HomeMy WebLinkAboutBID - 5983 SOUTH LEMAY AVENUE WIDENING PROJECTSPECIFICATIONS AND CONTRACT DOCUMENTS FOR South Lemay Avenue Widening Project BID NO. 5983 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS June 16, 2006 – 3:00 P.M. (OUR CLOCK) CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS SOILS REPORT 07/2001 Section 00020 Page 2 SECTION 00020 INVITATION TO BID 07/2001 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: May 15, 2006 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on June 16, 2006, for the South Lemay Avenue Widening Project; BID NO. 5983. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of intersection and arterial street improvements from Trilby Road south to Carpenter Road (approximately 5280 linear feet). Nassau Way to Carpenter( approximately 2350 linear feet) the scope includes widening Lemay Avenue to a four lane arterial street from its existing two-lane configuration, and interim widening at the Lemay/Carpenter intersection to accommodate auxiliary turn lanes. A full closure has been granted to construct all necessary improvements. The City of Fort Collins Pavement Maintenance Program is coordinating rehabilitation and overlay work on Lemay Avenue with this project. Roadway improvements include the installation of curb-and-gutter, asphalt paving, rotomilling operations, flyash operations, bike lanes, some landscaped medians, and storm and sanitary sewer installations. The Contractor will provide Traffic Control and Construction surveying. The Contractor will be required to work with our traffic control supervisor. This project will be done under a full closure. A total of 4 message Boards for 6 days will be required to notify the traveling public prior/during project construction. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available May 18, 2006. A prebid conference and job walk with representatives of prospective Bidders will be held at 10:00a.m., on June 2, 2006, at 281 N. College Ave, Conference Room A, Fort Collins. 07/2001 Section 00020 Page 2 The Contract Documents and Construction Drawings may be examined online at: 1. City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp 2. Mercury-LDO Reprographics: www.mercury-ldo.com Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be viewed and purchased at: 1. Mercury LDO Reprograhics: • FORT COLLINS: 422 S. Link Lane, Ft. Collins, CO 80524 Ph: 970-484-1201, Fax: 970-221-0404 • ENGLEWOOD: 9632 E. Arapahoe, Englewood, CO. 80112 Ph: 303-790-7169, Fax: 303-792-2936 • DENVER: 860 Bryant Street, Denver, CO. 80204 Ph: 303-893-8701, Fax: 303-893-0617 • COLORADO SPRINGS:11 E Las Vegas, Colorado Springs, CO. 80903 Ph: 719-231-8121, Fax: 719-633-5710 • LODO: 1660 Wynkoop Ste. 130, Denver, CO. 80202 Ph: 303-785-2520, Fax: 303-785-2522 • BOULDER: 2575 Pearl St. Unit C., Boulder, CO. 80302 Ph: 303-539-1350, Fax: 303-539-1356 2. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado. Construction Document Ordering Instructions (Download a complete PlanWell 4.0 Ordering Guide from www.planwell.com) 1. GO TO: www.mercury-ldo.com 2. SELECT: Denver Links: “Plan Well” 07/2001 Section 00020 Page 3 3. SELECT: Public Planroom: “GO” 4. SELECT: the desired “Project Number” from the list 5. CLICK: “Most Current Set” to View the list of documents available for the project 6. CLICK: Sheet No. to view 7. CLICK: to add a specific document to your “Shopping Cart” 8. CLICK: to place the order for printing 9. REGISTER –or- LOGIN 10. SELECT: Process-Media, Output Size and Binding options 11. ENTER: Job Number and PO information then click Next. 12. REVIEW: Recipient information. 13. ENTER: Quantities 14. CLICK: the down arrow to populate order. 15. SELECT: Delivery options and Due time. 16. ENTER: Your phone number in the special instructions box. 17. CLICK: Next. 18. REVIEW order 19. CLICK: SUBMIT Planwell contacts: Marie Owens 970-484-1201, mowens@mercury-ldo.com David Bacon-720-220-7683, dbacon@mercury-ldo.com 07/2001 Section 00020 Page 4 Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing/Risk Management Director 5983 South Lemay Avenue Widening Project Plan Holders List Revised 06/14/06 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR South Lemay Avenue Widening Project BID NO. 5983 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS June 16, 2006 – 3:00 P.M. (OUR CLOCK) CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS SOILS REPORT 07/2001 Section 00020 Page 2 SECTION 00020 INVITATION TO BID 07/2001 Section 00020 Page 1 SECTION 00020 INVITATION TO BID Date: May 15, 2006 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on June 16, 2006, for the South Lemay Avenue Widening Project; BID NO. 5983. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of intersection and arterial street improvements from Trilby Road south to Carpenter Road (approximately 5280 linear feet). Nassau Way to Carpenter( approximately 2350 linear feet) the scope includes widening Lemay Avenue to a four lane arterial street from its existing two-lane configuration, and interim widening at the Lemay/Carpenter intersection to accommodate auxiliary turn lanes. A full closure has been granted to construct all necessary improvements. The City of Fort Collins Pavement Maintenance Program is coordinating rehabilitation and overlay work on Lemay Avenue with this project. Roadway improvements include the installation of curb-and-gutter, asphalt paving, rotomilling operations, flyash operations, bike lanes, some landscaped medians, and storm and sanitary sewer installations. The Contractor will provide Traffic Control and Construction surveying. The Contractor will be required to work with our traffic control supervisor. This project will be done under a full closure. A total of 4 message Boards for 6 days will be required to notify the traveling public prior/during project construction. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Contract Documents will be available May 18, 2006. A prebid conference and job walk with representatives of prospective Bidders will be held at 10:00a.m., on June 2, 2006, at 281 N. College Ave, Conference Room A, Fort Collins. 07/2001 Section 00020 Page 2 The Contract Documents and Construction Drawings may be examined online at: 1. City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.jsp 2. Mercury-LDO Reprographics: www.mercury-ldo.com Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be viewed and purchased at: 1. Mercury LDO Reprograhics: • FORT COLLINS: 422 S. Link Lane, Ft. Collins, CO 80524 Ph: 970-484-1201, Fax: 970-221-0404 • ENGLEWOOD: 9632 E. Arapahoe, Englewood, CO. 80112 Ph: 303-790-7169, Fax: 303-792-2936 • DENVER: 860 Bryant Street, Denver, CO. 80204 Ph: 303-893-8701, Fax: 303-893-0617 • COLORADO SPRINGS:11 E Las Vegas, Colorado Springs, CO. 80903 Ph: 719-231-8121, Fax: 719-633-5710 • LODO: 1660 Wynkoop Ste. 130, Denver, CO. 80202 Ph: 303-785-2520, Fax: 303-785-2522 • BOULDER: 2575 Pearl St. Unit C., Boulder, CO. 80302 Ph: 303-539-1350, Fax: 303-539-1356 2. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado. Construction Document Ordering Instructions (Download a complete PlanWell 4.0 Ordering Guide from www.planwell.com) 1. GO TO: www.mercury-ldo.com 2. SELECT: Denver Links: “Plan Well” 07/2001 Section 00020 Page 3 3. SELECT: Public Planroom: “GO” 4. SELECT: the desired “Project Number” from the list 5. CLICK: “Most Current Set” to View the list of documents available for the project 6. CLICK: Sheet No. to view 7. CLICK: to add a specific document to your “Shopping Cart” 8. CLICK: to place the order for printing 9. REGISTER –or- LOGIN 10. SELECT: Process-Media, Output Size and Binding options 11. ENTER: Job Number and PO information then click Next. 12. REVIEW: Recipient information. 13. ENTER: Quantities 14. CLICK: the down arrow to populate order. 15. SELECT: Delivery options and Due time. 16. ENTER: Your phone number in the special instructions box. 17. CLICK: Next. 18. REVIEW order 19. CLICK: SUBMIT Planwell contacts: Marie Owens 970-484-1201, mowens@mercury-ldo.com David Bacon-720-220-7683, dbacon@mercury-ldo.com 07/2001 Section 00020 Page 4 Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By ______________________________________ James B. O'Neill, II, CPPO, FNIGP Purchasing/Risk Management Director SECTION 00100 INSTRUCTIONS TO BIDDERS 12/03 Section 00100 Page 1 SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 3.2. In accordance with Section 8-160 of the Code of the City of Fort 12/03 Section 00100 Page 2 Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 12/03 Section 00100 Page 3 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 8.0 LIQUIDATED DAMAGES. 12/03 Section 00100 Page 4 Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 12/03 Section 00100 Page 5 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 12/03 Section 00100 Page 6 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non-responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in 12/03 Section 00100 Page 7 the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. 12/03 Section 00100 Page 8 OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self- addressed, self-stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION SECTION 00300 BID FORM 7/96 Section 00300 Page 1 SECTION 00300 BID FORM PROJECT: 5983 South Lemay Avenue Widening Project Place Date 1. In compliance with your Invitation to Bid dated , and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ______________________________________________________ ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: _________________________________________________________. 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. _______through . 8 BID SCHEDULE (Base Bid) Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening: 202-01 Remove Pipe (RCP, CMP, PVC) 415 LF 202-02 Remove Existing FES (30" & 42" RCP) 4EA 202-03 Remove Landscape Timbers and Concrete Block in Driveway (Lot 1 of Emerson Acres Subdivision) 1 LS 202-04 Remove Concrete Irrigation Manholes 2EA 202-05 Remove Concrete Splitter Box 2EA 202-06 Remove Existing Irrigation Brick Vault 6' x 6' Wide x 12' Deep 1LS 202-07 Remove Concrete Ditch 1100 LF 202-08 Remove Curb And Gutter 235 LF 202-09 Remove Concrete Sidewalk 1356 SF 202-10 Saw Cut Asphalt 1156 LF 202-11 Rotomill Asphalt Pavement (Carpenter Road - 2" Depth) 2666 SY 202-12 Pulverize Asphalt In Place (5"-10" Depth) 10167 SY 202-13 Remove Existing Rip-Rap 289 SY 202-14 Transport Existing Rip-Rap To Drake & Ziegler 203 CY 202-15 Remove & Replace Existing Barricade (Type III) 1EA 202-16 Remove Tree Stump (Grinding) 2EA 202-17 Remove Fence (Various Types) 883 LF 202-18 Remove & Provide Temporary Mailbox 3EA 202-19 Cap Irrigation Sprinklers 2EA South Lemay Avenue Widening (2006) Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening (2006) 203-01 Unclassified Excavation (Including 8" of Existing Road) 1,865 CY 203-02 Embankment - (CIP) 4,304 CY 203-03 Stockpile & Place Pulverized Asphalt 2439 CY 203-04 Clear and Grub 1LS 203-05 Borrow ABC (Class 5 or 6) - (CIP) 100 TON 203-06 Muck Excavation - (CIP) 361 CY 203-07 Topsoil - (Stripping, Stockpiling, Placing) - 6" Depth 1876 CY 203-08 Temporary Access - All Weather Road (2000' x 12' ) 657 TN 203-09 Median Splashblock/ Hardscape Shaping - (CIP) 8962 SF 203-10 Potholing 1LS 203-11 Flowfill Section Over Shallow Utilities 600 LF 203-12 Import Screened Topsoil 3" Depth (BOC to sidewalk) - (CIP) 158 CY 208-01 Erosion Control 1LS 210-01 Adjust Manhole Ring/Cover 8EA 210-02 Modify Manhole 1EA 210-03 Adjust Valve Box (FCLWD) 7EA 210-04 Abandon Water Service 2EA 210-05 R & R Existing Water Meter Pit To New ROW Location 3EA 210-06 Reset Mailbox United States Postal Standards 3EA 210-07 Relocate Gate to ROW 1LS Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening (2006) 304-01 Aggregate Base Course - (Class 5 or 6) - 6" Depth - (CIP) 7615 TON 304-02 Aggregate Base Course Patch Placement - (Class 5 or 6) - 6" Depth - (CIP) 100 TON 304-03 Gravel Shoulder - Class 5 or 6 Aggregate Base (4" Depth) 45 TON 306-01 Reconditioning (8") 937 SY 307-01 Option A - Flyash Subgrade Stabilization - ( 6% ) 23502 SY 307-02 Option A - Flyash Subgrade Stabilization - (8%) 23502 SY 307-03 Option A - Flyash Operation Mobilization 1EA 403-01 Hot Bituminous Pavement - Grading S-100 (3" Depth) - (PG 64-28) 3,607 TON 403-02 Hot Bituminous Pavement - Grading SG-100 (4" Depth) - (PG 64-22) 4,809 TON 403-03 Overlay Existing Lemay- Grading S-100 (2" Depth) - (PG 64-28) 2,038 TON 403-04 Overlay Existing Carpenter- Grading S-100 (2" Depth) - (PG 64-28) 576 TON 403-05 Asphalt Leveling Course 3/4 Grading S-100 (PG 64-22) 400 TON 403-06 Asphalt Paver Patching Carpenter Rd. - Grading SG-100 (4" Depth) - (PG 64-22) 200 TON 403-07 Asphalt Patching - Grading SG-100 (4" Depth) - ( PG 64-22) 50 TON 420-01 Geotextile Paving Membrane 200 SY 506-01 10'x45' Type L Rip-Rap, 6" Topsoil (CIP Per Detail) 55 SY 506-02 6'x6' Type L Rip-Rap, 6" Topsoil (At the end of Curb and Gutter for Erosion Prevention) 3 EA 603-01 42" RCP Class lll 101 LF 603-02 42" RCP Class lll FES 3EA 603-03 30" RCP Class lll 25 LF Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening (2006) 603-04 30" RCP Class lll FES 1EA 603-05 Install Concrete Field Collar 4EA 604-01 10' Type R Inlet 1EA 604-02 Median Underdrain Pipe System - (4" Perforated Pipe) 507 LF 604-03 Median Underdrain Pipe System - (4" Solid Pipe) 194 LF 604-04 4" Median Under Drain Clean Out 8EA 604-05 Tie To Existing Storm Sewer Manhole for 4" Underdrain (Core Drill and Connect with Non-shrink Grout) 2 EA 604-06 8" SDR-35 Sewer Main 467 LF 604-07 Tie To Existing Sanitary Sewer Manhole Per FCLWD Spec 1EA 604-08 4' Diameter Sewer Manhole 1EA 604-09 Remove Existing Sewer Stub 60 LF 604-10 4" PVC Conduit Sleeving 620 LF 607-01 Orange Safety Fence 2300 LF 607-02 Smooth Wire Fence 883 LF 608-01 Concrete Sidewalk (6") 937 SY 608-02 Concrete Pedestrian Access Ramps with Truncated Domes (8") 60 SY 608-03 Concrete Drive Approach (6") 750 SF 608-04 6" Concrete Driveway Replacement 576 SF 608-05 Hi-Early Concrete (24 Hour) 50 CY 608-06 Flowable Fill Concrete 300 CY Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening (2006) 608-07 Exposed Aggregate Median Splashblock (4") 8962 SF 609-01 Vertical Curb & Gutter (30") 2780 LF 609-02 Outfall Curb & Gutter (18") 2842 LF 609-03 Driveway Curb Cuts (25' Width) 3EA 609-04 R & R Vertical Curb and Gutter 50 LF 609-05 R & R Concrete Sidewalk 20 SF 619-01 20" x 8" Tapping Saddle & 8" Valve/ Tap-TB-Valve Box/ FLWD Spec 2EA 619-02 8" C-900 Water Main 141 LF 619-03 8" x 2" Temporary Blow-Off 2EA 619-04 8" 22.5 Ductile Degree Bends 2EA 619-05 3/4" Irrigation Water Service & Meter Pit / Copper-Corp-Curb Stop/ FLWD Spec & COFC Spec Backflow Preventer/Metal Screen Cover 1 EA Subtotal South Lemay Widening Quantities: $ Landscaping Quantities: 2810-01 Irrigation 0SF 2000-01 Dry Land Seed 0.30 AC 2000-02 Topsoil - 60/40 compost mix for center median 288 CY Subtotal Landscaping Quantities: $ Project: Date: 05/10/2006 Spec/Item Number Description Estimated Quantity Unit Unit Cost Item Cost South Lemay Avenue Widening (2006) Miscellaneous Quantities: - Contract Bond 1.00 LS 625-01 Construction Surveying 1.00 LS 626-01 Mobilization 1.00 LS 630-01 Specialty Signs 3" Letters On 48" x 48" 7EA 630-02 Message Boards (4 Boards for a total of 6 Days) 6 DAY 630-03 Jersey Barriers 50 LF 630-04 Type III Barricades 8 SECTION 630-05 Traffic Control 1LS Subtotal Misc. Quantities: $ TOTAL PROJECT COST (South Lemay Widening with OPTION "A" Flyash, Landscaping Quantities, Misc. Quantities)= $ Dollars Cents ALTERNATE "B" FLYASH QUANTITIES: Flyash Quantities: 307-01 Option B - Flyash Subgrade Stabilization - (12%) 23502 SY 7/96 Section 00300 Page 8 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: __________________________________________________ Company ________________________________ __________________ Signature Date ________________________________ Title ________________________________ License Number (If Applicable) (Seal - if Bid is by corporation) Attest:___________________________ Address _____________________________________ _____________________________________ Telephone _____________________________________ 7/96 Section 00410 Page 1 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 2 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ ______________________ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 5983 South Lemay Avenue Widening Project. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 3 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20__, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name:_____________________________ __________________________________ Address:__________________________ __________________________________ __________________________________ __________________________________ By:_______________________________ By: ______________________________ Title: ___________________________ Title:____________________________ ATTEST: By:_______________________________ (SEAL) (SEAL) 7/96 Section 00420 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: _________________________________________________ 2. Permanent main office address: __________________________________ 3. When organized: _________________________________________________ 4. If a corporation, where incorporated: ___________________________ 5. How many years have you been engaged in the contracting business under your present firm or trade name?