Contract Documents complete with Construction Specifications and Drawing may be viewed at the following locations until the date set for opening of bids: 1. Online at the City of Fort Collins BuySpeed Webpage, www.fcgov.com/eprocurement 2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request a copy of the Bid. After the proposals have been opened, the low responsive, responsible bidder may obtain from the City of Fort Collins at no cost: 10 sets of plans and special provisions. W. Harmony Road Improvement Project Project Special Provisions 11 REVISION OF SECTION 104 SCOPE OF WORK Section 104 of the Standard Specifications is hereby revised for this project as follows: Subsection 104.02 shall include: Site Conditions A. General: 1. The Contractor acknowledges that he has satisfied himself as to the nature and location of the work, the general and local conditions, particularly those bearing upon access to the site; handling, storage, and disposal of materials; availability of water, electricity and roads; uncertainties of weather, river stages, or similar physical conditions at the site; the conformation and conditions of the ground; the equipment and facilities needed preliminary to and during the execution of the work; and all other matters which can in any way affect the work or the cost thereof under this Contract. 2. The Contractor further acknowledges that he has satisfied himself as to the character, quality and quantity of surface and subsurface materials to be encountered from his inspection of the site and from reviewing any available records of exploratory work furnished by the Owner or included in these Documents. Failure by the Contractor to acquaint himself with the physical conditions of the site and all the available information will not relieve him from responsibility for properly estimating the difficulty or cost of successfully performing the work. 3. The Contractor warrants that as a result of his examination and investigation of all the aforesaid data that he can perform the work in a good and workmanlike manner and to the satisfaction of the Owner. The Owner assumes no responsibility for any representations made by any of its officers or agents during or prior to the execution of this Contract, unless (1) such representations are expressly stated in the Contract, and (2) the Contract expressly provides that the responsibility therefore is assumed by the Owner. B. Information on Site Conditions: Any information obtained by the Engineer regarding site conditions, subsurface information, groundwater elevations, existing construction of site facilities, and similar data will be available for inspection, as applicable, at the office of the Engineer upon request. Such information is offered as supplementary information only. Neither the Engineer nor the Owner assumes any responsibility for the completeness or interpretation of such supplementary information. 1. Differing Subsurface Conditions: a. In the event that the subsurface or latent physical conditions are found materially different from those indicated in these Documents, and differing materially from those ordinarily encountered and generally recognized as inherent in the character of work covered in these Contract Documents, the Contractor shall promptly, and before such conditions are disturbed, notify the Engineer in writing of such changed conditions. W. Harmony Road Improvement Project Project Special Provisions 12 REVISION OF SECTION 104 SCOPE OF WORK b. The Engineer will investigate such conditions promptly and following this investigation, the Contractor shall proceed with the work, unless otherwise instructed by the Engineer. If the Engineer finds that such conditions do so materially differ and cause an increase or decrease in the cost of or in the time required for performing the work, the Engineer will recommend to the Owner the amount of adjustment in cost and time he considers reasonable. The Owner will make the final decision on all Change Orders to the Contract regarding any adjustment in cost or time for completion. 2. Underground Utilities: Known utilities and structures adjacent to or encountered in the work are shown on the Drawings. The locations shown are taken from existing records and the best information available from existing utility plans and potholing. However, it is expected that there may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the Contractor only, and no responsibility is assumed by either the Owner or the Engineer for their accuracy or completeness. C. Execution: 1. Where the Contractor's operations could cause damage or inconvenience to railway, telegraph, telephone, television, oil, gas, electricity, water, sewer, or irrigation systems, and the operations shall be suspended until all arrangements necessary for the protection of these utilities and services have been made by the Contractor. 2. Notify all utility offices which are affected by the construction operation at least 48 hours in advance. Under no circumstances expose any utility without first obtaining permission from the appropriate agency. Once permission has been granted, locate, expose, and provide temporary support for all existing underground utilities. 3. The Contractor shall protect all utility poles from damage. If interfering power poles, telephone poles, guy wires, or anchors are encountered, notify the Engineer and the appropriate utility company at least 48 hours in advance of construction operations to permit the necessary arrangements for protection or relocation of the interfering structure. 4. The Contractor shall be solely and directly responsible to the owner and operators of such properties for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character brought because of any injuries or damage which may result from the construction operations under this Contract. 5. Neither the Owner nor its officers or agents shall be responsible to the Contractor for damages as a result of the Contractor's failure to protect utilities encountered in the work. 6. If the Contractor, while performing the Contract, discovers utility facilities not identified in the Drawings or Specifications, he shall immediately notify the Owner, utility, and the Engineer in writing. 7. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result of accidental breakage due to construction operations, promptly notify the W. Harmony Road Improvement Project Project Special Provisions 13 REVISION OF SECTION 104 SCOPE OF WORK proper authority. Cooperate with said authority in the restoration of service as promptly as possible and bear all costs of repair. 8. The Contractor shall replace, at his own expense, any and all other existing utilities or structures removed or damaged during construction, unless otherwise provided for in these Contract Documents or ordered by the Engineer. 9. Interfering Structures - The Contractor shall take necessary precautions to prevent damage to existing structures whether on the surface, aboveground, or underground. An attempt has been made to show major structures on the Drawings. The completeness and accuracy cannot be guaranteed, and it is presented simply as a guide to avoid known possible difficulties. 10. Field Relocation - During the progress of construction, it is expected that minor relocations of the work will be necessary. Such relocations shall be made only by direction of the Engineer. If existing structures are encountered that prevent the construction, and that are not properly shown on the Drawings, notify the Engineer before continuing with the construction in order that the Engineer may make such field revision as necessary to avoid conflict with the existing structures. If the Contractor shall fail to so notify the Engineer when an existing structure is encountered, and shall proceed with the construction despite the interference, he shall do so at his own risk. D. Easements: Where portions of the work are located on public or private property, easements and permits will be obtained by the Owner. Easements will provide for the use of the property for construction purposes to the extent indicated on the easements. Copies of these easements and permits are available upon request to the Owner. It shall be the Contractor's responsibility to determine the adequacy of the easement obtained in every case and to abide by all requirements and provisions of the easement. The Contractor shall confine his construction operations to within the easement limits or make special arrangements with the property owners or appropriate public agency for the additional area required. Any damage to property, either inside or outside the limits of the easements provided by the Owner, shall be the responsibility of the Contractor as specified herein. The Contractor shall remove, protect, and replace all fences or other items encountered on public or private property. Before final payment will be authorized by the Engineer, the Contractor will be required to furnish the Owner with written releases from property owners or public agencies where side agreements or special easements have been made by the Contractor or where the Contractor's operations, for any reason, have not been kept within the construction right-of-way obtained by the Owner. E. Land Monuments: The Contractor shall notify the Engineer of any existing Federal, State, Town, County, and private land monuments encountered. Private monuments shall be preserved, or replaced by a licensed surveyor at the Contractor's expense. When Government monuments are encountered, the Contractor shall notify the Engineer at least two (2) weeks in advance of the proposed construction in order that the Engineer will have ample opportunity to notify the proper authority and reference these monuments for later replacement. Subsection 104.05 shall include: Contractors Use of Premises 14 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 104 SCOPE OF WORK The Contractor may use the Owner’s property designated within the construction limits shown on the Plans for equipment and materials as long as he confines his operations to those permitted by local laws, ordinance and permits and meet the following requirements: 1. Do not unreasonably encumber site with materials or equipment. 2. Assume full responsibility for protection and safekeeping of products stored on premise. 3. Move any stored products which interfere with operations of the Owner. 4. Obtain and pay for use of additional storage or work areas needed for operations. Limits of Construction The Contractor must maintain all of his construction activities within the Owner’s property and/or construction easements and limits of the project, or other stated areas, unless permits and/or written permission are obtained by the Contractor, from appropriate authorities or private property owners, outside of these areas. Contractor to fence all easements and work areas. The temporary permits must be secured and paid for by the Contractor at no extra cost to the Owner. Any temporary permits secured must be in writing and a copy of same provided to the Engineer. Security The Contractor shall at all times be responsible for the security of his facilities and equipment. The Owner will not take responsibility for missing or damaged equipment, tools, or personal belongings of the Contractor. 15 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 105 CONTROL OF WORK Section 105 of the Standard Specifications is hereby revised for this project as follows: Subsection 105.02 shall be replaced with: Submittals A. Requirements: 1. Where required by the Specifications, the Contractor shall submit descriptive information that will enable the Engineer to determine whether the Contractor’s proposed materials, equipment, methods of work are in general conformance to the design concept and in accordance with the Drawings and Specifications. The information submitted may consist of drawings, specifications, descriptive data, certificates, samples, test results, product data, and such other information, all as specifically required in the Specifications. In some instances, specified submittal information describes some, but not all features of the material, equipment, or method of work. 2. The Contractor shall be responsible for the accuracy and completeness of the information contained in each submittal and shall assure that the material, equipment, or method of work shall be as described in the submittal. The Contractor shall verify that all features of all products conform to the requirements of the Drawings and Specifications. The Contractor shall ensure that there is no conflict with other submittals and notify the Engineer in each case where its submittal may affect the work of another Contractor or the Owner. The Contractor shall ensure coordination of submittals among the related crafts and subcontractors. 3. Submittals will be reviewed for overall design intent and returned to Contractor with action to be indicated by the Engineer. It shall be the Contractor’s responsibility to assure that previously accepted documents are destroyed when they are superseded by a resubmittal as such. 4. It shall be the Contractor’s responsibility to ensure that required items are corrected and resubmitted. Any work done before approval shall be at the Contractor’s own risk. B. Submittal Procedure: 1. Unless a different number is called for in the individual sections, four (4) copies of each submittal and sample are required, two (2) of which will be retained by the Engineer. The Contractor shall receive two (2) copies in return. Faxed submittals will not be accepted. 2. Submittals that are related to or affect each other shall be forwarded simultaneously as a package to facilitate coordinated review. Uncoordinated submittals will be rejected. 3. If the items or system proposed are acceptable but the major part of the individual drawings or documents are incomplete or require revision, the submittal will be returned with requirements for completion. 16 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 105 CONTROL OF WORK 4. The right is reserved for the Engineer to require submittals in addition to those called for in individual sections. 5. Submittals regarding material and equipment shall be submitted directly to the Engineer and will be accompanied by a transmittal form. A separate form shall be used for each specific item, class of material, equipment, and items specified in separate discrete sections for which the submittal is required. Submittals for various items shall be made with a single form when the items taken together constitute a manufacturer’s package or are so functionally related that expediency indicates checking or review of the group or package as a whole. 6. A unique number, sequentially assigned, shall be noted on the transmittal form accompanying each item submitted. Original submittal numbers shall have the following format: “XXXY;” where “XXX” is the originally assigned submittal number and “Y” is a sequential letter assigned for resubmittals (i.e., A, B, or C being the first, second and third resubmittals, respectively). Submittal 25B, for example, is the second resubmittal of Submittal 25. 7. If the Contractor proposes to provide material, equipment, or method of work that deviates from the Contract Documents, it shall indicate so under “deviations” on the transmittal form accompanying the submittal copies. 8. Submittals that do not have all the information required to be submitted, including deviations, are not acceptable and will be returned without review. C. Review Procedure: 1. Submittals are specified for those features and characteristics of materials, equipment, and methods of operation that can be selected based on the Contractor’s judgment of their conformance to the requirements of the Drawing and Specifications. Other features and characteristics are specified in a manner that enables the Contractor to determine acceptable options without submittals. The review procedure is based on the Contractor’s guarantee that all features and characteristics not requiring submittals conform to the Drawings and Specifications. Review shall not extend to means, methods, techniques, sequences, or procedures of construction or to verifying quantities, dimensions, weights or gages, or fabrication processes (except where specifically indicated or required by the Specifications) of separate items, and as such, will not indicate approval of the assembly in which the item functions. 