Loading...
HomeMy WebLinkAboutBID - 6046 CONCRETE MAINTENANCE PROJECTSPECIFICATIONS AND CONTRACT DOCUMENTS FOR Concrete Maintenance Project BID NO. 6046 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS April 2, 2007 – 3:00 P.M. (OUR CLOCK) CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS 07/2001 Section 00020 Page 2 SECTION 00020 INVITATION TO BID 07/2001 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: March 15, 2007 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on April 2, for the Concrete Maintenance Project; BID NO. 6046. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. This is a one year agreement but, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Pricing changes shall be negotiated by and agreed to by both parties and may use the Denver - Boulder CPI-U as published by the Colorado State Planning and Budget Office as a guide. Written notice of renewal shall be provided to the Service Provider and mailed no later than 90 days prior to contract end. The Contract Documents consist of the removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive approaches, inlets, concrete pavement, and pedestrian access ramps and placement of temporary asphalt patching adjacent to new concrete on designated streets in the City of Fort Collins. Related traffic control is also included. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available March 16, 2007. A prebid conference and job walk with representatives of prospective Bidders will be held at March 20, 2007, at 10:00 a.m., at 281 N. College Ave. Conference Room 1B, Fort Collins. 07/2001 Section 00020 Page 2 The Contract Documents and Construction Drawings may be examined online at: City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be viewed at: City of Fort Collins Purchasing 215 N. Mason, 2nd Fl., Fort Collins 80524 Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing/Risk Management Director SPECIFICATIONS AND CONTRACT DOCUMENTS FOR Concrete Maintenance Project BID NO. 6046 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS April 2, 2007 – 3:00 P.M. (OUR CLOCK) CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS 07/2001 Section 00020 Page 2 SECTION 00020 INVITATION TO BID 07/2001 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: March 15, 2007 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on April 2, for the Concrete Maintenance Project; BID NO. 6046. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. This is a one year agreement but, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Pricing changes shall be negotiated by and agreed to by both parties and may use the Denver - Boulder CPI-U as published by the Colorado State Planning and Budget Office as a guide. Written notice of renewal shall be provided to the Service Provider and mailed no later than 90 days prior to contract end. The Contract Documents consist of the removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive approaches, inlets, concrete pavement, and pedestrian access ramps and placement of temporary asphalt patching adjacent to new concrete on designated streets in the City of Fort Collins. Related traffic control is also included. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available March 16, 2007. A prebid conference and job walk with representatives of prospective Bidders will be held at March 20, 2007, at 10:00 a.m., at 281 N. College Ave. Conference Room 1B, Fort Collins. 07/2001 Section 00020 Page 2 The Contract Documents and Construction Drawings may be examined online at: City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be viewed at: City of Fort Collins Purchasing 215 N. Mason, 2nd Fl., Fort Collins 80524 Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing/Risk Management Director SECTION 00100 INSTRUCTIONS TO BIDDERS 12/03 Section 00100 Page 1 SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 3.2. In accordance with Section 8-160 of the Code of the City of Fort 12/03 Section 00100 Page 2 Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 12/03 Section 00100 Page 3 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 8.0 LIQUIDATED DAMAGES. 12/03 Section 00100 Page 4 Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 12/03 Section 00100 Page 5 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 12/03 Section 00100 Page 6 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non-responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in 12/03 Section 00100 Page 7 the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. 12/03 Section 00100 Page 8 OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self- addressed, self-stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION SECTION 00300 BID FORM 7/96 Section 00300 Page 1 SECTION 00300 BID FORM PROJECT:6046 Concrete Maintenance Project Place Date 1. In compliance with your Invitation to Bid dated , and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ______________________________________________________ ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: _________________________________________________________. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. _______through . 8. BID SCHEDULE (Base Bid) City of Fort Collins Concrete Bid No.6046 Concrete Maintenance Project Unit Price Total 202.01 Sawcutting 4" L.F. 100 $ $ 202.02 Sawcutting - Additional Inch Depth LF/ IN. 100 $ $ 203.01 General Excavation CY 200 $ $ 203.02 Borrow TON 50 $ $ 212.01 Sod SF 500 $ $ 212.02 Landscape/Irrigation Labor HR 50 $ $ 304.01 Aggregate Base Course TON 1650 $ $ 403.01 Temporary Patching TON 425 $ $ 604.01 Type R Inlet - Remove & Replace (4' Opening) EA 1 $ $ 604.02 Type R Inlet - Reconstruct Deck (4' Opening) EA 5 $ $ 604.03 Type R Inlet - Reconstruct Deck Additional Foot Opening LF 5 $ $ 604.04 Catch Basin Inlet - Remove & Replace EA 1 $ $ 604.05 Catch Basin Inlet - Reconstruct Deck EA 10 $ $ 604.06 Catch Basin - Reconstruct Deck Additional Foot Opening LF 1 $ $ 604.07 Modified Type 13 Curb Inlet - Remove & Replace EA 1 $ $ 604.08 Modified Type 13 Curb Inlet - Reconstruct Deck EA 5 $ $ 604.09 Modified Type 13 Curb Inlet - Materials Only EA 1 $ $ 604.10 Concrete Sidewalk Culvert - Remove & Replace EA 1 $ $ 604.11 Metal Sidewalk Culvert 5/8" Plate - Remove & Replace EA 1 $ $ 604.12 Additional Square Foot of 5/8" Plate SF 5 $ $ 608.01 Remove Concrete SF 250 $ $ 608.02 Remove and Haul Fillets EA 5 $ $ 608.03 Apron 8" - Remove & Replace SF 2300 $ $ 608.04 Crosspan - 8" Remove & Replace SF 3500 $ $ 608.05 Driveover Curb, Gutter & 6" Sidewalk - Remove & Replace LF 6000 $ $ 608.06 Driveover Curb & Gutter - No Sidewalk - Remove & Replace LF 300 $ $ 608.07 Vertical Curb, Gutter & 6" Sidewalk - Remove & Replace LF 450 $ $ 608.08 Vertical Curb & Gutter - No Sidewalk - Remove & Replace LF 3250 $ $ 608.09 Vertical Outfall Curb & Gutter - Remove & Replace LF 50 $ $ 608.10 Barrier Curb 12" - Remove & Replace LF 25 $ $ 608.11 Hollywood Curb, Gutter & 6" Sidewalk - Remove & Replace LF 1500 $ $ 608.12 Hollywood Curb & Gutter - No Sidewalk - Remove & Replace LF 150 $ $ 608.13 Highback Curb & Gutter - No Sidewalk - Remove & Replace LF 3500 $ $ 608.14 Pedestrian Access Ramp - Remove & Replace SF 3500 $ $ 608.15 Pedestrian Access Ramp - Highback - Remove & Replace SF 2750 $ $ 608.16 Truncated Dome Panel SF 600 $ $ 608.17 Flatwork 4" - Remove & Replace SF 500 $ $ 608.18 Flatwork 6" - Remove & Replace SF 16000 $ $ Contract Item No. Quantity Contract Cost Description Unit Page 1 of 2 8. BID SCHEDULE (Base Bid) City of Fort Collins Concrete Bid No.6046 Concrete Maintenance Project Unit Price Total Contract Item No. Quantity Contract Cost Description Unit 608.19 Replace Flatwork - 1" Additional Depth SF 2550 $ $ 608.20 Colored Concrete 4" San Diego Buff - Up Charge SF 500 $ $ 608.21 4' Valley Pan (6") - Remove & Replace SF 250 $ $ 608.22 Concrete Pavement 8" - Remove & Replace SF 900 $ $ 608.23 Alley Approach 8" - Remove & Replace SF 2800 $ $ 608.24 Expansion & Caulking LF 500 $ $ 608.25 Splashblock 4" SF 500 $ $ 608.26 Exposed Aggregate 4" - Up Charge SF 200 $ $ 608.27 Reset Flagstone SF 1500 $ $ 623.01 Irrigation Sleeving 3" PVC - Complete In Place LF 86 $ $ 630.01 “No Parking” Sign With Stand Per Day Per Each 2000 $ $ 630.02 Vertical Panel Without Light Per Day Per Each 4150 $ $ 630.03 Channelizing Drum Without Light Per Day Per Each 2100 $ $ 630.04 Type I / II Barricade Without Light Per Day Per Each 23000 $ $ 630.05 Type III Barricade Without Light Per Day Per Each 750 $ $ 630.06 Size A Sign With Stand Per Day Per Each 2900 $ $ 630.07 Size B Sign With Stand Per Day Per Each 1200 $ $ 630.08 Size A Specialty Sign - Cost of Manufacturing Each 5 $ $ 630.09 Size B Specialty Sign - Cost of Manufacturing Each 5 $ $ 630.10 Cone With Reflective Strip Per Day Per Each 7500 $ $ 630.11 Safety Fence Per Day Per Roll 5 $ $ 630.12 Light Per Day Per Each 100 $ $ 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Day Per Each 15 $ $ 630.14 Variable Message Board Per Day Per Each 20 $ $ 630.15 Traffic Control Supervisor Per Day 100 $ $ 630.16 Traffic Control Supervisor Per Hour 400 $ $ 630.17 Flagging Per Hour 2500 $ $ TOTAL COST Dollars and Cents. Signed Address Company Phone/Fax Check One: Individual Doing Business in Company Name Corporation Partnership $ Page 2 of 2 7/96 Section 00300 Page 3 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: ________________________________ __________________ Signature Date ________________________________ Title ________________________________ License Number (If Applicable) (Seal - if Bid is by corporation) Attest:___________________________ Address _____________________________________ _____________________________________ Telephone _____________________________________ 7/96 Section 00410 Page 1 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 2 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ ______________________ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 6046 Concrete Maintenance Project. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 3 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20__, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name:_____________________________ __________________________________ Address:__________________________ __________________________________ __________________________________ __________________________________ By:_______________________________ By: ______________________________ Title: ___________________________ Title:____________________________ ATTEST: By:_______________________________ (SEAL) (SEAL) 7/96 Section 00420 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: _________________________________________________ 2. Permanent main office address: __________________________________ 3. When organized: _________________________________________________ 4. If a corporation, where incorporated: ___________________________ 5. How many years have you been engaged in the contracting business under your present firm or trade name?___________________________ 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ 7. General character of Work performed by your company: _________________________________________________________________ _________________________________________________________________ 8. Have you ever failed to complete any Work awarded to you?________ If so, where and why?____________________________________________ _________________________________________________________________ 9. Have your ever defaulted on a contract?__________________________ If so, where and why?____________________________________________ _________________________________________________________________ 10. Are you debarred by any government agency? ______________________ If yes list agency name._________________________________________ 7/96 Section 00420 Page 2 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 12. List your major equipment available for this contract. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 13. Experience in construction Work similar in importance to this project: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 14. Background and experience of the principal members of your organization, including officers: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 15. Credit available: $______________________________________________________ 16. Bank reference:__________________________________________________________ 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? _________________________________________________________________________ 18. Are you licensed as a General CONTRACTOR?________________________________ If yes, in what city, county and state? __________________________What class, license and numbers?______________________________________________ 19. Do you anticipate subcontracting Work under this Contract?_________________ If yes, what percent of total contract?__________________________________ and to whom?_____________________________________________________________ 20. Are any lawsuits pending against you or your firm at this time?__________ IF yes, DETAIL___________________________________________________________ _________________________________________________________________________ 7/96 Section 00420 Page 3 21. What are the limits of your public liability? DETAIL _________________________________________________________________________ What company?____________________________________________________________ 22. What are your company's bonding limitations?_____________________________ _________________________________________________________________________ 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ________________ this ______ day of __________________, 20__. _____________________________________________ Name of Bidder By:__________________________________________ Title:_______________________________________ State of________________________ ) County of_______________________ ___________________________________being duly sworn deposes and says that he is ______________________of_____________________________ and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _______ day of ____________, 20__. ___________________________________ Notary Public ___________________________________ ___________________________________ My commission expires _____________________________. 7/96 Section 00430 Page 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ SECTION 00500 AGREEMENT FORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed 9/12/01 Section 00510 Page 1 SECTION 00510 NOTICE OF AWARD Date: TO: PROJECT: 6046 Concrete Maintenance Project OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated ___________, 20__ for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 6046 Concrete Maintenance Project. The Price of your Agreement is ________________________________________________ _______________________________________________________________________________ Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by _________, 20__. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By:________________________________________ James B. O’Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management 9/12/01 Section 00520 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the day of in the year of 20__ and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the Bid 6046 Concrete Maintenance Project and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by the City of Fort Collins Engineering Department, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete within 120 calendar days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within 150 calendar days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 9/12/01 Section 00520 Page 2 1) Substantial Completion: One Thousand Dollars ($1,000) for each calendar day or fraction thereof that expires after the One Hundred Twenty (120) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, Five Hundred Dollars ($500) for each calendar day or fraction thereof that expires after the thirty (30) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($ ), $ Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application 9/12/01 Section 00520 Page 3 for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and 9/12/01 Section 00520 Page 4 conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers to , inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 9/12/01 Section 00520 Page 5 ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9/12/01 Section 00520 Page 6 OWNER: CITY OF FORT COLLINS CONTRACTOR: By: ____________________________ By:_______________________________ JAMES B. O’NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING __________________________________ AND RISK MANAGEMENT Title:____________________________ Date:___________________________ Date:_____________________________ (CORPORATE SEAL) Attest: ________________________ Attest:___________________________ City Clerk Address for giving notices: Address for giving notices: P. O. Box 580 __________________________________ Fort Collins, CO 80522 __________________________________ LICENSE NO.:______________________ Approved as to Form _______________________________ Assistant City Attorney 7/96 Section 00530 Page 1 SECTION 00530 NOTICE TO PROCEED Description of Work: 6046 Concrete Maintenance Project To: This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20__. The dates for Substantial Completion and Final Acceptance shall be , and , 20__, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20__. CONTRACTOR: By: Title: SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 7/96 Section 00610 Page 1 SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 6046 Concrete Maintenance Project. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00610 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ ________________________________________ ______________________________ ________________________________________ (Title) ________________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00615 Page 1 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 6046 Concrete Maintenance Project. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00615 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ By:___________________________________ ______________________________ ______________________________________ (Title) ______________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners ______________________________ ______________________________________ ______________________________ ______________________________________ IN PRESENCE OF: Surety ______________________________ By:___________________________________ ______________________________ By:___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00630 Page 1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. 7/96 Section 00635 Page 1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 6046 Concrete Maintenance Project _____________________________ PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins ____________________________ ____________________________ CONTRACTOR: ______________________________ ____________________________ CONTRACT DATE:____________________________ The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _________________________________ ________________________________________ ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. ________________________________ By: ________________________________________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: ________________________________________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: 7/96 Section 00640 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 20__ TO: Gentlemen: You are hereby notified that on the day of , 20__, the City of Fort Collins, Colorado, has accepted the Work completed by for the City of Fort Collins project, 6046 Concrete Maintenance Project. A check is attached hereto in the amount of $________________________ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated ________________. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date:___________________________. Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: 7/96 Section 00650 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT: 6046 Concrete Maintenance Project 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the 7/96 Section 00650 Page 2 project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20__. CONTRACTOR By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20__, by Witness my hand and official seal. My Commission Expires: . Notary Public 7/96 Section 00660 Page 1 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: PROJECT: 6046 Concrete Maintenance Project CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , ____ . (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in- Fact. Section 00670 Page 1 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Section 00670 Page 2 SECTION 00700 GENERAL CONDITIONS SE SECTION 00800 SUPPLEMENTARY CONDITIONS 7/96 Section 00800 Page 1 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). 