___________________________ 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ 7. General character of Work performed by your company: _________________________________________________________________ _________________________________________________________________ 8. Have you ever failed to complete any Work awarded to you?________ If so, where and why?____________________________________________ _________________________________________________________________ 9. Have your ever defaulted on a contract?__________________________ If so, where and why?____________________________________________ _________________________________________________________________ 10. Are you debarred by any government agency? ______________________ If yes list agency name._________________________________________ 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 12. List your major equipment available for this contract. 7/96 Section 00420 Page 2 _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 13. Experience in construction Work similar in importance to this project: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 14. Background and experience of the principal members of your organization, including officers: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 15. Credit available: $______________________________________________________ 16. Bank reference:__________________________________________________________ 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? _________________________________________________________________________ 18. Are you licensed as a General CONTRACTOR?________________________________ If yes, in what city, county and state? __________________________What class, license and numbers?______________________________________________ 19. Do you anticipate subcontracting Work under this Contract?_________________ If yes, what percent of total contract?__________________________________ and to whom?_____________________________________________________________ 20. Are any lawsuits pending against you or your firm at this time?__________ IF yes, DETAIL___________________________________________________________ _________________________________________________________________________ 21. What are the limits of your public liability? DETAIL _________________________________________________________________________ What company?____________________________________________________________ 22. What are your company's bonding limitations?_____________________________ _________________________________________________________________________ 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ________________ this ______ day of __________________, 20__. 7/96 Section 00420 Page 3 _____________________________________________ Name of Bidder By:__________________________________________ Title:_______________________________________ State of________________________ ) County of_______________________ ___________________________________being duly sworn deposes and says that he is ______________________of_____________________________ and that (Title) (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _______ day of ____________, 20__. ___________________________________ Notary Public ___________________________________ ___________________________________ My commission expires _____________________________. 7/96 Section 00430 Page 1 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ ______________________________ _______________________________ SECTION 00500 AGREEMENT FORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed 9/12/01 Section 00510 Page 1 SECTION 00510 NOTICE OF AWARD Date: TO: PROJECT: 5983 South Lemay Avenue Widening Project OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated ___________, 20__ for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 5983 South Lemay Avenue Widening Project. The Price of your Agreement is ________________________________________________ _______________________________________________________________________________ Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award that is by _________, 20__. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By:________________________________________ James B. O’Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management 9/12/01 Section 00520 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the day of in the year of 20__ and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of Bid 5983 South Lemay Avenue Widening Project and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by North Star Design, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete by October 1, 2006 as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions by October 11, 2006. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 9/12/01 Section 00520 Page 2 1) Substantial Completion: One Thousand One Hundred Fifty Dollars ($1,150) for each calendar day or fraction thereof that expires after October 1, 2006 for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, Five Hundred Dollars ($500) for each calendar day or fraction thereof that expires after October 11, 2006, the period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($ ), $ Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application 9/12/01 Section 00520 Page 3 for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 9/12/01 Section 00520 Page 4 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Sheet 1 Cover Sheet 2 General Notes Sheet 3 Typical Sections Sheet 4 Horizontal Control Plan Sheet 5 Right-of-Way Map Sheet 6-7 tility Remove, Replace and Installation Plan Sheet 8 Water and Sanitary Sewer Plan, Profile and Details Sheet 9-10 Remove, Replace Plan Sheet 11 Lemay/Carpenter Intersection Plan Sheet 12-13 Lemay Avenue Plan and Profile Sheet 14 Lemay Avenue Overlay Area Sheet 15-16 Lemay Avenue Control Line and Median Plan and Profile Sheet 17-18 Grading Plan / Storm Sewer Plan and Profile Sheet 19-20 Erosion Control Plan Sheet 21-22 Signing and Striping Plan Sheet 23-27 Cross Sections Sheet 28-29 Landscape and Irrigation Plan Sheet 22-23 Signing and Striping Plan Sheet 30-32 Details The Contract Drawings shall be stamped "Final for Construction" and dated. 9/12/01 Section 00520 Page 5 Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers to , inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9/12/01 Section 00520 Page 6 OWNER: CITY OF FORT COLLINS CONTRACTOR: By: ____________________________ By:_______________________________ JAMES B. O’NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING __________________________________ AND RISK MANAGEMENT Title:____________________________ Date:___________________________ Date:_____________________________ (CORPORATE SEAL) Attest: ________________________ Attest:___________________________ City Clerk Address for giving notices: Address for giving notices: P. O. Box 580 __________________________________ Fort Collins, CO 80522 __________________________________ LICENSE NO.:______________________ Approved as to Form _______________________________ Assistant City Attorney 7/96 Section 00530 Page 1 SECTION 00530 NOTICE TO PROCEED Description of Work: 5983 South Lemay Avenue Widening Project To: This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20__. The dates for Substantial Completion and Final Acceptance shall be _______________, 20__, and , 20__, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20__. CONTRACTOR: By: Title: SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 7/96 Section 00610 Page 1 SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 5983 South Lemay Avenue Widening Project. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00610 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ ________________________________________ ______________________________ ________________________________________ (Title) ________________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ By:_____________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00615 Page 1 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 20__, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, . NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00615 Page 2 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal ______________________________ By:___________________________________ ______________________________ ______________________________________ (Title) ______________________________________ (Address) (Corporate Seal) IN PRESENCE OF: Other Partners ______________________________ ______________________________________ ______________________________ ______________________________________ IN PRESENCE OF: Surety ______________________________ By:___________________________________ ______________________________ By:___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00630 Page 1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. 7/96 Section 00635 Page 1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 5983 South Lemay Avenue Widening Project _____________________________ PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins ____________________________ ____________________________ CONTRACTOR: ______________________________ ____________________________ CONTRACT DATE:____________________________ The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _________________________________ ________________________________________ ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. ________________________________ By: ________________________________________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: ________________________________________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: 7/96 Section 00640 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 20__ TO: Gentlemen: You are hereby notified that on the day of , 20__, the City of Fort Collins, Colorado, has accepted the Work completed by for the City of Fort Collins project, 5983 South Lemay Avenue Widening Project. A check is attached hereto in the amount of $________________________ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated ________________. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date:___________________________. Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: 7/96 Section 00650 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT:5983 South Lemay Avenue Widening Project 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the 7/96 Section 00650 Page 2 project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20__. CONTRACTOR By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20__, by Witness my hand and official seal. My Commission Expires: . Notary Public 7/96 Section 00660 Page 1 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: PROJECT: 5983 South Lemay Avenue Widening Project CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , ____ . (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in- Fact. Section 00670 Page 1 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Section 00670 Page 2 SECTION 00700 GENERAL CONDITIONS SE SECTION 00800 SUPPLEMENTARY CONDITIONS 7/96 Section 00800 Page 1 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-4.2 Subsurface and Physical Conditions: A. Add the following language to paragraph 4.2.1 of the General Conditions. 4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions at the site of the Work: CTL THOMPSON Incorporated -- Project Number: FC03658-135 Subgrade Investigation and Pavement Design for South Lemay Avenue Widening, Fort Collins, Colorado Prepared December 29, 2005 Revised March 9, 2006 Approved March 16, 2006 Contractor may rely upon the accuracy of the technical data contained in the geotechnical documents, but not upon nontechnical data, interpretations or opinions contained therein or upon the completeness of any information in the report. B. 4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in Paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 7/96 Section 00800 Page 2 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule nine (9) days lost due to abnormal weather conditions. 9/99 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment 9/99 Section 00950 Page 1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE:5983 South Lemay Avenue Widening Project CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: __ ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) _ ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: __ Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing 9/997/96 Section 00960 Page 1 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: 7/96 Section 00960 Page 2 CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 3 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 4 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 1 SOUTH LEMAY AVENUE WIDENING PROJECT (2006) The Engineers Joint Contract Documents Committee General Conditions govern the construction of this contract. The following General Requirements supplement these General Conditions. PROJECT GENERAL REQUIREMENTS TABLE OF CONTENTS SECTION PAGE 01010 SUMMARY OF WORK............................................................................................ General Reqs. 2-3 01040 COORDINATION ..................................................................................................... General Reqs. 4-5 01310 CONSTRUCTION SCHEDULES ............................................................................. General Reqs. 6-7 01330 SURVEY DATA – (Contractor Supplied) ................................................................. General Reqs. 8 01340 SHOP DRAWINGS ................................................................................................... General Reqs. 9-11 01410 TESTING ................................................................................................................... General Reqs. 12-13 01510 TEMPORARY UTILIITIES ...................................................................................... General Reqs. 14 01560 TEMPORARY CONTROL ....................................................................................... General Reqs. 15-16 01570 TREE PROTECTION ............................................................................................... General Reqs. 17-18 01580 TRAFFIC REGULATION – (Contractor Supplied) ................................................. General Reqs. 19-21 01700 CONTRACT CLOSEOUT ........................................................................................ General Reqs. 22 01711 SITE CLEANUP ....................................................................................................... General Reqs. 23 01720 PROJECT RECORD DOCUMENTS ....................................................................... General Reqs. 24 South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 2 SECTION 01010 SUMMARY OF WORK 1.1 DESCRIPTION OF WORK A. The Work shall consist of the construction of the outlined improvements: Bid 5983 South Lemay Avenue Widening Project 1. South Lemay Avenue Widening (2006): These improvements include intersection and arterial street improvements from Nassau Way south to Carpenter Road (approximately 2380 linear feet) . The scope includes reconstruction and widening Lemay Avenue to a four lane arterial street from its existing two-lane configuration, and interim widening at the Lemay/Carpenter intersection to accommodate auxiliary turn lanes. A full closure has been granted to construct all necessary improvements. The City of Fort Collins Pavement Maintenance Program is coordinating rehabilitation a 2”overlay work on Lemay Avenue From Trilby Road to Nassau Way ( approximately 2,500 linear feet) with this project. Roadway improvements include the installation of curb-and-gutter, asphalt paving, bike lanes, some landscaped medians, and storm and sanitary sewer installations in the area of reconstruction. B. Protection and Restoration. 1. Replace to equal or better conditions all items removed and replaced or damaged during construction. 2. Restore all areas disturbed to match surrounding surface conditions. 3. The Owners Field Representative must approve the condition of all replaced and/or restored areas prior to final payment. 1.2 NOTICES TO PRIVATE OWNERS AND AUTHORITIES The following items shall be coordinated between the Contractor and the Owners Field Representative. A. Notify private owners of adjacent properties, utilities, irrigation canals, and affected governmental agencies when prosecution of the Work may affect them. B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is necessary to temporarily deny access or services. C. Contact utilities at least 48 hours prior to excavating near underground utilities. D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed scope of work schedule and any items, which would affect their daily operation. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 3 E. Names and telephone numbers of affected agencies and utilities in the area are listed below for Contractor's convenience. UTILITIES Water: City of Fort Collins, Colorado 221-6681 Storm Sewer: City of Fort Collins, Colorado 221-6589 Sanitary Sewer: City of Fort Collins, Colorado 221-6681 Electric: City of Fort Collins, Colorado 221-6700 Gas/Electric: Xcel Energies 225-7847 Telephone: Qwest Communications 377-6401 Traffic Operations: City of Ft. Collins, Colorado 221-6630 Cable Television: AT&T Broadband 493-7400 FCLWD: Fort Collins Loveland Water District 226-3104 ext. 17 Water: Fort Collins Loveland Water District 226-3104 ext. 17 Sewer: Fort Collins Loveland Water District 226-3104 ext. 17 Electric: Poudre Valley REA 226-1234 *Utility Locates Under A One-call @ system 1-800-922-1987 Ditch Companies as required AGENCIES Occupational Safety & Health Administration (OSHA): 844-3061 Poudre Fire Authority Non-Emergency: 221-6581 Emergency: 911 City of Fort Collins Police Department Non-Emergency: 221-6550 Emergency: 911 Larimer County Sheriff's Department Non-Emergency: 221-7177 Emergency: 911 Postmaster: US Postal Service Judith Robertson: 225-4111 Ambulance: Poudre Valley Hospital Non-Emergency: 484-1227 Emergency: 911 Transportation: Transfort: 221-6620 Traffic Engineering: 221-6630 END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 4 SECTION 01040 COORDINATION 1.1 GENERAL CONTRACTOR RESPONSIBILITIES A. Coordinate operations under contract in a manner, which will facilitate progress of the Work. The Contractor shall also coordinate with the Utility Companies and City Traffic Department whose Work is separate from the General Contractor’s contract. B. Conform to the requirements of public utilities and concerned public agencies in respect to the timing and manner of performance of operations which affect the service of such utilities, agencies, or public safety. C. Coordinate operations under contract with utility work to allow for efficient completion of the Work. D. Coordinate all operations with the adjoining property owners, business owners, and surrounding neighborhoods to provide satisfactory access at all times and keep them informed at all times. To work with the local fire and police departments to ensure the traffic control plan is followed in emergency situations with no exceptions of disruption to traffic flow. E. Keep traffic areas and temporary residential accesses free of excavated material, construction equipment, pipe and other material and equipment. F. Keep fire hydrants and utility control valves free from obstruction and available for use at all times. G. Conduct operations in a manner to avoid unnecessary interference with public and private roads and drives. H. Provide and maintain temporary approaches or crossings at streets and residences. 1.2 SCHEDULE AND MILESTONES The Contractor shall submit a detailed project schedule showing milestones and the critical path for South Lemay Avenue Widening Project 2006. This schedule shall be agreed to by both the Owner and Contractor. It shall be made in writing and signed by both parties. 1.3 CONFERENCES A. A Pre-construction Conference will be held prior to the start of construction. 1. Contractor shall participate in the conference accompanied by all major Subcontractors. 2. Contractor shall designate/introduce Superintendent, and major Subcontractors supervisors assigned to project. 3. Contractor shall submit in writing proposed daily construction hours to Engineer for approval. 4. Contractor shall designate all access roads and parking areas in writing to the Engineer for approval. 5. The Engineer shall invite all utility and irrigation companies involved. 6. The Utilities will be asked to designate their coordination person, provide utility plans, and their anticipated schedules. 7. The Engineer shall introduce the Project Representatives. 8. At this time the superintendent will be expected to show that he has sufficient knowledge of the specifications and plans to orchestrate and coordinate the construction actives for this job. B. Additional project coordination conferences will be held prior to start of construction for coordination of the Work, refining project schedules, and utility coordination. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 5 C. The Engineer may hold coordination conferences, to be attended by all parties involved, when the Contractor's operations affect, or are affected by, the work of others. 1. Contractor shall participate in such conferences accompanied by Subcontractors as required by the Engineer. 1.4 PROGRESS MEETINGS A. Contractor and Project Manager shall schedule and hold regular progress meetings at least weekly and at other times as requested by the Engineer or required by the progress of the Work. B. Attendance shall include: 1. Contractor and Superintendent. 2. Owner's Representatives. 3. Engineer and Project Manager. 4. Others as may be requested by Contractor, Engineer or Owner. C. Minimum agenda shall include: 1. Review of work progress since last meeting. 2. Identification and discussion of problems affecting progress. 3. Review of any pending change orders. 4. Revision of Construction Schedule as appropriate. 5. Review Milestone Schedule. 6. Discuss the work scheduled for the next two weeks. 7. Discuss the surveying needed for the next week. D. The Engineer or a Project Representative shall preside at meetings and record and distribute minutes to the participants. E. The Engineer or Engineer's Field Representative and Contractor shall agree to weekly quantities at the progress meetings. The weekly quantity sheets shall be signed by both parties. These quantity sheets, when signed, shall be final and shall be the basis for the monthly progress estimates. This process ensures accurate monthly project pay estimates. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 6 SECTION 01310 CONSTRUCTION SCHEDULES 1.1 GENERAL A. The contractor shall prepare a detailed schedule of all construction operations and procurement after review of tentative schedule by parties attending the pre-construction conference. This schedule will show how the contractor intends to meet the milestones set forth. 1. No work is to begin at the site until Owner's acceptance of the Construction Progress Schedule and Report of delivery of equipment and materials. 1.2 FORMAT AND SUBMISSIONS A. Prepare construction and procure schedules in a graphic format suitable for displaying scheduled and actual progress. B. Submit two copies of each schedule to Owner for review. 1. Owner will return one copy to Contractor with revisions suggested or necessary for coordination of the Work with the needs of Owner or others. 2. The contractor will be required to submit a weekly progress schedule showing work to be completed, labor, equipment, work hours and methods of construction for the up coming week. This schedule will be required every Thursday in a daily calendar format. C. The schedule must show how the street, storm sewer, concrete and paving work will be coordinated. 1.3 CONTENT A. Construction Progress Schedule. 1. Show the complete work sequence of construction by activity and location. 2. Show changes to traffic control. 3. Show project milestones. B. Equipment, Materials and Submittals schedule. 1. Show delivery status of critical and major items of equipment and materials. 2. Include a critical path schedule for Shop Drawings, tests, and other submittal requirements for equipment and materials, reference Section 01340. 1.4 PROGRESS REVISIONS A. Submit revised schedules and reports at weekly project coordination meetings when changes are foreseen, when requested by Owner or Engineer, and with each application for progress payment. B. Show changes occurring since previous submission. 1. Actual progress of each item to date. 2. Revised projections of progress and completion. C. Provide a narrative report as needed to define: 1. Anticipated problems, recommended actions, and their effects on the schedule. 2. The effect of changes on schedules of others. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 7 1.5 OWNER'S RESPONSIBILITY A. Owner's review is only for the purpose of checking conformity with the Contract Documents and assisting the Contractor in coordinating the Work with the needs of the Project. B. It is not to be construed as relieving Contractor from any responsibility to determine the means, methods, techniques, sequences and procedures of construction as provided in the General Conditions. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 8 SECTION 01330 SURVEY DATA 1.1 SURVEY REQUIREMENTS A. The Owner will not provide the construction surveying for the Project. The Contractor will be responsible to provide the surveying required on this project. B. The Owner will make the projects CAD drawings available to the Contractor upon request. C. If the requested surveying cannot be accomplished in the time frame requested by the Contractor, the survey personnel shall notify the contractor with the date on which the requested work will be completed. D. Should a sudden change in the Contractor’s operations or schedule require the survey personnel to work overtime, the Contractor shall pay the additional overtime expense. E. The Contractor shall protect all survey monuments and construction stakes. If it is unavoidable to remove a survey monument or construction stakes, the Contractor is responsible for notifying the Surveyor and allowing enough time for the monuments or stakes to be relocated. The Contractor will be responsible for the cost of restaking construction stakes and for the cost of re-establishing a destroyed monument. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 9 SECTION 01340 SHOP DRAWINGS 1.1 GENERAL A. Submit Shop Drawings, Samples, and other submittals as required by individual specification sections. 1. The Engineer will not accept Shop Drawings or other submittals from anyone but the Contractor. B. Schedule: Reference Section 01310, Construction Schedules. Submittals received by the Engineer prior to the time set forth in the approved schedule will be reviewed at any time convenient to the Engineer before the time required by the schedule. C. Any need for more than one resubmission, or any other delay in obtaining the Engineer's review of submittals, will not entitle the Contractor to an extension of the Contract Time, unless delay of the Work is directly caused by failure of the Engineer to return any scheduled submittal within 10 days after receipt in his office of all information required for review of the submittals or for any other reason which prevents the Engineer's timely review. Failure of Contractor to coordinate submittals that must be reviewed together will not entitle the Contractor to an extension of Contract Time or an increase in Contract Price. D. Resubmit a corrected submittal if errors are discovered during manufacture or fabrication. E. Do not use materials or equipment for which Shop Drawings or samples are required until such submittals, stamped by the Contractor and properly marked by the Engineer, are at the site and available to workmen. F. Only use Shop Drawings which bear Engineer's mark "NO EXCEPTION TAKEN" in the performance of the Work. Review status designations listed on Engineer's submittal review stamp are defined as follows: 1. NO EXCEPTION TAKEN Signifies material or equipment represented by the submittal conforms with the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work. Contractor is to proceed with fabrication or procurement of the items and with related work. Copies of the submittal are to be transmitted for final distribution. 2. REVISE AS NOTED Signifies material or equipment represented by the submittal conforms with the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work in accordance with Engineer's notations. Contractor is to proceed with the Work in accordance with Engineer's notations and is to submit a revised submittal responsive to notations marked on the returned submittal or written in the letter of transmittal. 3. REJECTED Signifies material or equipment represented by the submittal does not conform with the design concept or comply with the information given in the Contract Documents and is not acceptable for use in the Work. Contractor is to submit submittals responsive to the Contract Documents. 4. FOR REFERENCE ONLY Signifies submittals which are for supplementary information only; pamphlets, general information sheets, catalog cuts, standard sheets, bulletins and similar data, all of which are useful to Engineer or Owner in design, operation, or maintenance. But these submittals do not constitute a basis for determining that items South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 10 represented thereby conform to the design concept or comply with the information given in the Contract Document. The Engineer reviews such submittals for general information, but not for substance. 1.2 SUBMITTAL REGISTER A. The Contractor shall complete the Submittal Register and submit with the Final Construction Schedule submittal. The Contractor must resubmit an updated Submittal Register with each application for progress payment. A format of the Submittal Register is provided below, Contractor should reproduce this format, (or an approved alternate) for this register. B. Instructions for Completing the Submittal Register: Column 1: References, specification section, and paragraph in which submittal is requested. This will be done for each item of equipment or material. Column 2: Describe types of submittal required, i.e., shop drawing, certificate, etc. Column 3: List the material or item for which submittal is required. Column 4: Contractor shall provide the date that he intends to make each submittal. Column 5: Contractor shall provide that date by which each submittal must be approved to accomplish timely incorporation into the project. Column 6: Contractor shall provide the mailing date of the initial submittal made to the Owner. Column 7: Contractor shall record the review action of the Owner to the last submittal for the item, equipment, or material. Column 8: Contractor shall record the mailing date of subsequent submittal for each item, equipment, and material until submittal is accepted by Owner. Column 9: Contractor may record remarks as necessary to coordinate with other submittal or provide necessary information. 1.3 SHOP DRAWINGS A. Include the following information as required to define each item proposed to be furnished. 1. Detailed installation drawings showing foundation details and clearances required for construction. 2. Relation to adjacent or critical features of the Work or materials. 3. Field dimensions, clearly identified as such. 4. Applicable standards, such as ASTM or Federal Specification numbers. 5. Drawings, catalogs or parts thereof, manufacturer's specifications and data, instructions, performance characteristics and capacities, and other information specified or necessary: a. For Engineer to determine that the materials and equipment conform to the design concept and comply with the intent of the Contract Documents. b. For the proper erection, installation, and maintenance of the materials and equipment which Engineer will review for general information but not for substance. c. For Engineer to determine what supports, anchorages, structural details, connections and services are required for materials and equipment, and the effect on contiguous or related structures, materials and equipment. 6. Complete dimensions, clearances required, design criteria, materials of construction and the like to enable Engineer to review the information effectively. B. Manufacturer's standard drawings, schematics and diagrams: 1. Delete information not applicable to the Work. 2. Supplement standard information to provide information specifically applicable to the Work. C. Format. 1. Present in a clear and thorough manner. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 11 2. Minimum sheet size: 8 ½” x 11". 3. Clearly mark each copy to identify pertinent products and models. 4. Individually annotate standard drawings, which are furnished, cross out items that do not apply, describe exactly which parts of the drawing apply to the equipment being furnished. 5. Individually annotate catalog sheets to identify applicable items. 6. Reproduction or copies of portions of Contract Documents: a. Not acceptable as complete fabrication or erection drawings. b. Acceptable when used as a drawing upon which to indicate information on erection or to identify detail drawings. 7. Clearly identify the following: a. Date of submission. b. Project title and number. c. Names of Contractor, Supplier and Manufacturer. d. Specification section number, specification article number for which items apply, intended use of item in the work, and equipment designation. e. Identify details by reference to sheet, detail, schedule or room numbers shown in the Contract Documents. f. Deviations from Contract Documents. g. Revisions on re-submittals. h. Contractor's stamp, initialed or signed, certifying the review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and the Contract Documents. 