2. Unless otherwise specified, within twenty-one (21) calendar days after receipt of the submittal, the Engineer will review the submittal and return copies. The returned submittal will indicate one of the following actions: a. If the review indicates that the material, equipment, or work method complies with the Specifications, submittal copies will be marked “NO EXCEPTIONS TAKEN”. In this event, the Contractor may begin to implement the work method or incorporate the material or equipment covered by the submittal. b. If the review indicates limited corrections are required, copies will be marked “REVIEWED, COMMENTS AS NOTED”. The Contractor may begin implementing the W. Harmony Road Improvement Project Project Special Provisions 17 REVISION OF SECTION 105 CONTROL OF WORK work method or incorporating the material and equipment covered by the submittal in accordance with the noted corrections. Where submittal information will be incorporated in Operation and Maintenance data, a corrected copy shall be provided. c. If the review indicates that the submittal is insufficient or contains incorrect data, copies will be marked “REVISE AND RESUBMIT”. Except at its own risk, the Contractor shall not undertake work covered by this submittal until it has been revised, resubmitted and returned marked either “NO EXCEPTIONS TAKEN” or “REVIEWED, COMMENTS AS NOTED”. d. If the review indicates that the material, equipment, or work method do not comply with the Specifications, copies of the submittal will be marked “REJECTED”. Submittals with deviations that have not been identified clearly may be rejected. Except at its own risk, the Contractor shall not undertake the work covered by such submittals until a new submittal is made and returned marked either “NO EXCEPTIONS TAKEN” or “REVIEWED, COMMENTS AS NOTED”. D. Drawing: 1. The term “shop drawings” includes drawings, diagrams, layouts, schematic, descriptive literature, illustrations schedules performance and test data, and similar materials furnished by Contractor to explain in detail specific portions of the work required by the Contract. 2. Contractor shall coordinate all such drawings, and review them for legibility, accuracy, completeness and compliance with contract requirements and shall indicate this approval thereon as evidence of such coordination and review. Shop drawing submitted to the Engineer without evidence of Contractor’s approval will be returned for resubmission. 3. Shop drawing shall be clearly identified with the name and project number of this contract, and references to applicable specification paragraphs and contract drawings. When catalog pages are submitted, applicable items shall be clearly identified. 4. Contractor shall stamp his approval on shop drawings prior to submission to the Engineer as indication of his checking and verification of dimensions and coordination with interrelated items. Stamp shall read: “(Contractor’s Name) represents that we have determined and verified all field dimensions and measurements, field construction criteria, materials, catalog numbers and similar data, and that we have checked with the requirements of the Specifications and Drawings, the Contract Documents, and General Conditions”. Marks on drawings by Contractor shall not be in red. Any marks by Contractor shall be duplicated on all copies submitted. 5. If shop drawings show variations from contract requirements, Contractor shall describe such variations in writing, separate from the drawings, at time of submission. All such variations W. Harmony Road Improvement Project Project Special Provisions 18 REVISION OF SECTION 105 CONTROL OF WORK must be approved by the Engineer. If Engineer approves any such variations, he shall issue an appropriate contract modification, except that, if the variation is minor and does not involve a change in price or in time of performance, a modification need not be issued. 6. Should the Contractor propose any item on his shop drawings or incorporate an item into the work, and that item should subsequently prove to be defective or otherwise unsatisfactory, (regardless of the Engineer’s preliminary review), the Contractor shall, at his own expense, replace the item with another item that will perform satisfactorily. E. Certificates: For those items called for in individual sections, furnish six (6) certificates of compliance from manufacturers or suppliers certifying that materials or equipment being furnished under the Contract comply with the requirements of these Specifications. F. Samples: Samples shall be sufficient in size to clearly illustrate functional characteristics and full range of color, texture, and pattern. G. Effect of Review of Contractor’s Submittals: Review of drawings, data, methods of work, or information regarding materials or equipment the Contractor proposes to provide, shall not relieve the contractor of its responsibility for errors therein and shall not be regarded as an assumption of risks or liability by the Engineer or the Owner, or by any officer or employee thereof, and the Contractor shall have no claim under the Contract on account of the failure or partial failure, of the method of work, material, or equipment so reviewed. A mark of “NO EXCEPTIONS TAKEN” or “REVIEWED, COMMENTS AS NOTED” shall mean that the Owner has no objection to the Contractor upon its own responsibility, using the plan or method of work proposed, or providing the materials or equipment proposed. Subsection 105.08 shall be revised as follows: Delete the second paragraph and replace with the following: In case of discrepancy the order of precedence is as follows: (a) General Conditions of the Construction Contract (b) Special Provisions 1. Project Special Specifications 2. Standard Special Provisions (c) Plans 1. Detailed Plans 2. Standard Plans Calculated dimensions will govern over scaled dimensions. W. Harmony Road Improvement Project Project Special Provisions 19 REVISION OF SECTION 105 CONTROL OF WORK (d) Supplemental Specifications (e) Standard Specifications Subsection 105.09 shall include: Coordination with Property Owners and Tenants The City of Fort Collins is committed to maintaining a positive working relationship with the businesses and residents in the project area. Every effort will be made to maintain pedestrian and bicycle flow and to accommodate special events and holidays for businesses, pedestrians, parking, and vehicle traffic. The Contractor shall be responsible to coordinate all work activities with private property owners and tenants along the project corridor. Access shall be maintained at all times. The Contractor shall be responsible for communicating accurate scheduling information to the project team to assure proper notification of businesses and residents. In particular, any proposed disruption or closure to an existing access must be communicated to the property Owners and tenants with as much notice as possible. The minimum notice that will be allowed for any proposed access change is 48 hours. The Contractor shall ensure that adequate alternate access is in place for vehicles and pedestrians and any property-specific access needs are addressed prior to any change in existing access. The Contractor shall coordinate his method of maintaining these accesses with the City of Fort Collins Traffic Operations Department. Subsection 105.11 shall include: The City of Fort Collins intends to construct the roadway improvements on Harmony Road and Shields Street simultaneously as per the traffic phasing plans shown in the contract documents. All work must be coordinated between the projects to assure all milestones are met for both projects. The City of Fort Collins will provide the construction traffic control and surveying to ensure the necessary coordination between the projects. A mandatory weekly meeting will be held on site between city representatives, the contractor’s representative in charge from each project, city traffic control supervisor and city survey crew. The schedule for each project must be submitted and coordinated at these meetings. Coordination with Traffic Engineer and Traffic Control Supervisor The Contractor shall coordinate with the Owner’s Traffic Engineer for all traffic control activities. Requests for initial Setup of the major project phases (road closures) must be made 3 weeks prior to projected set up. Allow up to 10 days for advanced warning signs. Requests for flaggers must be made and updated at the weekly progress meetings for the following week. Requests for minor traffic control set ups (lane drops, etc.) must be made 72 hours in advance of set up. Increased Traffic Control costs caused by delays assessed to the contractor will be the responsibility of the Contractor. Subsection 105.12 shall include: Surveying Coordination A. The Owner will provide construction surveying for the project. City Survey Crews will perform the surveying required. W. Harmony Road Improvement Project Project Special Provisions 20 REVISION OF SECTION 105 CONTROL OF WORK B. The Contractor must submit a survey request form to the City Surveyors a minimum of 72 hours prior to needing surveying. C. If the requested surveying cannot be accomplished in the time frame requested by the Contractor, the survey personnel shall notify the Contractor with the date on which the requested work will be completed. D. Should a sudden change in the Contractor’s operations or schedule require the survey personnel to work overtime, the Contractor shall pay the additional overtime expense. E. The Contractor shall protect all survey monuments and construction stakes. If it is unavoidable to remove a survey monument or construction stakes, the Contractor is responsible for notifying the Surveyor and allowing enough time for the monuments or stakes to be relocated. The Contractor will be responsible for the cost of restaking construction stakes and for the cost of re-establishing a destroyed monument. F. The Contractor shall be responsible for transferring the information from the construction staked to any necessary forms and for constructing all pipelines, drainage ways, pavements, inlets, walls, and other structures in accordance with the information on the stakes and grade sheets supplied by the Owner. W. Harmony Road Improvement Project Project Special Provisions 21 REVISION OF SECTION 106 CONTROL OF MATERIAL Section 106 of the Standard Specifications is hereby revised for this project as follows: Subsection 106.01 shall include: Substitutions and Product Options A. Description: 1. This section describes the procedure required by the Contractor for product substitutions. 2. Requests for Substitution: a. Base all bids on materials, equipment and procedures specified. b. Certain types of equipment and kinds of material are described in specifications by means of trade names and catalog numbers, and/or manufacturer’s names. Where this occurs, it is not intended to exclude from consideration such types of equipment and kinds of material bearing other trade names, catalog numbers and/or manufacturer’s names, capable of accomplishing purpose of types of equipment or kinds of material specifically indicated. c. Other types of equipment and kinds of material may be acceptable to the Owner and Engineer. d. Types of equipment, kinds of material and methods of construction, if not specifically indicated must be approved in writing by Engineer and the Owner. 3. Submission of Requests for Substitution: a. After Notice to Proceed, the Owner / Engineer will consider written requests for substitutions of products, materials, systems or other items. b. The Engineer reserves the right to require substitute items to comply color and pattern- wise with base specified items, if necessary to secure “design intent”. c. Submit six (6) copies of request for substitution. Include in request: 1) Complete data substantiating compliance of proposed substitute with Contract Documents. 2) For products: i. Product identification, including manufacturer’s name. ii. Manufacturer’s literature, marked to indicate specific model, type, size, and options to be considered: Product description; performance and test data; reference standards; difference in power demand; dimensional differences for specified unit. W. Harmony Road Improvement Project Project Special Provisions 22 REVISION OF SECTION 106 CONTROL OF MATERIAL iii. Name and address of similar projects on which product were used date of installation and field performance data. 3) For construction methods: i. Detailed description of proposed method. ii. Drawings illustrating methods. 4) Itemized comparison of proposed substitution with product or method specified. 5) Data relating to changes in construction schedule. 6) Relation to separate contracts. 7) Accurate cost data on proposed substitution in comparison with product or method specified. d. In making request for substitution, or in using an approved substitute item, Supplier / Manufacturer represents: 1) He has personally investigated proposed product or method, and has determined that it is equal or superior in all respects to that specified and that it will perform function for which it is intended. 2) He will provide same guarantee for substitute item as for product or method specified. 3) He will coordinate installation of accepted substitution into work, to include building modifications if necessary, making such changes as may be required for work to be complete in all aspects. 4) He waives all claims for additional costs related to substitution which subsequently become apparent. 4. Substitutions: Request sufficiently in advance to avoid delay in construction. 5. Contractor’s Option: a. For products specified only by reference standards, select any product meeting standards by any manufacturer indicate selected type in submission. b. For products specified by naming several products or manufacturers, select any product and manufacturer named, indicate selected type in submission. c. For products specified by naming one or more products, but indicating option of selecting equivalent products by stating “or equivalent” after specified product, Contractor must submit request, as required for substitution, for any product not specifically named. W. Harmony Road Improvement Project Project Special Provisions 23 REVISION OF SECTION 106 CONTROL OF MATERIAL 6. Rejection of Substitution or Optional Item: Substitutions and/or options will not be considered if they are indicated or implied on shop drawings, or project data submittals, without formal request submitted in accordance with this section. Subsection 106.03 shall include: Materials Testing A. Provide such equipment and facilities as are required for conducting field tests and for collecting and forwarding samples. Do not use any materials or equipment represented by samples until tests, if required, have been made and the materials or equipment found to be acceptable. Any product which becomes unfit for use after approval thereof shall not be incorporated into the work. B. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise provided, sampling and testing of all materials and the laboratory methods and testing equipment shall be in accordance with the latest standards and tentative methods of the American Society for Testing Materials (ASTM), and the American Association of Highway and Transportation Officials (AASHTO). C. Where additional or specific information concerning testing methods, sample sizes, etc., is required, such information is included under the applicable sections of the Specifications. Any modification of, or elaboration on, these test procedures which may be included for specific materials under their respective sections in the Specifications shall take precedence over these procedures. D. Owners Responsibilities 1. The Owner shall be responsible for and shall pay all costs in connection with the following testing: a. Soils compaction tests. b. Trench backfill. c. Pipe and structural bedding. d. Tests not called for by the Specifications of materials delivered to the site. e. Concrete tests. f. Pavement tests E. Contractors Responsibilities 1. In addition to those inspections and tests called for in the General Conditions, Contractor shall also be responsible for and shall pay all costs in connection with testing required for the following: W. Harmony Road Improvement Project Project Special Provisions 24 REVISION OF SECTION 106 CONTROL OF MATERIAL a. Concrete materials and mix designs. b. Design of asphalt mixtures. c. All performance and field-testing specifically called for by the Specifications. d. All retesting for work or materials found defective or unsatisfactory, including tests covered above. F. Transmittal of Test Reports Written reports of tests and engineering data furnished by Contractor for Engineer’s review of materials and equipment proposed to be used in the work shall be submitted as specified for Shop Drawings. The testing laboratory retained by the Owner or Engineer will furnish three (3) copies of a written report of each test performed by laboratory personnel in the field or laboratory. Two (2) copies of each test report will be transmitted to the Engineer and one (1) copy to the Contractor within seven (7) days after each test is completed. W. Harmony Road Improvement Project Project Special Provisions 25 REVISION OF SECTION 107 ENVIRONMENTAL CONTROLS Section 107 of the Standard Specifications is hereby modified to include the following: Environmental Controls The work of this section consists of obtaining permits and providing environmental controls consistent with regulatory permits through the duration of the work required under this project. A. Dust Control Application: 1. The Contractor shall execute work by methods to minimize raising dust from construction operations. 