9/99 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment 9/99 Section 00950 Page 1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: 6046 Concrete Maintenance Project CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: __ ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) _ ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: __ Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing 9/997/96 Section 00960 Page 1 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: 7/96 Section 00960 Page 2 CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 3 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 4 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 2007 CONCRETE MAINTENANCE PROJECT GENERAL REQUIREMENTS INDEX SECTION PAGE NUMBERS 01010 Summary of Work General Requirements 1-2 01040 Coordination General Requirements 3-4 01310 Construction Schedules General Requirements 5-6 01330 Survey Data General Requirements 7 01340 Shop Drawings General Requirements 8-10 01410 Testing General Requirements 11-12 01510 Temporary Utilities General Requirements 13 01560 Temporary Controls General Requirements 14-15 01700 Contract Closeout General Requirements 16 01800 Method of Measurement and Basis of Payment General Requirements 17 General Requirements - Page 1 of 17 SECTION 01010 SUMMARY OF WORK 1.1 DESCRIPTION OF WORK A. This work shall consist of the removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive approaches, inlets, concrete pavement, and pedestrian access ramps and placement of temporary asphalt patching adjacent to new concrete on designated streets in the City of Fort Collins. Specific locations are described in Section 3500, Project Map. B. Protection and Restoration. 1. Replace to equal or better conditions all items removed and replaced or damaged during construction. Restore all areas disturbed to match surrounding surface conditions. Also see tree protection standards. C. Construction Hours 1. Construction hours, except for emergencies, shall be limited to 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise authorized in writing by the Engineer. After hour equipment operation shall be in accordance with Section 1560. 2. Any work performed by the Contractor outside of the construction hours, whether or not authorized by the Engineer, shall entitle the Owner to deduct from compensation due to the Contractor sufficient funds to cover the Owner’s costs in providing field engineering and/or inspection services because of such work. The cost for field engineering and inspection shall be $50.00 per hour. 1.2 NOTICES TO PRIVATE OWNERS AND AUTHORITIES A. Notify private owners of adjacent property, utilities, irrigation canal, and affected governmental agencies when prosecution of the Work may affect them. B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is necessary to temporarily deny access or services. C. Contact utilities at least 48 hours prior excavating near underground utilities. D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed scope of work schedule and any items which would affect their daily operation. E. Rick Richter and/or Erika Keeton will be the ENGINEER (Project Engineer/Manager). Rick Richter 970.221.6798 Mobile/Pager 970.222.1132 Erika Keeton 970.221.6605 Mobile/Pager 970.222.0787 F. Names and telephone numbers of affected agencies and utilities in the area are listed below for Contractor's convenience. General Requirements - Page 2 of 17 UTILITIES Water: City of Fort Collins, Colorado 221-6700, Meter Shop 221-6759 Storm Sewer: City of Fort Collins, Colorado 221-6700 Sanitary Sewer: City of Fort Collins, Colorado 221-6700 Electrical: City of Fort Collins, Colorado 221-6700 Gas: Public Service Company of Colorado 482-5922, 221-8553 Telephone: U.S. West Communications 484-0300, 226-6310 Traffic Operations: City of Ft. Collins, Colorado 221-6608 Cable Television: Comcast 493-7400 *Utility Locates Under One-call System 1-800-922-1987 AGENCIES Safety: Larimer County Sheriff's Department: Occupational Safety and Health Administration Non-Emergency: 221-7177 (OSHA): 844-3061 Fire: Ambulance: Poudre Fire Authority Poudre Valley Hospital Non-Emergency: 221-6581 Non-Emergency: 484-1227 Emergency: 911 Emergency: 911 Police: City of Fort Collins Police Department Non-Emergency: 221-6550 Emergency: 911 Postmaster: US Postal Service: 225-4111 Transportation: Transfort: 221-6620 Traffic Engineering: 221-6608 END OF SECTION General Requirements - Page 3 of 17 SECTION 01040 COORDINATION 1.1 GENERAL CONTRACTOR RESPONSIBILITIES A. Coordinate operations under contract in a manner which will facilitate progress of the Work. The Contractor shall also coordinate with the Landscape Contractor whose Work is separate from the General Contractor’s contract. B. Conform to the requirements of public utilities and concerned public agencies in respect to the timing and manner of performance of operations which affect the service of such utilities, agencies, or public safety. C. Coordinate operations under contract with utility work to allow for efficient completion of the Work. D. Coordinate all operations with the adjoining property owners, business owners, and surrounding neighborhoods to provide satisfactory access at all times and keep them informed at all times. 1.2 CONFERENCES A. A Pre-construction Conference will be held prior to the start of construction. 1. Contractor shall participate in the conference accompanied by all major Subcontractors, including the Traffic Control Supervisor assigned to the project. 2. Contractor shall designate/introduce Superintendent, and major Subcontractors supervisors assigned to project. 3. The Engineer shall invite all utility companies involved. 4. The Utilities will be asked to designate their coordination person, provide utility plans, and their anticipated schedules. 5. The Engineer shall introduce the project Representatives. B. Additional project coordination conferences will be held prior to start of construction for coordination of the Work, refining project schedules, and utility coordination. C. Engineer may hold coordination conferences to be attended by all involved when Contractor's operations affects, or is affected by, the work of others. 1. Contractor shall participate in such conferences accompanied by Subcontractors as required by the Engineer. 1.3 PROGRESS MEETINGS A. Contractor and Engineer's Project Representatives shall schedule and hold regular progress meetings at least weekly and at other times as requested by the Engineer or required by the progress of the Work. B. Attendance shall include: 1. Contractor and Superintendent. 2. Owner's Representatives. 3. Engineer and Resident Project Representative. 4. Traffic Control Supervisor 5. Others as may be requested by Contractor, Engineer or Owner. General Requirements - Page 4 of 17 C. Minimum agenda shall include: 1. Review of work progress since last meeting. 2. Identification and discussion of problems affecting progress. 3. Review of any pending change orders. 4. Revision of Construction Schedule as appropriate. D. The Engineer and Contractor shall agree to weekly quantities at the progress meetings. The weekly quantity sheets shall be signed by both parties. These quantity sheets, when signed, shall be final and shall be the basis for the monthly progress estimates. This process ensures accurate monthly project pay estimates. END OF SECTION General Requirements - Page 5 of 17 SECTION 01310 CONSTRUCTION SCHEDULES 1.1 GENERAL A. The contractor shall prepare a detailed schedule of all construction operations and procurement after review of tentative schedule by parties attending the pre-construction conference. This schedule will show how the contractor intends to meet the milestones set forth. 1. No work is to begin at the site until Owner's acceptance of the Construction Progress Schedule and Report of delivery of equipment and materials. 1.2 FORMAT AND SUBMISSIONS A. Prepare construction and procure schedules in a graphic format suitable for displaying scheduled and actual progress. B. Submit two copies of each schedule to Owner for review. 1. Owner will return one copy to Contractor with revisions suggested or necessary for coordination of the Work with the needs of Owner or others. C. The schedule must show how the street, landscaping and various utility work will be coordinated. 1.3 CONTENT A. Construction Progress Schedule. 1. Show the complete work sequence of construction by activity and location. 2. Show changes to traffic control. 3. Show project milestones B. Report of delivery of equipment and materials. 1. Show delivery status of critical and major items of equipment and materials. 2. Include a schedule which includes the critical path for Shop Drawings, tests, and other submittal requirements for equipment and materials, reference Section 01340. 1.4 PROGRESS REVISIONS A. Submit revised schedules and reports at weekly project coordination meetings when changes are foreseen, when requested by Owner or Engineer, and with each application for progress payment. B. Show changes occurring since previous submission. 1. Actual progress of each item to date. 2. Revised projections of progress and completion. C. Provide a narrative report as needed to define: 1. Anticipated problems, recommended actions, and their effects on the schedule. 2. The effect of changes on schedules of others. General Requirements - Page 6 of 17 1.5 OWNER'S RESPONSIBILITY A. Owner's review is only for the purpose of checking conformity with the Contract Documents and assisting Contractor in coordinating the Work with the needs of the Project. B. It is not to be construed as relieving Contractor from any responsibility to determine the means, methods, techniques, sequences and procedures of construction as provided in the General Conditions. END OF SECTION General Requirements - Page 7 of 17 SECTION 01330 SURVEY DATA 1.1 SURVEY REQUIREMENTS A. The Owner will provide the construction surveying for the street and landscaping improvements. City Survey Crews will perform the surveying required. B. The Contractor must submit a survey request form to the City Surveyors a minimum of 48 hours prior to needing surveying. C. If the requested surveying cannot be accomplished in the time frame requested by the Contractor, the survey personnel shall notify the Contractor with the date on which the requested work will be completed. D. Should a sudden change in the Contractor's operations or schedule require the survey personnel to work overtime, the Contractor shall pay the additional overtime expense. E. The Contractor shall protect all survey monuments and construction stakes. If it is unavoidable to remove a survey monument or construction stakes, the Contractor is responsible for notifying the Surveyor and allowing enough time for the monuments or stakes to be relocated. The Contractor will be responsible for the cost of re-staking construction stakes and for the cost of re-establishing a destroyed monument. F. The Contractor shall be responsible for transferring the information from the construction stakes to any necessary forms and for constructing all pipelines, drainage ways, pavements, inlets, walls, and other structures in accordance with the information on the stakes and grade sheets supplied by the Owner. END OF SECTION General Requirements - Page 8 of 17 SECTION 01340 SHOP DRAWINGS 1.1 GENERAL A. Submit Shop Drawings, Samples, and other submittals as required by individual specification sections. 1. Engineer will not accept Shop Drawings or other submittals from anyone but Contractor. B. Schedule: Reference Section 01310, Construction Schedules. Submittals received by Engineer prior to the time set forth in the approved schedule will be reviewed at any time convenient to Engineer before the time required by the schedule. C. Any need for more than one re-submission, or any other delay in obtaining Engineer's review of submittals, will not entitle Contractor to extension of the Contract Time unless delay of the Work is directly caused by failure of Engineer to return any scheduled submittal within 10 days after receipt in his office of all information required for review of the submittals or for any other reason which prevents Engineer's timely review. Failure of Contractor to coordinate submittals that must be reviewed together will not entitle Contractor to an extension of Contract Time or an increase in Contract Price. D. Resubmit for review a correct submittal if errors are discovered during manufacture or fabrication. E. Do not use materials or equipment for which Shop Drawings or samples are required until such submittals, stamped by Contractor and properly marked by Engineer, are at the site and available to workmen. F. Do not use Shop Drawings which do not bear Engineer's mark "NO EXCEPTION TAKEN" in the performance of the Work. Review status designations listed on Engineer's submittal review stamp are defined as follows: 1. NO EXCEPTION TAKEN Signifies material or equipment represented by the submittal conforms with the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work. Contractor is to proceed with fabrication or procurement of the items and with related work. Copies of the submittal are to be transmitted for final distribution. 2. REVISE AS NOTED Signifies material or equipment represented by the submittal conforms with the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work in accordance with Engineer's notations. Contractor is to proceed with the Work in accordance with Engineer's notations and is to submit a revised submittal responsive to notations marked on the returned submittal or written in the letter of transmittal. 3. REJECTED Signifies material or equipment represented by the submittal does not conform with the design concept or comply with the information given in the Contract Documents and is not acceptable for use in the Work. Contractor is to submit submittals responsive to the Contract Documents. General Requirements - Page 9 of 17 4. FOR REFERENCE ONLY Signifies submittals which are for supplementary information only; pamphlets, general information sheets; catalog cuts, standard sheets, bulletins and similar data, all of which are useful to Engineer or Owner in design, operation, or maintenance, but which by their nature do not constitute a basis for determining that items represented thereby conform with the design concept or comply with the information given in the Contract Documents. Engineer reviews such submittals for general information but not for substance. 1.2 SHOP DRAWINGS A. Include the following information as required to define each item proposed to be furnished. 1. Detailed installation drawings showing foundation details, and clearances required for construction. 2. Relation to adjacent or critical features of the Work or materials. 3. Field dimensions, clearly identified as such. 4. Applicable standards, such as ASTM or Federal Specification numbers. 5. Drawings, catalogs or parts thereof, manufacturer's specifications and data, instructions, performance characteristics and capacities, and other information specified or necessary: a. For Engineer to determine that the materials and equipment conform with the design concept and comply with the intent of the Contract Documents. b. For the proper erection, installation, and maintenance of the materials and equipment which Engineer will review for general information but not for substance. c. For Engineer to determine what supports, anchorages, structural details, connections and services are required for materials and equipment, and the effect on contiguous or related structures, materials and equipment. 6. Complete dimensions, clearances required, design criteria, materials of construction and the like to enable Engineer to review the information effectively. B. Manufacturer's standard drawings, schematics and diagrams: 1. Delete information not applicable to the Work. 2. Supplement standard information to provide information specifically applicable to the Work. C. Format. 1. Present in a clear and thorough manner. 2. Minimum sheet size: 8 ½" x 11". 3. Clearly mark each copy to identify pertinent products and models. 4. Individually annotate standard drawings which are furnished, cross out items that do not apply, describe exactly which parts of the drawing apply to the equipment being furnished. 5. Individually annotate catalog sheets to identify applicable items. 6. Reproduction or copies of portions of Contract Documents: a. Not acceptable as complete fabrication or erection drawings. b. Acceptable when used as a drawing upon which to indicate information on erection or to identify detail drawings. 7. Clearly identify the following: a. Date of submission. b. Project title and number. c. Names of Contractor, Supplier and Manufacturer. d. Specification section number, specification article number for which items apply, intended use of item in the work, and equipment designation. e. Identify details by reference to sheet, detail, schedule or room numbers shown in the Contract Documents. f. Deviations from Contract Documents. g. Revisions on re-submittals. General Requirements - Page 10 of 17 h. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and the Contract Documents. 1.3 SUBMISSION REQUIREMENTS A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Minimum number required: 1. Shop Drawings. a. Three (3) copies minimum, two (2) copies which will be retained by Engineer. 1.4 RE-SUBMISSION REQUIREMENTS A. Make corrections or changes required by Engineer and resubmit until accepted. B. In writing call Engineer's attention to deviations that the submittal may have from the Contract Documents. C. In writing call specific attention to revisions other than those called for by Engineer on previous submissions. D. Shop Drawings. 1. Include additional drawings that may be required to show essential details of any changes proposed by Contractor along with required wiring and piping layouts. END OF SECTION General Requirements - Page 11 of 17 SECTION 01410 TESTING 1.1 GENERAL A. Provide such equipment and facilities as the Engineer may require for conducting field tests and for collecting and forwarding samples. Do not use any materials or equipment represented by samples until tests, if required, have been made and the materials or equipment are found to be acceptable. Any product which becomes unfit for use after approval hereof shall not be incorporated into the work. B. All materials or equipment proposed to be used may be tested at any time during their preparation or use. Furnish the required samples without charge and give sufficient notice of the placing of orders to permit the testing. Products may be sampled either prior to shipment or after being received at the site of the work. C. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise provided, sampling and testing of all materials and the laboratory methods and testing equipment shall be in accordance with the latest standards and tentative methods of the American Society for Testing Materials (ASTM). D. Where additional or specified information concerning testing methods, sample sizes, etc., is required, such information is included under the applicable sections of the Specifications. Any modification of, or elaboration on, these test procedures which may be included for specific materials under their respective sections in the Specifications shall take precedence over these procedures. 1.2 OWNER'S RESPONSIBILITIES A. Owner shall be responsible for and shall pay all costs in connection with testing for the following: 1. Soil tests, except those called for under Submittals thereof. 2. Tests not called for by the Specifications of materials delivered to the site but deemed necessary by Owner. 3. Concrete test, except those called for under Submittals thereof. 1.3 CONTRACTOR'S RESPONSIBILITIES A. In addition to those inspections and tests called for in the General Conditions, Contractor shall also be responsible for and shall pay all costs in connection with testing required for the following: 1. All performance and field testing specifically called for by the specifications. 