1.4 SUBMISSION REQUIREMENTS A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Minimum number required: 1. Shop Drawings. a. Three (3) copies minimum, two (2) copies which will be retained by Engineer. 1.5 RESUBMISSION REQUIREMENTS A. Make corrections or changes required by Engineer and resubmit until accepted. B. In writing, call Engineer's attention to deviations that the submittal may have from the Contract Documents. C. In writing, call specific attention to revisions other than those called for by Engineer on previous submissions. D. Shop Drawings 1. Include additional drawings that may be required to show essential details of any changes proposed by Contractor along with required wiring and piping layouts. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 12 SECTION 01410 TESTING 1.1 GENERAL A. Provide such equipment and facilities as the Engineer may require for conducting field tests and for collecting and forwarding samples. Do not use any materials or equipment represented by samples until tests, if required, have been made and the materials or equipment are found to be acceptable. Any product, which becomes unfit for use after approval hereof, shall not be incorporated into the work. B. All materials or equipment proposed to be used may be tested at any time during their preparation or use. Furnish the required samples without charge and give sufficient notice of the placing of orders to permit the testing. Products may be sampled either prior to shipment or after being received at the site of the work. C. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise provided, sampling and testing of all materials and the laboratory methods and testing equipment shall be in accordance with the latest standards and tentative methods of the American Society for Testing Materials (ASTM). D. Where additional or specified information concerning testing methods, sample sizes, etc., is required, such information is included under the applicable sections of the Specifications. Any modification of, or elaboration on these test procedures (which may be included for specific materials under their respective sections in the Specifications) shall take precedence over these procedures. 1.2 OWNER'S RESPONSIBILITIES A. Owner shall be responsible for and shall pay all costs in connection with testing for the following: 1. Soil tests, except those called for under Submittals thereof. 2. Tests not called for by the Specifications of materials delivered to the site but deemed necessary by Owner. 3. Concrete tests, except those called for under Submittals thereof. 4. Asphalt tests, except those called for under Submittals thereof. 1.3 CONTRACTOR'S RESPONSIBILITIES A. In addition to those inspections and tests called for in the General Conditions, the Contractor shall also be responsible for and shall pay all costs in connection with testing required for the following: 1. All performance and field testing specifically called for by the specifications. 2. All re-testing for Work or materials found defective or unsatisfactory, including tests covered under section 1.2 above. 3. All minimum call out charges or stand by time charges from the tester due to the Contractor's failure to pave, pour, or fill on schedule for any reason except by action of the Engineer. B. Contractor shall notify the Project Engineer 48 hours prior to performing an operation that would require testing. 1.4 CONTRACTOR'S QUALITY CONTROL SYSTEM A. General: The Contractor shall establish a quality control system to perform sufficient inspection and tests of all items of Work, including that of his subcontractors, to ensure conformance to the functional performance of this project. The control shall be established for all construction except where the Contract Documents provide for specific compliance tests by testing laboratories or engineers employed by the Owner. The Contractor’s control system shall specifically include all testing required by the various South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 13 sections of these Specifications. B. Superintendence: The Contractor SHALL employ a full time Superintendent whose sole responsibility is to monitor and coordinate all facets of the Work. The Superintendent shall be on site when work is in progress (i.e. weekend work). The Superintendent shall have adequate experience to perform the duties of Superintendent. The superintendent shall have the authority to act on behalf of the CONTRACTOR. The superintendent shall not be replaced without written notice to the Owner and Engineer. C. Quality Control: Contractor's quality control system is the means by which he assures himself that his construction complies with the requirements of the Contract Documents. Controls shall be adequate to cover all construction operations and should be keyed to the proposed construction schedule. D. Records: Maintain correct records on an appropriate form for all inspections and tests performed, instructions received from the Engineer and actions taken as a result of those instructions. These records shall include evidence that the required inspections or tests have been performed (including type and number of inspections or test, nature of defects, causes for rejection, etc.) proposed or directed remedial action, and corrective action taken. Contractor is responsible for documenting all inspections and tests as required by each section of the Specifications. Provide copies to the Engineer weekly. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 14 SECTION 01510 TEMPORARY UTILITIES 1.1 UTILITIES A. Furnish all utilities necessary for construction. B. Owner will furnish water in reasonable amounts for execution of the work at existing fire hydrants without charge to Contractor. The Contractor shall coordinate and schedule with the Owners’ Field Representative for the Water Department to select the appropriate fire hydrant and set the hydrant meter. C. Make arrangements with Owner as to the amount of water required and time when water will be needed. 1. Owner will fix the place, time, rate and duration of each withdrawal from the distribution system. 2. Unnecessary waste of water will not be tolerated. D. Furnish necessary water trucks, pipes, hoses, nozzles, and tools and perform all necessary labor. 1. Only Owner shall operate existing valves and hydrants. 1.2 SANITARY FACILITIES A. Contractor shall furnish temporary sanitary facilities at each site for the needs of construction workers and others performing work or furnishing services on the Project. Furnish a minimum of two portable toilets at the trailers (if office trailers are required) and a minimum of one at each project work site or as required to accommodate the number of personnel working on site. One facility will delivered to the City of Fort Collins trailer open notice of award of bid. B. Contractor shall properly maintain sanitary facilities of reasonable capacity throughout construction periods. C. Contractor to enforce the use of such sanitary facilities by all personnel at the site. D. Place facilities out of public view using the greatest practical extent. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 15 SECTION 01560 TEMPORARY CONTROLS 1.1 NOISE CONTROL A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed in populated areas. B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and operated in a manner to cause the least noise consistent with efficient performance of the Work. C. Cease operation of all machinery and vehicles between the hours of 7:30 p.m. and 6:30 a.m. 1.2 DUST CONTROL A. Dusty materials in piles or in transit shall be covered when necessary to prevent blowing. B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be kept moist with water or by application of a chemical dust suppressant. Chemical dust suppressant shall not be injurious to existing or future vegetation. C. Dust control within the lime deposit area shall conform to the project’s health and safety plan. At a minimum, the lime area shall be covered as soon as possible after compaction has been obtained to minimize surface drying and dust. Dust control for this area may involve multiple watering and/or continuous watering to maintain a moist surface. 1.3 POLLUTION CONTROL A. Prevent the pollution of drains and watercourses by sanitary wastes, concrete, sediment, debris and other substances resulting from construction activities. 1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the site. 2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and culverts. 1.4 EROSION CONTROL A. Take such measures as are necessary to prevent erosion of soil that might result from construction activities. Measures in general will include: 1. Control of runoff 2. Trapping of sediment 3. Minimizing area and duration of soil exposure 4. Temporary materials such as hay bales, sandbags, plastic sheets, riprap or culverts to prevent the erosion of banks and beds of watercourses or drainage swales where runoff will be increased due to construction activities. B. Preserve natural vegetation to greatest extent possible. C. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize erosion. D. Comply with the City of Fort Collins’ Storm Drainage Erosion Control Manual and Plan. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 16 1.5 SECURITY A. Contractor is responsible for protection of the site and all Work, materials, equipment and existing facilities thereon, against vandalism. B. No claim will be made against the Owner by reason of any act of an employee or trespasser, and the Contractor shall make good all damage resulting from his failure to provide security measures as specified. C. Security measures will be instituted to protect owners of existing facilities during normal operation, but will also include such additional security fencing, barricades, lighting, watchman services or other measures as Contractor feels is required to protect the site. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 17 SECTION 01570 TREE PROTECTION A. Tree Barriers: All trees which will be preserved, but are within the limits of construction, must be protected from all damage associated with construction. A sturdy, physical barrier (fluorescent orange in color) must be fixed in place around each tree for the duration of construction. This barrier will be placed no closer than six (6) feet from the trunk, or one-half of the drip line, whichever is greater. The barrier itself must be fixed so it cannot be moved easily, but the material can be flexible, such as orange safety fence attached to metal T- posts driven into the ground, but must act as an effective deterrent to deliberate or accidental damage of each tree. The Project Engineer or Manager must approve actual materials and location of barrier. The movement or storage of equipment, material, debris, or fill within these required protective barriers is completely prohibited. In situations where the construction will come closer to a tree than six (6) feet, the orange barrier must still be erected. However, additional padding must be placed around the trunk of each tree starting at ground level and proceeding up the trunk to a height of six or seven feet. Padding should be a minimum eight (8) inches thick, and made of a material strong enough to protect the bark from accidental impacts with hand tools or power equipment. B. Accidental Poisoning: During the construction, the Contractor shall not cause, or permit the cleaning of equipment or material within the root zone of any tree. The Contractor shall not store or dispose of waste material including, but not limited to; paints, solvents, asphalt, concrete, mortar, or any other material harmful to the life of a tree, within the root zone of each tree, or group of trees. C. Root Pruning Specifications: When the cutting of tree roots is necessary, each final cut must be made as cleanly as possible for all roots over three (3) inches in diameter using the following method: 1. The line of excavation will be drawn out and appropriate excavation equipment used to clear the area at least six inches in front of the actual finished excavation line. Roots can then be cut using tools such as axes, stump grinders, or trenchers. 2. Each root over three (3) inches in diameter will then be cut cleanly back to the excavation line using a stump grinder operated by an experienced licensed arborist. A sharp hand or bow saw is acceptable for roots under three (3) inches in diameter. Axes and trenchers do not cut roots cleanly and will not be used for final root cuts. D. Contractor shall coordinate with the Owners’ Field Representative prior to and during the installation of tree protection and root pruning activities. Owners’ Field Representative, at his/her opinion, will contact the City Forester and/or City Arborist for advice and approval of the tree protection measures taken by the Contractor and also the City’s advice and approval during the root pruning activities. E. No damaging attachments, wires, signs, permits or other objects may be fastened by any means to any tree preserved on this project. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 18 F. Violation of Specifications and Penalties for Damaging Trees: Any violation of these specifications will lead to penalties based on the type of violation and/or the resulting damages, and may be grounds for the termination of this contract. The penalties will be assessed based on the amount of damage done and the total value of that tree, or group of trees, prior to the damage. The minimum penalty will be $100.00. Penalties for any damage will be based on the total value of the tree as determined by the City Forestry Division staff and the severity of the damage as a proportion of the total value of that tree. This could include up to the full value of the tree. As an example, there are two American Elm trees to be preserved on another project. They are valued at $7,960 and $6,667 for the south and north trees respectively. The south tree is approximately 100 inches in circumference, therefore each inch is worth one-hundredth of the value, or $79.60 per inch. Similarly, the north tree is 91 inches in circumference, making each inch worth $73.26. To extend this to penalties paid, if one inch of the bark on the south tree is scuffed, the penalty would be $100 (the minimum allowed); if two inches are damaged, the penalty would be $159.20 and so on up to 50% of the circumference of the trunk. If 50% or more is damaged, the full value of the tree will be assessed as a penalty. (This example serves to illustrate how damages will be assessed). This method of assessing penalties will be applicable to all trees not marked for removal on the project, accidental poisoning and improper pruning. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 19 SECTION 01580 TRAFFIC REGULATION 1.1 TRAFFIC CONTROL A. The traffic control for this project shall be the responsibility of the Contractor. Traffic control is defined as those devices necessary to channelize vehicular and pedestrian traffic through the project. The Contractor is responsible for applying their costs associated to their predicted calendar day schedule to determine the lump sum amount. B. The Contractor and/or Traffic Control Contractor must submit traffic control plans and coordinate all traffic control with the City's Traffic Control Coordinator. The traffic control plans must be submitted and approved 72 hours prior to starting construction and before making each modification. C. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Manual of Uniform Traffic Control Devices (U.S. Dept. of Transportation), or applicable statutory requirements of authority having jurisdiction. D. The traffic access/control plan limitations for handling traffic for these projects are described below. NOTE: A minimum of six (6) specialty signs will be required to be installed at locations acceptable by the City of Fort Collins Traffic Operations Department throughout the project notifying the traveling public of the dates and location of the closure. South Lemay Avenue Full Closure: • South Lemay Avenue will be closed between Nassau Way to Carpenter Road. The Contractor will be required to barricade the Carpenter/Lemay intersection with New Jersey Barriers placed behind the stop sign on Lemay from the east sidewalk to the west sidewalk. In addition, type III barricades must be placed at the end of the closures with a 48”x48” sign stating that the road is closed with start and finish dates. • A temporary all-access road must be constructed and maintained throughout the project allowing the Emerson Acres residents access to their homes. The access road must be clearly designated with vertical barricades spaced every 75 feet for 2040 linear feet on both edges of the temporary roadway. A 48”x48” sign with all of the resident’s addresses must be placed on a type III barricade. It will be the responsibility of the Traffic Control Company to inspect the temporary access control devices twice daily or as needed until the project is complete. South Lemay Overlay: • The overlay operation between Trilby Road and Nassau Way will require a one-lane operation. The Contractor will be required to provide seven (7) flaggers to control all side streets and the Trilby intersection during paving operations. Carpenter Road Overlay: • The milling operations will be done under a traveling operation with a one way road traffic control method. The overlay operation at the Carpenter/Lemay intersection will require flaggers to control the east-west traffic movements. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 20 Pedestrian Access – Pedestrian traffic shall be maintained along the West side of Lemay Avenue at all times, utilizing temporary sidewalks when necessary. All other pedestrian traffic will be closed and pedestrians will be re-routed per plan. Bike Lanes – Bike lanes must be maintained on the West side of Lemay Avenue. All bicyclists will be required to merge with the pedestrians. Specialty signs must designate the temporary re-route. Residential Access – Access to all residential drives must be maintained at all times. The Contractor will be responsible for constructing, maintaining and delineating a temporary all-weather access road and coordinating with adjacent property owners and the City of Fort Collins representatives. Any modifications to the traffic control plan must be approved by the City’s Traffic Control Coordinator and the Engineer. E. Vehicle, bike and pedestrian access to all side streets and private drives shall be maintained at all times. The Contractor will develop an access control plan in coordination with adjacent property owners, and submit it in conjunction with the traffic control plan to the Engineer for approval prior to the start of any Work. Pedestrian and bicycle traffic shall be maintained along the West side of Lemay at all times, utilizing temporary sidewalks when necessary. F. The Contractor must work with the adjacent residents to provide and maintain sufficient access for them during the duration of the project. It will be the Contractors responsibility to coordinate and communicate with the residents during construction. G. The Contractor must maintain, at their cost, access to the Lemay Estates construction site during their business hours. It will be the Contractors responsibility to coordinate and communicate with the businesses during construction. H. The Contractor shall keep traffic areas free of excavated material, construction equipment, pipe, and other materials and equipment. I. The Contractor shall keep fire hydrants and utility control valves free from obstruction and available for use at all times. J. The Contractor shall provide and maintain, at their cost, temporary driveway approaches on driveways open to traffic at all times to insure that the approaches are smooth, compacted, and will not prohibit or inhibit the use of the driveway. The driveway approaches must be maintained seven days a week. In the case of bad weather the Contractor must repair the driveways immediately following the storm and must work to maintain access during the storm. 1.2 WORK AREA SAFETY A. The Contractor shall maintain a safe work area and protect area residents, motorists, bicyclists, pedestrians, and children from work area hazards. B. The Contractor shall provide all work area safety control devices, such as barricades and safety fence around all excavations and drop-offs. C. Work area safety control devices will not be paid for separately. Cost for this equipment should be included in the lump sum cost for the work items which will require work area safety control devices. South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 21 1.3 PARKING A. Provide suitable parking areas for the use of all construction workers and others performing work or furnishing services in connection with the Project so as to avoid interference with public traffic, Owner's operations, or construction activities. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 22 SECTION 01700 CONTRACT CLOSEOUT 1.1 SUBSTANTIAL COMPLETION A. Substantial Completion for the South Lemay Avenue Widening Project (2006) shall be defined as the following: 1. All work requiring lane or shoulder closures or other traffic obstructions is complete. 2. Traffic is following the lane arrangements shown on the plans for finished roadway. 3. All pavement construction, joint sealing, and shoulder embankment is complete. 4. Traffic control devices and pavement markings are in their final positions. 5. All pedestrian sidewalks and decorative crosswalks within right-of-way are complete. 6. All medians are constructed with irrigation in place. B. Substantial Completion must be met by October 1, 2006. This information is outlined in Section 00520 - Agreement. 1.2 FINAL COMPLETION A. Final Completion shall be defined as the following: 1. Once substantial completion has been met, the Contractor will be allowed 10 working days to reach final completion. 2. This will include the completion of all Work including cleanup, Project Record Documents shall be turned over to the Owner, all punch list items completed, and all processing of all change orders. The Work must be ready for final payment and acceptance. B. Final Completion will be subject to the terms outlined in Section 00520 - Agreement. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 23 SECTION 01711 SITE CLEANUP 1.1 GENERAL A. Execute cleanup, during progress of the Work, and at completion of the Work. B. Adequate cleanup will be a condition for recommendation of progress payments. 1.2 DESCRIPTION A. Store volatile wastes in covered metal containers and dispose off site. B. Provide on-site covered containers for the collection of waste materials, debris and rubbish. C. Neatly store construction materials, such as concrete forms, when not in use. D. Broom clean adjacent paved surfaces and rake other adjacent surfaces. E. The streets adjacent to the construction area shall be cleaned of debris generated by the project by the Contractor at the earliest opportunity, but in no case shall the street be left unclean after the completion of the day's work. It shall be the Contractor's responsibility to provide the necessary equipment and materials to satisfactorily clean the roadway at no additional cost to the project. The City's Street Department will sweep the street at an approximate hourly rate of $90.00 for a minimum of 2 hours. The Contractor must sign a Contract with the City Street Department prior to requesting street sweeping. Construction “DRAG OUT” will not be tolerated. The Contractor must have the means to sweep, wash and scrape the roadway clear of any materials drug out by construction traffic on-site. The Contractor will monitor his construction traffic and clean as necessary or as directed by the on-site Project Engineer. If the streets are not cleaned by the Contractor within 24 hours after having been given notice from the Project Engineer, the Project Engineer will have the Streets Department sweep the streets at the rates listed above and will back charge the Contractor for expenses incurred. 1.3 DISPOSAL A. Wastes shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers, streams or waterways. B. Remove waste materials, clearing materials, demolition materials, unsuitable excavated materials, debris and rubbish from the site at least weekly and dispose of at disposal areas furnished by Contractor away from the site. END OF SECTION South Lemay Widening Project (2006) Project Date: April 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\General Reqs General Reqs. - 24 SECTION 01720 PROJECT RECORD DOCUMENTS 1.1 GENERAL A. Maintain at the site one record copy of: 1. Documents and samples called for in General Conditions 6.19. 2. Field Test Records. 3. Certificates of compliance. 1.2 MAINTENANCE OF DOCUMENTS AND SAMPLES A. File documents and samples in accordance with the specifications section numbers. B. Maintain documents and samples in a clean, dry, legible condition and in good order. Do not use record documents for construction purposes. 1.3 RECORDING A. Label each document "PROJECT RECORD" in neat large printed letters. B. Record information concurrently with construction progress. 1. Do not cover Work until required information is recorded. C. Marking of Project Records. 1. Legible and with a dark pen or pencil. 2. Ink shall not be water based or subject to easy smearing. D. Mark Drawings to record actual construction. 1. Field dimensions, elevations, and details. 2. Changes made by a Modification. 3. Details not on original Drawings. 4. Horizontal and vertical locations of underground utilities and appurtenances referenced to a minimum of three permanent surface improvements. 5. Depths of various elements in relation to project datum. 6. Location of utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure. 1.4 SUBMISSION A. Accompany submittal with transmittal letter in duplicate containing: 1. Date. 2. Project title and number. 3. Contractor's names, address, and telephone number. 4. Index containing title and number of each Record Document. 5. Signature of Contractor or his authorized representative. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 1 ZIEGLER ROAD AND KECHTER ROAD ROUNDABOUT PROJECT The Colorado Division of Highways "Standard Specifications for Road and Bridge Construction" (2005), except as revised herein, is hereby adopted as a minimum standard of compliance for this project. The City of Fort Collins Storm Drainage Construction Standards, City of Fort Collins Water Utilities Standard Construction Specifications, Larimer County Urban Area Street Standards, the Fort Collins – Loveland Water District and South Fort Collins Sanitation District Standards, and City of Fort Collins Work Area Traffic Control Handbook, shall also serve as minimum standards of compliance for this project. They are not included in the contract documents, but may be obtained at the appropriate City Departments. It shall be the Contractor's responsibility to purchase and familiarize themselves with all of the City Department Specifications. These project specifications, City Department specifications, and CDOT standard specifications are considered minimum standards for compliance on this project. In those instances where the CDOT Standard Specifications conflict with the City specifications listed above, the City specifications shall govern. In those instances where the CDOT Standard Specifications conflict with any of the provisions of the preceding Sections 00001 through 01750, General Requirements, the preceding sections shall govern. PROJECT CONSTRUCTION SPECIFICATIONS INDEX OF REVISIONS SECTION PAGE 202 REMOVALS.............................................................................................................. Technical Specs 2-4 203 EXCAVATION AND EMBANKMENT................................................................... Technical Specs 5-7 208 EROSION CONTROL .............................................................................................. Technical Specs 8 210 RESET STRUCTURES ............................................................................................. Technical Specs 9-10 304 AGGREGATE BASE COURSE................................................................................ Technical Specs 11 306 RECONDITIONING.................................................................................................. Technical Specs 12 307 FLY ASH SUBGRADE STABILIZATION .............................................................. Technical Specs 13 - 16 401 PLANT MIX PAVEMENTS - GENERAL................................................................ Technical Specs 17 - 22 403 HOT BITUMINOUS PAVEMENT ........................................................................... Technical Specs 23 – 26 420 GEOSYNTHETICS ................................................................................................... Technical Specs 27 - 28 506 RIPRAP ..................................................................................................................... Technical Specs 29 - 30 603 CULVERTS AND SEWERS .................................................................................... Technical Specs 31 604 MANHOLES, INLETS AND METER VAULTS...................................................... Technical Specs 32 607 FENCES .................................................................................................................... Technical Specs 33 608 SIDEWALKS AND DECORATIVE CROSSWALKS ............................................. Technical Specs 34 – 35 609 CURB AND GUTTER............................................................................................... Technical Specs 36 619 WATER LINES ........................................................................................................ Technical Specs 37 630 TRAFFIC CONTROL DEVICES (Contractor Supplied)........................................ Technical Specs 38 - 41 South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 2 REVISION OF SECTION 202 REMOVALS Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 is revised to include the following: The Contractor shall remove and dispose of all concrete sidewalk, curb and gutter, crosspans, driveways, inlets, irrigation structures, pipe, structures, asphalt, fence, trees, retaining walls and any other obstructions that are designated for removal by the Engineer. All such removals will be measured in the field, and quantities agreed to by the Contractor and the Engineer. Subsection 202.02 is revised to include the following: Remove Pipe (RCP, CMP, PVC) - The Contractor shall remove all (clay tile, concrete, PVC, ductile, corrugated metal, steel) pipes according to the construction drawings or as directed by the Engineer. All trenches will be backfilled to City of Fort Collins specifications to 95% compaction. All areas must be graded according to Engineers direction and all pipe removed is to be the property of the Contractor except in the residential drive approaches. The pipes that cross the Emerson Acres Lots will become the property of the adjacent property owners. All property owners must be given 24 hours notice prior to any work. If the property owners are not interested in keeping the pipe, the pipe then becomes the property of the Contractor. In the instance that the property owner retains the pipes, the Contractor will be asked to place the pipe at the right-of-way boundary for the property owner to retrieve. All drive approaches must be re-compacted and temporary surface placed for access. The driveway materials will be paid for under the Borrow ABC line item. All other labor, materials and equipment used to remove the pipe and re-compact the excavated areas. Remove Existing FES (30” and 42” RCP) - The Contractor shall remove the flared end sections and have the City representative determine if they can be re-used. If the flared end sections are in determined to be in good conditions, then the Contractor will be responsible for storing and placing this item. If the flared end sections have been determined to be unacceptable, then it becomes the property of the Contractor. All labor, equipment, and materials necessary to perform this work, will be paid for under this item. Remove Landscape Timbers and Concrete Block in Driveway (Lot 1 Emerson Acres) – The property owner will be given the option to keep the materials. If the owner is not interested in salvaging the railroad ties and concrete blocks, then the materials become the property of the Contractor. In the case that the owner is interested in retaining the landscaping materials, then the Contractor will be asked to place all materials along the right-of-way boundary. Remove Concrete Irrigation Manholes – The Contractor must expose the 12” ADS pipe on the manhole located on the west side of Lemay Avenue and cut the pipe to protect the existing pipe. The end of the pipe will be plugged with concrete, the manhole removed and the area compacted to 95%. The manhole on the east side of Lemay Avenue will need to be removed and the area compacted to 95%. All labor, materials, equipment, disposal cost and cost to plug the existing pipe must be included in this unit price. Remove Concrete Ditch – Contractor will be required to remove and dispose of all materials. The unit price must include all equipment, labor and materials necessary to complete this work. Rotomill Asphalt Pavement (Carpenter Road – 2” Depth) – This work will be done under traffic. The Contractor must submit a traffic control plan to the City of Fort Collins Traffic Operations department for review, 2 weeks prior to work commencing. The Contractor must provide: pick-up broom, labor, small front end loader (skip tractor), superintendent, and TCS. Prior to the rotomill operations, the Contractor will be required to spot check elevations with a string line or transit. The material will be the property of the Owner and will be hauled to a designated area on site. This item will be paid for by the square yard (SY). Remove Existing Rip-Rap – The Contractor will remove and stockpile the existing rip-rap. Once the proposed storm pipes have been installed, the Contractor will use this rip-rap per drainage plan. Any excess rip-rap will be the property of the Owner. The Contractor will be required to haul the excess to Drake and Ziegler Road within the designated South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 3 project limits. The Contractor Shall remove and dispose of all concrete sidewalk, curb and gutter, cross pans, driveways, inlets, irrigation structures, pipe, structures, asphalt, fence, trees, retaining walls and any other obstructions that are designated for removal by the Engineer. All such removals will be measured in the field and quantities agreed to by the Contractor and the Engineer. Prior to removal, concrete and/or asphalt shall be saw cut full depth to a clean and straight vertical line. Pieces of concrete which, due to the Contractor’s operations, crack or break beyond the limits of construction shall be saw-cut, or removed to the nearest joint, and removed and replaced at the Contractor’s expense. The limit of the repair will be determined by the Engineer. The initial saw cutting to remove existing concrete and/or asphalt shall be considered incidental to the work and shall not be paid for separately under this item. Removal of concrete, asphalt and/or obstructions as described in section 202.01 beyond the limits designated b y the Engineer will be the responsibility of the Contractor and will not be paid for under this section. Disposal Site - Materials designated for removal shall become property of the Contractor, unless noted in the specifications or specified by the Engineer to be salvaged or stockpiled. It shall be the Contractor's responsibility to obtain disposal sites for all unusable material, which is removed. Subsection 202.12 is revised to include the following: The Contractor and the Engineer shall field measure and agree upon the quantity to be removed before the work commences. Should the Contractor fail to request the Engineer to measure any work, the Contractor shall not be compensated for materials that were not measured by the Engineer. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 202-01 Remove Pipe (RCP, CMP, PVC) – (LF) 202-02 Remove Existing FES (30” & 42” RCP) – (EA) 202-03 Remove Landscape Timbers and Concrete Block in Driveway (Lot 1 of Emerson Acres Subdivision) – (LS) 202-04 Remove Concrete Irrigation Manholes – (EA) 202-05 Remove Concrete Splitter Box – (EA) 202-06 Remove Existing Irrigation Brick Vault 6’ x 6’ x 12’ – (LS) 202-07 Remove Concrete Ditch – (LF) 202-08 Remove Curb and Gutter – (LF) 202-09 Remove Concrete Sidewalk – (SF) 202-10 Saw Cut Asphalt – (LF) 202-11 Rotomill Asphalt Pavement (Carpenter Road – 2” Depth) – (SY) 202-12 Pulverize Asphalt in Place (5” – 10” Depth) – (SY) 202-13 Remove Existing Rip-Rap – (SY) 202-14 Transport Existing Rip-Rap to Drake and Ziegler – (CY) 202-15 Remove & Replace Existing Barricade (Type III) – (EA) 202-16 Remove Tree Stump (Grinding) – (EA) South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 4 202-17 Remove Fence (Various Types) – (LF) 202-18 Remove and Provide Temporary Mailbox – (EA) 202-19 Cap Irrigation Sprinklers – (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in removals and rotomilling, including excavation, backfill, haul and disposal, as specified in these specifications, and as directed by the Engineer. All saw cutting involved in removing the necessary items in order to complete the Work shall be considered incidental to the Work and will not be paid for separately. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 5 REVISION OF SECTION 203 EXCAVATION AND EMBANKMENT Section 203 of the Standard Specifications is hereby revised as follows: Subsection 203.01 is revised to include the following: Unclassified Excavation (Including 8” of Existing Road) - This shall consist of excavation of all materials on the site to final grades, excluding the bid items listed in Section 202. Excavation of unsuitable material will only be paid for if it is found to be unsuitable in its original state. This item shall be measured from the plans and cross sections, and will be paid for by the cubic yard. This item shall be paid according to plan quantity. Embankment (Complete in Place) - All excavated material, except the material being hauled and disposed, shall be placed as embankment and compacted, to final grades, as specified in Section 203.07. The use of scrapers will not be permitted to compact the material. A disk with 4 wheel drive tractor 815 CAT or equal will be required to do this work. The embankment quantity was not adjusted to allow for shrinkage during compaction. This item will be measured from the plans and cross sections and will be paid for by the cubic yard. This item will be paid according to plan quantity. Stockpile and Place Pulverized Asphalt – This item shall include the costs associated in transporting the material to the designated stockpile site, stockpiling, placing 3” to 4” of recycled asphalt to the roadway subgrade. Clear and Grub – This item shall include the removal of any tree stumps, shrubs, or other protruding objects prior to stripping the top 6”. Borrow - ABC (Class 5 or 6) - (Complete in Place) - This shall include supplying, placing, and compacting aggregate base course as directed by the Engineer. This item will be measured in the field and paid for by the ton. This item will not be paid for as Embankment. Borrow material will only be used for fill if there is a shortage of suitable material onsite and/or as directed by the Engineer and may be used under sidewalks. Muck Excavation (Complete in Place) - This shall include excavation of unsuitable material, supplying and placing Class 1 or 2 Structural Backfill, Pit Run or an approved fill, re-compacting material to finish grade, and haul and disposal of unsuitable material. NOTE: Muck-excavation of material from rain or weather damage or dewatering pump failure will not be paid for and is entirely the Contractor's responsibility. This item shall be measured in the field, and will be paid for by the cubic yard. Topsoil - (Stripping, Stockpiling, Placing) 6” Depth – All areas that have suitable topsoil material shall be stripped to a depth of 6 inches. This material shall be stockpiled and placed after the final grades have been established. This item shall include stripping existing vegetation, temporarily stockpiling, loading, hauling, and placing topsoil material for back of walk and curb areas, and other designated areas. This item shall be paid according to plan quantity. Temporary Access – All Weather Road (2000’ x 12’) – The Contractor will be required to construct a 2000 foot long, 12 foot wide, 4” deep temporary all weather access roadway for the residents in Emerson Acres on the east side of Lemay Avenue. The roadway must be maintained throughout the duration of the project. In the event of bad weather, the Contractor will be required to blade the roadway as necessary to ensure emergency vehicle access in and out. The costs associated in constructing and maintaining this access road must be included in the unit price. Median Splashblock/Hardscape Shaping (Complete in Place) – The areas in the medians beneath the exposed aggregate concrete shall be backfilled with suitable onsite material approved by the Engineer. These areas shall be backfilled in lifts not to exceed six inches (6”) and compacted with a plate compactor or as directed by the Engineer. This item will not be paid for as Embankment. This item will be measured in the field and will be paid for by the square foot. Potholing – The Contractor shall be responsible for locating electrical, gas, fiber optic, cable, telephone, traffic signal conduit and other existing utility lines and shall be performed every 100 lineal feet or as deemed necessary by the Contractor. All related work, including excavation, backfilling, shoring, labor and number of hours will not be measured and paid for separately, but shall be included in the work. Repair of damaged existing utility lines caused by the Contractor will be at the Contractor’s expense. Potholing will be paid as a lump sum item. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 6 Flowfill Section Over Shallow Utilities – This work shall consist of the removal of soil above an existing utility, after subgrade elevation has been achieved, one foot (1’) deep and three feet (3’) wide. This excavated area that can not be treated with flyash, will be filled with flowable fill to the top of subgade to protect the existing utility. All related work, material and equipment will not be measured and paid for separately, but shall be included in the work. This work shall be measured and paid for by the linear foot. Import Screened Topsoil (3”) – Parkway Areas – This shall include supplying, hauling, placing, and grading screened topsoil between the new curb and gutter and sidewalk, and/or as directed by the Engineer of this project. This material shall be placed and graded on the surface for the future seeding and landscaping (by others). This item will be measured in the field and paid for by the cubic yard. This item will not be paid for as Embankment. These items will not be paid separately under items in section 202, 210, 603, or 604. Embankment and sub-grade material shall be compacted to 95% of maximum density at +/- 2% optimum moisture. Maximum density shall be determined by ASTM D 698. This will apply under the roadway, curb and gutter, sidewalk, and driveways. Topsoil shall be compacted to 85% of maximum density at/or near optimum moisture. Excavation and Embankment will only be paid when a significant change in grade is required, as determined by the Engineer. Minor cuts and fills shall be considered incidental to the work, and shall not be paid separately under this section. If unsuitable sub-grade is encountered and the Engineer directs the Contractor to over excavate the material, the Contractor shall use Aggregate Base Courses (Class 5 or 6), Class 1 or 2 Structural Backfill, Pit Run or an approved fill to backfill the over excavated area if there is not any acceptable material onsite. This Work will not be paid for separately but will be paid under the Muck Excavation item. The proposed material shall meet the following minimum requirements: LL Maximum: 30 PI Maximum: 6 "R" Value Minimum: 78 The minimum strength coefficient of the Aggregate Base Coarse shall be 0.11. After specified compaction has been obtained, the sub-grade under the curb, gutter, sidewalk, and pavement shall be proof-rolled with a heavily loaded rubber tired roller, fully loaded water truck, or approved equal. Those areas which produce a rut depth of over one-half (1/2) inch or which crack the sub-grade after pumping and rebounding shall be ripped, scarified, wetted or dried if necessary, and re-compacted to the requirements for density and moisture at the Contractor’s expense. Where unsuitable material is encountered, the Engineer may require the Contractor to remove the unsuitable materials and backfill to the finished grade with approved material. The completed sub-grade shall be proof-rolled again after placement of approved material. This will be paid for at the contract unit price for Muck Excavation. The Contractor shall refer to the plans for re-grading information. This work shall include all excavation, embankment, and grading required to prepare these sites for landscaping. Subsection 203.04 is revised to include the following: The excavations and embankments shall be finished to smooth and uniform surfaces conforming to the typical sections specified. Variation from the sub-grade plan elevations specified shall not be more than 0.08 feet. Subsection 203.13 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 7 203-01 Unclassified Excavation (Including the 8” of Existing Roadway) – (CY) 203-02 Embankment – (CIP) – (CY) 203-03 Stockpile and Place Pulverized Asphalt – (CY) 203-04 Clear and Grub – (LS) 203-05 Borrow ABC (Cl 5 or 6) – (CIP) – (TON) 203-06 Muck Excavation – (CIP) – (CY) 203-07 Topsoil–(Stripping & Stockpiling) – 6” Depth – (CY) 203-08 Temporary Access – All weather Road (2000’ x 12’) – (TON) 203-09 Median Splashblock/Hardscape Shaping - CIP – (SF) 203-10 Potholing – (LS) 203-11 Flowfill Section Over Shallow Utilities – (LF) 203-12 Import Screened Topsoil (3”) in Parkway Areas – (CY) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Unclassified Excavation, Embankment, Haul & Dispose, Topsoil (stripping, stockpiling, placing), Muck Excavation, Borrow ABC and Median Hardscape Shaping, including without limitation, haul, stockpiling, placing of material, watering or drying soil, compaction, proof rolling, finish grading, and disposal of unusable materials, as shown on the plans and as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 8 REVISION OF SECTION 208 EROSION CONTROL Section 208 of the Standard Specifications is hereby revised as follows: Subsection 208.05 is revised to include the following: All Erosion Control Devices, Materials, and Techniques required to prevent damage to the storm water facilities as outlined in the City of Fort Collins Standards will be considered incidental to the work, and shall be included in the price. No measurement for payment shall be made for maintenance of Erosion Control devices. This item will be paid for as a lump sum price to the Contractor. Subsection 208.07 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 208-01 Erosion Control – (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in installing and maintaining erosion control, complete-in-place, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 9 REVISION OF SECTION 210 RESET STRUCTURES Section 210 of the Standard Specifications is hereby revised as follows: Subsection 210.10 is revised to include the following: Work contained in this Subsection shall meet the requirements of the current City of Fort Collins and Fort Collins- Loveland Water District Utilities Standard Construction Specifications or other applicable water utility agency standard construction specifications. Copies of the specifications can be obtained at The Fort Collins Loveland Water District at 5150 Snead Dr, Fort Collins Colorado. The Contractor shall cooperate and coordinate with the City Water Utilities Department, Fort Collins-Loveland Water District and South Fort Collins Sanitation District or other applicable water utility when shutting off water to minimize downtime to customers. The Contractor shall also coordinate work involving the relocation of fire hydrants, water meters, curb stops, and water valves, and lowering water and sewer service lines, and water lines. The Contractor shall supply all materials required to complete the work that is not supplied by the City or other applicable water utility, and these materials shall be included in the costs of each item. This shall include, but not be limited to; new copper line and fittings, new stop boxes, meter pits, excavation, backfill and compaction. New copper fittings, stop boxes, and meter pits will be required at each location. All structures located in bituminous pavements to be surfaced shall be adjusted prior to, or during paving operations. All structures located within a concrete pavement shall be adjusted prior to pouring the concrete pavement section. The Contractor shall perform all work needed to ensure that said structures can be readily adjusted and shall have all necessary materials on hand prior to commencing the work. The adjustments shall be made as noted below. All structures shall be adjusted to be ¼”, (+/-) ⅛” below the pavement surface. The Contractor shall be responsible for immediately cleaning out all construction materials that may fall into manholes, valve boxes, or other structures during the construction process. In the event that a structure was not properly adjusted (i.e. too high or too low) or the structure was covered and not adjusted after the paving operation, written notice will be given by the Engineer to the Contractor requiring the Contractor to make the necessary adjustments within 5 working days. In the event that the structure is not adjusted within said time frame; the Engineer shall have the right to engage a third party to complete the work, and to withhold the cost of such work from payments due the Contractor. If a structure is adjusted prior to an overlay operation, the Contractor shall place bituminous base material around the structure as directed by the Engineer to insure that it will not be a hazard to vehicular traffic. This will be paid for under the bid item for Asphalt Patching. Adjust Manhole Ring/Cover – Manholes located within existing asphalt pavement shall be adjusted by removing an area of pavement with a minimum diameter one foot (1’) larger than the structure (centered on the structure). This shall be done by cutting vertical edges, adjusting the manhole by grouting concrete rings and/or utilizing metal shims to raise the structure to the proper grade, then spreading and mechanically compacting bituminous material of the same grade and quality as the adjacent pavement. NOTE: All manholes shall be raised through the top lift. When the manhole adjustment