2. The Contractor shall provide and apply dust control at all times, including evenings, holidays and weekends, as required to abate dust nuisance on and about the site that is a direct result of construction activities. The use of non-approved chemicals, oil, or similar palliatives will not be allowed. Dust control agents may be used only after prior approval of the Owner. The Contractor shall be required to provide sufficient quantities of equipment and personnel for dust control sufficient to prevent dust nuisance on and about the site. 3. The Owner will have authority to order dust control work whenever in its opinion it is required, and there shall be no additional cost to the Owner. The Contractor shall be expected to maintain dust control measures effectively whether the Owner or Engineer specifically orders such Work. B. Preservation of Natural Features: Confine operations as much as possible. Exercise special care to maintain natural surroundings in an undamaged condition. Within the work limits, barricade trees, rock outcroppings, and natural features to be preserved. C. Housekeeping: Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all rubbish. Do not allow rubbish to accumulate. Provide on-site containers for collection of rubbish and dispose of it at frequent intervals during progress of work. D. Disposal 1. Disposal of Waste (Unsuitable) Materials: All material determined by the Engineer to be waste will be disposed of in approved landfill in a manner meeting all regulations. Dispose of waste materials, legally, at public or private dumping areas. Do not bury wastes inside of the limits of construction. All costs for dump fees, permits, etc., to be borne by the Contractor. 2. Disposal of Garbage and Other Construction Materials: Provide sanitary containers/dumpsters and haul away contents such that no overflow exists. 3. Excess excavation shall become the property of the Contractor and shall be legally disposed of by him outside the limits of construction to an approved disposal site. Excess excavated material suitable for backfill shall not be disposed of until all backfill operations are complete. W. Harmony Road Improvement Project Project Special Provisions 26 REVISION OF SECTION 107 ENVIRONMENTAL CONTROLS 4. The Contractor is to immediately inform Engineer of any hazardous materials encountered during construction. Dispose of waste materials legally at private or public facilities. E. Burning: No burning of debris will be permitted. F. Water Control: A portion of the project work is located within a natural drainage course and is subject to periodic flooding due to rainfall and snowmelt, flows for adjacent developed areas and storm water pipes and ground water flows from saturated soils or other ground water sources. The Contractor is responsible for managing water within the construction site and protecting property. G. Noise Control: All mechanical equipment shall be equipped with the best available mufflers to reduce noise. The Contractor shall be responsible for obtaining any necessary permits and shall limit noise to the permitted levels. Noise level monitoring shall be performed by the Contractor as necessary to show that the permitted levels are not being exceeded. Permission from Owner must be obtained prior to the operation of any machinery and/or vehicles between the hours of 6 p.m. and 7 a.m. H. Erosion and Sediment Control: It shall be the responsibility of the Contractor to prepare and obtain an approved Erosion and Sediment Control Plan from the Owner. I. Permits: 1. All work must be performed in accordance with all applicable regulatory permits. 2. It shall be the responsibility of the Owner to prepare a Stormwater Management Plan (SWMP), and submit the SWMP to the Colorado Department of Public Health and Environment for review and approval. The SWMP shall be transferred to the Contractor’s possession prior to beginning the Work. The Contractor shall also provide inspection reports as required by the SWMP to the Owner upon completion of each inspection. 3. The Contractor shall be responsible for obtaining all other necessary permits associated with the Work. W. Harmony Road Improvement Project Project Special Provisions 27 REVISION OF SECTION 108 PROSECUTION AND PROGRESS Section 108 of the Standard Specifications is hereby revised as follows: Subsection 108.03 shall include the following: Project Meetings A. Pre-Construction Conference: A Pre-Construction Conference will be held after Notice of Award and before the Notice to Proceed, the date, time and location will be determined after Notice of Award. The conference shall be attended by: 1. Contractor and Contractor’s Superintendent 2. Contractor’s Subcontractors (including the city provided Traffic Control Supervisor and Surveyor) 3. Engineer 4. Owner 5. Utility Companies 6. Contractor or Contractor’s Superintendent from the Harmony Road Project 7. Others as requested by the Contractor, Owner, or Engineer. Unless previously submitted to the Owner, the Contractor shall bring to the conference a tentative schedule of the construction project, include in the schedule shop drawings and other submittals. Any submittals requiring long lead times and therefore must be expedited shall be submitted at the pre-construction conference, or as soon thereafter as possible. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. The agenda will include: 1. Contractor’s tentative Schedule a. The Contractor will be required to submit a detailed plan at the pre-construction meeting regarding the installation of the waterline crossing and the connection to the 16” City of Fort Collins waterline. These two tasks are critical to the project and must be scheduled at the beginning of construction. All efforts must be made to coordinate with the Harmony/Shields project manager and the Contractor must ensure that the work necessary to install these improvements will not interfere with the construction schedule of the Harmony/Shields project. 2. Permit applications and submittals, including Dewatering Permit, Erosion and Sediment Control Plan, and Traffic Control Plan 3. Transmittal, review and distribution of Contractor’s submittals 4. Processing applications for payment 5. Maintaining record documents 6. Critical work sequencing 7. Field decision and change orders W. Harmony Road Improvement Project Project Special Provisions 28 REVISION OF SECTION 108 PROSECUTION AND PROGRESS 8. Use of premises, office and storage areas, staging area, security, housekeeping, and Owner’s needs 9. Contractor’s assignment of safety and first aid B. Construction Progress Meetings for the W. Harmony Road Project: Progress meetings will be conducted weekly or at some other frequency, if approved by the Engineer. These meetings shall be attended by the Owner, the Engineer, the Contractor’s representative and any others invited by these people. The Engineer will conduct the meeting and the Engineer will arrange for keeping the minutes and distributing the minutes to all persons in attendance. The agenda of these project meetings will include construction progress, the status of submittal reviews, and the status of information requests, critical work sequencing, review of strategies for connections into existing facilities, status of field orders and change orders, and any general business. The Contractor will prepare a “two week look ahead” schedule to facilitate coordination of work items. C. Coordination Meeting with the Harmony/Shields Intersection Improvements Project: Coordination meetings will be conducted weekly or at some other frequency, if approved by the Engineer. These meetings shall be attended by the Owner, the Engineer, the Contractor’s representative from both projects, the Surveyor, the Traffic Control Supervisor, and any others invited by these people. The Engineer will conduct the meeting and the Engineer will arrange for keeping the minutes and distributing the minutes to all persons in attendance. The agenda of these coordination meetings will include projected schedule, construction progress, local business needs, traveling public updates, critical work sequencing, review of strategies for connections into adjoining project improvements, status of field orders, traffic control needs, and any general business. The Contractor will prepare a “two week look ahead” schedule to facilitate coordination of work items. Modifications to Time of Completion in the Approved Schedule The date of beginning and the time for completion of the work are essential conditions of the Contract Documents and the work embraced shall be commenced on a date specified in the Notice to Proceed. The Contractor will proceed with the work at such rate of progress to ensure full completion within the contract time. It is expressly understood and agreed, by and between the Contractor and the Owner that the contract time for the completion of the work described herein is a reasonable time, taking into consideration the climatic and other factors prevailing in the locality of the work. W. Harmony Road Improvement Project Project Special Provisions 29 REVISION OF SECTION 108 PROSECUTION AND PROGRESS Every effort shall be made by the Contractor to complete the project within the "Contract Time" shown in the proposal. The "Contract Time" anticipates "Normal" weather and climate conditions in and around the vicinity of the Project site during the times of year that the construction will be carried out. Extensions of time based upon weather conditions shall be granted only if the Contractor demonstrates clearly that such conditions were "unusually severe," would not have been reasonably anticipated, and that such conditions adversely affected the Contractor’s work and thus required additional time to complete the work. The following specifies the procedure for the determination of time extensions for unusually severe weather. The listing below defines the anticipated number of calendar days lost to adverse weather for each month and is based upon National Oceanic and Atmospheric Administration (NOAA) or similar data for the geographic location of the project. Monthly Anticipated Calendar Days Lost to Adverse Weather Conditions J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C (7) (4) (4) (4) (6) (3) (4) (2) (3) (3) (2) (5) The above schedule of anticipated adverse weather will constitute the base line for monthly (or portion thereof) weather time evaluations. Upon acknowledgment of the Notice to Proceed and continuing throughout the contract on a monthly basis, actual adverse weather days and the impact of adverse weather days that delay the work will be recorded on a day-to-day basis. It is assumed that the work will be carried out Mondays through Fridays (holidays accepted) unless an approved construction schedule or written authorization from the Owner indicates otherwise. The number of days of delayed work due to adverse weather or the impact thereof will then be compared to the monthly adverse weather schedule above. An actual adverse weather day must prevent work for 50 percent or more of the Contractor’s workday, delay work critical to the timely completion of the project, and be documented by the Contractor. The City Representative observing the construction shall determine on a daily basis whether or not work can proceed or if work is delayed due to adverse weather or the effects thereof. The Contractor shall notify the Engineer in writing of any disagreement as to whether or not work can proceed on a given date, within 2 calendar days of that date. The Owner will use the above written notification in determining the number of working days for which work was delayed during each month. At the end of each month, if the number of working days for which work was delayed due to adverse weather exceeds that shown in the above schedule, a Change Order will be executed which increases the Contract Time. The number of work days delayed due to adverse weather or the impact thereof will then be converted to Calendar Days based on the contract completion day and date. This conversion assumes a 5-day work week, Mondays through Fridays, holidays excepted; should the Contractor have authorization to work weekends and/or holidays, and then the method of conversion of workdays to calendar days would take this into consideration. The contract time period will then be increased by the number of calendar days calculated above and a new contract completion day and date will be set. The Contractor’s schedule must reflect the above-anticipated adverse weather delays on all weather- dependent activities. W. Harmony Road Improvement Project Project Special Provisions 30 REVISION OF SECTION 108 PROSECUTION AND PROGRESS While extensions of time shall be granted for "unusually severe" weather or climate conditions, the Owner shall make no monetary compensation for any costs to the Contractor arising out of such delays. The Contractor shall comply with the portions of the Contract Documents relating to his project schedule and amendments thereto which result from the "unusually severe" weather condition. Breakdowns in equipment or lack of performance by the Contractor will not be considered justification for an extension of time. Liquidated damages will be assessed as delineated elsewhere. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following, and the Contractor has promptly given written notice of such delay to the Owner or Engineer. 1. To any preference, priority, or allocation order duly issued by the Owner. 2. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, or of the public enemy, acts of the Owner, acts of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather as provided above. 3. To any delays of Subcontractors occasioned by any of the causes specified in paragraphs 1 and 2, above. 4. To any delays created by the adjoining Harmony/Shields Intersection Improvements Project. Subsection 108.04 shall include the following: Work Hours: Standard work hours are 7 AM to 6 PM, Monday through Friday. No work shall be permitted on weekends or holidays without written approval from the Project Manager. Work requests beyond normal working hours must be submitted to the Project Manager a minimum of (5) working days prior to the request date. W. Harmony Road Improvement Project Project Special Provisions 31 REVISION OF SECTION 201 CLEARING AND GRUBBING Section 201 of the standard specifications is hereby revised for this project as follows: Subsection 201.02 shall include the following: Ralph Zentz, assistant city forester (970-221-6302), shall be responsible for identifying the removal of tree branches, stumps, shrubs and/or other plant materials beyond those trees identified in the removal plans for removal and/or transplant. Coordinate with the assistant city forester to have tree branches, stumps, shrubs, and other plant materials marked for removal. Clearing and grubbing shall include the removal of trees less than six (6) inches in diameter, bushes and shrubs as identified by the engineer or the assistant city forester to be either removed or trimmed. All removed debris shall become the property of the contractor and shall be removed from the project site, not buried on-site. Clearing and grubbing shall include the removal of landscape timbers as directed by the engineer. Subsection 201.04 shall include the following: Pay Item Pay Unit Clearing and Grubbing Lump Sum W. Harmony Road Improvement Project Project Special Provisions 32 REVISION OF SECTION 202 REMOVAL AND TRIMMING OF TREES Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.02 shall include the following: This work includes the removal and the trimming of trees as directed by the Engineer. This work includes the preservation from injury or defacement of all vegetation and objects designated to remain. The Engineer will establish environmental limits. All trees, shrubs, plants, grasses, and other vegetative materials shall remain, except as designated by the Engineer. Once all directed clearing, trimming, and pruning is completed and accepted, no additional clearing, trimming, cutting, or pruning will be allowed unless approved, in writing, by the Engineer. This work shall be done by a Contractor or subcontractor who is a qualified tree surgeon and a member of the National Arborist Association. The firm's or individual's name and qualifications shall be submitted at the preconstruction conference for the Engineer's approval. A list of references and other clients shall be included with the qualifications statement. A written description of work methods and time schedules shall be submitted