2. All retesting for Work or materials found defective or unsatisfactory, including tests covered under 1.2 above. 3. All minimum call out charges or stand by time charges from the tester due to the Contractor's failure to pave, pour, or fill on schedule for any reason except by action of the Engineer. B. Contractor shall notify the Project Engineer 48 hours prior to performing an operation that would require testing. 1.4 CONTRACTOR'S QUALITY CONTROL SYSTEM A. General: The Contractor shall establish a quality control system to perform sufficient inspection and tests of all items of Work, including that of his subcontractors, to ensure conformance to the functional performance of this project. This control shall be established for all construction except where the Contract Documents provide for specific compliance tests by testing laboratories or engineers employed by the Owner. The Contractor’s control system shall specifically include all testing required by the various sections of these Specifications. General Requirements - Page 12 of 17 B. Superintendence: The Contractor shall employ a full time Superintendent to monitor and coordinate all facets of the Work. The Superintendent shall have adequate experience to perform the duties of Superintendent. C. Contractor's quality control system is the means by which he assures himself that his construction complies with the requirements of the Contract Documents. Controls shall be adequate to cover all construction operations and should be keyed to the proposed construction schedule. D. Records: Maintain correct records on an appropriate form for all inspections and tests performed, instructions received from the Engineer and actions taken as a result of those instructions. These records shall include evidence that the required inspections or tests have been performed (including type and number of inspections or test, nature of defects, causes for rejection, etc.) proposed or directed remedial action, and corrective action taken. Document inspections and tests as required by each section of the Specifications. Provide copies to Engineer weekly. END OF SECTION General Requirements - Page 13 of 17 SECTION 01510 TEMPORARY UTILITIES 1.1 UTILITIES A. Furnish all utilities necessary for construction. B. Make arrangements with Owner as to the amount of water required and time when water will be needed. 1. Meters may be obtained through the Water Utility Meter Shop at 221-6759 2. Unnecessary waste of water will not be tolerated. C. Furnish necessary water trucks, pipes, hoses, nozzles, and tools and perform all necessary labor. 1.2 SANITARY FACILITIES A. Furnish temporary sanitary facilities at each site for the needs of construction workers and others performing work or furnishing services on the Project. B. Properly maintain sanitary facilities of reasonable capacity throughout construction periods. C. Enforce the use of such sanitary facilities by all personnel at the site. D. Obscure from public view to the greatest practical extent. END OF SECTION General Requirements - Page 14 of 17 SECTION 01560 TEMPORARY CONTROLS 1.1 NOISE CONTROL A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed in populated areas. B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and operated in a manner to cause the least noise consistent with efficient performance of the Work. C. Cease operation of all machinery and vehicles between the hours of 6:00 p.m. and 7:00 a.m. 1.2 DUST CONTROL A. Dusty materials in piles or in transit shall be covered when necessary to prevent blowing. B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be kept moist with water or by application of a chemical dust suppressant. 1. Chemical dust suppressant shall not be injurious to existing or future vegetation. 1.3 POLLUTION CONTROL A. Prevent the pollution of drains and water courses by sanitary wastes, concrete, sediment, debris and other substances resulting from construction activities. 1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the site. 2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and culverts. 1.4 EROSION CONTROL A. Take such measures as are necessary to prevent erosion of soil that might result from construction activities. 1. Measures in general will include: a. Control of runoff. b. Trapping of sediment. c. Minimizing area and duration of soil exposure. d. Temporary materials such as hay bales, sand bags, plastic sheets, riprap or culverts to prevent the erosion of banks and beds of watercourses or drainage swales where runoff will be increased due to construction activities. B. Preserve natural vegetation to greatest extent possible. C. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize erosion. D. Comply with the City of Fort Collins' Storm Drainage Erosion Control Manual. General Requirements - Page 15 of 17 1.5 TRAFFIC CONTROL A. Maintain traffic control in accordance with the “Manual of Uniform Traffic Control Devices” (MUTCD), the City of Fort Collins “Work Area Traffic Control Handbook,” and the current “Larimer County Urban Area Street Standards.” In the event of a conflict between the MUTCD criteria and the City’s criteria, the City’s criteria shall govern. 1.6 HAUL ROUTES The Engineer reserves the right to set haul routes in order to protect pavements, both new and old, from heavy loads. These pavements may include, but are not limited to, recently constructed pavements, recently overlaid pavements, and/or pavements whose condition would be significantly damaged by heavy loads. END OF SECTION General Requirements - Page 16 of 17 SECTION 01700 CONTRACT CLOSEOUT 1.1 CLEANING AND RESTORATION A. Return the premises and adjacent properties to conditions existing or better than existing at the time the work was begun. This will include providing labor, equipment and materials for cleaning, repairing and replacing facilities damaged or soiled during construction. The Engineer will be the judge of the degree of restoration required. 1.2 PROJECT RECORD DOCUMENTS A. Maintain on the job site, and make available to the Engineer upon request, one current marked-up set of the drawings which accurately indicate all approved variations in the completed work that differ from the design information shown on the drawings. Further, these drawings should reflect all underground obstacles encountered. B. These record drawings along with any survey records, photographs and written descriptions of said work as may be required by the Engineer shall be submitted prior to project acceptance. END OF SECTION General Requirements - Page 17 of 17 SECTION 01800 METHOD OF MEASUREMENT AND BASIS OF PAYMENT 1.1 DEFECTIVE WORK A. Owner will not pay for defective work and will not pay for repair or additional work required to bring the project to a point of acceptance. 1.2 BID PRICE A. The Total Bid Price covers all Work required by the Contract Documents. All work not specifically set forth as a pay item in the Bid Form shall be considered a subsidiary obligation of Contractor and all costs in connection therewith shall be included in the prices bid for the various items of Work. B. Prices shall include all costs in connection with the proper and successful completion of the Work, including furnishing all materials, equipment and tools; and performing all labor and supervision to fully complete the Work. C. Unit prices shall govern over extensions of sums. D. Unit prices shall not be subject to re-negotiation. 1.3 ESTIMATED QUANTITIES A. All quantities stipulated in the Bid Form at unit prices are approximate and are to be used only as a basis for estimating the probable cost of the Work and for the purpose of comparing the bids submitted to the Work. The basis of payment shall be the actual amount of materials furnished and Work done. B. Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amount of Work actually performed and materials actually furnished and the estimated amount therefor. END OF SECTION SECTION 02000 PROJECT SPECIFICATIONS The Colorado Division of Transportation "Standard Specifications for Road and Bridge Construction", 2005, and the current Larimer County “Urban Area Street Standards”, (hereafter referred to as the "Standard Specifications") are made a part of this Contract by this reference, except as revised herein, and are hereby adopted as the minimum Standard Specifications of Compliance for this project. In those instances where the Standard Specifications conflict with any of the provisions of the preceding Sections, the preceding Sections shall govern. INDEX OF REVISIONS SECTION 104 Traffic and Parking Control 105 Control of Work 107 Protection and Restoration of Property and Landscape 108 Prosecution and Progress 201 Clearing and Grubbing 202 Removal of Structures and Obstructions 203 Excavation and Embankment 212 Seeding, Fertilizer, and Sodding 304 Aggregate Base Course 403 Hot Mix Asphalt - Patching 604 Inlets and Culverts 608 & 609 Sidewalks, Curb and Gutter, Drive Approaches, Aprons, Crosspans, and Concrete Pavement 630 Construction Zone Traffic Control Project Specifications - Page 2 of 30 REVISION OF SECTION 104 TRAFFIC AND PARKING CONTROL Section 104 of the Standard Specifications is hereby revised as follows: Subsection 104.04 shall include the following. It shall be the Contractor's responsibility to clear parking from the streets when such parking will interfere with the work. Prior to work that requires the street(s) to be closed to parking and/or traffic, the street(s) shall be posted for "NO PARKING". The placement of these signs shall take place at least 24 hours prior to the commencement of work and shall clearly show the type of work, and the day, date and times that the message on the sign is in effect. (For example, if a street is to be patched on Wednesday, July 2, the street shall be posted no later than Tuesday, July 1, by 7:00 a.m. with a sign that reads similar to "NO PARKING, WEDNESDAY, JULY 2, 7:00 A.M. TO 6:00 P.M., PATCHING.) See sample "NO PARKING" sign. “NO PARKING” signs shall remain in place until the street is opened to traffic and all clean up operations completed. All information on the "NO PARKING" signs, with the exception of the date, shall be in block letters permanently affixed to the sign. Any information added to a sign, such as dates, shall be clearly legible and written in block style letters. The “NO PARKING” signs shall be in effect for one or two days only. Any work done by the Contractor without traffic control will not be paid for under the terms of this Contract. The Contractor will not be paid for traffic control costs incurred during Contractor caused delays. At or near the end of each work day, a representative of the Contractor, the Traffic Control Supervisor, and the Engineer will meet to discuss the progress of the work and the placement of traffic control devices including "NO PARKING" signs. Any necessary adjustments shall be made. The Contractor shall also review at this time with the Engineer the proposed means of handling parking and traffic control for upcoming work. It is the responsibility of the Contractor to minimize any inconvenience to the public as a result of this work. At the above referenced meeting, the quantity of traffic control devices used that day shall be agreed upon by the Contractor and the Engineer. The Contractor shall utilize forms approved by the Engineer for the tabulation of Traffic Control Devices utilized. The Contractor shall maintain pedestrian and vehicular access to all businesses within the project at all times. Pedestrian access must be clearly delineated and buffered from construction activities at all times, and may include construction and installation of temporary ramps and wooden walkways as necessary. Any changes in the traffic control, including additional signs, barricades, and/or flaggers needed in the field shall be immediately implemented as directed by the Engineer. The cost for traffic control is covered in “Revision of Section 630, Construction Zone Traffic Control” found herein. Project Specifications - Page 3 of 30 NO PARKING Wed July 7 7:00 AM - 6:00 PM PATCHING REVISION OF SECTION 105 CONTROL OF WORK Project Specifications - Page 4 of 30 Section 105 of the Standard Specifications is hereby revised as follows: COOPERATION WITH UTILITIES Subsection 105.10 shall include the following: Concrete construction and/or reconstruction operations at intersections may involve the destruction and replacement of traffic signal loop detectors. The existing traffic signal loop detectors shall be removed by the contractor at no additional cost. New loop detectors may be installed at other intersections where they do not now exist. New and replacement loop detectors will be installed by the City Traffic Division. The Contractor shall cooperate with the schedule of this work to insure the timely installation of new loop detectors. Also, the Contractor shall coordinate with the City Traffic Division to insure that any cleanup required after the installation of the loop detectors will be completed before concrete placement operations begin. COOPERATION BETWEEN CONTRACTORS Subsection 105.11 shall include the following: City Utilities, Streets, Parks, Traffic, and utility contractors may perform work related to the project within or near the limits of this project. The Contractor shall conduct the work without interfering or hindering the progress or completion of the work being performed by other contractors. The Contractor shall coordinate extensively with these entities to minimize traffic control and scheduling conflicts, and ensure timely completion of all the work. INSPECTION AND TESTING OF WORK Subsection 105.15 shall include the following: The Contractor shall keep the Engineer informed of his future construction operations to facilitate scheduling of required inspection, measuring for pay quantities, and sampling. The Contractor shall notify the Engineer a minimum of 24 hours in advance of starting any construction operation that will require inspection, measuring for pay quantities, or sampling. Failure of the Contractor to provide such notice will relieve the owner and the Engineer from any responsibility for additional costs or delays caused by such failure. Inspection of the work or materials shall not relieve the Contractor of any of his obligations to fulfill his contract as prescribed. Work and materials not meeting specifications shall be corrected and unsuitable work or materials may be rejected, notwithstanding that such work or materials have been previously inspected by the Engineer or that payment therefore has been included in the progress estimate. MAINTENANCE DURING CONSTRUCTION Subsection 105.18 shall include the following: The roadway area, including curb, gutter, and sidewalk, adjacent to and through the construction area shall be cleaned of debris by the Contractor at the earliest opportunity, but in no case shall the area be left uncleaned after the completion of the day's work. It shall be the Contractor's responsibility to provide the necessary manpower and equipment to satisfactorily clean the roadway area. REVISION OF SECTION 105 CONTROL OF WORK Project Specifications - Page 5 of 30 The Contractor shall utilize a combination of pick-up brooms, side brooms and/or other equipment as needed to clean the streets. All sweeping and clean up equipment shall be approved by the Engineer prior to the commencement of work. The Contractor shall maintain the streets during the construction process as prescribed above. If a street requires additional sweeping by City forces, the Owner shall deduct from compensation due the Contractor sufficient funds to cover the Owner's cost to provide said service. All cost of maintaining the work during construction and before the project is accepted will not be paid for separately, but shall be included in the work. REVISION OF SECTION 107 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE Project Specifications - Page 6 of 30 Section 107 of the Standard Specifications is hereby revised as follows: Subsection 107.12 shall include the following: The fact that any underground facility - sprinkler systems, utility services, etc. - is not shown on the plans, details or construction documents shall not relieve the Contractor of his responsibilities as provided for in the Contract. It shall be the Contractor's responsibility, pursuant thereto, to ascertain the location of such underground improvements which may be subject to such damage by reason of his operations. Any pruning of vegetation shall require the written permission of the property owner and/or the Engineer. If the area to be repaired is five (5) inches or less in width, the Contractor shall clean the area of all debris (i.e. concrete, road base, etc.) to a minimum depth of four (4) inches, prepare all edges to be clean and vertical, and place (see below) and compact topsoil. The topsoil shall be compacted utilizing a hand operated roller or other method approved by the Engineer. For concrete repair locations, the placement of topsoil (backfill) shall be completed within two (2) working days of the placement of the concrete. The topsoil shall consist of loose friable loam reasonably free of admixtures of subsoil, refuse, stumps, roots, rocks, brush, weeds, heavy clay, hard clods, toxic substances or other material which would be detrimental to the proper development of vegetative growth. The material to be utilized shall be approved by the Engineer prior to placement. The topsoil shall be in a relatively dry state and placed during dry weather. The topsoil shall be fine graded to eliminate rough and low areas and ensure positive drainage. The existing levels, profiles and contours shall be maintained. If any portion of the area to be repaired is greater than five (5) inches in width, the Contractor shall clean and prepare the area along the entire length of the repair location as stated above to a minimum of one (1) foot, place sod over the entire area, water once, and notify the property owner in writing of the nature of the work that has taken place and that the sod will be watered only once. If the area to be repaired is only damaged on the surface, the Contractor shall remove the damaged areas of sod to a depth that will allow new sod to be placed, place new sod, water once and notify the property owner in writing of the nature of the work that has taken place and the fact that the sod will be watered only once. The minimum overall width of the area to be sodded shall be one (1) foot. For concrete repair locations, the placement of sod shall be completed by the end of the first working day of the week following the placement of the concrete. Sprinkler systems - Sprinkler systems designated for relocation shall be capped off at the limits of construction and protected from damage by the contractor. Sprinkler heads shall be salvaged and stockpiled on each property for use when reconstructing the sprinkler systems. Sprinkler systems damaged outside of the construction limits as a result of construction operations shall be replaced at the Contractor's expense, within three (3) working days from the date of damage. In areas where the Engineer directs new work or the reconstruction areas require grade adjustment, the placement of topsoil, sod and sprinkler relocation will be provided by the City under separate contract. REVISION OF SECTION 107 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE Project Specifications - Page 7 of 30 All landscaping that is damaged due to construction operations shall be replaced by the Contractor at his expense unless a written waiver is obtained from the property owner and submitted to the Engineer. Re-sodded lawns shall be watered once by the Contractor. All costs for protecting and restoring landscaping and lawns shall be considered a subsidiary obligation of the Contractor in connection with the various items of the Work, and no measurement or payment shall be made separately for the protection and restoration of landscaping and lawns. All restoration of landscaping and lawns damaged by construction operations, other than concrete repair, shall take place within three (3) working days from the date of damage. In areas where the Engineer directs new work or the reconstruction areas require grade adjustment, the placement of topsoil, sod, and sprinkler relocation will be provided by the City under separate contract. All labor, materials, tools, equipment, incidentals, and work involved in protecting or repairing underground facilities shall be considered incidental to the work being done and shall not be measured and paid for separately. REVISION OF SECTION 108 