is complete, the slope of the top surface of the manhole cover shall match the slope of the pavement in both the longitudinal and traverse directions. Any manhole cover which is unstable or noisy under traffic shall be replaced. This item will be paid under Adjust Manhole Ring/Cover – (EA). Modify Manhole - Manholes located within existing asphalt pavement or sub-grade shall be adjusted by removing an area of pavement or sub-grade with a minimum diameter two foot (2’) larger than the structure (centered on the structure). All OSHA shoring is the responsibility of the Contractor. This shall be done by cutting vertical edges in the pavement, if required, and excavating below the ground surface to the required barrel seam needed to start the adjustment. The cone section shall be removed and additional sections added or removed to obtain the plan finished South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 10 elevation. All manhole sections shall be cleaned and an approved gasket material applied prior to reassembly. This work shall be done in accordance with the City of Fort Collins Standard Construction Specification and/or the South Fort Collins Sanitation District Specifications for Sewer Mains. The excavation shall be backfilled with on-site material and shall be mechanically compacted or Flowable Fill used if directed by the Engineer. This item will be paid under Modify Manhole – (EA). Flowable Fill will be paid under Section 608. Adjust Valve Box – Valve boxes located within asphalt pavement shall be adjusted by removing the existing pavement around the valve box, adjusting the valve by turning it to the proper grade, trimming the existing asphalt by cutting vertical edges, then spreading and mechanically compacting bituminous material of the same grade and quality as the adjacent pavement. If a valve box cannot be turned up, or can be turned up, but not sufficiently to achieve the proper grade or if the top section of the valve box is in poor condition, the Contractor shall excavate around the top section of the valve box and remove and replace the top section with a longer section supplied by the Contractor. The excavation shall then be back filled with Non-Shrink flowfill to the top of sub-grade, and then, material of the same grade and quality as the adjacent pavement shall be placed. The Contractor shall exercise reasonable care while attempting to adjust the valve boxes. If, in the opinion of the Engineer, the Contractor is negligent and breaks the valve box, the valve box shall be replaced at the Contractor’s expense. This item will be paid under Adjust Valve Box – (EA). Subsection 210.13 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 210-01 Adjust Manhole Ring/Cover – (EA) 210-02 Modify Manhole – (EA) 210-03 Adjust Valve Box (FCLWD) – (EA) 210-04 Abandon Water Service – (EA) 210-05 R&R Existing Water Meter Pit to new ROW Location – (EA) 210-06 Reset Mailbox United States Postal Standards – (EA) 210-07 Relocate Gate to ROW – (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the Work involved in adjusting structures, complete-in-place, including non-shrink backfill, concrete, metal shims, bituminous materials, haul and disposal, excavation, bedding material, backfill, and compaction as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 11 REVISION OF SECTION 304 AGGREGATE BASE COURSE Section 304 of the Standard Specifications is revised as follows: Subsection 304.01 is revised to include the following: This work shall consist of placing 6” of Aggregate Base Course (Class 5 or 6) over previously prepared pavement sub- grade approved by the Engineer. Aggregate Base Course will be used under the asphalt pavement section and shall meet the requirements of Subsection 703.03. The proposed material shall meet the following minimum requirements: LL Maximum: 30 PI Maximum: 6 “R” Value Minimum: 78 The minimum strength coefficient of the Class 5 or 6 Aggregate Base Course shall be 0.11 Subsection 304.06 is revised to include the following: Aggregate Base Course shall be compacted to at least 95% of maximum density at or near optimum moisture as determined by ASTM D698. Subsection 304.07 is revised to include the following: Aggregate Base Course will be measured by the ton at proper moisture. Quantity will be adjusted accordingly if the moisture content is too high. Haul and water necessary to bring mixture to optimum moisture will not be measured or paid for separately, but shall be included in the price for Aggregate Base Course. Load tickets shall be consecutively numbered for each day. Soil sterilization shall be applied under all new asphalt paving and shall be considered incidental to the work. Sterilization shall not be paid for separately under this item. Subsection 304.08 is revised to include the following: The accepted quantities of Aggregate Base Course will be paid for at the contract unit price per ton. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 304-01 Aggregate Base Course – (Class 5 or 6) - 6” Depth – (CIP) – (TON) 304-02 Aggregate Base Course Patch Placement – (Class 5 or 6) – 6” Depth – (CIP) – (TON) 304-03 Gravel Shoulder – Class 5 or 6 Aggregate Base (4” Depth) – (TON) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Aggregate Base Course including haul, sterilization, and water. The work will be complete-in-place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 12 REVISION OF SECTION 306 RECONDITIONING Section 306 of the Standard Specifications is hereby revised for this project as follows: Subsection 306.02 is revised to include the following: The top 8" of the sub-grade including fill areas (curb, gutter and sidewalk areas) shall be reconditioned by scarifying and re-compacting. The sub-grade shall be thoroughly mixed and dried or moistened to full depth and compacted as specified in Section 203.07. The reconditioned surface shall not vary above or below the lines and grades as staked by more than 0.04 foot under asphalt or concrete pavement or 0.08 foot under aggregate base course. The surface shall be tested prior to application of any base course or pavement. All defective work shall be corrected as directed by the Engineer. The surface shall be protected and maintained until base course or pavement has been placed. If the Contractor chooses to use road base as a fine grading material or a material to mitigate over excavated or rain damaged areas this shall be entirely the Contractor's cost and shall be considered incidental to the Work. The Contractor shall be paid for reconditioning, if reconditioning has been attempted, and muck excavation in the event that unsuitable material is encountered and removed at the direction of the Engineer. It shall be at the Engineer’s discretion to determine if the Contractor has made a sufficient effort to control the moisture in the sub-grade material and made a reasonable effort to recondition the sub-grade. Soil sterilization shall be applied under all new asphalt paving and shall be considered incidental to the work. Sterilization shall not be paid for separately under this item. This item (Reconditioning) will not be necessary or paid for in flyash stabilized areas. Subsection 306.04 is revised to include the following: The accepted quantities of Reconditioning will be paid for at the contract unit price per square yard. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 306-01 Reconditioning (8") - (SY) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Reconditioning, complete-in-place, including compaction, wetting or drying, and finish grading, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 13 REVISION OF SECTION 307 FLYASH SUBGRADE STABILIZATION Section 307 of the Standard Specifications is revised as follows: This item shall consist of treating the sub-grade, from back of curb to back of curb, adding Class "C" flyash, mixing and compacting of the mixed material to the required depth and density. This item applies to natural ground or embankment and shall be constructed as specified herein and in conformity with the typical sections, lines and grades as shown on the plans or as established by the Engineer. MATERIALS A. Flyash - The flyash shall meet ASTM Specification 618, Section 3.2, when sampled and tested in accordance with Sections 4, 6, and 8 unless otherwise shown on the plans. Flyash shall be Class C designation containing a minimum of 25 percent CaO. B. Water - The water used in the stabilized mixture shall be clean, clear, and free of sewage, vegetable matter, oil, acid, and alkali. Water known to be potable may be used without testing. All other sources shall be tested in accordance with AASHTO T-26 and approved by the Materials Engineer. EQUIPMENT A. The machinery, tools and equipment necessary for proper prosecution of the Work shall be on the project site and approved by the Engineer prior to the beginning of construction operations. All machinery, tools and equipment used shall be maintained in a satisfactory and workmanlike manner. B. Flyash shall be stored and handled in closed weatherproof containers until immediately before distribution on the road. If storage bins are used, they shall be completely enclosed. C. If flyash is furnished in trucks, each truck shall have the weight of flyash certified on public scales or the Contractor shall place a set of standard platform truck scales or hopper scales at a location approved by the Engineer. D. All sheep foot compactors shall have all cleaner bars in working condition. E. At the direction of the on-site Engineer a water truck will be on site to support finish and tilling operation. CONSTRUCTION METHODS A. General It is the primary purpose of this specification to secure a completed course of treated material that contains the following: 1. Uniform flyash/soil mixture with no loose or segregated areas; 2. Uniform density and moisture content 3. Is well bound for its full depth 4. A smooth surface suitable for placing subsequent courses. It shall be the responsibility of the Contractor to regulate the sequence of his work; to process a sufficient quantity of material to achieve full depth as shown on plans; to use the proper amounts of flyash; to maintain the work; and to rework the courses as necessary to meet the above requirements at no additional cost. Before other construction operations are initiated, the sub-grade shall be graded and shaped to enable the flyash treatment of materials in place, in conformance with the lines, grades, and thickness shown on the plans. Unsuitable soil or materials shall be removed and replaced with acceptable material. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 14 The sub-grade shall be firm and able to support, without displacement, the construction equipment and the compaction hereinafter specified. Soft or yielding sub-grade shall be corrected and made stable by scarifying, adding flyash, and compacting until it is of uniform stability. If the Contractor elects to use a trimming machine that will remove the sub-grade material accurately to the secondary grade, he will not be required to expose the secondary grade or windrow the material. However, the Contractor shall be required to roll the sub-grade, as directed by the Engineer, before using the trimming machine and correcting any soft areas that this rolling may reveal. This method will be permitted only where a machine is provided which will ensure that the material is cut uniformly to the proper depth and which has cutters that will plane the secondary grade to a smooth surface over the entire width of the cut. The machine shall be of such design that visible indication is given at all times that the machine is cutting to the proper depth. B. Application The flyash shall be spread by an approved spreader at the rate of 12% dry weight of soil as shown on the plans and as directed by the Engineer. A motor grader shall not be used to spread the flyash. The flyash shall be distributed at a uniform rate and in such manner as to reduce the scattering of fly sh by wind to a minimum. Flyash shall not be applied when wind conditions, in the opinion of the Engineer, are such that blowing flyash becomes objectionable to traffic or adjacent property owners. During final mixing, water shall be added to the materials as directed by the Engineer, until the proper moisture content has been secured. Water shall be added through the pulverizing machine or method acceptable to the Engineer to develop a uniform, controlled rate addition of the needed moisture. Initial mixing after the addition of flyash will be accomplished dry or with a minimum of water to prevent flyash balls. Final moisture content of the mix, prior to compaction, shall not exceed the optimum moisture content of the mix by more than two percent nor by less than the optimum by more than four percent. Should the natural moisture content of the soil be above the specified range, aeration of the soil may be required prior to addition of the flyash. C. Mixing The soil and flyash shall be thoroughly mixed by approved rotary mixers or other approved equipment, and the mixing continued until, in the opinion of the Engineer, a homogeneous, friable mixture of soil and flyash is obtained, free from all clods or lumps. Water required to achieve the specified moisture content for the mixture should be added after initial mixing. If the soil flyash mixture contains clods, they shall be reduced in size by raking, blading, disking, harrowing, scarifying or the use of other approved pulverization methods so that when all non-slaking aggregates retained on the No. 4 sieve are removed, the remainder of the material shall meet the following requirements when tested at the field moisture condition or dry by laboratory sieves: Minimum Passing: 1inch sieve 100 percent Minimum Passing: No. 4 sieve 60 percent D. Compaction Compaction of the mixture shall begin immediately after mixing of the flyash and be completed within one hour following addition of flyash and water. The material shall be sprinkled as necessary to maintain the optimum moisture. Compaction of the mixture shall begin at the bottom and shall continue until the entire depth of mixture is uniformly compacted to a specified density. All non-uniform (too wet, too dry or insufficiently treated) areas which appear shall be corrected immediately by scarifying the areas affected, adding or removing material as required and reshaping the re-compacting by sprinkling and rolling. The surface of the course shall be maintained in a smooth condition, free from undulations and ruts, until other work is placed thereon or the work is accepted. The stabilized section shall be compacted to the extent necessary to provide the density specified below: South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 15 Description For flyash treated sub-grade, existing sub-base or existing base that will receive subsequent sub-base or base courses Not less than 95 percent maximum pry density (ASTM D-698) For flyash treated sub-base or base that will receive surface course Not less than 95 percent maximum dry density (ASTM D-698) In addition to the requirements specified for density, the full depth of the material shown on the plans shall be compacted to the extent necessary to remain firm and stable under construction equipment. After each section is completed, the Engineer will make tests as necessary. If the material fails to meet the density requirements, the Engineer may require it to be reworked as necessary to meet those requirements or require the Contractor to change his construction methods to obtain required density on the next section. Throughout this entire operation, the shape of the course shall be maintained with a blade, and the surface, upon completion, shall be smooth and in conformity with the typical section shown on the plans and to the established lines and grades. Grading should be terminated within two hours after blending of the flyash. Should the material, due to any reason or cause, lose the required stability, density and finish before the next course is placed or the work is accepted, it shall be reprocessed, re-compacted and refinished at the sole expense of the Contractor. Reprocessing shall follow the same pattern as the initial stabilization, including the addition of flyash. E. Finishing, Curing and Preparation for Surfacing After the final course of the treated sub-grade, sub-base or base has been compacted; it shall be brought the required lines and grades in accordance with the typical sections. 1. The resulting base surface shall be thoroughly rolled with a pneumatic tire roller and “clipped”, “skinned” or “tight bladed” by a power grader to a depth of approximately 3 inch, removing all loosened stabilized material from the section. Re-compaction of the loose material should not be attempted. The surface shall then be thoroughly compacted with the pneumatic roller, adding small increments of moisture as needed during rolling. If plus No. 4 aggregate is present in the mixture; one complete coverage of the section with the fat wheel roller shall be made immediately after the “clipping” operation. When directed by the Engineer, surface finishing methods may be varied from this procedure provided a dense, uniform surface, free of surface compaction plans, is produced. The moisture content of the surface material must be maintained within the specified range during all finishing operations. Surface compaction and finishing shall proceed in such a manner as to produce, in not more than two hours, a smooth, closely knit surface, free of cracks, ridges or loose material conforming to the crown, grade and line shown on the plans. 