and approved in writing by the Engineer prior to work commencing. Access for the removal or pruning of trees will be extremely limited. Trees shall be felled at the risk of the Contractor. Strict limits of disturbance will be defined and shall be adhered to. Branches on trees or shrubs shall be removed as directed by the Engineer. All trimming shall be done by skilled workmen. All work shall be done according to the following requirements: (1) Pruning shall be done with proper, sharp, clean tools in such a manner as to preserve the natural character of the tree. (2) All final cuts shall leave no projections on or off the branch and shall not be cut so close as to eliminate the branch collar. (3) To avoid bark stripping, all branches 2 inches in diameter and larger shall be cut using the 3-cut method. These branches shall be lowered to the ground by proper ropes. (4) Tools used on trees known or found to be diseased, shall be disinfected with alcohol before they are used on other trees. (5) Structural weaknesses, decayed trunk or branches, or split crotches shall be reported to the Engineer. (6) When cutting back or topping trees, the Contractor shall use the drop-crotch method and avoid cutting back to small suckers. Smaller limbs and twigs shall be removed in such a manner so as to leave the foliage pattern evenly distributed. W. Harmony Road Improvement Project Project Special Provisions 33 REVISION OF SECTION 202 REMOVAL AND TRIMMING OF TREES (7) When reducing size (cut back or topping) not more than one-third of the total area shall be reduced at a single operation. (8) Climbing spikes shall not be used on trees not scheduled for removal. All brush, branches, limbs, and foliage hauled off site. Stumps shall be ground 8 inches below ground level. Subsection 202.12 shall include the following: Pay Item Pay Unit Removal of Tree Each Trimming Tree Each Chipping, stockpiling mulch, and hauling and stockpiling trunks and limbs will not be paid for separately but shall be included in the work. Removal of trees less than 3 inches in diameter will not be paid for separately but shall be included in the work. All clearing and grubbing directed by the Engineer will be paid for as lump sum under the clearing and grubbing item. W. Harmony Road Improvement Project Project Special Provisions 34 REVISION OF SECTION 202 REMOVAL OF TREE STUMP Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing tree stumps (approximately 2-foot diameter to 4- foot diameter) within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The existing tree stumps designated for removal shall be ground down to an approved depth. The removed material shall become the property of the Contractor and shall be disposed of outside the project site legally. Subsection 202.11 shall include the following: The removal of the existing stumps will be measured by the number of tree stumps removed, and accepted. Potholing will not be paid separately and shall be included in the cost for removal of tree stump. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Tree Stump Each Work shall include all material, equipment, labor, and disposal of materials to complete the work. W. Harmony Road Improvement Project Project Special Provisions 35 REVISION OF SECTION 202 REMOVAL OF INLET Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing concrete inlet within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The inlet shall be removed in a manner that minimizes disturbance to the surrounding area. All removed inlet materials shall become the property of the Contractor and shall be disposed of outside the project site legally. Subsection 202.11 shall include the following: The removal of the existing concrete inlet will be measured by the number of inlets removed, and accepted. Location of sawcutting shall be directed by the Engineer. Sawcutting, excavation and backfilling will not be paid separately and shall be included in the cost for removal of inlet. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Inlet Each Work shall include all material, equipment, labor, and disposal of materials to complete the work. W. Harmony Road Improvement Project Project Special Provisions 36 REVISION OF SECTION 202 REMOVAL OF PIPE Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing pipe within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The removed pipe shall become the property of the Contractor and shall be disposed of outside the project site legally. Subsection 202.11 shall include the following: The removal of the existing pipe will be measured by the linear foot of concrete pipe removed, and accepted. Excavation and backfilling will not be paid separately and shall be included in the cost for removal of pipe. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of pipe Linear Foot Work shall include all material, equipment, labor, and disposal of materials to complete the work. W. Harmony Road Improvement Project Project Special Provisions 37 REVISION OF SECTION 202 REMOVAL OF SIDEWALK Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing sidewalk within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The existing sidewalk (6 inches thick) shall be removed in a manner that minimizes contamination of the removed sidewalk with underlying material. The removed sidewalk shall become the property of the Contractor and shall be disposed of outside the project site legally. The Contractor may dispose the removed sidewalk at the City of Fort Collins Recycling Center at Hoffman Mill Road. It is the responsibility of the Contractor to be familiar with acceptable disposal specifications of the City Recycling Center. Subsection 202.11 shall include the following: The removal of the existing sidewalk will be measured by the square yard of sidewalk removed to the required depth, and accepted. Sawcutting will not be paid separately and shall be included in the cost for removal of sidewalk. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Sidewalk Square Yard Work shall include all material, equipment, labor, and disposal of materials, including hauling, to complete the work. W. Harmony Road Improvement Project Project Special Provisions 38 REVISION OF SECTION 202 REMOVAL OF CURB AND GUTTER Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing curb within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The removed curb shall become the property of the Contractor and shall be disposed of outside the project site legally. The Contractor may dispose the removed curb at the City of Fort Collins Recycling Center at Hoffman Mill Road. It is the responsibility of the Contractor to be familiar with acceptable disposal specifications of the City Recycling Center. Subsection 202.11 shall include the following: The removal of the existing curb will be measured by the linear foot of curb removed, and accepted. Sawcutting will not be paid separately and shall be included in the cost for removal of curb. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Curb and Gutter Linear Foot Work shall include all material, equipment, labor, and disposal of materials, including hauling, to complete the work. W. Harmony Road Improvement Project Project Special Provisions 39 REVISION OF SECTION 202 REMOVAL OF CONCRETE PAVEMENT Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing concrete pavement within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The existing concrete pavement (10 inches thick) shall be removed in a manner that minimizes contamination of the removed pavement with underlying material. The removed pavement shall become the property of the Contractor and shall be disposed of outside the project site legally. The Contractor may dispose the removed pavement at the City of Fort Collins Recycling Center at: 1380 Hoffman Mill Road Fort Collins, Colorado (970)482- 1249 It is the responsibility of the Contractor to be familiar with acceptable disposal specifications of the City Recycling Center. Subsection 202.11 shall include the following: The removal of the existing concrete pavement will be measured by the square yard of pavement removed to the required depth, and accepted. Location of sawcutting shall be as directly by the Engineer. Sawcutting will not be paid separately and shall be included in the cost for removal of concrete pavement. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Concrete Pavement Square Yard W. Harmony Road Improvement Project Project Special Provisions 40 REVISION OF SECTION 202 REMOVAL OF ASPHALT MAT Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing asphalt mat within the project limits as shown on the plans or at locations directed by the Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The existing asphalt mat shall be removed in a manner that minimizes contamination of the removed asphalt with underlying material. The removed mat shall become the property of the City and be disposed of by any one or more of the following described methods: 1. Place material in bottom of fills as approved by the Engineer. 2. Haul offsite to City of Fort Collins Recycling Center at: 1380 Hoffman Mill Road Fort Collins, Colorado (970)482-1249 It is the responsibility of the Contractor to be familiar with acceptable disposal specifications of the City Recycling Center. Subsection 202.11 shall include the following: The removal of the existing asphalt mat will be measured by the square yard of mat removed to the required depth, and accepted. Location of sawcutting shall be as directed by the Engineer. Sawcutting will not be paid separately and shall be included in the cost for removal of asphalt mat. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Asphalt Mat Square Yard Work shall include all material, equipment, labor, and disposal of materials, including hauling, to complete the work. W. Harmony Road Improvement Project Project Special Provisions 41 REVISION OF SECTION 203 PROOF ROLLING Section 203 of the Standard Specifications is hereby revised for this project as follows: Subsection 203.13(f) delete and replace with the following: Proof rolling will not be measured but shall be incidental to the work. Subsection 203.14 shall include the following: Proof rolling will not be measure and paid for separately, but shall be included in the work. W. Harmony Road Improvement Project Project Special Provisions 42 REVISION OF SECTION 207 TOPSOIL Section 207 of the standard specifications is hereby revised for this project as follows: Delete Subsection 207.04 and replace with the following: Topsoil placed behind the back of walk to the project limits shown on the plans shall be paid for by the cubic yard per plan quantity. The top six inches (6 “) of vegetation shall be stripped from the existing ground between the project limits and the existing pavement and stockpiled onsite. This material shall be used for the topsoil quantity and topsoil special – amended topsoil quantity unless otherwise directed by the engineer. All excess material shall be hauled offsite at the Contractor’s expense. This material shall be paid by the cubic yard per plan quantity as Stockpile Topsoil. Subsection 207.05 shall include the following: Payment will be made under: Pay Item Pay Unit Topsoil Cubic Yard Stockpile Topsoil Cubic Yard Tilling and disking operations will not be paid for separately, but shall be included in the work. Organic amendment will not be paid for separately but shall also be included in the work. W. Harmony Road Improvement Project Project Special Provisions 43 REVISION OF SECTION 207 TOPSOIL (SPECIAL) - AMENDED ONSITE FOR MEDIAN AND PARKWAY AREAS Section 207 of the standard specifications is hereby revised for this project as follows: Subsection 207.01 shall be revised to include the following: The Contractor will have the option to either purchase amended topsoil that meets the following requirements or mix the existing material on-site to meet the requirements. If mixed on site, this work shall consist of using the onsite stockpiled topsoil and mixing with the required imported soil amending material to produce the standard 7 5/25 topsoil mix material. This material shall be placed in the designated landscape medians and parkway areas indicated on the plans. Subsection 207.02 shall include the following: Topsoil for this project shall consist of loose friable loam amended with organic enhancements. A. Amended Topsoil Onsite shall have the following characteristics: Shall have a range of three to four percent organic matter as determined by the ignition of moisture free sample dried to determine loss in accordance with current methods of the Association of Official Agriculture Chemists. Shall have a pH between 6.5 to 8.0. Sodium Absorption Rate (SAR) and Electrical Conductivity (EC) readings are not to exceed three mmhos/cm. Particle Sizes: Topsoil shall be loam to sandy loam. Must be weed free at the time of spreading operations. This can be achieved by following subsection 217.03 B. Soil Amendment: Onsite amended topsoil - Material brought to the site for amendment process shall meet the amendments at the following rate: 3 cubic yards per 1,000 square feet of organic amendment The organic amendment shall include the following: An organic product containing a mixture of composted cow or sheep manure and wood residue that has been aerobically and naturally processed in such a manner as to maintain a consistent temperature of 60 degrees Celsius (140 degrees Fahrenheit) or greater for a period of time that is long enough to accomplish the following specifications: W. Harmony Road Improvement Project Project Special Provisions 44 REVISION OF SECTION 207 TOPSOIL (SPECIAL) - AMENDED ONSITE FOR MEDIAN AND PARKWAY AREAS 1. The windrows of composted organic amendment (cow or sheep manure) have to be composted for 70 to 90 days. Certification must be provided to prove the product has gone through this process. 2. Eradicate harmful pathogens, including coliform bacteria. 3. Create a carbon to nitrogen ratio of no less than 15/1to 25/1 4. Contain no solid particle greater than 1/2 inch in diameter. 5. Have a non-offensive smell similar to fresh turned soil. 6. Contain no significant level of dirt or soil and contain a maximum of 30 percent composted wood residue (pine or aspen wood). The ph after composting shall be between 5.0 and 7.5 with an organic matter content of no less than 30 percent. The contractor shall submit a 2 lb. Sample of the product four weeks before its use on the project site revision for the Engineer’s approval. A Certificate of Compliance shall be provided to the Engineer to verify the organic matter content, pH and carbon matter to nitrogen ratio. The Contractor shall submit two samples of topsoil to a soils laboratory for analysis. The cost of the test shall be at the Contractor’s expense. The results will be submitted to the Engineer for review at least 60 days prior to placement. Based on the results, the Engineer can request soil amendments appropriate to have topsoil conform to these specifications at no cost to the project. The organic amendment shall be an organic product containing a mixture of composted cow or sheep manure and wood residue that has been aerobically and naturally processed in such a manner as to maintain a consistent temperature of 140 degrees. Fahrenheit or greater for a period of time of 70 to 90 days, and be approved by the Engineer. Subsection 207.03 shall include the following: All areas planted with shrubs behind the curb (parkway area) shall have the top 8 inches of soil tilled. Upon completion of tilling, the Contractor shall disk soil so as to break up all dirt clods to a size of two inches or smaller. Topsoil placement shall occur immediately after disking is complete. All areas shall be seeded or temporarily stabilized within seven calendar days after topsoil placement is completed. Spread topsoil over all areas to be planted with shrubs, to a depth of three inches. Begin placement after all rough grading, tilling, and disking operations are complete. Ten days before notice to proceed, Contractor shall submit a weed mitigation plan t the Engineer for approval. This plan shall include a graphic time line showing milestone and completion dates of herbicide treatment, topsoil stockpiling, topsoil spreading and all seeding and planting times. Delete Subsection 207.04 and replace with the following: Topsoil salvaged from the roadway placed in stockpile shall paid by the cubic yard per plan quantity as Stockpile Topsoil. Topsoil special shall be measured in place by measuring random depths of topsoil, and computing the volume by multiplying the area times the average depth. Topsoil special includes the amended W. Harmony Road Improvement Project Project Special Provisions 45 REVISION OF SECTION 207 TOPSOIL (SPECIAL) - AMENDED ONSITE FOR MEDIAN AND PARKWAY AREAS material secured from a source outside the right-of-way, mixing the stockpiled topsoil material with the amended material to meet the requirements for an