PROSECUTION AND PROGRESS Project Specifications - Page 8 of 30 Section 108 of the Standard Specifications is hereby revised as follows: SCHEDULE Subsection 108.03 shall include the following: A schedule of work must accompany any bid, and shall include number of working days per area to complete all unit work items covered by the contract. Vicinity maps of each area are included in Section 03500, Project Maps. The schedule should take any priorities into consideration. The schedule should also include projected start and end dates. Individual street quantities are described in Section 02500, Quantity Estimates. Prior to award, mutually acceptable milestones shall be determined by the Contractor and the City based on the schedule of working days discussed above. LIMITATION OF OPERATIONS Subsection 108.04 shall include the following: The work shall be completed within the following calendar months: JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC DETERMINATION AND EXTENSION OF TIME Subsection 108.07 shall include the following: Work hours shall be 7:00 a.m. to 6:00 p.m., Monday through Friday, or as approved by the Engineer. All Work is to be completed in one hundred twenty (120) consecutive working days. FAILURE TO COMPLETE WORK ON TIME Subsection 108.08 shall include the following: Failure to meet the agreed upon milestones or fully complete the project in one hundred twenty (120) working days, shall result in damages assessed against the Contractor. At the City’s option, liquidated damages in the amount of $1000.00 per day may be retained from any monies due the Contractor, or the City may retain an additional contractor(s) to complete the work, or portion thereof, and retain any costs incurred above and beyond the bid prices of the Contractor from any monies due the Contractor in lieu of liquidated damages. REVISION OF SECTION 201 CLEARING AND GRUBBING Project Specifications - Page 9 of 30 Section 201 of the Standard Specifications is hereby revised as follows: CONSTRUCTION REQUIREMENTS Subsection 201.02 shall be amended to include the following: When any tree roots are encountered during construction operations, the Contractor shall notify the Engineer prior to any root removals. The Engineer and the City Forester's representative shall then make a determination regarding removal. Tree roots shall be removed with a sharpened, sanitized saw, cut orthogonally to its longitudinal axis as closely as practical, to leave the freshly cut root surface in a clean and smooth condition. Axes or other blunt objects shall not be used to cut tree roots. Where it is anticipated that tree roots may be encountered, great care shall be taken by the Contractor to prevent any damage to the roots with tools or equipment. BASIS OF PAYMENT Subsection 201.04 shall be amended to include the following: All costs for removing tree roots shall be considered a subsidiary obligation of the Contractor in connection with the various items of the Work, and no measurement or payment shall be made separately for the removal of tree roots. REVISION OF SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS Project Specifications - Page 10 of 30 Section 202 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 202.01 is revised to include the following: This work consists of sawing and cutting to facilitate controlled breaking and removal of concrete and asphalt to a neat line. CONSTRUCTION REQUIREMENTS Subsection 202.02 is revised to include the following: Sawing of concrete shall be done to a true line, with a vertical face, unless otherwise specified. The depth of a saw cut in concrete shall be 4 inches or less, as directed by the Engineer. Residue from sawing shall be removed by the Contractor at the earliest opportunity. The Contractor shall prevent tracking of residue onto the roadway or walkway, and shall prevent discharge into the storm drainage system. METHOD OF MEASUREMENT Subsection 202.11 is revised to include the following: Sawing shall be measured by the lineal foot. This item shall only be used where the Engineer directs sawing not already being paid under another item. Sawcutting related to the items described in Revision of Section 608, Sidewalks, Curb & Gutter, Drive Approaches, Aprons, Crosspans, and Concrete Pavement, shall be considered a subsidiary obligation of the Contractor, and shall not be measured or paid for separately. BASIS OF PAYMENT Subsection 202.12 is revised to include the following: Payment will be made under: Pay Item Unit 202.01 Sawcutting ≤ 4” LF 202.02 Sawcutting – Additional Inch Depth LF/Inch The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Sawcutting as specified in these specifications, as shown on the plans, and as directed by the Engineer. REVISION OF SECTION 203 EXCAVATION AND EMBANKMENT Project Specifications - Page 11 of 30 Section 203 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 203.01 is revised to include the following: This work shall consist of removing and disposing of the existing pavement, base or other material, preparing the subgrade for the subsequent course, and placing borrow in accordance with the specifications and in reasonably close conformity with the lines, grades, and typical cross sections shown on the plans or as designated by the Engineer. All excavation will be classified, "General Excavation", as hereafter described. The Contractor shall dispose of all excavated material. CONSTRUCTION REQUIREMENTS Subsection 203.05 is revised to include the following: General Excavation shall consist of the excavation of all materials of whatever character required for the work not being removed under some other item. The Contractor shall be responsible for the protection of the subgrade/base course until subsequent courses have been placed. The excavation will be accomplished in the following manner: General Excavation: The areas to be removed will be marked on the surface by the Engineer with paint. A straight vertical cut shall be made through the pavement, if necessary, to provide a square or rectangular opening, such that each edge will be parallel or at right angles to the direction of traffic. Wheel cutting shall not be allowed. If, in the opinion of the Engineer, the subgrade material is unsuitable, it shall be removed to the limits and depths designated. Where excavation to the finished grade section (including General Excavation and Patching) results in a subgrade of unsuitable soil, the Engineer may require the Contractor to remove the unsuitable materials and backfill to the finished grade section with approved material (asphalt or borrow). After the material has been removed to the depth specified by the Engineer, the Contractor shall prepare the subgrade by compacting with a sheepsfoot roller, rubber tired roller and/or other compaction equipment as approved by the Engineer. The subgrade preparation shall not be measured and paid for separately, but shall be included in the contract unit price for General Excavation. Borrow: Borrow shall be placed as directed by the Engineer. The minimum amount of borrow shall be one load (approximately ten (10) ton). The cost for compaction shall be included in the Contract Unit Price for Borrow. Borrow material shall meet the grading requirement for Class 1 (Pit Run) or Class 5 (Road Base) Aggregate Base Course. (The Class 1 Aggregate Base Course need not be crushed and can be of the pit run variety provided it falls within the gradation requirements as shown in the Standard Specifications.) The material required for a specific location shall be directed by the Engineer REVISION OF SECTION 203 EXCAVATION AND EMBANKMENT Project Specifications - Page 12 of 30 Borrow will be paid by the ton at the proper moisture. Haul and water necessary to bring mixture to optimum moisture content will not be measured or paid for separately, but shall be included in the contract unit price for Borrow. Load slips shall be consecutively numbered for each day, and submitted to the Engineer daily. METHOD OF MEASUREMENT Subsection 203.13 shall include the following: The Contractor and the Engineer shall field measure and agree upon the excavated quantity before any further work continues. Should the Contractor fail to request the Engineer to measure any work and perform other work that would prevent the Engineer from measuring pay quantities, the Contractor shall not be compensated for materials not measured by the Engineer. The accepted quantities of Excavation will be paid for at the contract unit price per cubic yard. Subgrade preparation, haul and disposal will not be measured and paid for separately. The accepted quantities of Borrow will be paid for at the contract unit price per ton. Compaction and haul will not be measured and paid for separately. BASIS OF PAYMENT Subsection 203.14 shall include the following: Payment will be made under: Pay Item Unit 203.01 Excavation – General CY 203.02 Borrow Ton The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in Excavation and Borrow including haul, stockpiling, placing material, watering or drying soil, compaction, proof rolling, finish grading and disposal of unusable materials, as shown on the plans, as specified in these specifications, and as directed by the Engineer. REVISION OF SECTION 212 SEEDING, FERTILIZER AND SODDING Project Specifications - Page 13 of 30 Section 212 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 212.01 is revised to include the following: This work shall consist of soil preparation and furnishing and placing topsoil and blue grass sod in accordance with these specifications, accepted horticulture practice, and in reasonably close conformity with the locations and details shown on the plans or as designated. This work shall not include locations of concrete repair in which grade changes and additional work does not occur. See "Protection and Restoration of Property" found herein. MATERIALS Subsection 212.02 is revised to include the following: Topsoil Topsoil shall conform to the requirements of “Protection and Restoration of Property" found herein. Sod Bluegrass sod shall be nursery grown, 99% Kentucky Blue Grass and 99% weed free. Other sod type may be used only if approved in writing by the Engineer. The 1% allowable weeds shall not include any undesirable perennial or annual grasses or plants. Soil thickness of sod cuts shall not be less than 3/4 inch nor more than one inch. Sod shall be cut in uniform strips with minimum dimensions of 12 inches in width and 48 inches in length. The Contractor shall submit a sample of the sod he proposes to furnish. Said sample shall serve as a standard. Any sod furnished, whether in place or not, that is not up to the standard of the sample may be rejected. Sod that has been cut for more than 24 hours shall not be used. Each load of sod shall be accompanied by a certificate from the grower stating the type of sod, and the date and time of cutting. CONSTRUCTION REQUIREMENTS Subsection 212.05 is revised to include the following: Sodding: Soil Preparation. The area shall be cleaned with a minimum depth of four (4) inches (where topsoil does not exist) and a minimum width of one (1) foot, all irregularities in the ground surface shall be removed, and all edges clean and vertical. Sticks, stones, debris, and other similar material more than ½ inch in diameter shall be removed. Any objectionable depressions or other variances from a smooth grade shall be corrected. Topsoil Placement. Topsoil shall be placed and compacted with a minimum depth of four (4) inches. The amount of compaction required shall be as directed by the Engineer. Sod Placement. The minimum width for sod shall be one (1) foot. The area to be sodded shall be smooth. The sod shall be laid by staggering joints with all edges touching. On any slopes, the sod shall run approximately parallel to the slope contours. The Contractor shall water the sod once and notify the property owner in writing of the nature of the work that has taken place and that the sod will only be watered once. Sod placement/replacement required due to Contractor negligence shall follow the requirements of this section but will not be measured and paid for under the terms of this contract. REVISION OF SECTION 212 SEEDING, FERTILIZER AND SODDING Project Specifications - Page 14 of 30 BASIS OF PAYMENT Subsection 212.08 is revised to include the following: No measurement for payment shall be made for re-sodding lawn damaged by the Contractor adjacent to new concrete, when the grade of the existing lawn reasonably matches the grade of the new concrete. Re-sodding in this instance shall be considered incidental to the work being performed. Payment will be made under: Pay Item Unit 212.01 Sod Square Foot 212.02 Landscape/Irrigation Labor Hour The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in the placement of Seeding, Fertilizer and Sodding, complete-in-place, including removal, haul, disposal, and water, as shown on the plans, as specified in these specifications, and as directed by the Engineer. REVISION OF SECTION 304 AGGREGATE BASE COURSE Project Specifications - Page 15 of 30 Section 304 of the Standard Specifications is hereby revised as follows: MATERIALS Subsection 304.02 is revised to include the following: Aggregate Base Course shall meet the grading requirements for Class 5. Recycled asphalt or recycled concrete may be substituted for Aggregate Base Course at any time as directed by the Engineer. METHOD OF MEASUREMENT Subsection 304.07 is revised to include the following: Aggregate Base Course will be measured by the ton at the proper moisture. Haul and water necessary to bring mixture to optimum moisture content will not be measured and paid for separately, but shall be included in the contract unit price for Aggregate Base Course. Aggregate Base Course will be paid at a fixed 75% of the total amount used. The remaining 25% is intended to cover incidentals such as temporary patching, wash pits, form board reinforcement, and storm water protection. Failure to protect open excavations, or any other use not directly related to the Work, shall not be measured or paid for separately but shall be included in the Work. Borrow that is placed as a result of excavation of unsuitable subgrade will be paid for at the unit price for Borrow under Revision of Section 203, Excavation and Embankment. Load slips shall be consecutively numbered for each day, and submitted to the Engineer daily. The accepted quantities for Aggregate Base Course will be paid for at the contract unit price per ton. BASIS OF PAYMENT Subsection 304.08 is revised to include the following: Payment will be made under: Pay Item Unit 304.01 Aggregate Base Course Ton The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in the placement of Aggregate Base Course, complete-in-place, including haul and water, as shown on the plans, as specified in these specifications, and as directed by the Engineer. REVISION OF SECTION 403 HOT BITUMINOUS PAVEMENT - PATCHING Project Specifications - Page 16 of 30 Section 403 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 403.01 is revised to include the following: This work consists of the placement of hot mix asphalt as a temporary repair to provide vehicle or pedestrian access, until such time as the permanent repair can be made. CONSTRUCTION REQUIREMENTS Subsection 403.03 is revised to include the following: In all concrete repair locations, the Contractor shall remove no more than six (6) inches of asphalt pavement. The pavement areas shall be temporarily patched with a minimum of two (2) inches of hot mix asphalt, up to a maximum depth of six (6) inches. These locations shall be paid under the Contract Unit Price for Temporary Patching. METHOD OF MEASUREMENT Subsection 403.04 is revised to include the following: The accepted quantities for Temporary Patching will be measured and paid for at the contract unit price per ton. Pavement cutting, excavation, subgrade preparation, haul, disposal, and bituminous materials will not be measured or paid for separately, but shall be included in the contract price for Temporary Patching. Load slips shall be consecutively numbered for each day and shall include the batch time. BASIS OF PAYMENT Subsection 403.05 is revised to include the following: Payment will be made under: Pay Item Unit 403.01 Temporary Patching Ton The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in Temporary Patching, including pavement cutting, excavation, haul, disposal, surface preparation, and bituminous materials, complete-in-place, as shown on these plans, as specified in these specifications, and as directed by the Engineer. REVISION OF SECTION 604 INLETS AND CULVERTS Project Specifications - Page 17 of 30 Section 604 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 604.01 is revised to include the following: This work shall consist of the installation of, or removal and replacement of inlets, inlet decks, and sidewalk culverts in accordance with these specifications, and in reasonably close conformity with the lines and grades shown on the plans or established by the Engineer. CONSTRUCTION REQUIREMENTS Subsection 604.04 is revised to include the following: The existing frames, grates, bonnets and angle iron faces shall be salvaged and reused in the reconstruction of the inlet deck or replacement of the inlet. Salvable material shall remain the property of the City of Fort Collins, and shall be stockpiled by the Contractor at specified locations within the project limits. The Contractor shall safeguard salvable materials and shall be responsible for the expense of repairing or replacing damaged or missing material until it is incorporated into the work, or is loaded onto City equipment by the Contractor. If the frame, grate, bonnet or angle iron face cannot be salvaged, the City will provide the replacement material for all inlet types. In the event the City cannot provide material for the Modified Type 13 Curb Inlets, the Contractor shall supply new material. This item shall include the frame, grate and adjustable curb bonnet for a Modified Type 13 Curb Inlet, and will be paid as “Modified Type 13 Curb Inlet - Materials Only”. This item will be paid in addition to the “Remove & Replace” or “Reconstruct Deck” inlet items. All reinforcing steel encountered during removal shall be replaced with new steel of the grade and size as shown on the detail found herein. The “Metal Sidewalk Culvert with 5/8” Plate” item shall include a new frame and plate. The existing frame and plate shall be salvaged to the maximum extent feasible. Salvable material shall remain the property of the City of Fort Collins. When concrete is to be removed and replaced around an existing grate without disturbing the deck or box, this shall not constitute Reconstruct Inlet Deck. These locations shall be measured and paid for separately under the items described in Revision of Sections 608 and 609 - Sidewalks, Curb and Gutter, Drive Approaches, Aprons and Crosspans found herein. Expansion joint material shall be installed every 500' in long runs and between new structure slabs and existing concrete slabs, where called for, and around fire hydrants, poles, inlets, sidewalk culverts, mid-block ramps, radius points at intersections, and other fixed objects, i.e. ends of sidewalk slabs and curbs. Expansion joint material must be set vertical and installed in accordance with the CDOT M&S Standards for Concrete Pavement Joints. The joint shall be edged with a suitable edging tool and sealed in accordance with CDOT Section 412.18. Expansion and caulking shall be paid as “Expansion and Caulking” by the lineal foot. REVISION OF SECTION 604 INLETS AND CULVERTS Project Specifications - Page 18 of 30 METHOD OF MEASUREMENT Subsection 604.06 is revised to include the following: Reconstruct Deck shall include the deck reconstruction of existing inlets, including two, three and a half foot (3.5') transitions, measured from inside face of box, on each side. Inlets with openings greater than those defined on the detail shall be paid for as “Reconstruct Deck” per each, plus “Reconstruct Deck Additional Foot Opening” per lineal foot. BASIS OF PAYMENT Subsection 604.07 is revised to include the following: Payment will be made under: Pay Item Unit 604.01 Type R Inlet – Remove & Replace (4’ Opening) Each 604.02 Type R Inlet – Reconstruct Deck (4’ Opening) Each 604.03 Type R Inlet – Reconstruct Deck Additional Foot Opening Lineal Foot 604.04 Catch Basin - Remove & Replace Each 604.05 Catch Basin - Reconstruct Deck Each 604.06 Catch Basin - Reconstruct Deck Additional Foot Opening Lineal Foot 604.07 Modified Type 13 Curb Inlet - Remove & Replace Each 604.08 Modified Type 13 Curb Inlet - Reconstruct Deck Each 604.09 Modified Type 13 Curb Inlet - Materials Only Each 604.10 Concrete Sidewalk Culvert - Remove & Replace Each 604.11 Metal Sidewalk Culvert with 5/8” Plate - Remove & Replace Each 604.12 Additional Square Foot 5/8” Plate Square Foot The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Inlets, including demolition, disposal, reinforcement and replacement, complete-in-place, as specified in these specifications, as shown on the plans, and as directed by the Engineer. REVISION OF SECTIONS 608 AND 609 SIDEWALKS, CURB & GUTTER, DRIVE APPROACHES, APRONS, CROSSPANS, AND CONCRETE PAVEMENT Project Specifications - Page 19 of 30 Sections 608 and 609 of the Standard Specifications are to be deleted and replaced with the Larimer County Urban Area Street Standards, October 2002, except as noted herein. DESCRIPTION This work consists of the construction of concrete sidewalks, curb and gutter, drive approaches, aprons, crosspans, curb ramps and concrete pavement in accordance with these specifications and in conformity with the lines and grades shown on the plans or established. MATERIALS The mix designs for all types of concrete to be utilized shall be determined by the Contractor and submitted to the Engineer and approved a minimum of one week prior to the beginning of construction. Cement used shall conform to the Standard Specification for Portland Cement, ASTM C 150-85, AASHTO M85, Type I, Type I/II, or Type III. The air content shall be four (4) to seven (7) percent. “High Early” concrete shall be used for concrete repair locations. “High Early” concrete shall have a specified compressive strength of 4000 psi and a minimum 48 hour compressive strength of 3000 psi. The concrete shall have a maximum water/cement ratio of 0.45. The type of concrete used for a particular location shall be approved by the Engineer. See also Section 2.05, ‘Rigid Pavement Design’, and Section 4.2.4., ‘Concrete Streets’, of the City of Fort Collins Design Criteria and Standards for Streets." Water Reducing Agents shall conform to ASTM C 494-82. Accelerating Agents shall conform to ASTM C 494-82. Calcium Chloride shall not be utilized as an accelerating agent. The Contractor shall furnish a load slip containing the information required by AASHTO M157, Section 13, Subsection 13.1 and 13.2, with each batch of concrete. In addition, the type of concrete (mix code) shall be shown on each load slip. Concrete delivered without a load slip containing complete information as specified will be subject to rejection. Curing materials shall be white pigmented liquid linseed oil based or paraffin based curing compound, and shall conform to ASTM Specification C 309-81 Type II, Class B. The application rate for curing compound shall be 150 sq. ft./gal. for all concrete. The curing compound shall be applied immediately upon completion of the finishing. CONSTRUCTION REQUIREMENTS The Remove Concrete item shall include removal and disposal or salvage of existing asphalt, concrete, or flagstone as directed by the Engineer. Care shall be taken during removal of fillets to protect the existing concrete from damage. Any damage to the existing concrete shall be repaired or replaced at the Contractors expense. Monolithic hybrids of curb, gutter, sidewalk and highback vertical curb and gutter will be replaced using the same configuration as it was originally installed, unless a flaw in its engineering should become apparent. In these cases the design may be modified by the Engineer. REVISION OF SECTIONS 608 AND 609 SIDEWALKS, CURB & GUTTER, DRIVE APPROACHES, APRONS, CROSSPANS, AND CONCRETE PAVEMENT Project Specifications - Page 20 of 30 The finished exposed surface and edging of the concrete will match as closely as possible the surface treatment of the surrounding existing concrete. In locations where concrete pavement is replaced, the new pavement shall have a minimum thickness of 8". Existing pavement shall be saw cut to obtain a straight and neat edge for paving and shall be deep enough to cut through the entire pavement thickness. All joints shall be sealed with an asphalt filler compound, or approved equal, in accordance with the detail for “Concrete Pavement Joints” contained herein. The cost for joint sealing shall be included in the contract unit price for “Concrete Pavement.” The top of the new pavement shall be even with the existing concrete pavement. The concrete shall be consolidated with a mechanical vibrator. All construction joints shall be doweled except for expansion joints, joints along existing curb and gutter, and contraction joints, in accordance with the detail for “Concrete Pavement Joints” contained herein. In addition, dowels shall be 16” smooth #5 bars. The dowels shall be placed in drilled holes, 12” OC. Dowels shall fit snugly into 8” deep drilled holes, or shall be epoxy grouted. In locations where concrete pavement is being replaced, the construction joint (s) shall be constructed in accordance with the detail for “Concrete Pavement Joints” contained herein. This item will not be measured or paid for separately under the terms of this contract. The maximum spacing for transverse joints in crosspans and concrete pavement shall be ten (10) feet. All construction joints for crosspans and/or aprons adjacent to new or existing concrete shall be constructed in accordance with the detail for "Concrete Construction Joints" contained herein. This item will not be measured or paid for separately under the terms of this contract. Restoration of landscape shall be in accordance with "Revision of Section 107 - Protection and Restoration of Property and Landscape" found herein. The time frame for restoration shall be within two (2) working days from the time the concrete was placed for backfill with topsoil and by no later than the end of the first working day of the following week for sod replacement. The Contractor shall be responsible for the protection of the subgrade/base course until the concrete is placed. The Contractor shall protect the concrete against moisture loss, rapid temperature change, rain, flowing water, mechanical injury, pedestrian and vehicular traffic, and Contractor's equipment for a minimum of 36 hours after the placement of curing compound for 48 hour high early concrete. Concrete blankets shall be used when the temperature is expected to fall to 32ºF or below within 36 hours after placement of curing compound for 48 hour high early concrete. Asphalt patching against fresh concrete shall not be permitted during the time frames for protection of concrete stated above. The debris immediately adjacent to a concrete repair location shall be completely cleaned up on the work day following the placement of the concrete. If required, the concrete shall be protected as stated above. Any damage caused during the cleanup process shall be the Contractor's responsibility. The Contractor shall utilize forms approved by the Engineer for the tabulation of concrete quantities. REVISION OF SECTIONS 608 AND 609 SIDEWALKS, CURB & GUTTER, DRIVE APPROACHES, APRONS, CROSSPANS, AND CONCRETE PAVEMENT Project Specifications - Page 21 of 30 Concrete washout/truck washout shall be contained in such a manner that no visual evidence of cement or aggregate spoils remains on the site. In addition, direct washout to curb and gutter flow lines or inlet structures is prohibited. Washout may be accomplished by use of a designated spoils/base pile, as described in Section 208 of the Standard Specifications, or at an identified off-site location. Methods shall be submitted for approval by the Engineer. Flagstone sidewalk, brick pavers and trolley roadbed bricks shall be salvaged to the maximum extent feasible. All flagstones, pavers and bricks shall become the property of the City of Fort Collins. Flagstones shall be hauled by the contractor and delivered to the City’s site located at 1500 Hoffman Mill Road. This item will not be measured or paid for separately, but shall be considered incidental to the related remove and replace item. In areas where the Engineer directs the re-setting of flagstone, the existing flagstone shall be salvaged and reset on compacted base. The elevation of the flagstone shall match as closely as possible the surface treatment of the surrounding existing area. METHOD OF MEASUREMENT Sawcutting related to the items in this section shall be considered a subsidiary obligation of the Contractor, and shall not be measured or paid for separately. Pedestrian Access Ramp shall be measured by the square foot and shall include the area between the back of the curb and both points of curvature, if on the radius, or the top of transition if mid-block. Pedestrian Access Ramp – Highback Curb shall be measured by the square foot. The length shall be measured from the back of the curb to the top of the transition at the back of the ramp, and the width shall be measured at the midpoint. All pedestrian access ramps shall be placed in accordance with the details contained herein. The ramp items shall include all labor, materials (except truncated domes), equipment and incidentals, including removal, saw- cutting, haul and disposal, and for doing all the work involved in removal and replacement of pedestrian access ramps. Truncated dome panels shall be placed on all pedestrian access ramps. Truncated Dome Panel will be paid in addition to the ramp item. This item shall include all labor, materials, and surface preparation to supply and place the panels at pedestrian access ramps. Truncated dome panels shall be red pre-fabricated concrete or cast iron, and shall meet all ADA requirements. The type of truncated dome panels to be used shall be submitted to the Engineer for approval prior to installation. Dome panels shall be placed at the same time as the initial ramp placement. All panels shall be epoxied on the non-exposed surfaces prior to being set in wet concrete. Expansion joint material shall be installed every 500' in long runs and between new structure slabs and existing concrete slabs, where called for and around fire hydrants, poles, inlets, sidewalk under-drains, mid-block ramps, radius points at intersections, and other fixed objects, i.e. ends of sidewalk slabs and curbs. Expansion joint material must be set vertical and installed in accordance with the CDOT M&S Standards for Concrete Pavement Joints. The joint shall be edged with a suitable edging tool and sealed in accordance with CDOT Section 412.18. This item will be paid as Expansion and Caulking by the lineal foot. Reset Flagstone shall be measured by the square foot of reset area. REVISION OF SECTIONS 608 AND 609 SIDEWALKS, CURB & GUTTER, DRIVE APPROACHES, APRONS, CROSSPANS, AND CONCRETE PAVEMENT Project Specifications - Page 22 of 30 BASIS OF PAYMENT Payment will be made under: Pay Item Unit 608.01 Remove Concrete SF 608.02 Remove and Haul Fillets EACH 608.03 Apron 8” - Remove & Replace SF 608.04 Crosspan 8” - Remove & Replace SF 608.05 Driveover Curb, Gutter and 6” Sidewalk Remove & Replace LF 608.06 Driveover Curb and Gutter, No Sidewalk Remove & Replace LF 608.07 Vertical Curb, Gutter and 6” Sidewalk Remove & Replace LF 608.08 Vertical Curb and Gutter - No Sidewalk Remove & Replace LF 608.09 Vertical Outfall Curb and Gutter - Remove & Replace LF 608.10 Barrier Curb 12” – Remove & Replace LF 608.11 Hollywood Curb, Gutter and 6” Sidewalk LF Remove & Replace 608.12 Hollywood Curb and Gutter - No Sidewalk LF Remove & Replace 608.13 Highback Curb and Gutter - No Sidewalk LF Remove & Replace 608.14 Pedestrian Access Ramp - Remove & Replace SF 608.15 Pedestrian Access Ramp, Highback Curb Remove and Replace SF 608.16 Truncated Dome Panel SF 608.17 Flatwork 4” - Remove & Replace SF 608.18 Flatwork 6” - Remove & Replace SF 608.19 Replace Flatwork – 1” Additional Depth SF REVISION OF SECTIONS 608 AND 609 SIDEWALKS, CURB & GUTTER, DRIVE APPROACHES, APRONS, CROSSPANS, AND CONCRETE PAVEMENT Project Specifications - Page 23 of 30 608.20 Colored Concrete (4”) San Diego Buff – Up Charge SF 608.21 4’ Valley Pan (6") – Remove & Replace SF 608.22 Concrete Pavement 8” - Remove & Replace SF 608.23 Alley Approach 8” - Remove & Replace SF 608.24 Expansion & Caulking LF 608.25 Splashblock 4” SF 608.26 Exposed Aggregate 4” – Up Charge SF 608.27 Reset Flagstone SF The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in Sidewalks, Curb & Gutter, Drive Approaches, Aprons, Crosspans, and Concrete Pavement, complete-in-place, including removal, sawcutting, haul and disposal, as shown on the plans, as specified in these specifications, and as directed by the Engineer. REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 24 of 30 Section 630 of the Standard Specifications is hereby revised as follows: DESCRIPTION Subsection 630.01 shall be revised as follows: This work shall consist of furnishing, installing, moving maintaining and removing temporary traffic signs, advance warning arrows panels, barricades, channelizing devices, and delineators as required by the latest revision of the "Manual on Uniform Traffic Control Devices for Streets and Highways" (MUTCD), the City of Fort Collins “Work Area Traffic Control Handbook", and the current Larimer County Urban Area Street Standards. In the event of a conflict between the MUTCD criteria and the City's criteria, the City's criteria shall govern. When a device is not in use, the Contractor shall remove it from the project for the period it is not needed. Devices temporarily not in use shall, as a minimum, be removed from the area. Moving will include devices removed from the project and later returned to use. Payment shall be made for the maximum number of each type of traffic control device being used at one given time per day. Traffic control devices shall be placed and/or stored in the City right-of-way in such a manner that minimizes the hazards to pedestrians, bicyclists and vehicles. Traffic control devices shall be removed from the site immediately upon completion of the work for any street(s). MATERIALS Subsection 630.02 shall include the following: All traffic control devices placed for this project must meet or exceed the minimum standards set forth in the MUTCD. All traffic control devices shall be clean and in good operating condition when delivered and shall be maintained in that manner on a daily basis. All traffic control devices shall be clearly marked and free of crossed out information or any other form of defacement that detracts from the purpose for which they are intended (i.e. crossed out information, information written in long-hand style, etc.) Additionally, any sign blank with sign faces on both sides must have the back sign face covered when in use to avoid confusion to motorists traveling in the opposite direction and other potentially affected parties, such as residents affected by any information the sign may present. CONSTRUCTION REQUIREMENTS Subsection 630.09 shall be revised as follows: TRAFFIC CONTROL PLAN Traffic control through the construction areas is the responsibility of the Contractor. For all locations, a Traffic Control Plan shall be prepared. The Traffic Control Plans shall be on City supplied forms. The Traffic Control Plans shall be submitted for approval to the Engineer by 8:00 a.m., two working days prior to the commencement of work. (Note: Traffic Control Plans for work done on Monday and Tuesday shall be submitted the previous Friday by 8:00 a.m.) Full road closure plans shall be submitted no later than Friday mornings by 8:00 a.m. for projects starting the following week. All plans shall be delivered to City REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 25 of 30 Engineering, 281 North College Avenue. Facsimiles of plans shall not be allowed. No phase of the construction shall start until the Traffic Control Plan has been approved. Failure to have an approved Traffic Control Plan shall constitute cause for the City to stop work, as well as the Contractor's forfeiture of payment for all work and materials at that location, with no adjustment in the contract time. All costs associated with Traffic Control Plan review will not be measured or paid for separately, but shall be considered incidental to the Work. The Traffic Control Plan shall include, as a minimum, the following: (1) A detailed diagram which shows the location of all sign placements, including advance construction signs (if not previously approved) and speed limit signs; method, length and time duration for lane closures, and location of flag persons. (2) A tabulation of all traffic control devices shown on the detailed diagram including, but not limited to: construction signs; vertical panel; vertical panel with light; Type I, Type II, and Type III barricades; cones; drum channelizing devices; advance warning flashing or sequencing arrow panel. Certain traffic control devices may be used for more than one operation or phase. However, all devices required for any particular phase must be detailed and tabulated for each phase. (3) Number of flaggers to be used. (4) Parking Restrictions to be in affect. Approval of the proposed method of handling traffic is intended to indicate those devices for which payment is to be made. Such approval does not relieve the Contractor of liability specifically assigned to him under this contract. Parking Restriction Plans shall be submitted and approved which show the location and quantity of "NO PARKING" signs, the date to be placed, and the date to be removed. The plans shall be prepared on City supplied forms. The Parking Restriction Plans shall be submitted to the Engineer by 8:00 a.m., two working days prior to the commencement of work. (Note: Parking Restriction Plans for work done on Monday and Tuesday shall be submitted the previous Friday by 8:00 a.m.) All plans shall be delivered to City Engineering, 281 North College Avenue. Facsimiles of plans shall not be allowed. No phase of the construction shall start until the Parking Restriction Plan has been approved. Failure to have an approved Parking Restriction Plan shall constitute cause for the City to stop work, as well as the Contractor's forfeiture of payment for all work and materials at that location, with no adjustment in the contract time. The cost for preparing and submitting the traffic control plan shall be included in the contract unit price for Traffic Control Supervisor. Subsection 630.10 shall be revised as follows: TRAFFIC CONTROL MANAGEMENT Traffic Control Management shall be performed by a Traffic Control Supervisor (TCS). The TCS(s) shall possess a current American Traffic Safety Services Association (ATSSA) certification as a Worksite Traffic Control Supervisor or Colorado Contractor's Association (CCA) certification as a Traffic Control Supervisor. (Proof of certification shall be presented to the City Traffic Control Manager, and when requested by a City representative, for each TCS utilized on this project.) One TCS shall be designated as the Head TCS. The Head TCS shall have a minimum of one year experience as a certified TCS. Qualifications shall be submitted to the Engineer for approval a minimum of one week prior to commencement of the work. The Head TCS shall be on site at all times during the construction when REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 26 of 30 payment is made under the contract unit price for Traffic Control Supervisor per day. When the TCS is being paid under the TCS per hour item, time spent on site may be modified by the City Representative, as needed, based on the size and complexity of the project, location of work, duration of the project, traffic factors, weather, and roadway characteristics. The TCS shall be equipped with a cellular phone. The cost of this phone shall be incidental to the day or hour pay unit for TCS. It is the intent of the specifications that the Head TCS be the same throughout the project. If the Head TCS is to be replaced during the project, the Engineer shall be given a minimum of one (1) weeks notice and qualifications shall be submitted for approval for the replacement. The Head TCS will be paid for under the TCS item. The TCS's duties shall include, but not be limited to: (1) Preparing, revising and submitting Traffic Control Plans as required. (Review fees will not be measured or paid for separately, but shall be considered incidental to the Work.) (2) Direct supervision of project flaggers. (3) Coordinating all traffic control related operations, including those of the Subcontractors and suppliers. (4) Coordinating project activities with appropriate