approved 7 5/25 mix, and placing in the designated areas. Subsection 207.05 shall include the following: Payment will be made under: Pay Item Pay Unit Topsoil (Special) - Amended Onsite for Median and Parkway Materials Cubic Yard Tilling and disking operations will not be paid for separately, but shall be included in the work. Organic amendment will not be paid for separately but shall also be included in the work. W. Harmony Road Improvement Project Project Special Provisions 46 REVISION OF SECTION 208 EROSION CONTROL Section 208 of the Standard Specifications is hereby revised for this project as follows: Section 208.01 of the Standard Specifications is hereby revised for this project to include the following: Any loss of time or materials related to erosion shall be the sole responsibility of the Contractor. Any damage to surrounding properties or facilities (either on site or off site) related to erosion caused by construction of this project, will be the sole responsibility of the Contractor. Subsection 208.05 shall include the following: Silt fence shall be installed in accordance with City of Fort Collins stormwater detail D-28 and maintained for the duration of the project. Wattles shall be installed in accordance with detail in the plan set. Storm drain inlet protection shall be installed in accordance with the details in the plan set labeled IP1 andIP-3. It shall be the responsibility of the contractor to ensure that all roadways near the project are kept clean of construction debris. Section 208.07 shall be deleted and replaced with the following: All erosion control measures identified in the Contract and as directed by the Project Manager will not be measured and paid for separately but will be the plan quantities. The unit cost price bid will be full compensation for all work required to complete the item. The Erosion Control Supervisor will be measured by the hour. Street sweeping will not be measured but shall be incidental to the work. Subsection 208.08 shall include the following: Pay Item Pay Unit Silt Fence Linear Foot Concrete Washout Structure Each Storm Drain Inlet Protection (Type 1) Each Storm Drain Inlet Protection (Type 3) Each Wattle Each Construction Fence Linear Foot Stabilized Construction Entrance Each Erosion Control Supervisor Hour Street sweeping will not be measure and paid for separately, but shall be included in the work. The travel time for the Erosion Control Supervisor shall be considered incidental to the work. 47 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 209 WATERING Section 209 of the Standard Specifications is hereby revised for this project as follows: Subsection 209.06 shall include the following: All landscaping including but not limited to the existing trees, shrubs, flower beds, and sod planted at all locations on the project where the construction has affected the existing irrigation system shall be watered as directed by the Engineer for the months of November through April. This item will be measured by the gallon. Pay Item Pay Unit Water (Landscaping) Gallon W. Harmony Road Improvement Project Project Special Provisions 48 REVISION OF SECTION 2l0 RESET STRUCTURE – ELECTRIC GATE AND CONTROL BOX Section 2l0 of the Standard Specifications is hereby revised for this project as follows: Subsection 2l0.02 shall include the following: Reset Structure – Electric Gate and Control Box consists of removing the entrance gate at the location shown on the plans and resetting with all existing gate materials, control box and all necessary conduits required to properly install at the new location. The Contractor shall cooperate and coordinate with the adjacent land owner to minimize disturbance. The Contractor shall be required to store all salvageable materials in a safe location until the gate is reset. Subsection 2l0.12 shall include the following: Reset Structure – Electric Gate and Control Box will be measured by the actual number reset and shall include all work and materials necessary to remove items from their existing location and reset them at the new location and to install the gate. Subsection 2l0.13 shall include the following: Pay Item Pay Unit Reset Structure – Electric Gate and Control Box Each W. Harmony Road Improvement Project Project Special Provisions 49 REVISION OF SECTION 2l0 RESET STRUCTURE – IRRIGATION FLUME Section 2l0 of the Standard Specifications is hereby revised for this project as follows: Subsection 2l0.02 shall include the following: Reset Structure – Irrigation Flume consists of removing the flume and resetting at the location indicated on the plans salvaging the existing metal irrigation structure or replacing with an equivalent flume. The Contractor shall coordinate with the adjacent property owner and the Pleasant Valley Irrigation Company prior to commencing work. Construction methods shall follow manufactures requirements or ditch company standards. The Contractor shall ensure the device is level in all directions and that the water gauges are properly installed. It shall be the Contractor’s responsibility to protect all salvageable materials once removed until time of placement. Subsection 2l0.12 shall include the following: Reset Structure – Irrigation Flume will be measured by the actual number reset and shall include all work and materials necessary to remove items from their existing location and reset them at the new location. Subsection 2l0.13 shall include the following: Pay Item Pay Unit Reset Structure – Irrigation Flume Each W. Harmony Road Improvement Project Project Special Provisions 50 REVISION OF SECTION 2l0 RESET WATER SERVICE Section 2l0 of the Standard Specifications is hereby revised for this project as follows: Subsection 2l0.02 shall include the following: Reset Water Service consists of removing the existing water meter and meter pit and installing a new water meter and meter pit at locations shown on the plans according to the requirements of the current Fort Collins-Loveland Water District Utilities Standard Construction Specifications. The Contractor shall cooperate and coordinate with the Fort Collins-Loveland Water District when shutting off water to minimize downtime to customers. Subsection 2l0.12 shall include the following: Reset Water Service will be measured by the actual number reset and shall include all work and materials necessary to remove items from their existing location and reset them at the new location and to install the new water meter. Subsection 2l0.13 shall include the following: Pay Item Pay Unit Reset Water Service Each W. Harmony Road Improvement Project Project Special Provisions 51 REVISION OF SECTION 2l0 RESET FIRE HYDRANT Section 2l0 of the Standard Specifications is hereby revised for this project as follows: Subsection 2l0.02 shall include the following: Reset fire hydrant consists of removing the existing fire hydrant assymbly and installing a new fire hydrant assymbly at locations shown on the plans according to the requirements of the current Fort Collins-Loveland Water District Utilities Standard Construction Specifications. The Contractor shall cooperate and coordinate with the Fort Collins-Loveland Water District when shutting off water to minimize downtime to customers. Subsection 2l0.12 shall include the following: Reset Water Service will be measured by the actual number reset and shall include all work and materials necessary to remove items from their existing location and reset them at the new location and to install the new water meter. Subsection 2l0.13 shall include the following: Pay Item Pay Unit Reset Water Service Each W. Harmony Road Improvement Project Project Special Provisions 52 REVISION OF SECTION 2l0 RELAY RIPRAP Section 2l0 of the Standard Specifications is hereby revised for this project as follows: Subsection 2l0.02 shall include the following: Relay Riprap consists of removing the existing riprap along Front Range Community College, stockpiling in approved location on site, and relaying within the areas designated on the plans or at locations directed by the Engineer. Subsection 2l0.12 shall include the following: Relay Riprap will be measured by the actual cubic yards and shall include all work and materials necessary to remove items from their existing location, stockpile, and relay at the new location and according to plan. Subsection 2l0.13 shall include the following: Pay Item Pay Unit Relay Riprap Cubic Yards Work shall include all material, equipment, labor, and dewatering to complete the work, including excaving and backfilling. W. Harmony Road Improvement Project Project Special Provisions 53 REVISION OF SECTION 304 AGGREGATE BASE COURSE Section 304 of the Standard Specifications is hereby revised for this project as follows: Subsection 304.02 shall include the following: Materials for the base course shall be Aggregate Base Course (Class 6) as shown in subsection 703.03 The aggregate base course (Class 6) must meet the gradation requirements and have a resilient modulus of at least 32,883 psi or a resistance value, R78 when tested by the Hveem Stabilometer method. Subsection 304.04 shall include the following: Any excavation and fill required to place the aggregate base course and the preparation of the subgrade will not be measure and paid for separately, but shall be included in the work. Any access excavated material not used on site shall become the property of the Contractor and shall be disposed of at the City of Fort Collins Recycling Center at Hoffman Mill Road. Materials not accepted at the City Recycling Center shall be disposed of outside the project site. Subsection 304.08 shall include the following: Payment will be made under: Pay Item Pay Unit Aggregate Base Course (Class 6) Ton Work shall include all material, equipment, labor, and disposal of any access excavated materials, including hauling, to complete the work. 54 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 403 HOT MIX ASPHALT Section 403 of the Standard Specifications is hereby revised for this project as follows: Subsection 403.02 shall include the following: The design mix for hot mix asphalt shall conform to the following: TABLE 403-1 Value For Grading P r o p e r t Test Method S(100) SG(100) Air Voids, percent at: N (initial) [for information only] CPL 5115 >11.0 >11.0 N(design) 3.5–4.5 3.5–4.5 Lab Compaction (Revolutions): N (initial) [for information only] CPL 5115 8 8 N (design) 100 100 Stability, minimum CPL 5106 30 30 Minimum % of the aggregate retained on the 4.75 mm (No. 4) sieve having at least 2 mechanically induced fractured faces CP 45 90 80 Accelerated Moisture Susceptibility CPL 5109 Tensile Strength Ratio (Lottman), minimum Method B 80 80 Minimum Dry Split Tensile Strength, kPa (psi) CPL 5109 Method 205 (30) 205 (30) Grade of Asphalt Cement, Top Layer PG 64-2 8 Grade of Asphalt Cement, Layers below PG 5 8-28 Top Voids in the Mineral Aggregate (VMA) See Table See Table % minimum CP 48 403-2 403-2 Voids Filled with Asphalt (VFA), % AI MS-2 65-75 65-75 Dust to Asphalt Ratio Fine Gradation CP 50 0.6 - 1.2 0.6 - 1.2 Coarse Gradation 0.8 - 1.6 0.8 - 1.6 Note: AI MS-2 = Asphalt Institute Manual Series 2 Note: The current version of CPL 5115 is available from the Region Materials Engineer. Note: Mixes with gradations having less than 40% passing the 4.75 mm (No. 4) sieve shall be approached with caution because of constructability problems. Note: Gradations for mixes with a nominal maximum aggregate size of one-inch or larger are considered a coarse gradation if they pass below the maximum density line at the #4 screen. Gradations for mixes with a nominal maximum aggregate size of 3/4 inch or smaller are considered a coarse gradation if they pass below the maximum density line at the #8 screen. 55 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 403 HOT MIX ASPHALT All mix designs shall be run with a gyratory compaction angle of 1.25 degrees and properties must satisfy Table 403-1. Form 43 will establish construction targets for Asphalt Cement and all mix properties at Air Voids up to 1.0 percent below the mix design optimum TABLE 403-2 Minimum Voids in the Mineral Aggregate (VMA) Nominal ***Design Air Voids ** Maximum Size*, mm (inches) 3.5% 4.0% 4.5% 37.5 (11/2) 11.5 12.0 12.5 25.0 (1) 12.5 13.0 13.5 19.0 (3/4) 13.5 14.0 14.5 12.5 (1/2) 14.5 15.0 15.5 9.5 (3/8) 15.5 16.0 16.5 * The Nominal Maximum Size is defined as one sieve larger than the first sieve to retain more than 10%. ** Interpolate specified VMA values for design air voids between those listed. ' ' Air Void Criteria: A design air void range of 3.5 to 4.5% with a target of 4.0% will be used on all mixes. The air void criteria will be applied to the approval of the design mix. The Contractor shall prepare a quality control plan outlining the steps taken to minimize segregation of HMA. This plan shall be submitted to the Engineer and approved prior to beginning the paving operations. When the Engineer determines that segregation is unacceptable, the paving shall stop and the cause of segregation shall be corrected before paving operations will be allowed to resume. The hot mix asphalt top layer shall not contain any reclaimed or recycled asphalt pavement. Hot mix asphalt for patching shall conform to the gradation requirements for Hot Mix Asphalt (Grading S) (100). To prevent stripping, a minimum of 1 percent hydrated lime by weight of the combined aggregate shall be added to the aggregate for all hot mix asphalt. W. Harmony Road Improvement Project Project Special Provisions 56 REVISION OF SECTION 403 HOT MIX ASPHALT Acceptance samples shall be taken as per CP-4 1. Subsection 403.03 shall include the following: The Contractor shall construct the work such that all roadway pavement placed prior to the time paving operations end for the year, shall be completed to the full thickness required by the plans. The Contractor's Progress Schedule shall show the methods to be used to comply with this requirement. Delete subsection 403.05 and replace with the following: 403.05 The accepted quantities of hot mix asphalt will be paid for in accordance with subsection 401.22, at the contract unit price per ton for the bituminous mixture. Payment will be made under: Pay Item Pay Unit Hot Mix Asphalt (Grading SG) (100) (PG 58-28) Ton Hot Mix Asphalt (Grading S) (100) (PG 64-28) Ton Aggregate, asphalt recycling agent, additives, hydrated lime, and all other work necessary to complete each hot mix asphalt item will not be paid for separately, but shall be included in the unit price bid. When the pay item includes the PG binder grade, the asphalt cement will not be measured and paid for separately, but shall be included in the work. When the pay item does not include the PG binder grade, asphalt cement will be measured and paid for in accordance with Section 411. Asphalt cement used in Hot Mix Asphalt (Patching) will not be measured and paid for separately, but shall be included in the work. Excavation, preparation, and tack coat of areas to be patched will not be measured and paid for separately, but shall be included in the work. W. Harmony Road Improvement Project Project Special Provisions 57 REVISION OF SECTION 412 FAST TRACK PORTLAND CEMENT CONCRETE PAVEMENT Section 412 of the Standard Specifications is hereby revised for this project as follows: Subsection 412.03 shall include the following: Where Concrete Pavement (Fast Track) is specified in the Contract, the concrete shall be Concrete Class P (Fast Track) and shall conform to the requirements for Concrete Class P as described in Section 601. Substitution of other classes of concrete will not be allowed. Subsection 412.04 shall include the following: Type III cement will be permitted for Concrete Class P (Fast Track). For Concrete Class P (Fast Track), the Contractor shall develop maturity relationships in accordance with ASTM C 1074 with the following additions or modifications: 1. The cylinders used to establish the compressive strength vs. maturity relationship shall be cast and cured in the field in conditions similar to the project. 2. These cylinders shall be tested in pairs at times which yield compressive strengths three sets of which are at or below 17 Mpa (2500 psi) and one of which is above 17 Mpa (2500 psi). 3. Testing to determine datum temperature or activation energy will not be required. 