police and fire control agencies, Transfort, school districts and other affected agencies and parties prior to construction. Typed hand delivered notification to all businesses and residents at least 24 hours prior to construction. (The notification of residents and businesses may be accomplished by a representative of the TCS.) (5) Maintaining a project traffic control diary which shall become part of the City's project records. (6) Inspecting traffic control devices on every calendar day for the duration of the project. (7) Insuring that traffic control devices are functioning as required. (8) Overseeing all requirements covered by the plans and specifications which contribute to the convenience, safety and orderly movement of traffic. (9) Flagging. (10) Setting up traffic control devices. Notification of residents and businesses shall be the responsibility of the TCS and shall consist of distributing letters indicating the nature of the work to be completed, any special instructions to the residents (i.e. limits on lawn watering during concrete pouring, etc.), the dates and times of the work, and the parking and access restrictions that will apply, as well as thorough information placed on "NO PARKING" signs. Sample letters will be provided by the Engineer and shall be distributed prior to the commencement of each phase of the work. Letters shall be submitted with the Traffic Control Plans for approval. Approved letters shall be distributed a minimum of 24 hours prior to the commencement of work. (Note: The time frame criteria for distributing letters are the same as for posting "NO PARKING" signs.) The cost for preparing and distributing the letters shall be included in the cost for TCS. REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 27 of 30 Traffic control management shall be maintained on a 24 hour per day basis. The Contractor shall make arrangements so that the Traffic Control Supervisor or their approved representative will be available on every working day, "on call" at all times and available upon the Engineer's request at other than normal working hours. All costs associated with “on call” service, excluding actual hours worked, shall be included in the contract unit price for Traffic Control Supervisor. The TCS's will be paid only for days the Contractor works, and as directed by the Engineer. On weekends and other days the Contractor is not working, the TCS will not be paid. Time spent maintaining signs on the weekends, holidays, bad weather days, and other days the Contractor does not work shall be included in the unit prices for the equipment. Time spent setting up equipment, modifying equipment, maintaining equipment, and picking up equipment shall be included in the unit prices for the equipment. All traffic control devices shall be placed under the supervision of a Traffic Control Supervisor. The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins' "Work Area Traffic Control Handbook", and Part VI of the MUTCD, pertaining to traffic controls for street and highway construction, available at all times. METHOD OF MEASUREMENT Subsection 630.14 shall be revised as follows: Quantities to be measured for construction traffic control devices shall be the number of units of the various sizes and descriptions listed below: Construction Traffic Signs: Size A Signs - 0.01 to 9.00 Square Feet Size B Signs - 9.01 to 16.00 Square Feet "NO PARKING" Sign with Stand will be measured and paid for separately and not included in the item for Size A Signs. "NO PARKING" Sign with Stand shall consist of a metal sign attached to a device (stand) such as a Vertical Panel or Type I Barricade. The sign material and stand shall be approved by the Engineer. The sign material and stand will not be measured and paid for separately but shall be included in the Contract Unit Price for "NO PARKING" Sign with Stand. The cost for "NO PARKING" Sign with Stand shall include delivery, rental, setup, modification, maintenance, and pickup. “NO PARKING” signs must remain in place until the street is open to traffic. The “NO PARKING” signs shall be in effect for one or two days only. Traffic channelizing devices consisting of vertical panel, cones, or drum channelizing devices will be measured by the unit. Barricade warning lights shall be measured and paid for separately if approved by the Engineer. Advance Warning Flashing or Sequencing Arrow Panels will be measured by the unit. The number of Traffic Control Supervisors shall be approved by the Engineer prior to each days work. The quantity to be measured for Traffic Control Supervisor will be the number of authorized days performed by the Traffic Control Supervisor or his approved representative. An authorized day shall be any day, or portion of a day, authorized by the Engineer, that construction operation would require a Traffic Control Supervisor. "On Call" and project inspections on all other days will not be measured and paid for separately but shall be included in the work. The cost for setting up equipment, modifying equipment, maintaining equipment, and picking up equipment (not including "NO PARKING" Sign with Stand) during authorized days shall be included in the Contract Unit Price for Traffic Control Supervisor. REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 28 of 30 If a TCS(s) is used for an authorized day, but not for the entire day, the TCS shall be paid at the Contract Unit Price for "Traffic Control Supervisor" at the per hour rate. The quantity to be measured for flagging will be the total number of hours that flagging is actually used as authorized. Hours of flagging in excess of those authorized shall be at the Contractor's expense. Flagger breaks shall be included in the Contract Unit Price for Flagging. The method for covering flagger breaks shall be approved by the Engineer. Flagging outside of the construction work hours will not be paid for under the terms of this contract unless authorized in writing by the Engineer. Flagger stand-by time will not be paid for under the terms of this contract. In locations where traffic control is set up and the work is not performed due to Contractor caused delays, the traffic control shall not be paid for under the terms of this contract. The costs for advance warning "NO PARKING" signs for periods in excess of 24 hours prior to the advancement of work, including those instances when said signs have been changed or otherwise updated to reflect current schedules, will not be paid for under the terms of this contract unless authorized by the Engineer in writing. In addition, the Owner shall deduct from compensation due the Contractor $10.00 for each traffic control device per day for said conditions, including "NO PARKING" signs and any signs which are not removed from the site immediately upon completion of the work. BASIS OF PAYMENT Subsection 630.15 shall be revised as follows: The cost for Traffic Control Devices, not including "NO PARKING" Sign with Stand, shall include delivery, rental, and pickup. The cost for setting up equipment, modifying equipment, and maintaining equipment will be paid for under the Contract Unit Price for TCS as described above. The cost for "NO PARKING" Sign with Stand shall include delivery, rental, setup, modification, maintenance, and pickup. Payment shall be full compensation for furnishing, erecting, maintaining, moving, removing and disposing of construction traffic control devices necessary to complete the work. All construction traffic control devices which are not permanently incorporated into the project will remain the property of the Contractor. The initial manufacturing will be paid for Specialty Signs per unit and the actual use paid for under the appropriate unit cost for Size A or Size B sign. This item shall apply to new signs only. Once manufactured, they may be used throughout the project. Upon completion of the work, the Specialty Signs shall be returned to the Contractor. The accepted quantities will be paid for at the contract unit price for each of the pay items listed below: Pay Item Unit 630.01 "NO PARKING" Sign with Stand Per Day Per Each 630.02 Vertical Panel without Light Per Day Per Each 630.03 Channelizing Drum without Light Per Day Per Each REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 29 of 30 630.04 Type I/II Barricade without Light Per Day Per Each 630.05 Type III Barricade without Light Per Day Per Each 630.06 Size A Sign with Stand Per Day Per Each 630.07 Size B Sign with Stand Per Day Per Each 630.08 Size A Specialty Sign - Cost of Manufacturing Each 630.09 Size B Specialty Sign - Cost of Manufacturing Each 630.10 Cone with Reflective Strip Per Day Per Each 630.11 Safety Fence Per Day Per Roll 630.12 Light Per Day Per Each 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Unit Per Day 630.14 Variable Message Board Per Day Per Each 630.15 Traffic Control Supervisor Per Day 630.16 Traffic Control Supervisor Per Hour 630.17 Flagging Per Each Per Hour Flagger hand signs will not be measured and paid for separately, but shall be included in the work. The flaggers shall be provided with electronic communication devices when required. These devices will not be measured and paid for separately, but shall be included in the work. The cost of batteries, electricity and/or fuel for all lighting or warning devices will not be paid for separately but will be considered subsidiary to the item. Sand bags will not be measured and paid for separately, but shall be included in the work. The Contractor may provide larger construction traffic signs than those typically used in accordance with the MUTCD, if approved; however, payment will be made for the typical panel size. The City shall not be responsible for any losses or damage due to theft or vandalism. REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Project Specifications - Page 30 of 30 SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLLECTORS NOTE: CROSS STREET TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS AUTHORIZED BY THE ENGINEER IN WRITING. NOTE: FULL CLOSURES ON ARTERIALS AND COLLECTORS, INCLUDING THOSE LISTED ABOVE, WILL BE ALLOWED UNDER EXTREME CIRCUMSTANCES AND ONLY UPON APPROVAL OF THE ENGINEER. PLANS SHALL BE APPROVED A MINIMUM OF ONE WEEK PRIOR TO THE COMMENCEMENT OF WORK AND/OR THE TIME REQUIRED TO ADEQUATELY NOTIFY THE PUBLIC THROUGH THE MEDIA. SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS NOTE: FULL CLOSURES ON ALL RESIDENTIAL STREETS SHALL BE ALLOWED AS SHOWN ON THE TRAFFIC CONTROL PLANS. SECTION 02500 QUANTITY ESTIMATE This work shall consist of removal and/or installation of concrete curbs, gutters, sidewalks, crosspans, aprons, drive approaches and pedestrian access ramps, and placement of temporary asphalt patching adjacent to new concrete, on designated streets in the City of Fort Collins. Specific locations are described herein; however, additional quantities are included in the Bid Schedule for locations not yet identified at the time of the bid. All quantities stipulated in the Bid Schedule at unit prices are approximate and are to be used only as a basis for estimating the probable cost of the Work and for the purpose of comparing the bids submitted to the Work. The basis of payment shall be the actual amount of materials furnished and Work done. Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amount of Work actually performed and materials actually furnished and the estimated amount therefor. SECTION 02500 QUANTITY ESTIMATE 202.01 203.01 304.07 403.50 604.02 604.03 604.05 604.08 608.01 LF CY TON TON EA LF EA EA SF EASTDALE DR STOVER ST STOVER ST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOARDWALK DR S. COLLEGE AV LANDINGS DR 0.00 0.00 12.00 2.00 0.00 0.00 0.00 0.00 0.00 LANDINGS DR BOARDWALK DR HORSETOOTH RD 0.00 0.00 88.00 13.00 0.00 0.00 0.00 0.00 0.00 STARBOARD CT LANDINGS DR CDS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 15.00 0.00 0.00 0.00 0.00 0.00 MULBERY ST S. COLLEGE AV RIVERSIDE AV 0.00 154.07 370.00 40.00 1.00 0.00 5.00 0.00 198.00 0.00 154.07 370.00 40.00 1.00 0.00 5.00 0.00 198.00 HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. 0.00 0.00 39.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 7.00 0.00 0.00 0.00 0.00 0.00 REMINGTON ST E. OLIVE ST LOCUST ST 0.00 0.00 202.00 21.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 202.00 21.00 0.00 0.00 0.00 5.00 0.00 EASTWOOD DR DRAKE RD KIRKWOOD DR 0.00 0.00 97.00 18.00 3.00 5.00 4.00 0.00 0.00 KIRKWOOD DR CREEKWOOD DR EASTWOOD DR 0.00 0.00 8.00 2.00 0.00 0.00 0.00 0.00 0.00 CREEKWOOD DR TRAILWOOD DR E. STUART DR 0.00 0.00 55.00 10.00 1.00 0.00 0.00 0.00 0.00 CREEKWOOD DR CDS CREEKWOOD DR END 0.00 0.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 163.00 31.00 4.00 5.00 4.00 0.00 0.00 ANTELOPE RD END CARIBOU DR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOBCAT PL ANTELOPE RD END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 COYOTE PL ARTIC FOX DR END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DALL PL ARTIC FOX DR END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 JAGUAR PL ANTELOPE RD END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 KODIAK RD WAPITI RD CARIBOU DR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MULEY ST ANTELOPE RD WAPITI RD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PUMA PL ARTIC FOX DR END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RED WOLF PL END ANTELOPE RD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SLIVER TIP PL ANTELOPE RD END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 WAPITI RD ARTIC FOX DR CARIBOU DR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 WHITETAIL PL ARTIC FOX DR END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DEINES CT SMITH PL CDS 0.00 0.00 2.71 1.01 0.00 0.00 0.00 0.00 0.00 MATHEWS ST E. PROSPECT RD PARKER ST 0.00 0.00 8.80 3.19 0.00 0.00 0.00 0.00 0.00 PARKER ST S. COLLEGE AV STOVER ST 0.00 0.00 14.70 19.05 0.00 0.00 1.00 0.00 0.00 PERSON CT PARKER ST N. END 0.00 0.00 2.13 0.79 0.00 0.00 0.00 0.00 0.00 PETERSON PL E. PROSPECT RD PARKER ST 0.00 0.00 1.39 0.53 0.00 0.00 0.00 0.00 0.00 SMITH PL E. PROSPECT RD PARKER ST 0.00 0.00 10.78 4.51 0.00 0.00 0.00 0.00 0.00 WHEDBEE ST E. PROSPECT RD PARKER ST 0.00 0.00 1.47 0.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.98 29.64 0.00 0.00 1.00 0.00 0.00 Sawcut 4" Aggregate Base Temp. Patching General Excavation Recon Modified Type 13 Curb Inlet Deck Remove Concrete Recon Inlet Deck - Catch Basin Recon. Type R SECTION 02500 QUANTITY ESTIMATE EASTDALE DR STOVER ST STOVER ST BOARDWALK DR S. COLLEGE AV LANDINGS DR LANDINGS DR BOARDWALK DR HORSETOOTH RD STARBOARD CT LANDINGS DR CDS MULBERY ST S. COLLEGE AV RIVERSIDE AV HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. REMINGTON ST E. OLIVE ST LOCUST ST EASTWOOD DR DRAKE RD KIRKWOOD DR KIRKWOOD DR CREEKWOOD DR EASTWOOD DR CREEKWOOD DR TRAILWOOD DR E. STUART DR CREEKWOOD DR CDS CREEKWOOD DR END ANTELOPE RD END CARIBOU DR ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR BOBCAT PL ANTELOPE RD END COYOTE PL ARTIC FOX DR END DALL PL ARTIC FOX DR END JAGUAR PL ANTELOPE RD END KODIAK RD WAPITI RD CARIBOU DR MULEY ST ANTELOPE RD WAPITI RD PUMA PL ARTIC FOX DR END RED WOLF PL END ANTELOPE RD SLIVER TIP PL ANTELOPE RD END WAPITI RD ARTIC FOX DR CARIBOU DR WHITETAIL PL ARTIC FOX DR END DEINES CT SMITH PL CDS MATHEWS ST E. PROSPECT RD PARKER ST PARKER ST S. COLLEGE AV STOVER ST PERSON CT PARKER ST N. END PETERSON PL E. PROSPECT RD PARKER ST SMITH PL E. PROSPECT RD PARKER ST WHEDBEE ST E. PROSPECT RD PARKER ST FROM TO W. HARMONY RD. E. MULBERRY STREET STREET PARKER AREA FOX MEADOWS PARKWOOD EAST REMINGTON STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA 608.02 608.03 608.04 608.05 608.06 608.07 608.08 608.09 608.10 608.11 EA SF SF LF LF LF LF LF LF LF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 109.00 0.00 0.00 0.00 0.00 252.00 0.00 0.00 0.00 120.00 774.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 0.00 0.00 0.00 120.00 883.00 0.00 0.00 0.00 SECTION 02500 QUANTITY ESTIMATE EASTDALE DR STOVER ST STOVER ST BOARDWALK DR S. COLLEGE AV LANDINGS DR LANDINGS DR BOARDWALK DR HORSETOOTH RD STARBOARD CT LANDINGS DR CDS MULBERY ST S. COLLEGE AV RIVERSIDE AV HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. REMINGTON ST E. OLIVE ST LOCUST ST EASTWOOD DR DRAKE RD KIRKWOOD DR KIRKWOOD DR CREEKWOOD DR EASTWOOD DR CREEKWOOD DR TRAILWOOD DR E. STUART DR CREEKWOOD DR CDS CREEKWOOD DR END ANTELOPE RD END CARIBOU DR ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR BOBCAT PL ANTELOPE RD END COYOTE PL ARTIC FOX DR END DALL PL ARTIC FOX DR END JAGUAR PL ANTELOPE RD END KODIAK RD WAPITI RD CARIBOU DR MULEY ST ANTELOPE RD WAPITI RD PUMA PL ARTIC FOX DR END RED WOLF PL END ANTELOPE RD SLIVER TIP PL ANTELOPE RD END WAPITI RD ARTIC FOX DR CARIBOU DR WHITETAIL PL ARTIC FOX DR END DEINES CT SMITH PL CDS MATHEWS ST E. PROSPECT RD PARKER ST PARKER ST S. COLLEGE AV STOVER ST PERSON CT PARKER ST N. END PETERSON PL E. PROSPECT RD PARKER ST SMITH PL E. PROSPECT RD PARKER ST WHEDBEE ST E. PROSPECT RD PARKER ST FROM TO W. HARMONY RD. E. MULBERRY STREET STREET PARKER AREA FOX MEADOWS PARKWOOD EAST REMINGTON STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA 608.12 608.13 608.14 608.15 608.16 608.17 608.18 608.19 608.22 608.23 LF LF SF SF SF SF SF SF SF SF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.00 0.00 12.00 36.00 154.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 442.00 1145.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.00 0.00 24.00 478.00 1299.00 0.00 0.00 0.00 SECTION 02500 QUANTITY ESTIMATE EASTDALE DR STOVER ST STOVER ST BOARDWALK DR S. COLLEGE AV LANDINGS DR LANDINGS DR BOARDWALK DR HORSETOOTH RD STARBOARD CT LANDINGS DR CDS MULBERY ST S. COLLEGE AV RIVERSIDE AV HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. REMINGTON ST E. OLIVE ST LOCUST ST EASTWOOD DR DRAKE RD KIRKWOOD DR KIRKWOOD DR CREEKWOOD DR EASTWOOD DR CREEKWOOD DR TRAILWOOD DR E. STUART DR CREEKWOOD DR CDS CREEKWOOD DR END ANTELOPE RD END CARIBOU DR ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR BOBCAT PL ANTELOPE RD END COYOTE PL ARTIC FOX DR END DALL PL ARTIC FOX DR END JAGUAR PL ANTELOPE RD END KODIAK RD WAPITI RD CARIBOU DR MULEY ST ANTELOPE RD WAPITI RD PUMA PL ARTIC FOX DR END RED WOLF PL END ANTELOPE RD SLIVER TIP PL ANTELOPE RD END WAPITI RD ARTIC FOX DR CARIBOU DR WHITETAIL PL ARTIC FOX DR END DEINES CT SMITH PL CDS MATHEWS ST E. PROSPECT RD PARKER ST PARKER ST S. COLLEGE AV STOVER ST PERSON CT PARKER ST N. END PETERSON PL E. PROSPECT RD PARKER ST SMITH PL E. PROSPECT RD PARKER ST WHEDBEE ST E. PROSPECT RD PARKER ST FROM TO W. HARMONY RD. E. MULBERRY STREET STREET PARKER AREA FOX MEADOWS PARKWOOD EAST REMINGTON STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA 608.24 LF 0.00 0.00 10.00 10.00 0.00 20.00 SECTION 02500 QUANTITY ESTIMATE 202.01 203.01 304.07 403.50 604.02 604.03 604.05 604.08 608.01 LF CY TON TON EA LF EA EA SF Sawcut 4" Aggregate Base Temp. Patching General Excavation Recon Modified Type 13 Curb Inlet Deck Remove Concrete Recon Inlet Deck - Catch Basin Recon. Type R Curb Inlet Deck - Add. 1' Opening STREET FROM TO Recon Type R Inlet Deck 4' Opening AZALEA CT AZALEA DR CDS 0.00 0.00 4.25 1.85 0.00 0.00 0.00 0.00 0.00 AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL 0.00 0.00 23.83 11.72 0.00 0.00 0.00 0.00 0.00 HOLLY ST LARCH ST HOLLY WAY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LARCH ST W. PROSPECT RD SUMAC ST 0.00 0.00 17.45 7.43 0.00 0.00 0.00 0.00 0.00 PALM DR W. PROSPECT RD S. OVERLAND TRAIL 0.00 0.00 9.31 3.68 0.00 0.00 0.00 0.00 0.00 RAMS LN PECAN ST REAL CT 0.00 0.00 11.15 6.00 0.00 0.00 0.00 0.00 0.00 REAL CT PECAN ST S. OVERLAND TRAIL 0.00 0.00 4.25 1.56 0.00 0.00 0.00 0.00 0.00 SUMAC ST LARCH ST S. OVERLAND TRAIL 0.00 0.00 14.81 5.37 0.00 0.00 0.00 0.00 0.00 PECAN ST PALM DR S. OVERLAND TRAIL 7.00 0.00 24.42 10.46 0.00 0.00 0.00 0.00 0.00 7.00 0.00 109.49 48.07 0.00 0.00 0.00 0.00 0.00 BLUE MESA AV COLONY DR WORTHINGTON AV 0.00 0.00 3.52 1.28 0.00 0.00 0.00 0.00 0.00 CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY 0.00 0.00 7.92 4.47 0.00 0.00 0.00 0.00 0.00 CIMARRON CT ROCKY MOUNTAIN WY CDS 0.00 0.00 2.57 1.65 0.00 0.00 0.00 0.00 0.00 FAIRPLAY CT GUNNISON DR CDS 0.00 0.00 3.30 1.22 0.00 0.00 0.00 0.00 0.00 GUNNISON DR WORTHINGTON AV CDS 0.00 0.00 18.19 6.68 0.00 0.00 0.00 0.00 0.00 LONGHORN CT BLUE MESA AV CDS 0.00 0.00 0.66 0.26 0.00 0.00 0.00 0.00 0.00 PLACER ST W. SWALLOW RD WORTHINGTON AV 0.00 0.00 7.04 2.57 0.00 0.00 0.00 0.00 0.00 POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR 0.00 0.00 6.89 2.50 0.00 0.00 0.00 0.00 0.00 ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST 0.00 0.00 3.01 1.11 0.00 0.00 0.00 0.00 0.00 SILVERTHORN DR GUNNISON DR CDS 0.00 0.00 1.03 0.83 0.00 0.00 0.00 0.00 0.00 TUMBLEWEED LN ROCKY MOUNTAIN WY CDS 0.00 0.00 2.27 1.54 0.00 0.00 0.00 0.00 0.00 WAGONWHEEL DR ROCKY MOUNTAIN WY CDS 0.00 0.00 40.55 14.78 0.00 0.00 0.00 0.00 0.00 WINCHESTER DR WAGONWHEEL DR CDS 0.00 0.00 13.20 4.77 0.00 0.00 0.00 0.00 0.00 WORTHINGTON AV W. DRAKE RD CDS 0.00 0.00 24.27 8.51 0.00 0.00 0.00 0.00 0.00 YELLOW PINE CT GUNNISON DR CDS 0.00 0.00 4.03 1.