4. A test slab shall be cast at the same time and location as the cylinders. The test slab shall have a length and width of 2 m x 2 m (6 feet x 6 feet) and a thickness equal to the pavement design thickness. The maturity of the test slab, when used in the compressive strength vs. maturity relationship from the cylinders, shall indicate that a compressive strength of 17 Mpa (2500 psi) is achieved in the required time. Slab maturity will be determined with two probes located in the slab approximately 300 mm and 600 mm (1 and 2 feet) from the edge. The test slab shall be covered with a blanket similar to the one to be used on the pavement. The development of the maturity relationship and maturity determination of the test slab is part of the trial mix and shall thus be documented in the Concrete Mix Design Report. The Contractor shall provide a multi-channel maturity meter and all necessary wire and connectors. The Contractor shall be responsible for the placement and maintenance of the maturity meter and wire. Placement shall be as directed by the Engineer. Calcium chloride will not be allowed. Admixtures which conform to AASHTO M 194 Type F (water reducing, high range) and Type G (water reducing, high range and retarding) will be permitted for Concrete Class P (Fast Track). Subsection 412.14 shall include the following: For Concrete Pavement (Fast Track) curing blankets with a minimum R-Value of 0.5 shall be provided, in addition to the membrane curing, and shall be placed as soon as they can be placed without marring the surface W. Harmony Road Improvement Project Project Special Provisions 58 REVISION OF SECTION 412 FAST TRACK PORTLAND CEMENT CONCRETE PAVEMENT Subsection 412.18 shall include the following: The transverse and untied longitudinal joints of Concrete Pavement (Fast Track) shall be cleaned and sealed with preformed compression joint seals prior to opening of the pavement to traffic. Subsection 412.22 shall include the following: The Concrete Pavement (Fast Track) shall not be opened to traffic until the maturity value of the last concrete placed, determined by the Contractor in accordance with ASTM C 1074 as modified in subsection 412.04, as revised for this project, indicates that 17 MPa (2500 psi) minimum field compressive strength has been achieved. For Concrete Class P (Fast Track) a field compressive strength of 17 MPa (2500 psi) shall be achieved within 24 and 48 hours after placement. Subsection 4 12.24(a) shall include the following: Pay Item Pay Unit Concrete Pavement (1 0-1/2 inch) (Fast Track) (24 Hour) Square Yard Furnishing, calibrating and use of the maturity meter, wire, and other appurtenances including the molding, curing and breaking of cylinders for calibration, and placement of the slab will not be measured and paid for separately, but shall be included in the work. W. Harmony Road Improvement Project Project Special Provisions 59 REVISION OF SECTION 605 MEDIAN UNDERDRAIN Section 605 of the Standard Specifications is hereby revised for this project as follows: Subsection 605.01 shall include the following: This work consists of constructing median underdrains in accordance with these specifications and in conformity of the median detail indicated on the plans. This work shall include installing the 10 Mil plastic liner, the 4” perforated pipe wrapped in weed barrier fabric, and class 67 bedding. Subsection 605.07 shall include the following: The median underdrain including the plastic liner, the 4” perforated pipe wrapped in weed barrier fabric, and class 67 bedding will all be measured as one unit and paid for as 4 Inch Perforated Pipe Underdrain by the linear foot. Payment will be made under: Pay Item Pay Unit 4 Inch Nonperforated Pipe Underdrain LF 4 Inch Perforated Pipe Underdrain LF All labor, excavation, preparation, compaction, and clean outs will not be measured and paid for separately, but shall be included in the work. W. Harmony Road Improvement Project Project Special Provisions 60 REVISION OF SECTION 608 SIDEWALKS AND BIKEWAYS Section 608 of the Standard Specifications is hereby revised for this project as follows: Section 608.01 shall include the following: This work consists of the construction of the paving for concrete sidewalks, and concrete curb ramps. In subsection 608.02 delete the second paragraph and replace with the following: Concrete for sidewalks, bikeways and shall be Class B, and meet the requirements in Section 601. Subsection 608.03 shall include the following: Finished products that do not match the approved test slab shall be removed and replaced by the Contractor at no cost to the Owner. Record date, location, and quantity of pour, as well as air temperature at time of pour. Subsection 608.03(b) shall include the following: For Surfaces Exposed to View: Form faces must be free from raised grain, tears, worn edges, patches, dents, or other defects which would impair texture of the concrete surfaces. Minimize number of seams in form material, and arrange seams in an orderly fashion. To minimize potential cracking, no section of concrete shall have any angle less than 90 degrees. After stripping of the forms, if any concrete is found to be not formed as shown on the drawings, is out of alignment of level, or shows a defective surface, it will be considered as not conforming with the intent of these standards and specifications, and shall be removed and replaced at the Contractor’s expense, unless the Engineer gives permission to patch the defective area. Delete subsection 608.03(d) and replace with the following: Sidewalk: Concrete sidewalks trails shall be medium broom finished with joints located per drawings. All outside edges of the slab and all joints shall be edged with a 1/4-inch radius edging tool. Thoroughly wash the surface with water prior to acceptance. Surface Planeness for Concrete Paving. Unless otherwise specified, produce slabs with the following tolerance. Finishes shall be true planes within 1/4-inch in 10 feet, as determined by a 10 foot straight edge placed anywhere on the slab in any direction. Subsection 608.03(e) shall include the following: W. Harmony Road Improvement Project Project Special Provisions 61 REVISION OF SECTION 608 SIDEWALKS AND BIKEWAYS A. Expansion joints/construction joints/ for concrete paving: 1. Expansion joints to be spaced no greater than every 300 feet. 2. Extend joint filler the full depth of the slab. Hold back filler 1/2-inch from top of slab. 3. Joint sealant or caulk shall match color of concrete; caulking shall not extend above level of pavement. B. Score Joints. 1. Construct sawcut and tooled score joints as detailed on the plans. 2. Score joints shall be 1/4 of paving depth. 3. Tooledjoints to have a 1/4-inch radius and shall not incorporate a trowelled edge except where indicated on the drawings. Score joints into plastic concrete during finishing operations. Subsection 608.06 shall include the following: Pay Item Pay Unit Concrete Sidewalk SY The price all pay items shall be full compensation for furnishing and placing all materials including test slabs, and demolition of test slabs, excavation, concrete, forms, joint materials, reinforcement, tooling and finishing. 62 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 608 CONCRETE CURB RAMP Section 608 of the Standard Specifications is hereby revised for this project as follows: Subsection 608.01 shall include the following: This work includes the installation of detectable warnings on concrete curb ramps at the locations shown on the plans and in accordance with the plans. Subsection 608.02 shall include the following: Detectable warnings on curb ramps shall be truncated domes of the dimensions shown on the plans. Domes shall be prefabricated by the manufacturer as a pattern on concrete or masonry pavers. Pavers shall meet all Americans with Disabilities Act (ADA) requirements for truncated domes, and when installed, shall be capable of producing the pattern of domes as shown on the plans. Pavers shall meet the requirements of ASTM C 902 or ASTM C 936. Alternate materials may be used, if pre-approved by the Engineer. The Contractor shall submit a sample of the product, the name of the selected supplier, and documentation that the product meets all contrast requirements and will be fully compatible with the curb ramp surface to the Engineer for approval prior to start of work. Known vendors of alternate products include but are not limited to the following: II. Vendor Name III. Product IV. Phone Numbers TMA Construction Supply CAST in TACT Warning Panels 303-295-6050 East Jordan Iron Works, Inc. Truncated Dome Plates 800-626-4653 The domes and the underlying surface shall have a minimum of 70% contrast with the light reflectivity of the adjoining surface. The contrast shall be verified using the following equation: Where B1 = Light Reflectance Value (LRV) of the lighter area B2 = LRV of the darker area Absolute black and white will not be permitted. The contrast shall be achieved by adding pigment during the fabrication of the paver. Prior to start of work, the Contractor shall submit appropriate documentation from the manufacturer verifying that the contrast has been met, along with a sample paver, to the Engineer for approval. W. Harmony Road Improvement Project Project Special Provisions 63 REVISION OF SECTION 608 CONCRETE CURB RAMP Bedding and joint sand shall be free of deleterious or foreign matter. The sand shall be natural or manufactured from crushed rock. Limestone screenings or stone dust shall not be used. Sand for bedding material shall conform to ASTM C 33. Sand that is to be placed between joints shall conform to ASTM C 144. Subsection 608.03 shall include the following: (g) Detectable Warnings. Pre-fabricated pavers for detectable warnings shall be brought to the site in steel banded, plastic banded or plastic wrapped cubes capable of being transported by a fork lift or clamp lift. Pavers shall be carefully removed and stacked in a manner which results in the least amount of damage. All pavers that are damaged during transport or delivery will be rejected and shall be replaced at the Contractor’s expense. Minor cracks or chipping due to transport and handling that do not interfere with the structural integrity of the paver or the overall pattern of truncated domes will not be deemed as grounds for rejection. The Contractor shall spread the bedding sand evenly in the area defined and shall screed the sand to an appropriate embedment depth as shown on the plans or as directed by the Engineer. Sufficient sand should be placed to stay ahead of laid pavers Pavers shall be placed in a running bond pattern. Domes shall be aligned to create a square grid in the predominant direction of travel as shown in the plans. Pavers shall be installed such that the base of the truncated dome is at the same elevation as the adjoining surface, allowing for a smooth transition between the curb ramp and the detectable warning. When cut pavers are required to fill gaps between the pavers and the edge of concrete, the Contractor shall bevel portions of the truncated domes at a 45-degree angle to create a smooth transition between the partial dome and the curb ramp surface. Unless otherwise directed by the Engineer, pavers shall be cut and installed in such a manner that the domes on the cut sections will not significantly impact the overall pattern of the truncated domes. The Contractor shall use a plate vibrator to embed the pavers into the sand. The size and type of plate vibrator shall be in accordance with manufacturer’s recommendations, or as directed by the Engineer. All pavers that are damaged during embedment shall be replaced at the Contractor’s expense. Joint spacing between paver units shall be in accordance with the manufacturer’s recommendations, or as approved by the Engineer. Joints shall be filled completely with joint sand. Excess sand shall be removed by sweeping. (h) Alternate products. Alternate materials shall be installed in accordance with manufacturer’s recommendations. The concrete surface to which alternate materials are to be applied shall be prepared in accordance with manufacturer’s recommendations. Material requirements, color and application shall be in accordance with manufacturer’s recommendations and as approved by the Engineer. Subsection 608.05 shall include the following: W. Harmony Road Improvement Project Project Special Provisions 64 REVISION OF SECTION 608 CONCRETE CURB RAMP Detectable warnings on curb ramps, including sand, pavers, alternate materials, and all other work and materials necessary for fabrication, transport, and installation will not be measured and paid for separately, but shall be included in the work. W. Harmony Road Improvement Project Project Special Provisions 65 REVISION OF SECTION 609 CURB AND GUTTER Section 609 of the Standard Specifications is hereby revised for this project as follows: Subsection 609.02 shall be deleted in its entirety and replaced with the following: 609.02 Materials shall meet the requirements specified in the following subsections: Joint Fillers 705.01 Bed Course Material 703.07 All concrete used for Curb and Gutter shall be Class B and meet the requirements in Section 601. All concrete mix designs utilized shall be submitted to the City representative and approved a minimum of one week prior to the beginning of construction. Concrete mixes will be subject to inspection and tests as required to assure compliance with quality requirements. Subsection 609.06 shall include the following: Pay Item Pay Unit Curb and Gutter Type 2 (Section I-B) LF Curb and Gutter Type 2 (Section II-B) LF Gutter Type 2(10 Foot) LF The price of all pay items shall be full compensation for all excavation, concrete, forms, joint materials, reinforcement, tooling and finishing. W. Harmony Road Improvement Project Project Special Provisions 66 REVISION OF SECTION 610 MEDIAN COVER MATERIAL Section 610 of the Standard Specifications is hereby revised for this project as follows: In subsection 610.02 delete the second paragraph and replace with the following: All concrete used for median cover material shall be Class B and meet the requirements in Section 601. Coloring agent shall be Davis Color San Diego Buff. All concrete mix designs utilized shall be submitted to the City representative and approved a minimum of one week prior to the beginning of construction. In subsection 610.03 delete the third paragraph and replace with the following: (b) Concrete. Construction requirements shall conform to the requirements of subsection 608.03. The surface finish shall be exposed aggregate as indicated on the plans. Subsection 610.05 shall include the following: Pay Item Pay Unit Median Cover Material (Decorative) SF The price for all pay items shall be full compensation for furnishing and placing all materials including test slabs, and demolition of test slabs, excavation, concrete, forms, joint materials, reinforcement, tooling, finishing and removing polyethylene. W. Harmony Road Improvement Project Project Special Provisions 67 REVISION OF 614 TRAFFIC CONTROL DEVICES Section 614 of the Standard Specifications is hereby revised for this project as follows: Subsection 614.01 shall include the following: The City of Fort Collins will furnish and install all traffic control devices for the project. The Contractor is required to coordinate with the City for the completion of the work. W. Harmony Road Improvement Project Project Special Provisions 68 REVISION OF SECTION 619 WATERLINES – DIRECTION DRILLING 10” C-900 CERTA LOCK IN PLACE BELLS Section 619 of the Standard Specifications is hereby revised for this project to include the following: Subsection 619.01 shall include the following: This work includes installing a 10” PVC-C900 Certalock waterline across the Harmony and Shields intersection avoiding conflicting existing utilities with minimal disruption to traffic flows. This work shall meet the requirements of the current Fort Collins-Loveland Water District Standards. It shall be the Contractors responsibility to purchase and familiarize themselves with these specifications. The City of Fort Collins has potholed the existing utilities within the project limits and confirmed the location of the underground utilities. This information is provided in the plans and profiles within the plan set. The Contractor will be required to pothole all utilities prior to commencement of work to ensure the installation of the new waterline does not interrupt service of buried utilities. Delete subsection 619.02 and replace with the following: All material shall meet the specifications and standards of the Fort Collins – Loveland Water District must be approved by the District or project engineer prior to installation. The 10” PVC-C900 Certalock pipe shall be bell and spicket restrained. Subsection 619.03 shall include the following: This work includes installing the 10”PVC-C900 Certalock pipe by means of directional drilling (Option A) or by open trench (Option B) as directed by the Engineer. The Contract will be awarded using the directional drilling (Option A) method for this project. The open trench (Option B) method is an alternate method for this project and is addressed on the Bid Schedule under Alternate 1. Minimal traffic disruption is mandatory during the installation of this work. The Contractor must coordinate all construction operations with the City of Fort Collins Traffic Operartions Department and the Fort Collins-Loveland Water District. Prior to construction the Contractor must provide a plan to the project engineer describing how they will respond in