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.45 53.90 0.00 0.00 0.00 0.00 0.00 TOTAL 7.00 154.07 1163.92 245.61 5.00 5.00 10.00 5.00 198.00 AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS Page 5 of 8 SECTION 02500 QUANTITY ESTIMATE STREET FROM TO AZALEA CT AZALEA DR CDS AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL HOLLY ST LARCH ST HOLLY WAY LARCH ST W. PROSPECT RD SUMAC ST PALM DR W. PROSPECT RD S. OVERLAND TRAIL RAMS LN PECAN ST REAL CT REAL CT PECAN ST S. OVERLAND TRAIL SUMAC ST LARCH ST S. OVERLAND TRAIL PECAN ST PALM DR S. OVERLAND TRAIL BLUE MESA AV COLONY DR WORTHINGTON AV CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY CIMARRON CT ROCKY MOUNTAIN WY CDS FAIRPLAY CT GUNNISON DR CDS GUNNISON DR WORTHINGTON AV CDS LONGHORN CT BLUE MESA AV CDS PLACER ST W. SWALLOW RD WORTHINGTON AV POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST SILVERTHORN DR GUNNISON DR CDS TUMBLEWEED LN ROCKY MOUNTAIN WY CDS WAGONWHEEL DR ROCKY MOUNTAIN WY CDS WINCHESTER DR WAGONWHEEL DR CDS WORTHINGTON AV W. DRAKE RD CDS YELLOW PINE CT GUNNISON DR CDS TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS 608.02 608.03 608.04 608.05 608.06 608.07 608.08 608.09 608.10 608.11 EA SF SF LF LF LF LF LF LF LF Hollywood w/ 6" Walk R&R Barrier Curb 12" R&R VC Outfall Median Curb R&R VC w/ 6" Walk R&R VC NSW R&R DO w/ 6" Walk R&R DO NSW R&R Crosspan Remove & Replace Remove Fillets Apron Remove & Replace 0.00 25.97 52.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 SECTION 02500 QUANTITY ESTIMATE STREET FROM TO AZALEA CT AZALEA DR CDS AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL HOLLY ST LARCH ST HOLLY WAY LARCH ST W. PROSPECT RD SUMAC ST PALM DR W. PROSPECT RD S. OVERLAND TRAIL RAMS LN PECAN ST REAL CT REAL CT PECAN ST S. OVERLAND TRAIL SUMAC ST LARCH ST S. OVERLAND TRAIL PECAN ST PALM DR S. OVERLAND TRAIL BLUE MESA AV COLONY DR WORTHINGTON AV CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY CIMARRON CT ROCKY MOUNTAIN WY CDS FAIRPLAY CT GUNNISON DR CDS GUNNISON DR WORTHINGTON AV CDS LONGHORN CT BLUE MESA AV CDS PLACER ST W. SWALLOW RD WORTHINGTON AV POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST SILVERTHORN DR GUNNISON DR CDS TUMBLEWEED LN ROCKY MOUNTAIN WY CDS WAGONWHEEL DR ROCKY MOUNTAIN WY CDS WINCHESTER DR WAGONWHEEL DR CDS WORTHINGTON AV W. DRAKE RD CDS YELLOW PINE CT GUNNISON DR CDS TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS 608.12 608.13 608.14 608.15 608.16 608.17 608.18 608.19 608.22 608.23 LF LF SF SF SF SF SF SF SF SF 6" Flatwork R&R Pedestrian Access Ramp Highback R&R Concrete Pavement 8" R&R Replace Flatwork 1" Add. Depth Alley Approach 8" R&R 4" Flatwork R&R Truncated Dome Panels (2' x 2') Highback SECTION 02500 QUANTITY ESTIMATE STREET FROM TO AZALEA CT AZALEA DR CDS AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL HOLLY ST LARCH ST HOLLY WAY LARCH ST W. PROSPECT RD SUMAC ST PALM DR W. PROSPECT RD S. OVERLAND TRAIL RAMS LN PECAN ST REAL CT REAL CT PECAN ST S. OVERLAND TRAIL SUMAC ST LARCH ST S. OVERLAND TRAIL PECAN ST PALM DR S. OVERLAND TRAIL BLUE MESA AV COLONY DR WORTHINGTON AV CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY CIMARRON CT ROCKY MOUNTAIN WY CDS FAIRPLAY CT GUNNISON DR CDS GUNNISON DR WORTHINGTON AV CDS LONGHORN CT BLUE MESA AV CDS PLACER ST W. SWALLOW RD WORTHINGTON AV POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST SILVERTHORN DR GUNNISON DR CDS TUMBLEWEED LN ROCKY MOUNTAIN WY CDS WAGONWHEEL DR ROCKY MOUNTAIN WY CDS WINCHESTER DR WAGONWHEEL DR CDS WORTHINGTON AV W. DRAKE RD CDS YELLOW PINE CT GUNNISON DR CDS TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS 608.24 LF Expansion & Caulking 9.00 9.00 0.00 0.00 0.00 0.00 0.00 13.00 9.00 40.00 13.00 0.00 18.00 0.00 21.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 SECTION 03000 DETAILS INDEX Curb and Gutter 701 Curb, Gutter, and Sidewalk D-6 Median (Island) Curbs 703 Standard Driveway Approach (I & II) 706 Standard Driveway Approach (III & IV) 707 Street Intersection Crosspan 708 Drainage Under Sidewalk 709 Curb Inlet 4’ Opening – Vertical Curb & Gutter D-7a, 7b Curb Inlet 4’ Opening – Driveover Curb & Gutter D-8a, 8b Concrete Sidewalk Culvert D-12, 13 Area Inlet D-9a Modified Type 13 Inlet Catch Basin Alley Intersections 803 Standard Manhole Cover 1201 Standard Sidewalk 1601 Sidewalk Detail 1602 Access Ramp Details 1603 Detached Walk/Intersection Detail 1604 Detached Walk/Intersection Detail 1605 Pedestrian Ramp Detail 1606 Residential Local Street Access Ramps 1606(a) Truncated Dome Warning for Access Ramps 1607 Median Islands and Pedestrian Refuge Area 1608 Sidewalk Widening Details 2501 Concrete Pavement Joints M-412-1 SECTION 03500 PROJECT MAPS Mulberry/Remington/Eastdale Areas Parker Area Stadium Heights Parkwood East Wood West Landings & Boardwalk Fox Meadows West Harmony Road SMITH ST WHEDBEE ST MATHEWS ST PETERSON ST STOVER ST REMINGTON ST S COLLEGE AVE E LAUREL ST LOCUST ST E MYRTLE ST E PLUM ST E ELIZABETH ST E MULBERRY ST E OLIVE ST E OAK ST RIVERSIDE AVE EDWARDS ST E MAGNOLIA ST GARFIELD ST COWAN ST COLORADO ST ENDICOTT ST ELLIS ST LILAC LN NEWSOM ST WILLIAMS ST EASTDALE DR LOCUST CT KENROY CT Emigh Lateral Cache La Poudre River Cache La Poudre River ´ City of Fort Collins 2007 Street Maintenance Project Mulberry/Remington/Eastdale - Rehab ú ú PARKER ST E STUART ST E PROSPECT RD WHEDBEE ST REMINGTON ST S COLLEGE AVE STOVER ST MATHEWS ST PETERSON ST ALPERT AVE SMITH PL PETERSON PL CIRCLE DR BUSCH CT PERSON CT DEINES CT MORNINGSIDE DR SMITH ST INDIAN MEADOWS LN BRISTOL CT MATHEWS ST STOVER ST PETERSON ST Spring Creek Pitkin Lateral ´ City of Fort Collins 2007 Street Maintenance Project Parker Area - Slurry Seal PECAN ST S OVERLAND TRL LARCH ST AZALEA DR SUMAC ST W PROSPECT RD PALM DR HOLLY WAY RAMS LN SOMERVILLE DR HOLLY ST REAL CT ROSS CT ZIRKELS CT ROSS DR LANGSHIRE DR AZALEA CT ´ City of Fort Collins 2007 Street Maintenance Project Stadium Heights - Slurry ú E DRAKE RD BROOKWOOD DR KIRKWOOD DR EASTWOOD DR ROLLINGWOOD DR E STUART ST TEAKWOOD DR TANGLEWOOD DR PARKWOOD DR STONEHENGE DR BARNWOOD DR CREEKWOOD DR SAGEWOOD DR ROLLINGWOOD LN TRAILWOOD DR PARKLAKE DR ABILENE CT ADOBE DR SHADOW CT SILVER CREEK DR ROLF CT LAKESHORE DR RIVERSIDE AVE YUCCA CT DOGWOOD CT SHADOW MOUNTAIN DR EASTWOOD CT BEAR CT DORADO CT TEAKWOOD CT KENWOOD CT OSPREY CT CREEKWOOD DR Sherwood Lateral ´ City of Fort Collins 2007 Street Maintenance Project Parkwood East - Rehab S SHIELDS ST W DRAKE RD MEADOWLARK AVE W SWALLOW RD WORTHINGTON AVE WAGONWHEEL DR COLONY DR ROCKY MOUNTAIN WAY GUNNISON DR MORSMAN DR BLUE MESA AVE POWDERHORN DR RUSTIC CT WINCHESTER DR DAVIDSON DR ZUNI CIR PLACER ST APPALOOSA CT SILVERTHORNE DR CONESTOGA CT KILLDEER DR CUMBERLAND CT PLACER CT CHAPARRAL DR EAGLE DR BOZEMAN CT AVOCET RD ROCKY MOUNTAIN CT CIMARRON CT FAIRPLAY CT HOMESTEAD CT COLT CT CAVALRY CT EAGLE ´ DR City of Fort Collins 2007 Street Maintenance Project Wood West - Slurry ú ú ú ú S COLLEGE AVE LANDINGS DR JOHN F KENNEDY PKWY BOARDWALK DR E HORSETOOTH RD MITCHELL DR MARINER LN SKYSAIL LN BOCKMAN DR SPINNAKER LN LEEWARD CT BOWLINE CT HIGH POINTE DR STANFORD RD CORMORANT CT STARBOARD CT Larimer County Canal No. 2 ´ City of Fort Collins 2007 Street Maintenance Project Landings Area - Stabilize & Reconstruct CARIBOU DR S TIMBERLINE RD WAPITI RD ANTELOPE RD E HORSETOOTH RD KODIAK RD ARCTIC FOX DR BIGHORN RD STONEGATE DR RED MOUNTAIN DR BISON RD SUNBURST DR STONEY CREEK DR SUNSTONE DR FIELDSTONE DR PIKE CIR N CUCHARAS CT MULEY ST CAPSTONE CT COCHETOPA CT STONEWAY CT SILVERTIP PL KENOSHA CT SUNRAY CT BOBCAT PL WHITETAIL PL JAGUAR PL COYOTE PL DALL PL RED WOLF PL SUNSTONE DR ´ City of Fort Collins 2007 Street Maintenance Project Fox Meadows - Rehab ú ú ú SENECA ST S TAFT HILL RD W HARMONY RD REGENCY DR LYNDA LN SILVERGATE RD ROYAL DR OVERLOOK DR VISTA DR GOODELL LN GREENGATE DR CAPITOL DR PRAIRIE RIDGE DR CRESCENT DR ROLLING GATE RD CRAIG DR MESAVIEW LN CHIPPENDALE DR FROMME PRAIRIE WAY HILBURN DR LOOKOUT LN WESTFIELD DR CEDARGATE DR DUSTY SAGE DR CENTER GATE CT WHIPPENY DR CHOKECHERRY TRL WINDCREEK CT BLUE SAGE DR HILBURN CT PRAIRIE VISTA DR WESTFIELD DR F ossil Creek ´ City of Fort Collins 2007 Street Maintenance Project West Harmony Road - Hot In Place Recycling Administrative Services Purchasing Divison 215 North Mason Street  2nd Floor  P.O. Box 580  Fort Collins, CO 80522-0580  (970) 221-6775  Fax (970) 221-6707 www.fcgov.com ADDENDUM No. 1 6046 Concrete Maintenance Project SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid: 6046 Concrete Maintenance Project OPENING DATE: 3:00 P.M. (Our Clock) April, 2, 2007 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. CHANGE: • "Class C Fly Ash will not be permitted in any mix design" shall be added to Revision of Section 608 and 609 of the Project Specifcations, page 20 of 30 as shown below: • “High Early” concrete shall be used for concrete repair locations. “High Early” concrete shall have a specified compressive strength of 4000 psi and a minimum 48 hour compressive strength of 3000 psi. The concrete shall have a maximum water/cement ratio of 0.45. The type of concrete used for a particular location shall be approved by the Engineer. Class C Fly Ash will not be permitted in any mix design. See also Section 2.05, ‘Rigid Pavement Design’, and Section 4.2.4., ‘Concrete Streets’, of the City of Fort Collins Design Criteria and Standards for Streets. • Several quantities have been increased. Bidders shall use the revised bid tab, attached. • Also attached is a revised quantity estimate and map of The Overlook at Woodridge areas. Please contact John D. Stephen, CPPO, CPPB, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED ADDENDUM 1 BID SCHEDULE - REVISED City of Fort Collins Bid No. 6046 Concrete Maintenance Project Unit Price Total 202.01 Sawcutting 4" L.F. 100 $ $ 202.02 Sawcutting - Additional Inch Depth LF/ IN. 100 $ $ 203.01 General Excavation CY 200 $ $ 203.02 Borrow TON 50 $ $ 212.01 Sod SF 500 $ $ 212.02 Landscape/Irrigation Labor HR 50 $ $ 304.01 Aggregate Base Course TON 1800 $ $ 403.01 Temporary Patching TON 400 $ $ 604.01 Type R Inlet - Remove & Replace (4' Opening) EA 1 $ $ 604.02 Type R Inlet - Reconstruct Deck (4' Opening) EA 7 $ $ 604.03 Type R Inlet - Reconstruct Deck Additional Foot Opening LF 5 $ $ 604.04 Catch Basin Inlet - Remove & Replace EA 1 $ $ 604.05 Catch Basin Inlet - Reconstruct Deck EA 10 $ $ 604.06 Catch Basin - Reconstruct Deck Additional Foot Opening LF 1 $ $ 604.07 Modified Type 13 Curb Inlet - Remove & Replace EA 1 $ $ 604.08 Modified Type 13 Curb Inlet - Reconstruct Deck EA 5 $ $ 604.09 Modified Type 13 Curb Inlet - Materials Only EA 1 $ $ 604.10 Concrete Sidewalk Culvert - Remove & Replace EA 1 $ $ 604.11 Metal Sidewalk Culvert 5/8" Plate - Remove & Replace EA 1 $ $ 604.12 Additional Square Foot of 5/8" Plate SF 5 $ $ 608.01 Remove Concrete SF 250 $ $ 608.02 Remove and Haul Fillets EA 12 $ $ 608.03 Apron 8" - Remove & Replace SF 6000 $ $ 608.04 Crosspan - 8" Remove & Replace SF 6075 $ $ 608.05 Driveover Curb, Gutter & 6" Sidewalk - Remove & Replace LF 7600 $ $ 608.06 Driveover Curb & Gutter - No Sidewalk - Remove & Replace LF 1325 $ $ 608.07 Vertical Curb, Gutter & 6" Sidewalk - Remove & Replace LF 200 $ $ 608.08 Vertical Curb & Gutter - No Sidewalk - Remove & Replace LF 3350 $ $ 608.09 Vertical Outfall Curb & Gutter - Remove & Replace LF 50 $ $ 608.10 Barrier Curb 12" - Remove & Replace LF 25 $ $ 608.11 Hollywood Curb, Gutter & 6" Sidewalk - Remove & Replace LF 2000 $ $ 608.12 Hollywood Curb & Gutter - No Sidewalk - Remove & Replace LF 175 $ $ 608.13 Highback Curb & Gutter - No Sidewalk - Remove & Replace LF 3200 $ $ 608.14 Pedestrian Access Ramp - Remove & Replace SF 7250 $ $ 608.15 Pedestrian Access Ramp - Highback - Remove & Replace SF 3250 $ $ 608.16 Truncated Dome Panel SF 975 $ $ 608.17 Flatwork 4" - Remove & Replace SF 500 $ $ 608.18 Flatwork 6" - Remove & Replace SF 16000 $ $ Contract Quantity Item No. Contract Cost Description Unit Page 1 of 2 ADDENDUM 1 BID SCHEDULE - REVISED City of Fort Collins Bid No. 6046 Concrete Maintenance Project Unit Price Total Contract Quantity Item No. Contract Cost Description Unit 608.19 Replace Flatwork - 1" Additional Depth SF 2550 $ $ 608.20 Colored Concrete 4" San Diego Buff - Up Charge SF 500 $ $ 608.21 4' Valley Pan (6") - Remove & Replace SF 250 $ $ 608.22 Concrete Pavement 8" - Remove & Replace SF 1200 $ $ 608.23 Alley Approach 8" - Remove & Replace SF 1850 $ $ 608.24 Expansion & Caulking LF 1200 $ $ 608.25 Splashblock 4" SF 500 $ $ 608.26 Exposed Aggregate 4" - Up Charge SF 200 $ $ 608.27 Reset Flagstone SF 1500 $ $ 623.01 Irrigation Sleeving 3" PVC - Complete In Place LF 86 $ $ 630.01 “No Parking” Sign With Stand Per Day Per Each 2200 $ $ 630.02 Vertical Panel Without Light Per Day Per Each 4900 $ $ 630.03 Channelizing Drum Without Light Per Day Per Each 2500 $ $ 630.04 Type I / II Barricade Without Light Per Day Per Each 27500 $ $ 630.05 Type III Barricade Without Light Per Day Per Each 900 $ $ 630.06 Size A Sign With Stand Per Day Per Each 3500 $ $ 630.07 Size B Sign With Stand Per Day Per Each 1350 $ $ 630.08 Size A Specialty Sign - Cost of Manufacturing Each 5 $ $ 630.09 Size B Specialty Sign - Cost of Manufacturing Each 5 $ $ 630.10 Cone With Reflective Strip Per Day Per Each 8500 $ $ 630.11 Safety Fence Per Day Per Roll 5 $ $ 630.12 Light Per Day Per Each 50 $ $ 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Day Per Each 15 $ $ 630.14 Variable Message Board Per Day Per Each 5 $ $ 630.15 Traffic Control Supervisor Per Day 100 $ $ 630.16 Traffic Control Supervisor Per Hour 400 $ $ 630.17 Flagging Per Hour 2650 $ $ TOTAL COST Dollars and Cents. Signed Address Company Phone/Fax Check One: Individual Doing Business in Company Name Corporation Partnership $ Page 2 of 2 SECTION 02500 QUANTITY ESTIMATE 202.01 203.01 304.07 403.50 604.02 604.03 604.05 604.08 608.01 608.02 608.03 LF CY TON TON EA LF EA EA SF EA SF EASTDALE DR STOVER ST STOVER ST 0.00 0.00 63.00 11.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 63.00 11.00 0.00 0.00 0.00 0.00 0.00 5.00 0.00 BOARDWALK DR S. COLLEGE AV LANDINGS DR 0.00 0.00 12.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LANDINGS DR BOARDWALK DR HORSETOOTH RD 0.00 0.00 88.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 STARBOARD CT LANDINGS DR CDS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 252.00 MULBERY ST S. COLLEGE AV RIVERSIDE AV 20.00 154.07 383.00 43.00 2.00 0.00 5.00 0.00 198.00 0.00 334.00 20.00 154.07 383.00 43.00 2.00 0.00 5.00 0.00 198.00 0.00 334.00 HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. 0.00 0.00 40.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 392.27 0.00 0.00 40.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 392.27 REMINGTON ST E. OLIVE ST LOCUST ST 0.00 0.00 224.00 25.00 0.00 0.00 0.00 5.00 0.00 0.00 14.00 0.00 0.00 224.00 25.00 0.00 0.00 0.00 5.00 0.00 0.00 14.00 EASTWOOD DR DRAKE RD KIRKWOOD DR 0.00 0.00 97.00 18.00 3.00 5.00 4.00 0.00 0.00 0.00 272.00 EASTWOOD CT EASTWOOD DR CDS 0.00 0.00 31.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 KIRKWOOD DR CREEKWOOD DR EASTWOOD DR 0.00 0.00 8.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 CREEKWOOD DR TRAILWOOD DR E. STUART DR 0.00 0.00 55.00 10.00 1.00 0.00 0.00 0.00 0.00 0.00 207.00 CREEKWOOD DR CDS CREEKWOOD DR END 0.00 0.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 194.00 37.00 4.00 5.00 4.00 0.00 0.00 0.00 504.00 ANTELOPE RD END CARIBOU DR 0.00 0.00 53.00 10.00 1.00 0.00 0.00 0.00 0.00 2.00 263.00 ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR 0.00 0.00 38.00 7.00 0.00 0.00 0.00 0.00 0.00 1.00 325.00 BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR 0.00 0.00 30.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 373.00 BOBCAT PL ANTELOPE RD END 0.00 0.00 15.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 270.00 COYOTE PL ARTIC FOX DR END 0.00 0.00 22.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 204.00 CARIBOU DR E HORSETOOTH RD 0.00 0.00 7.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 97.00 DALL PL ARTIC FOX DR END 0.00 0.00 12.00 2.00 0.00 0.00 0.00 0.00 0.00 1.00 220.00 JAGUAR PL ANTELOPE RD END 0.00 0.00 11.00 2.00 0.00 0.00 0.00 0.00 0.00 1.00 180.00 KODIAK RD WAPITI RD CARIBOU DR 0.00 0.00 36.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 312.00 MULEY ST ANTELOPE RD WAPITI RD 0.00 0.00 13.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 250.00 PUMA PL ARTIC FOX DR END 0.00 0.00 15.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 165.00 RED WOLF PL END ANTELOPE RD 0.00 0.00 17.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 198.00 SLIVER TIP PL ANTELOPE RD END 0.00 0.00 20.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 201.00 WAPITI RD ARTIC FOX DR CARIBOU DR 7.00 0.00 85.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 444.00 WHITETAIL PL ARTIC FOX DR END 0.00 0.00 7.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 0.00 381.00 67.00 1.00 0.00 0.00 0.00 0.00 5.00 3502.00 DEINES CT SMITH PL CDS 0.00 0.00 2.71 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MATHEWS ST E. PROSPECT RD PARKER ST 0.00 0.00 8.80 3.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PARKER ST S. COLLEGE AV STOVER ST 0.00 0.00 14.70 19.05 0.00 0.00 1.00 0.00 0.00 0.00 0.00 PERSON CT PARKER ST N. END 0.00 0.00 2.13 0.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PETERSON PL E. PROSPECT RD PARKER ST 0.00 0.00 1.39 0.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SMITH PL E. PROSPECT RD PARKER ST 0.00 0.00 10.78 4.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 WHEDBEE ST E. PROSPECT RD PARKER ST 0.00 0.00 1.47 0.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.98 29.64 0.00 0.00 1.00 0.00 0.00 0.00 0.00 Aggregate Base Temp. Patching General TO Excavation Recon Modified Type 13 Curb Inlet Deck Remove Concrete Remove Fillets SECTION 02500 QUANTITY ESTIMATE EASTDALE DR STOVER ST STOVER ST BOARDWALK DR S. COLLEGE AV LANDINGS DR LANDINGS DR BOARDWALK DR HORSETOOTH RD STARBOARD CT LANDINGS DR CDS MULBERY ST S. COLLEGE AV RIVERSIDE AV HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. REMINGTON ST E. OLIVE ST LOCUST ST EASTWOOD DR DRAKE RD KIRKWOOD DR EASTWOOD CT EASTWOOD DR CDS KIRKWOOD DR CREEKWOOD DR EASTWOOD DR CREEKWOOD DR TRAILWOOD DR E. STUART DR CREEKWOOD DR CDS CREEKWOOD DR END ANTELOPE RD END CARIBOU DR ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR BOBCAT PL ANTELOPE RD END COYOTE PL ARTIC FOX DR END CARIBOU DR E HORSETOOTH RD DALL PL ARTIC FOX DR END JAGUAR PL ANTELOPE RD END KODIAK RD WAPITI RD CARIBOU DR MULEY ST ANTELOPE RD WAPITI RD PUMA PL ARTIC FOX DR END RED WOLF PL END ANTELOPE RD SLIVER TIP PL ANTELOPE RD END WAPITI RD ARTIC FOX DR CARIBOU DR WHITETAIL PL ARTIC FOX DR END DEINES CT SMITH PL CDS MATHEWS ST E. PROSPECT RD PARKER ST PARKER ST S. COLLEGE AV STOVER ST PERSON CT PARKER ST N. END PETERSON PL E. PROSPECT RD PARKER ST SMITH PL E. PROSPECT RD PARKER ST WHEDBEE ST E. PROSPECT RD PARKER ST TO E. MULBERRY STREET STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA FROM AREA SUB TOTAL AREA SUB TOTAL PARKER AREA AREA SUB TOTAL AREA SUB TOTAL FOX MEADOWS PARKWOOD EAST REMINGTON STREET AREA SUB TOTAL AREA SUB TOTAL W. HARMONY RD. 608.04 608.05 608.06 608.07 608.08 608.09 608.10 608.11 608.12 608.13 608.14 608.15 SF LF LF LF LF LF LF LF LF LF SF SF 342.00 0.00 0.00 0.00 0.00 0.00 0.00 713.00 30.00 0.00 28.00 0.00 342.00 0.00 0.00 0.00 0.00 0.00 0.00 713.00 30.00 0.00 28.00 0.00 0.00 0.00 0.00 0.00 109.00 0.00 0.00 0.00 0.00 0.00 132.00 0.00 SECTION 02500 QUANTITY ESTIMATE EASTDALE DR STOVER ST STOVER ST BOARDWALK DR S. COLLEGE AV LANDINGS DR LANDINGS DR BOARDWALK DR HORSETOOTH RD STARBOARD CT LANDINGS DR CDS MULBERY ST S. COLLEGE AV RIVERSIDE AV HARMONY RD. CHOKECHERRY TRL. TAFT HILL RD. REMINGTON ST E. OLIVE ST LOCUST ST EASTWOOD DR DRAKE RD KIRKWOOD DR EASTWOOD CT EASTWOOD DR CDS KIRKWOOD DR CREEKWOOD DR EASTWOOD DR CREEKWOOD DR TRAILWOOD DR E. STUART DR CREEKWOOD DR CDS CREEKWOOD DR END ANTELOPE RD END CARIBOU DR ARCTIC FOX DR E. HORSETOOTH RD CARIBOU DR BIGHORN RD S. TIMBERLINE RD ARCTIC FOX DR BOBCAT PL ANTELOPE RD END COYOTE PL ARTIC FOX DR END CARIBOU DR E HORSETOOTH RD DALL PL ARTIC FOX DR END JAGUAR PL ANTELOPE RD END KODIAK RD WAPITI RD CARIBOU DR MULEY ST ANTELOPE RD WAPITI RD PUMA PL ARTIC FOX DR END RED WOLF PL END ANTELOPE RD SLIVER TIP PL ANTELOPE RD END WAPITI RD ARTIC FOX DR CARIBOU DR WHITETAIL PL ARTIC FOX DR END DEINES CT SMITH PL CDS MATHEWS ST E. PROSPECT RD PARKER ST PARKER ST S. COLLEGE AV STOVER ST PERSON CT PARKER ST N. END PETERSON PL E. PROSPECT RD PARKER ST SMITH PL E. PROSPECT RD PARKER ST WHEDBEE ST E. PROSPECT RD PARKER ST TO E. MULBERRY STREET STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA FROM AREA SUB TOTAL AREA SUB TOTAL PARKER AREA AREA SUB TOTAL AREA SUB TOTAL FOX MEADOWS PARKWOOD EAST REMINGTON STREET AREA SUB TOTAL AREA SUB TOTAL W. HARMONY RD. 608.16 608.17 608.18 608.19 608.22 608.23 608.24 SF SF SF SF SF SF LF 16.00 0.00 148.00 0.00 0.00 168.00 16.00 16.00 0.00 148.00 0.00 0.00 168.00 16.00 12.00 36.00 154.00 0.00 0.00 0.00 10.00 SECTION 02500 QUANTITY ESTIMATE 202.01 203.01 304.07 403.50 604.02 604.03 604.05 604.08 608.01 608.02 608.03 LF CY TON TON EA LF EA EA SF EA SF Aggregate Base Temp. Patching General TO Excavation Recon Modified Type 13 Curb Inlet Deck Remove Concrete Remove Fillets Apron Remove & Replace STREET Sawcut 4" Recon Type R Inlet Deck 4' Opening Recon Inlet Deck - Catch Basin Recon. Type R Curb Inlet Deck - Add. 1' Opening FROM AZALEA CT AZALEA DR CDS 0.00 0.00 4.25 1.85 0.00 0.00 0.00 0.00 0.00 0.00 25.97 AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL 0.00 0.00 23.83 11.72 0.00 0.00 0.00 0.00 0.00 0.00 6.00 HOLLY ST LARCH ST HOLLY WAY 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LARCH ST W. PROSPECT RD SUMAC ST 0.00 0.00 17.45 7.