the event an existing underground utility breaks while installing the waterline. It shall be the Contractor’s responsiblility to provide a method of handling vehicle and pedestrian traffic that has been pre-approved by the City of Fort Collins, the appropriate emergency services, and affected utility companies. The Fort Collins-Loveland Water District must be notified a minimum of 72 hours prior to construction operations when an outage is necessary for connecting to existing lines. Open trench operations will be required to be backfilled with flowable fill concrete up to the proposed subgrade. Subsection 619.04 shall include the following: All work associated with installing the water lines that is NOT itemized in the bid tab shall be considered incidental to the work and will not be paid for separately for both Option A and Option B. W. Harmony Road Improvement Project Project Special Provisions 69 REVISION OF SECTION 619 WATERLINES – DIRECTION DRILLING 10” C-900 CERTA LOCK IN PLACE BELLS This includes, but is not limited to excavating and backfilling, valve boxes, plugs, thrust blocks, bedding materials, poly-wrap, chlorinating, pressure testing and all materials incidental to completing the installation and connections to existing water lines. Pay Item Pay Unit 10” PVC-C900 Certalock – Directional Drilling (OPTION A) LF Alternate 1: 10” PVC-C900 Certalock – Open Trench (OPTION B) LF 70 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 619 WATERLINES – 1” IRRIGATION SERVICE Section 619 of the Standard Specifications is hereby revised for this project to include the following: Subsection 619.01 shall include the following: This work includes installing a 1” water service at the location provided on the plans and shall meet the requirements of the current Fort Collins-Loveland Water District Standards. It shall be the Contractors responsibility to purchase and familiarize themselves with these specifications. The City of Fort Collins has potholed the existing utilities within the project limits and confirmed the location of the underground utilities. This information is provided in the plans and profiles within the plan set. The Contractor will be required to pothole all utilities prior to commencement of work to ensure the installation of the new waterline does not interrupt service of buried utilities. Delete subsection 619.02 and replace with the following: All material shall meet the specifications and standards of the Fort Collins – Loveland Water District must be approved by the District or project engineer prior to installation. Subsection 619.03 shall include the following: The Contractor shall install the 1” irrigation service in accordance to the Fort Collins – Loveland Water District Standards. Subsection 619.04 shall include the following: All labor, equipment, material, testing necessary to meet the stardards will be included the cost of the work. All work associated with installing the water lines that is NOT itemized in the bid tab shall be considered incidental to the work and will not be paid for separately. This includes, but is not limited to excavating and backfilling, tapping into the existing waterline, flowable fill backfill, and all other appurtnenances. This item will be paid for as a lump sum. Pay Item Pay Unit Connect to Existing 16” COFC Waterline LS 71 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 619 WATERLINES – CONNECT TO EXISTING 16” COFC WATERLINE Section 619 of the Standard Specifications is hereby revised for this project to include the following: Subsection 619.01 shall include the following: This work consists of abandoning a 4” FCLWD line service (Faith Evangelical Free Church at 4036 South Shields) and tying into the existing 16” City of Fort Collins watermain. The Contractor will be required to follow the City of Fort Collins Water Utilities standards for what is not indicated on the plans. It shall be the Contractors responsibility to purchase and familiarize themselves with these specifications. The City of Fort Collins has potholed the existing utilities within the project limits and confirmed the location of the underground utilities. This information is provided in the plans and profiles within the plan set. The Contractor will be required to pothole all utilities prior to commencement of work to ensure the installation of the new waterline does not interrupt service of buried utilities. Delete subsection 619.02 and replace with the following: All material shall conform to City of Fort Collins Water Department and include 16” x 4” saddle and tapping valve, 4” gate valve, and various sleeves to tie into the existing 4” line. All material shall meet the specifications and standards of the City of Fort Collins Water Utilities and must be approved by the City or project engineer prior to installation. Subsection 619.03 shall include the following: The contractor shall coordinate with the City of Fort Collins Water Department and the Fort Collins Loveland Water District to allow seamless connection to the church’s water service. The Contractor shall coordinate with the church for outage. The Contractor shall follow plans for the tie in and abondment procedures. The Contractor will be required to verify the existing water service pipe Outer Diamter/Inner Diamter for correct material to join both pipes together before cutting service. Subsection 619.04 shall include the following: All labor, equipment, material, testing necessary to meet the stardards will be included the cost of the work. All work associated with installing the water lines that is NOT itemized in the bid tab shall be considered incidental to the work and will not be paid for separately. This includes, but is not limited to excavating and backfilling, tapping into the existing waterline, corp, copper pipe, stop box, meter pit, meter setter, flowable fill backfill, copper pigtail, and all other appurtnenances. This item will be paid for as a lump sum. Pay Item Pay Unit 1” Waterservice with Meter Pit LS 72 REVISION OF SECTION 620 FIELD FACILITIES Section 620 of the Standard Specifications is hereby revised for this project as follows: Subsection 620.01 shall be deleted in its entirety and replaced with the following: The Contractor shall furnish a temporary field office for the owner and sanitary facilities separate from the Contractor’s facilities. The Contractor shall provide the location for the facility and construction staging area subject to the owner’s acceptance. The Contractor shall furnish, install and maintain a temporary field office for the owner during the entire construction period, including providing and paying for utility hook-up to include power and heating and cooling. These units are to be maintained and cleaned at least weekly by the Contractor and removed when the project is completed unless released earlier by the Engineer. Subsection 620.02 shall be deleted in its entirety and replaced with the following: 620.02 Field Offices. Field Office shall be Class 2 and substantially conform to the requirements of this section. The field office shall be a minimum of 330 square feet in plan with a 90-inch or higher ceiling and shall be of weathertight construction. Windows shall be placed on not fewer than two sides. At least two latchable windows and one entrance door complete with cylinder lock and four keys shall be built into the walls. The Contractor shall provide and pay for the following furnishings: Minimum of 4 electrical outlet boxes 2 Suitable office desks with drawers and locks 2 suitable office tables not less than 3’x5’ 3 office chairs 2 waste baskets 1 supply cabinet with not less than 10 square feet of shelving 1 metal filing cabinet, 18” x 32” with 4 lockable drawers Exterior Lighting and Entrance door Automatic heating and air conditioning equipment to maintain comfort conditions of 70ºF. Drinking water dispensed with an acceptable cooling device Toilet facilities One (1) 10-inch outdoor type thermometer Locking doors with two (2) sets of keys The materials may be new or used, but must be serviceable, adequate for the required purpose, and must not violate applicable codes or regulations. In subsection 620.07 delete the third paragraph regarding telephone. 73 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 625 CONSTRUCTION SURVEYING Section 625 of the Standard Specifications is hereby revised for this project as follows: Subsection 625.01 is hereby revised to include the following: The City of Fort Collins will provide all construction survey staking for the project. City Survey Crews will perform the surveying required for the Harmony and Shields Intersection Improvement Project No AQC M455-074 and the Harmony Road Improvements Project. The Contractor must submit a survey request form to the City Surveyors a minimum of 72 hours prior to needing any surveying. If the requested survey cannot be accomplished in the time frame requested by the Contractor and it will affect the critical path on the construction schedule, the City will utilize a Contract Surveyor at the owner’s expense. Should a sudden change in the Contractor’s operations or schedule require the survey personnel to work overtime, the Contractor shall pay the additional overtime expense. The Contractor shall specify the offsets required for each survey item. This information shall be provided at the pre-construction meeting. All survey staking destroyed by the Contractor, vandalism or by any other reason will be replaced at the Contractor’s expense. The Contractor’s designated representative will be required to authorize any requested re-staking or additional services at the time the services are completed. Services designated as extra will be billed at an hourly rate per the prevailing rate schedule of the surveyor. The Contractor shall be responsible for transferring the information from the construction staked to any necessary forms and for constructing all pipelines, drainage ways, pavements, inlets, walls, and other structures in accordance with the information on the stakes and grade sheets supplied by the owner. All existing survey monuments and property corner located outside of the project grading limits as defined on the plans that are damaged or destroyed by the Contractor will be replaced at the Contractor’s expense. The Contractor shall have supervision, knowledge of the project requirements and proper installation, and construction procedures, available in the field at all times that work is progressing. All existing survey monuments and property corners located within the project grading limits which are intended to remain in place and intact as defined on the plans shall be protected by the Contractor. Where necessary monuments, property corners, and section corners will be adjusted or replaced by the City for this project. 1. Control Location of horizontal and vertical control points will be provided at approximately 1000-foot intervals. Monuments will be set outside the limits of construction. 2. Easements and Right of Way 74 W. Harmony Road Improvement Project Project Special Provisions REVISION OF SECTION 625 CONSTRUCTION SURVEYING Temporary construction easements (TCE) and those portions of right of way between TCE’s will be staked at 100 foot intervals on tangents, PCs, 50 foot intervals on curves, angle points and corner points. 3. Excavation and Embankment a. One set of slope stakes at 50-foot intervals (stations) on each side of the proposed road including intersections. Staking information to include cut/fill for  “limit of cut” or “limit of fill” location  decision point (ditch flowline or grade break)  edge of pavement  roadway centerline b. One set of shoulder and/or curb stakes at 50-foot stations on each side of the road including intersections. c. One set of slope or shoulder stakes for the grading of each driveway and field access. d. Ditch grades shall be defined by the slope staking described above. 1 Storm Drain One set of offset stakes for each storm drain pipe and inlets. 2 Utility Crossing One set of offset stakes for the utility conduit crossings. 3. Subgrade and Paving a. One set of blue top subgrade stakes at 50-foot stations on tangents, PCs and PT’s after completion of the subgrade preparation. Stakes to be set at 25-foot stations for horizontal curves with radius less than 1,000 feet and at all vertical curves. Blue tops will be set on centerline and the edge of pavement on both sides of the roadway. These blue tops will remain in place to be used for the aggregate base course or paving operations. 4. Signs One set of stakes to locate each sign. 5. Delineators No survey will be provided. The Contractor shall install delineators as specified in the plans. 6. Striping City of Fort Collins will provide layout of all temporary pavement striping for the Contractor. 7. Mailboxes, Newspaper Boxes and Address Posts W. Harmony Road Improvement Project Project Special Provisions 75 REVISION OF SECTION 625 CONSTRUCTION SURVEYING No survey will be provided. The Contractor shall reset all mailboxes, newspaper boxes and address posts per agreement with the property owner and approval by the Engineer. 8. Property Corners and Section Corners Reset property corners located along the right of way and section corners within the project grading limits. W. Harmony Road Improvement Project Project Special Provisions 76 REVISION OF 627 PAVEMENT MARKING Section 627 of the Standard Specifications is hereby revised for this project as follows: Subsection 627.01 shall include the following: The City of Fort Collins will furnish and install all permanent pavement markings and signing for the project. The Contractor is required to coordinate with the City for the completion of the work. W. Harmony Road Improvement Project Project Special Provisions 77 REVISION OF 630 CONSTRUCTION ZONE TRAFFIC CONTROL Section 630 of the Standard Specifications is hereby revised for this project as follows: Subsection 630.01 shall include the following: The City of Fort Collins will furnish construction zone traffic control. City Traffic Operation Crews will perform the traffic control required for the Harmony and Shields Intersection Improvement Project No AQC M455-074 and the Harmony Road Improvements Project. The Contractor is required to coordinate with the City for the completion of the work. All requests for initial setup of the major project phases that follow the traffic phasing plan indicated in the plans must be made 3 weeks prior to construction commencement. The Contractor shall allow ten (10) days for advanced warning signs. All requests for flaggers must be made and updated at the weekly progress meetings for the following week. All requests for minor traffic control set ups must be made 72 hours prior to construction operations. Increased Traffic Control costs caused by delays assessed to the Contractor will be the responsibility of the Contractor. 78 W. Harmony Road Improvement Project Project Special Provisions TRAFFIC CONTROL PLAN – GENERAL The key elements of the Contractor's method of handling traffic (MHT) are outlined in subsection 630.09. The components of the TCP for this project are included in the following:  City of Fort Collins Work Area Traffic Control Handbook, Manual of Uniform Traffic Control Devices (U.S. Department of Transportation), or applicable statutory requirements of authority having jurisdiction. Fort Collins Handbook takes precedence over Manual of Uniform Traffic Control Devices.  Section 630 of the specifications.  Revision of Sections 100, 104, and 108 of these Project Specifications.  Standard Plan S-63 0-1, Traffic Controls for Highway Construction, Case 11 and 18, and Standard Plan S-630-2.  