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PALM DR W. PROSPECT RD S. OVERLAND TRAIL 0.00 0.00 9.31 3.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RAMS LN PECAN ST REAL CT 0.00 0.00 11.15 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 REAL CT PECAN ST S. OVERLAND TRAIL 0.00 0.00 4.25 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SUMAC ST LARCH ST S. OVERLAND TRAIL 0.00 0.00 14.81 5.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PECAN ST PALM DR S. OVERLAND TRAIL 7.00 0.00 24.42 10.46 0.00 0.00 0.00 0.00 0.00 0.00 62.02 7.00 0.00 109.49 48.07 0.00 0.00 0.00 0.00 0.00 0.00 93.99 BLUE MESA AV COLONY DR WORTHINGTON AV 0.00 0.00 3.52 1.28 0.00 0.00 0.00 0.00 0.00 0.00 4.00 CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY 0.00 0.00 7.92 4.47 0.00 0.00 0.00 0.00 0.00 0.00 51.73 CIMARRON CT ROCKY MOUNTAIN WY CDS 0.00 0.00 2.57 1.65 0.00 0.00 0.00 0.00 0.00 0.00 96.02 FAIRPLAY CT GUNNISON DR CDS 0.00 0.00 3.30 1.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GUNNISON DR WORTHINGTON AV CDS 0.00 0.00 18.19 6.68 0.00 0.00 0.00 0.00 0.00 0.00 5.00 LONGHORN CT BLUE MESA AV CDS 0.00 0.00 0.66 0.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PLACER ST W. SWALLOW RD WORTHINGTON AV 0.00 0.00 7.04 2.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR 0.00 0.00 6.89 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST 0.00 0.00 3.01 1.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SILVERTHORN DR GUNNISON DR CDS 0.00 0.00 1.03 0.83 0.00 0.00 0.00 0.00 0.00 1.00 0.00 TUMBLEWEED LN ROCKY MOUNTAIN WY CDS 0.00 0.00 2.27 1.54 0.00 0.00 0.00 0.00 0.00 0.00 78.00 WAGONWHEEL DR ROCKY MOUNTAIN WY CDS 0.00 0.00 40.55 14.78 0.00 0.00 0.00 0.00 0.00 0.00 96.00 WINCHESTER DR WAGONWHEEL DR CDS 0.00 0.00 13.20 4.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 WORTHINGTON AV W. DRAKE RD CDS 0.00 0.00 24.27 8.51 0.00 0.00 0.00 0.00 0.00 1.00 94.64 YELLOW PINE CT GUNNISON DR CDS 0.00 0.00 4.03 1.73 0.00 0.00 0.00 0.00 0.00 0.00 51.00 0.00 0.00 138.45 53.90 0.00 0.00 0.00 0.00 0.00 2.00 476.39 THE OVERLOOK AT WOODRIDGE SECTION 02500 QUANTITY ESTIMATE STREET FROM TO AZALEA CT AZALEA DR CDS AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL HOLLY ST LARCH ST HOLLY WAY LARCH ST W. PROSPECT RD SUMAC ST PALM DR W. PROSPECT RD S. OVERLAND TRAIL RAMS LN PECAN ST REAL CT REAL CT PECAN ST S. OVERLAND TRAIL SUMAC ST LARCH ST S. OVERLAND TRAIL PECAN ST PALM DR S. OVERLAND TRAIL BLUE MESA AV COLONY DR WORTHINGTON AV CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY CIMARRON CT ROCKY MOUNTAIN WY CDS FAIRPLAY CT GUNNISON DR CDS GUNNISON DR WORTHINGTON AV CDS LONGHORN CT BLUE MESA AV CDS PLACER ST W. SWALLOW RD WORTHINGTON AV POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST SILVERTHORN DR GUNNISON DR CDS TUMBLEWEED LN ROCKY MOUNTAIN WY CDS WAGONWHEEL DR ROCKY MOUNTAIN WY CDS WINCHESTER DR WAGONWHEEL DR CDS WORTHINGTON AV W. DRAKE RD CDS YELLOW PINE CT GUNNISON DR CDS THE OVERLOOK AT WOODRIDGE BRIXTON RD MESAVIEW LN TAFT HILL RD. GREENGATE DR W. HARMONY RD END LOOKOUT LN TRAIL VIEW LN BRIXTON RD MESAVIEW CT MESAVIEW LN END MESAVIEW LN BRIXTON RD 1800 BLK OF MESAVIEW LN TRAILVIEW LN LOOKOUT LN MESAVIEW LN CLIFFSIDE CT OVERLOOK DR END CRESTVIEW CT OVERLOOK DR END GLENVIEW CT VISTA DR END MEADOWVIEW CT VISTA DR END OVERLOOK DR W. HARMONY RD WESTPOINT CT PRAIRIEVIEW CT OVERLOOK DR END SILVERVIEW CT SILVERGATE RD END SILVERGATE RD W. HARMONY RD WESTPOINT CT VIEWPOINT CT OVERLOOK DR END VISTA DR SILVERGATE RD END WESTPOINT CT OVERLOOK DR END TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS 608.04 608.05 608.06 608.07 608.08 608.09 608.10 608.11 608.12 608.13 608.14 608.15 SF LF LF LF LF LF LF LF LF LF SF SF Pedestrian Access Ramp Highback R&R Highback NSW R&R SECTION 02500 QUANTITY ESTIMATE STREET FROM TO AZALEA CT AZALEA DR CDS AZALEA DR W. PROSPECT RD S. OVERLAND TRAIL HOLLY ST LARCH ST HOLLY WAY LARCH ST W. PROSPECT RD SUMAC ST PALM DR W. PROSPECT RD S. OVERLAND TRAIL RAMS LN PECAN ST REAL CT REAL CT PECAN ST S. OVERLAND TRAIL SUMAC ST LARCH ST S. OVERLAND TRAIL PECAN ST PALM DR S. OVERLAND TRAIL BLUE MESA AV COLONY DR WORTHINGTON AV CHAPARRAL DR POWDERHORN DR ROCKY MOUNTAIN WY CIMARRON CT ROCKY MOUNTAIN WY CDS FAIRPLAY CT GUNNISON DR CDS GUNNISON DR WORTHINGTON AV CDS LONGHORN CT BLUE MESA AV CDS PLACER ST W. SWALLOW RD WORTHINGTON AV POWDERHORN DR WORTHINGTON AV WAGONWHEEL DR ROCKY MOUNTAIN WY WORTHINGTON AV S. SHIELDS ST SILVERTHORN DR GUNNISON DR CDS TUMBLEWEED LN ROCKY MOUNTAIN WY CDS WAGONWHEEL DR ROCKY MOUNTAIN WY CDS WINCHESTER DR WAGONWHEEL DR CDS WORTHINGTON AV W. DRAKE RD CDS YELLOW PINE CT GUNNISON DR CDS THE OVERLOOK AT WOODRIDGE BRIXTON RD MESAVIEW LN TAFT HILL RD. GREENGATE DR W. HARMONY RD END LOOKOUT LN TRAIL VIEW LN BRIXTON RD MESAVIEW CT MESAVIEW LN END MESAVIEW LN BRIXTON RD 1800 BLK OF MESAVIEW LN TRAILVIEW LN LOOKOUT LN MESAVIEW LN CLIFFSIDE CT OVERLOOK DR END CRESTVIEW CT OVERLOOK DR END GLENVIEW CT VISTA DR END MEADOWVIEW CT VISTA DR END OVERLOOK DR W. HARMONY RD WESTPOINT CT PRAIRIEVIEW CT OVERLOOK DR END SILVERVIEW CT SILVERGATE RD END SILVERGATE RD W. HARMONY RD WESTPOINT CT VIEWPOINT CT OVERLOOK DR END VISTA DR SILVERGATE RD END WESTPOINT CT OVERLOOK DR END TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS 608.16 608.17 608.18 608.19 608.22 608.23 608.24 SF SF SF SF SF SF LF 6" Flatwork R&R 4" Flatwork R&R Truncated ú W HARMONY RD S TAFT HILL RD SILVERGATE RD SENECA ST BRIXTON RD OVERLOOK DR VISTA DR GREENGATE DR ROLLING GATE RD PICADILLY DR WHIPPENY DR MESAVIEW LN FROMME PRAIRIE WAY LOOKOUT LN GROSVENOR CT W COUNTY ROAD 38E CEDARGATE DR CENTER GATE CT TRAIL VIEW LN APPLEGAT E CT PICADILLY CT UPHAM CT MESAVIEW CT SILVERVIEW CT PEARLGATE CT CLIFFSIDE CT WESTPOINT CT MEADOWVIEW CT CRESTVIEW CT PRAIRIE VIEW CT BRIARGATE CT ROSEGATE CT IRONGATE CT CEDARGATE CT WILLOWGATE CT BLUEGATE CT City of Fort Collins 2007 Street Maintenance Project The Overlook at Woodridge · SLURRY 2007 REHAB 2007 Dome Panels (2' x 2') Concrete Pavement 8" R&R Replace Flatwork 1" Add. Depth Alley Approach 8" R&R Expansion & Caulking 8.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 8.00 0.00 0.00 0.00 0.00 0.00 9.00 16.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 21.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 0.00 36.00 0.00 0.00 0.00 83.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 21.00 0.00 0.00 9.00 0.00 0.00 0.00 21.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 28.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 32.00 0.00 29.00 0.00 0.00 0.00 105.00 928.00 478.00 15469.00 2504.00 1170.00 1747.00 1135.00 Page 6 of 6 Pedestrian Access Ramp R&R Hollywood NSW R&R Hollywood w/ 6" Walk R&R Barrier Curb 12" R&R VC Outfall Median Curb R&R VC w/ 6" Walk R&R VC NSW R&R DO w/ 6" Walk R&R DO NSW R&R Crosspan Remove & Replace 52.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 28.00 0.00 126.00 0.00 308.00 0.00 0.00 0.00 0.00 0.00 0.00 325.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 238.00 0.00 0.00 0.00 0.00 20.00 127.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 216.00 152.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.00 0.00 0.00 0.00 0.00 0.00 73.00 0.00 0.00 0.00 0.00 228.00 135.00 0.00 0.00 0.00 0.00 0.00 182.00 16.00 0.00 72.00 0.00 944.00 601.00 0.00 0.00 0.00 0.00 0.00 848.00 44.00 0.00 198.00 0.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 174.00 108.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 13.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.00 0.00 0.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 223.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 546.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 260.00 71.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.00 0.00 60.00 42.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 612.00 1750.50 131.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 590.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 110.00 17.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 238.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 204.00 0.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.00 0.00 0.00 75.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 144.00 0.00 108.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 480.00 561.00 118.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 642.00 0.00 6048.00 7487.50 1272.00 170.00 3280.00 16.00 10.00 1921.00 165.00 3107.00 7148.00 3110.00 Page 5 of 6 BRIXTON RD MESAVIEW LN TAFT HILL RD. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GREENGATE DR W. HARMONY RD END 0.00 0.00 2.86 1.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LOOKOUT LN TRAIL VIEW LN BRIXTON RD 0.00 0.00 2.13 0.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MESAVIEW CT MESAVIEW LN END 0.00 0.00 0.73 0.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MESAVIEW LN BRIXTON RD 1800 BLK OF MESAVIEW LN 8.00 0.00 3.52 1.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TRAILVIEW LN LOOKOUT LN MESAVIEW LN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CLIFFSIDE CT OVERLOOK DR END 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CRESTVIEW CT OVERLOOK DR END 0.00 0.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 GLENVIEW CT VISTA DR END 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MEADOWVIEW CT VISTA DR END 0.00 0.00 5.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 32.00 OVERLOOK DR W. HARMONY RD WESTPOINT CT 0.00 0.00 12.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRAIRIEVIEW CT OVERLOOK DR END 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SILVERVIEW CT SILVERGATE RD END 0.00 0.00 13.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 212.00 SILVERGATE RD W. HARMONY RD WESTPOINT CT 0.00 0.00 6.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VIEWPOINT CT OVERLOOK DR END 16.00 0.00 5.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 VISTA DR SILVERGATE RD END 4.00 0.00 11.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 WESTPOINT CT OVERLOOK DR END 0.00 0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 0.00 68.24 14.02 0.00 0.00 0.00 0.00 0.00 0.00 361.00 TOTAL 62.00 154.07 1743.16 351.63 7.00 5.00 10.00 5.00 198.00 12.00 5929.64 AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL WOOD WEST STADIUM HEIGHTS Page 4 of 6 12.00 442.00 1145.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 478.00 1299.00 0.00 0.00 0.00 20.00 238.00 0.00 7515.00 2472.00 948.00 1473.00 80.00 238.00 0.00 7515.00 2472.00 948.00 1473.00 80.00 30.00 0.00 357.00 32.00 0.00 0.00 34.50 30.00 0.00 357.00 32.00 0.00 0.00 34.50 200.00 0.00 5386.00 0.00 0.00 32.00 51.00 200.00 0.00 5386.00 0.00 0.00 32.00 51.00 38.00 0.00 187.00 0.00 0.00 0.00 131.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 0.00 140.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.00 0.00 327.00 0.00 0.00 0.00 172.50 16.00 0.00 18.00 0.00 0.00 0.00 70.00 38.00 0.00 33.00 0.00 0.00 0.00 41.00 16.00 0.00 176.00 0.00 0.00 0.00 26.00 16.00 0.00 0.00 0.00 0.00 0.00 27.00 16.00 0.00 0.00 0.00 0.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 28.00 16.00 0.00 0.00 0.00 0.00 0.00 33.00 16.00 0.00 0.00 0.00 0.00 0.00 28.00 16.00 0.00 0.00 0.00 0.00 0.00 38.00 16.00 0.00 0.00 0.00 0.00 0.00 27.00 16.00 0.00 0.00 0.00 0.00 0.00 32.00 16.00 0.00 0.00 0.00 0.00 0.00 36.00 48.00 0.00 0.00 0.00 0.00 0.00 84.00 16.00 0.00 0.00 0.00 0.00 0.00 28.00 278.00 0.00 227.00 0.00 0.00 0.00 528.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.50 0.00 0.00 145.00 0.00 222.00 74.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 145.00 0.00 222.00 74.00 4.50 6" Flatwork R&R 4" Flatwork R&R Truncated Dome Panels (2' x 2') Concrete Pavement 8" R&R Replace Flatwork 1" Add. Depth Alley Approach 8" R&R Expansion & Caulking Page 3 of 6 0.00 0.00 0.00 120.00 774.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 883.00 0.00 0.00 0.00 0.00 0.00 132.00 0.00 0.00 0.00 0.00 0.00 1708.00 0.00 10.00 0.00 0.00 1368.00 1296.00 1238.00 0.00 0.00 0.00 0.00 1708.00 0.00 10.00 0.00 0.00 1368.00 1296.00 1238.00 660.00 16.00 0.00 0.00 217.00 16.00 0.00 0.00 0.00 0.00 336.00 0.00 660.00 16.00 0.00 0.00 217.00 16.00 0.00 0.00 0.00 0.00 336.00 0.00 162.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 0.00 1739.00 70.00 1644.00 162.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 0.00 1739.00 70.00 1644.00 240.00 1022.00 83.00 0.00 63.00 0.00 0.00 0.00 0.00 0.00 248.00 0.00 0.00 425.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.00 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 476.00 491.00 35.00 2.00 59.00 0.00 0.00 0.00 0.00 0.00 184.00 0.00 210.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 926.00 1948.00 118.00 43.00 180.00 0.00 0.00 0.00 0.00 0.00 432.00 0.00 72.00 568.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 228.00 192.00 270.00 67.00 0.00 31.00 0.00 0.00 0.00 0.00 0.00 316.00 0.00 78.00 115.00 65.00 7.00 81.00 0.00 0.00 0.00 0.00 0.00 248.00 0.00 114.00 42.00 59.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 236.00 0.00 180.00 136.00 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.00 0.00 312.00 0.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 186.00 12.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 0.00 132.00 29.00 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.00 0.00 180.00 284.00 74.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 296.00 0.00 0.00 27.00 69.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 276.00 0.00 48.00 76.00 59.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.00 0.00 180.00 93.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 192.00 0.00 0.00 153.00 51.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 204.00 0.00 208.00 778.00 160.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 640.00 0.00 0.00 28.00 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.00 0.00 1882.00 2611.00 905.00 7.00 145.00 0.00 0.00 0.00 0.00 0.00 3424.00 228.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 0.00 0.00 81.00 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 93.00 54.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 48.00 0.00 0.00 360.00 91.00 0.00 0.00 0.00 Pedestrian Access Ramp Highback R&R Highback NSW R&R Pedestrian Access Ramp R&R Hollywood NSW R&R Hollywood w/ 6" Walk R&R Barrier Curb 12" R&R VC Outfall Median Curb R&R VC w/ 6" Walk R&R VC NSW R&R DO w/ 6" Walk R&R DO NSW R&R Crosspan Remove & Replace Page 2 of 6 Apron Remove & Replace Sawcut 4" E. MULBERRY STREET STREET Recon Type R Inlet Deck 4' Opening EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA Recon Inlet Deck - Catch Basin Recon. Type R Curb Inlet Deck - Add. 1' Opening FROM AREA SUB TOTAL AREA SUB TOTAL PARKER AREA AREA SUB TOTAL AREA SUB TOTAL FOX MEADOWS PARKWOOD EAST REMINGTON STREET AREA SUB TOTAL AREA SUB TOTAL W. HARMONY RD. Page 1 of 6 0.00 83.50 486.00 Page 8 of 8 NSW R&R Pedestrian Access Ramp R&R Hollywood NSW R&R 28.00 0.00 126.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.00 72.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 44.00 0.00 198.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 590.00 0.00 32.00 0.00 36.00 0.00 0.00 0.00 135.00 2560.00 2743.00 2657.00 582.00 478.00 14995.00 2504.00 864.00 2749.00 Page 7 of 8 0.00 6.00 308.00 0.00 0.00 0.00 0.00 0.00 0.00 325.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 238.00 0.00 0.00 20.00 127.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 216.00 152.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.00 0.00 0.00 0.00 0.00 0.00 73.00 0.00 62.02 228.00 135.00 0.00 0.00 0.00 0.00 0.00 182.00 0.00 93.99 944.00 601.00 0.00 0.00 0.00 0.00 0.00 848.00 0.00 4.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.73 174.00 108.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.02 120.00 13.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 54.00 223.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 42.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.00 72.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 96.00 30.00 546.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 94.64 60.00 260.00 71.00 0.00 0.00 0.00 0.00 0.00 0.00 51.00 60.00 42.00 13.00 0.00 0.00 0.00 0.00 0.00 2.00 476.39 612.00 1750.50 131.00 0.00 0.00 0.00 0.00 0.00 2.00 2220.64 3359.00 3880.50 259.00 163.00 3129.00 16.00 10.00 1208.00 Page 6 of 8 80.00 80.00 34.50 34.50 51.00 51.00 131.50 0.00 41.00 0.00 172.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.50 0.00 0.00 0.00 0.00 0.00 4.50 Expansion & Caulking Page 4 of 8 0.00 1121.00 985.00 1013.00 218.00 0.00 7445.00 2472.00 642.00 2643.00 0.00 1121.00 985.00 1013.00 218.00 0.00 7445.00 2472.00 642.00 2643.00 0.00 0.00 336.00 0.00 30.00 0.00 357.00 32.00 0.00 0.00 0.00 0.00 336.00 0.00 30.00 0.00 357.00 32.00 0.00 0.00 0.00 1439.00 70.00 1644.00 200.00 0.00 5386.00 0.00 0.00 32.00 0.00 1439.00 70.00 1644.00 200.00 0.00 5386.00 0.00 0.00 32.00 0.00 0.00 248.00 0.00 38.00 0.00 187.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 184.00 0.00 24.00 0.00 140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 432.00 0.00 62.00 0.00 327.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 0.00 0.00 0.00 0.00 0.00 145.00 0.00 222.00 74.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.00 0.00 0.00 0.00 0.00 0.00 145.00 0.00 222.00 74.00 6" Flatwork R&R Pedestrian Access Ramp Highback R&R Concrete Pavement 8" R&R Replace Flatwork 1" Add. Depth Alley Approach 8" R&R 4" Flatwork R&R Truncated Dome Panels (2' x 2') Highback NSW R&R Pedestrian Access Ramp R&R Hollywood NSW R&R Page 3 of 8 0.00 475.00 0.00 0.00 0.00 0.00 1708.00 0.00 10.00 0.00 0.00 475.00 0.00 0.00 0.00 0.00 1708.00 0.00 10.00 0.00 0.00 392.27 660.00 16.00 0.00 0.00 211.00 16.00 0.00 0.00 0.00 392.27 660.00 16.00 0.00 0.00 211.00 16.00 0.00 0.00 0.00 42.00 162.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 0.00 42.00 162.00 0.00 0.00 0.00 99.00 0.00 0.00 0.00 0.00 257.00 255.00 1022.00 83.00 0.00 63.00 0.00 0.00 0.00 0.00 25.00 0.00 0.00 0.00 41.00 58.00 0.00 0.00 0.00 0.00 207.00 476.00 491.00 35.00 2.00 59.00 0.00 0.00 0.00 0.00 0.00 210.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 489.00 941.00 1513.00 128.00 43.00 180.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 0.00 0.00 81.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 93.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 40.00 0.00 0.00 0.00 48.00 0.00 0.00 360.00 Hollywood w/ 6" Walk R&R Barrier Curb 12" R&R VC Outfall Median Curb R&R VC w/ 6" Walk R&R VC NSW R&R DO w/ 6" Walk R&R DO NSW R&R Crosspan Remove & Replace Remove Fillets Apron Remove & Replace Page 2 of 8 Curb Inlet Deck - Add. 1' Opening FROM TO W. HARMONY RD. E. MULBERRY STREET STREET Recon Type R Inlet Deck 4' Opening PARKER AREA FOX MEADOWS PARKWOOD EAST REMINGTON STREET EASTDALE DRIVE AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL AREA SUB TOTAL LANDINGS AREA Page 1 of 8