Signing and Striping Plans Special Traffic Control Plan requirements for this project are as follows: A. The City of Fort Collins Traffic Operations crews will provide all construction traffic control for the project. The Contractor shall coordinate all construction phasing and construction traffic control requests with the City crews. This project will be constructed in conjunction with the Harmony Road Improvements Project. All work related to coordinating traffic operations with the adjoining project must be approved by the City Traffic Engineer. Submittals for major project phases shall be made at least three weeks before implementation of any element of the plan. Adjustments to the approved plan may be required by the Owner based on actual traffic operation. B. No work interfering with traffic flow on Shields Street shall be permitted during the hours of 7:00 AM to 8:30 AM or from 3:30 PM to 5:30 PM unless authorized in writing by the Traffic Engineer. C. Road closures will follow the phasing plan provided in the construction documents and plans. D. The Contractor shall maintain pedestrian and bicycle movements through the project site and the surrounding trails. The Traffic Control plan shall address the method of handling these movements. E. The Contractor shall, at all times, provide for emergency vehicle access into and through the construction site. F. Keep traffic areas free of excavated material, construction equipment, pipe, and other materials and equipment. G. Keep fire hydrants and water control valves free from obstruction and available for use at all times. H. Conduct operations in a manner to avoid unnecessary interference with public and private roads and drives. W. Harmony Road Improvement Project Project Special Provisions 79 TRAFFIC CONTROL PLAN – GENERAL I. Provide and maintain continual temporary access for businesses and residences. J. Roadway Usage Between Operations – At all times when work is not actually in progress, Contractor shall make passable and shall open to traffic such portion s of the project and temporary roadways or portions thereof as may be agreed upon between Contractor and Owner and all authorities having jurisdiction over any properties involved. K. The Contractor shall not have construction equipment or materials in the lanes open to traffic at any time, unless directed. L. The Contractor shall coordinate Traffic Control activities with the City of Fort Collins Traffic Engineering and Electric Departments to assure that work activities by those departments are coordinated with the Contractor’s activities. At the least 48 hours notice is required. M. The Contractor shall maintain 12’lanes throughout the project. N. The Contractor shall provide a flagger for equipment, trucks, or other pertinent construction equipment entering or leaving the construction area into traffic at all times. W. Harmony Road Improvement Project Project Special Provisions 80 UTILITIES The following Utilities are known to be within the project limits: Utility/Agency Contact Phone Sanitary Sewer – City of Fort Collins Roger Buffington (970) 221-6854 Water – City of Fort Collins Roger Buffington (970) 221-6854 Fort Collins – Loveland Water District Terry Farrill (970)226-3104 (Water and Sewer) Storm Water – City of Fort Collins Glen Schlueter (970) 224-6065 Electric – City of Fort Collins Doug Martine (970) 224-6152 Forester – City of Fort Collins Ralph Zentz (970) 221-6302 Lighting - City of Fort Collins Janet McTague (970) 221-6700 Telephone - Qwest Bill Johnson (970) 377-6451 Electric – Poudre Valley REA Matt Organ (970)229-5311 Gas – Xcel Len Hildebrand (970)225-7848 Cable – Comcast Don Kapperman (970)567-0245 Traffic Operations – City of Fort Collins Ward Stanford (970) 221-6820 Pleasant Valley & Lake Canal Co Ed Wendel (970)226-4795 The work described in these plans and specifications will require full coordination between the Contractor and the Utility Companies, in accordance with Subsection 105.06 and while performing their respective operations, so the utility work can be completed with minimum delays to all parties concerned. The following utility work shall be performed by the Contractor: The Contractor shall be responsible for coordinating the adjustment of all utilities on this project and scheduling the work to coincide with construction activities. The Contractor shall keep each utility company advised of any work being done to their facilities by the contractor’s forces, so that each utility company can coordinate their inspections for final acceptance with the Engineer. Provide written notice to each utility company, with a copy to the Engineer, prior to any work by a utility company that is to be coordinated with project construction. A minimum of three (3) calendar weeks of prior notice is required. Contractor to obtain necessary permits form the City and utility companies prior to starting construction activities. If needed, or as directed by the Engineer, the Contractor shall provide traffic control for any utility work to be coordinated with the project’s construction, in accordance with an approved Method of Handling Traffic (MHT). W. Harmony Road Improvement Project Project Special Provisions 81 UTILITIES The Contractor shall coordinate with the City of Fort Collins Water, when resetting valves, CP test station, and adjustment of manhole. The Contractor shall coordinate with the Fort Collins – Loveland Water District, when resetting valves, CP test station, and adjustment of manhole. The Contractor shall also coordinate with the City of Fort Collins Traffic Department regarding the protection and adjustment of traffic signal equipment. The following utility work shall be performed by the Utility Company or their agents: Telephone – Qwest: Relocating and resetting pedestals and manholes Cable – Comcast: Relocating and resetting pedestals and manholes Lighting – City of Fort Collins: Relocate existing streetlights Electric – City of Fort Collins: Relocate power poles, reset transformers, adjust manholes, and relocate boxes Electric – Poudre Valley REA: Relocate overhead power poles Gas – Xcel: Relocate gas line and markers Traffic Operations – City of Fort Collins: Resetting of traffic control boxes and signal relocations General The Contractor shall comply with Article 1.5 of Title 9, CRS (“Excavation Requirements”), when excavation or grading is planned in the area of underground utility facilities. The Contractor shall notify all affected utilities at least three (3) business days prior to commencing such operations. Contact the Utility Notification Center of Colorado (UNCC) to have locations of UNCC-registered lines marked by member companies. Call 1-800-922-1987 for locate requests outside the Denver Metro area. All other underground facilities shall be located by contacting the respective company. Utility service laterals shall also be located prior to beginning excavation or grading. The locations of utility facilities, as shown on the plans and profile sheets and described herein, were obtained from the best available information. All costs incidental to the foregoing requirements will not be paid for separately, but shall be included in the work. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid: 7004 West Harmony Road Improvements OPENING DATE: 3:00 P.M. (Our Clock) January 30, 2009 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. CHANGE: Corrected Section 7.3 Drawings – Index Sheet is attached. I. In the Contract Documents: A. Add the following language to the Instruction to Bidders: This project is planned to be constructed in conjunction with the Harmony and Shields Intersection Improvements Project that is shown on the phasing plan included with these construction documents. It is imperative that both projects meet all milestones indicated in the Contract Documents and that coordination between both projects throughout the duration of construction takes place daily. Contractors are invited to submit proposals for both projects. If Contractor is low bid on both the Harmony Road Improvement Project and the Harmony and Shields Intersection Project, then the Contractor will be required to submit to the City, prior to award, documentation of at least 2 completed projects in the last 5 years of project equal to or larger than the combined bid amount for the Harmony Improvement Project and Harmony and Shields Improvement Project. The City will also require a manpower plan and commitment showing how the Contractor plans to complete both projects on schedule. B. Index of Plan Sheets should reference W. Harmony Road Improvements Plan Set Index of Sheets – See Attached Index II. In the Project Special Provisions: A. Omit the NOTICE TO BIDDERS B. Under Revision of Section 104 Scope of Work, subsection 104.02 Site Conditions: Delete the current paragraph and replace with the following paragraph: 1. General: The Contractor acknowledges that he has satisfied himself as to the nature and location of the work, the general and local conditions, particularly those bearing upon access to the site; handling, storage, and disposal of materials; availability of water, electricity and roads; uncertainties of weather, Pleasant Valley Irrigation Ditch water use schedule and construction requirements, or similar physical conditions at the site; the conformation and conditions of the ground; the equipment and facilities needed preliminary to and during the execution of the work; and all other matters which can in any way affect the work or the cost thereof under this Contract. C. Under Revision of Section 107, Environmental Controls, I-2: Delete the following paragraph as it currently reads and replace with the paragraph below: Currently Reads: It shall be the responsibility of the Owner to prepare a Stormwater Management Plan (SWMP), and submit the SWMP to the Colorado Department of Public Health and Environment for review and approval. The SWMP shall be transferred to the Contractor’s possession prior to beginning the Work. The Contractor shall also provide inspection reports as required by the SWMP to the Owner upon completion of each inspection. Replace with the following: It shall be the responsibility of the Contractor to prepare a Stormwater Management Plan (SWMP), and submit the SWMP to the Colorado Department of Public Health and Environment for review and approval. The Contractor shall also provide inspection reports as required by the SWMP to the Owner upon completion of each inspection. D. Addition of Revision of Section 109 Asphalt Cement Cost Adjustment (Asphalt Cement included in the Work): E. Add the following Revision under Section 202: The City of Fort Collins Traffic Operations Department shall be responsible for the removal of all traffic signal poles, arms, and control boxes. The Contractor shall be responsible for removing the top three (3) feet of the existing concrete traffic signal bases and disposing of the material off-site. This work shall be coordinated with the City of Fort Collins Traffic Operations Department. The removal of the top three (3) feet of the existing concrete traffic signal pole bases will be measured by the number of bases removed. All work shall include all material, equipment, labor and disposal to complete the work. Payment will be made under: Pay Item Pay Unit Removal of Concrete Traffic Signal Pole Base (Top 3 Feet) EA F. Omit Revision of Section 202 Removal of Inlet G. Under Revision of Section 208 Add the following language to Section 208.07: “Excavation required for removal of accumulated sediment from traps, basins, areas adjacent to silt fences and erosion bales, and other clean out excavation of accumulated sediment, and the disposal of such sediment, shall be considered incidental to the work.” H. Under Revision of Section 209 Watering, change the following paragraph to read as follows: Subsection 209.06 shall include the following: All landscaping including but not limited to the existing trees, shrubs, flower beds, and sod planted at all locations on the project where the construction has affected the existing irrigation system shall be watered twice monthly or as directed by the Engineer during the length of irrigation disruption. This item will be measured by the lump sum. Pay Item Pay Unit Water (Landscaping) Lump Sum I. Under Revision of Section 304, include Class 5 Aggregate Found in Table 703.03 of the Colorado Department of Transportation Standard Specifications for Road and Bridge Construction: Subsection 304.02: Change the following paragraphs to include the information highlighted in yellow: Materials for the base course shall be Aggregate Base Course (Class 5 or 6) as shown in subsection 703.03 The aggregate base course (Class 5 or 6) must meet the gradation requirements and have a resilient modulus of at least 32,883 psi or a resistance value, R≥78 when tested by the Hveem Stabilometer method. Subsection 304.08 Change the following pay item to include the information highlighted in yellow: Pay Item Pay Unit Aggregate Base Course (Class 5 or 6) Ton J. Under Revision of Section 609 Curb and Gutter the Pay Items are to read as follows: Pay Item Pay Unit Curb Type 2 (6” Barrier) (Section B) LF Curb and Gutter Type 2 (Section I-B) LF Curb and Gutter Type 2 (Section II-B) LF Gutter Type 2 (2 Foot) LF Gutter Type 2 (10 Foot) LF III. Add the Attached Standard Special Provisions: See Attachment A IV. The Attached Bid Schedule Changes: A. Deletes Line Items: 202-00019 Removal of Inlet 202-04001 Plug Culvert B. Add Line Items: 202-xxxxx Removal of Concrete Traffic Signal Pole Base (Top 3 Feet) 4 EA C. Revises Line Items: Currently Reads: 209-00100 Watering (Landscaping) 3750 GAL 210-04010 Adjust Manhole 3 EA 304-04000 Aggregate Base Course (Class 6) (4” Depth) – Driveways and 2’ Wide Shoulder 304-06000 Aggregate Base Course (Class 6) (6” Depth) 604-00305 Inlet Type C (5’) 608-10004 Sidewalk Drain (4’ Curb Cut with Concrete Chase) 609-24004 Gutter Type 2 (4 Foot) Change To: 209-00100 Watering (Landscaping) 1 LS 210-04010 Adjust Manhole 4 EA 304-04000 Aggregate Base Course (Class 5 or 6) (4” Depth) – Driveways and 2’ Wide Shoulder 304-06000 Aggregate Base Course (Class 5 or 6) (6” Depth) 604-00305 Inlet Type C 608-10002 Sidewalk Drain (2’ Curb Cut with Metal Plates) 609-24002 Gutter Type 2 (2 Foot) V. Revisions to the Plans: A. 10” DIP shown on the plans should be labeled C-900 Pipe B. The PRV in front of Butler property is to be relocated by others (Fort Collins Loveland Water District) C. On the TYPICAL LANDSCAPE MEDIAN SECTION detail the note that states “CDOT CLASS I COMPACTED STRUCTURAL BACKFILL TO 2’ DEPTH BELOW GEOTEXTILE. SUBGRADE MUST BE SCARIFIED AND RECOMPANCTED TO 95% OF STANDARD PROCTOR FOR ONSITE MATERIAL TO 2’ DEPTH BELOW STRUCTURAL BACKFILL” will be removed. D. The two - 4’ Sidewalk Chases shown on the plans should be changed to two - 2’ Sidewalk Chases with metal plates per drawing 709 on Sheet 49 of the drawings E. The two 4’ Pans shown on the plans (Behind Sidewalk Chases) should be changed to two 2’ Pans VI. Pre-Bid Clarifications Not Resulting in Changes to the Bid Documents: A. Seed Mix is shown on the Erosion Control Plan Sheets B. All excess Unclassified Excavation Material becomes the property of the Contractor – This is identified correctly in the “Summary of Earthwork Quantities” Plan Sheets. C. Item 207-00405 Topsoil (Special) to be a mix of 75% topsoil and 25% composted manure mixed well prior to being placed in medians and in parkways. Please contact John D. Stephen, CPPO, CPPB, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. W. HARMONY ROAD IMPROVEMENTS INDEX OF SHEETS Sheet No. Description Of Sheets 1111 COVER SHEET 2222 GENERAL NOTES 3333 SUMMARY OF APPROXIMATE & EARTHWORK QUANTITIES 4 –––– 6 TABULATION TAB ULATION OF QUANTITIES 7 –––– 8 EXPLORATORY BORING LOGS 9 -10 EXISTING UNDERGROUND UTILITY LOCATES 11 HORIZONTAL CONTROL PLAN 12 –––– 14 TYPICAL SECTIONS 15 –––– 17 REMOVAL & RELOCATION PLANS 18 –––– 22 ROADWAY PLAN & PROFILES 23 –––– 25 MEDIAN PLAN & PROFILES 22226666 CONCRETE APPROACH JOINTING PLAN 27 –––– 29 GRADING PLANS 30 –––– 32 EROSION CONTROL PLANS 33 –––– 35 STORM SEWER PLAN & PROFILES 36 PRIVATE IRRIGATION EXTENSION PLAN& PROFILE 37 –––– 38 WATER PLAN & PROFILE 39 –––– 41 PHASING PLANS 42 –––– 48 CROSS SECTIONS 49 –––– 57 DETAILS FOR INFORMATION ONLY (WORK BY OTHERS) 58 –––– 60 SIGNING & STRIPING PLANS 61 TRAFFIC SIGNAL PLANS SPECIFICATIONS AND CONTRACT DOCUMENTS FOR West Harmony Road Improvements BID NO. 7004 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS January 30, 2009 – 3:00 P.M. (OUR CLOCK) Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Rev 10/20/07 Section 00020 Page 2 CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 Rev 10/20/07 Section 00020 Page 3 SECTION 00020 INVITATION TO BID Rev 10/20/07 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: January 5, 2009 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on January 30, 2009, for the West Harmony Road Improvements; BID NO. 7004. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of Bid 7004 West Harmony Road Improvements. The contract documents provide for: 1. Reconstruction and widening of approximately 1-mile of arterial roadway. 2. Signal work, signing and striping, traffic control, and surveying are by City forces. 3. Installation of approximately 1,300 LF of reinforced concrete pipe storm sewer line ranging in size from 36” to 15”. 4. Full roadway reconstruction (asphalt) with section of mill and inlay. Total asphalt quantity is approximately 15,600 TONS. 5. Approximately 3000 SY of Concrete Paving (10.5 inch and 11 inch thick). All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available Monday, January 6th, 2009. A prebid conference and job walk with representatives of prospective Bidders will be held at 1:00 p.m., on Friday, January 16th, 2009, at 215 N. Mason, 1st Floor, Community Room, Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. The Contract Documents and Construction Drawings may be examined online at: • City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp Bids will be received as set forth in the Bidding Documents. Rev 10/20/07 Section 00020 Page 2 The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing & Risk Management Director