2. After the flyash treated course has been finished as specified herein, the surface shall be protected against rapid drying by either of the following curing methods for a period of not less than three days or until the surface or subsequent courses are placed: (a) Maintain a thorough and continuously moist condition by sprinkling. (b) Apply a two-inch layer of earth on the completed course and maintain in a moist condition. (c) Apply an asphalt membrane to the treated course, immediately after same is completed. The quantity and type of asphalt approved for use by the Engineer shall be sufficient to completely cover and seal the total surface of the base between crown lines and all voids. If the Contractor elects to use this method, it shall be the responsibility of the Contractor to protect the asphalt membrane from being picked up by traffic by either sanding or dusting the surface of same. The asphalt membrane may remain in place when the proposed surface or other base courses are placed. Asphaltic emulsions are not acceptable for the asphaltic membrane. METHOD OF MEASUREMENT Flyash Sub-grade Stabilization will be measured by the square yard to the limits as constructed in the field and be paid for at the contract unit price per square yard. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 16 NOTE: The square yards of Flyash Sub-grade Stabilization is an estimate only based on the soils report and general knowledge of the soil conditions in this area. The sub-grade areas to be stabilized with flyash will be determined by the Engineer based upon results after proof rolling and effects resulting from inclement weather conditions. Sub-grade areas not requiring flyash stabilization will be Reconditioned (Revision of Section 306), measured by the square yard as constructed in the field and paid for at the Reconditioning contract unit price per square yard. Subsection 307.01 and 307-02 is revised to include the following: If the field soil tests show one or more sulfate indicate a concertration of 0.5 percent a doubble treatment of flyash will occure. The first treatment of 6 percent flyash will installed. The cure time will be two weeks the area will be damped to cure with all coonstruction traffic kept off of area. The second application of flyash will be at 8 percent a cure time of 2 days will be required. In each application of flyash the area will be treated in proceedure as the normal specifications called out in Section 307. the sub grade will be blue topped and cut accrdingly. Subsection 307.03 is revised to include the following; The cost to mobilization for the second application treatment of flyash is to be included into the unit cost. BASIS OF PAYMENT Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 307-01 Option A Flyash Subgrade Stabilization – (6%) - (SY) 307-02 Option A Flyash Subgrade Stabilization – (8%) – (SY) 307-03 Option A Flyash Operation Mobilization – (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Flyash stabilization, complete-in-place, including compaction, and wetting or drying as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 17 REVISION OF SECTION 401 & 703 PLANT MIX PAVEMENTS – GENERAL & AGGREGATES Section 401 and 703 of the Standard Specifications is hereby revised as follows: Subsection 401.02 is hereby revised to include the following: Requests made in writing by the Contractor for changes in the job mix formula will be considered by the Engineer. A job mix formula shall be determined by the Contractor and submitted to the Engineer for approval a minimum of one week prior to the beginning of construction for each proposed change. The Contractor shall provide the Engineer with an asphalt mix design report from an independent testing laboratory acceptable to the Engineer. The report shall state the Mix properties, optimum oil content, job mix formula and recommended mixing and placing temperatures. The costs for all job mix formulas shall be the responsibility of the Contractor. If the Contractor uses more than three (3) job mix formulas for a type of plant mix pavement used, the City may charge the Contractor for testing and evaluation of the mix designs, including the costs for calibration of a Nuclear Asphalt Oven. For Superpave Mixes, delete Table 401-2 and replace with the following: TABLE 401-2 Grading Test Procedure Minimum Test Result Sampling Frequency All Gradings CP L-5109 Method B 80 One per 10, 000 metric tons (10,000 tons) or fraction thereof (minimum) In subsection 401.02, delete the second, third, and fourth paragraphs and replace with the following: 1. A proposed plant mix pavement mix design prepared in accordance with Colorado Procedure 52(CP52-99), including a proposed job-mix gradation for each mixture required by the Contract which shall be fully within the Master Range Table, Tables 703-3A, B, and C, before the tolerances shown in Table 401-1 are applied. The weight of lime shall be included in the total weight of the material passing the 75 mm (No. 200) sieve. The restricted zone boundaries shown for all gradings in Tables 703-3A, 703-3B, and 703-3C are to be used as guidelines in mix design development. However, the job-mix gradation is not required to pass above or below the restricted zone boundaries. 2. The name of the refinery supplying the asphalt cement and the source of the anti-stripping additive. 3. A sufficient quantity of each aggregate for the Department to perform the tests specified in section 2.2.1 of CP52. In subsection 401.02 delete Table 401-1, including the footnotes, and replace with the following: TABLE 401-1Bitumen Content Asphalt Recycling Agent Temperature of Mixture When Discharged from Mixer ±0.3% ±0.2% ±10°C 1Hot Bituminous Pavement - Item 403 Passing the 9.5 mm (3/8²) and larger sieves Passing the the 4.75 mm (No. 4) and 2.36 mm (No. 8) sieves Passing the 600 mm (#30) sieve Passing the 75 mm (#200) sieve ±6% ±5% ±4% ±2% 1When 100% passing is designated, there shall be no tolerance. When 90-100% passing is designated, 90% shall be the minimum; no tolerance shall be used. Delete Subsection 401.07 and replace with the following: South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 18 Plant mix pavement shall be placed only on properly prepared unfrozen surfaces which are free of water, snow, and ice. The plant mix pavement shall be placed only when both the air and surface temperatures equal or exceed the temperatures specified in Table 401-3 and the Engineer determines that the weather conditions permit the pavement to be properly placed and compacted. Table 401-3 Placement Temperature Limitations in ºC Compacted Layer Thickness in mm (inches) Minimum Surface and Air Temperature ºC (ºF) Top Layer Layers Below Top Layer <38 (1½) 38 (1½) - <75 (3) 75 (3) or more 15 (60) 10 (50) 7 (45) 10 (50) 5 (40) 2 (35) Note: Air temperature is taken in the shade. Surface is defined as the existing base on which the new pavement is to be placed. If the temperature falls below the minimum air or surface temperatures, paving shall stop. The Contractor shall schedule the work so that no planed or recycled surface is left without resurfacing for more than 10 calendar days during the period specified in Table 401-3A, below. The Contractor shall immediately place a temporary hot bituminous pavement layer on any surface that has been planed or recycled and can not be resurfaced in accordance with the above temperature requirements within 10 calendar days after being planed or recycled. The minimum thickness of the temporary hot bituminous pavement layer shall be 50 mm (2 inches). The Contractor shall perform the quality control required to assure adequate quality of the hot bituminous pavement used in the temporary layer. All applicable pavement markings shall be applied to the temporary layer surface. The Contractor shall maintain the temporary layer for the entire period that it is open to traffic. Distress which affects the ride, safety, or serviceability of the temporary layer shall be immediately corrected to the satisfaction of the Engineer. The temporary hot bituminous pavement layer shall be removed when work resumes. Table No. 401-3A Periods Requiring Overlay of Treated Surfaces Location by Elevation Period During Which Planed or Recycled Surfaces Must be Overlaid within Ten Days All areas below and including 2100 m (7000 feet) October 1 to March 1 All areas above 2100 m (7000 feet) up to and including 2600 m (8500 feet) September 5 to April 1 All areas above 2600 m (8500 feet) August 20 to May 15 In Subsection 401.15, delete the third and fourth paragraphs (including table) and replace with the following: The minimum temperature of the mixture when discharged from the mixer and when delivered for use shall be as shown in the following table: South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 19 Asphalt Grade Minimum Mix Discharge Temperature, °C (ºF)* Minimum Delivered Mix Temperature, °C (ºF)** PG 58-28 135 (275) 113 (235) PG 58-22 138 (280) 113 (235) PG 64-22 143 (290) 113 (235) AC-20 Rubberized 160 (320) 138 (280) PG 76-28 160 (320) 138 (280) PG 70-28 149 (300) 138 (280) PG 64-28 149 (300) 138 (280) PG 58-34 149 (300) 138 (280) * The maximum mix discharge temperature shall not exceed the minimum discharge temperature by more than 17°C (30ºF) . ** Delivered mix temperature shall be measured behind the paver screed. Hot-mix asphalt mixture shall be produced at the lowest temperature within the specified temperature range that produces a workable mix and provides for uniform coating of aggregates (95% minimum in accordance with AASHTO T 195), and that allows the required compaction to be achieved. Subsection 401.16 is hereby revised to include the following: The mixture shall be laid upon an approved surface, spread and struck off to provide for drainage to the side(s) of the roadway with a minimum cross slope of two percent (2%) or as directed by the Engineer. In subsection 401.17, first paragraph, delete the last two (2) sentence and replace with the following: When the mixture contains unmodified asphalt cement (PG 58-28, PG 58-22, or PG 64-22) or modified (PG 58-34), and the surface temperature falls below 85°C (185 ºF), no further compaction effort will be permitted unless approved. If the mixture contains modified asphalt cement (AC-20R, PG 76-28, PG 70-28, or PG 64-28) and the surface temperature falls below 110°C (230 ºF), no further compaction effort will be permitted unless approved. Subsection 401.17 is hereby revised to include the following: All pneumatic tire rubbers shall be equipped with rubber skirts. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 20 In subsection 703.04 delete Table 703-3 and replace with Tables 703-3A, B, and C as follows: TABLE 703-3A Master Range Table for Hot Bituminous Pavement (Grading S) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (1½”) 25.0 mm (1”) 100 19.0 mm (¾”) 90 - 100 12.5 mm (½”) * 9.5 mm (3/8”) * 4.75 mm (#4) * 2.36 mm (#8) 23 - 49 34.6 34.6 1.18 mm (#16) 22.3 28.3 600 mm (#30) * 16.7 20.7 300 mm (#50) 13.7 13.7 150 mm (#100) 75 mm (#200) 2 - 8 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 21 TABLE 703-3B Master Range Table for Hot Bituminous Pavement (Grading SX) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (1½”) 25.0 mm (1”) 19.0 mm (¾”) 100 12.5 mm (½”) 90 - 100 9.5 mm (3/8”) * 4.75 mm (#4) * 2.36 mm (#8) 28 - 58 39.1 39.1 1.18 mm (#16) 25.6 31.6 600 mm (#30) * 19.1 23.1 300 mm (#50) 15.5 15.5 150 mm (#100) 75 mm (#200) 2 - 10 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 22 TABLE 703-3C Master Range Table for Hot Bituminous Pavement (Grading SG) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (1½”) 100 25.0 mm (1”) 90 - 100 19.0 mm (¾”) 12.5 mm (½”) * 9.5 mm (3/8”) * 4.75 mm (#4) * 39.5 39.5 2.36 mm (#8) 19 - 45 26.8 30.8 1.18 mm (#16) 18.1 24.1 600 mm (#30) * 13.6 17.6 300 mm (#50) 11.4 11.4 150 mm (#100) 75 mm (#200) 1 - 7 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 23 REVISION OF SECTION 403 HOT BITUMINOUS PAVEMENT Section 403 of the Standard Specifications is hereby revised as follows: Subsection 403.01 is revised to include the following: Hot Bituminous Pavement – This shall consist of constructing one or more courses of HBP Grading S & SG over existing pavement or subgrade surfaces previously prepared by the contractor or City of Fort Collins Crews. Asphalt Paver Patching – HBP Grading S & SG shall be used in locations as directed by the Engineer. This work shall consist of the placement of asphalt with a paver in small areas. Asphalt Patching – HBP Grading S & SG shall be used in locations as directed by the Engineer. These quantities will be restricted to small areas which require hand placement methods and conventional paving equipment cannot be utilized. Subsection 403.02 is revised to include the following: Laboratory Mix Design – Grading S & SG - The mix designs shall be prepared by an independent laboratory acceptable to the Engineer and shall be submitted by the Contractor to the Engineer for approval a minimum on one (1) month prior to the beginning of paving for this project. The criteria for the mix design is as follows: HBP Grading S & SG ESAL’s: Lemay Avenue = 1,460,000 Binder : Grading S-100-PG 64-28 / Grading SG-100 – PG 64-22 Designed according to the most recent set of SUPERPAVE Specifications available. SEE TABLE 403-1 NEXT PAGE FOR DESIGN CRITERIA A request made in writing by the Contractor for changes in the job mix formula will be considered by the Engineer. The Contractor shall prepare a quality control plan outlining the steps taken to minimize segregation of HBP. This plan shall be submitted to the Engineer and approved prior to beginning the paving operations. When the Engineer determines that segregation is unacceptable, the paving shall stop and the cause of segregation shall be corrected before paving operations will be allowed to resume. The Contractor will not be allowed to clean the paver hoper during paving operations. Reclaimed materials will not be allowed in Hot Bituminous Pavement. A maximum of 20% reclaimed material will be allowed for HBP Grading SG. The Contractor shall construct the work such that all roadway pavement placed prior to the time paving operations end for the year, shall be completed to the full thickness required by the plans. The Contractor's Progress Schedule shall show the methods to be used to comply with this requirement. Vertical drop offs will not be allowed at the end of any days paving. Paper joints will be required to a taper equaling 3 times the amount of drop. Paving joints shall be at the lane lines or in the center of the lane. In no case shall the paving joints be in the wheel path. The contractor shall submit a longitudinal joint and pavement marking plan 3 days prior to paving. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 24 PAVEMENT SECTION: Lemay Avenue: Grading S-100 (PG 64-28) 3” Grading SG-100 (PG58-28) 4” Aggregate Base Coarse 6” Flyash Treated Subgrade 12” 7 Day CPT of 150 psi The design mix for Grading S, SX, and SG shall conform to the following: TABLE 403-1 Property Test Method Grading S Grading SG Grading SX N/A this Project Air Voids, percent at: N (initial) N (design) N (maximum) CPL 5115 > 11.0 3.0 - 5.0 > 2.0 > 11.0 3.0 - 5.0 > 2.0 > 11.0 3.0 - 5.0 > 2.0 Lab Compaction (Revolutions): N (initial) (a) N (design) (b) N (maximum) (a) CPL 5115 8 100 174 8 100 174 (a) (b) (a) Stability, minimum (a) (for information) CPL 5106 42 42 (a) Aggregate Retained on the 4.75 mm (No. 4) Sieve with at least two Mechanically Induced Fractured Faces, % minimum CP 45 60 60 60 Accelerated Moisture Susceptibility Tensile Strength Ratio (Lottman), minimum CPL 5109 Method B 80 80 80 Minimum Dry Split Tensile Strength, kPa (psi) CPL 5109 Method B 205 (30) 205 (30) 205 (30) Grade of Asphalt Cement Top Layer PG 64-28 PG 58-28 PG 64-28 South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 25 Subsection 403.03 is revised to include the following: Regardless of the delivery temperature, the mixture shall not be placed for use on the roadway at a temperature lower than 225º F. Emulsified Asphalt for tack coat shall be Grade CSS-1h. The tack coat shall consist of a 1:1 dilution (one (1) part emulsified asphalt to one (1) part water). The application rate for tack coat shall be approximately 0.1 gallons per square yard. The existing pavement shall be broomed and cleaned to be free of dirt, water, vegetation and other deleterious matter immediately prior to commencing the paving operation. Edges of the area to be patched shall be sawcut vertically, and perpendicular or parallel to the roadway, as directed by the Engineer. Tack coat shall be placed against clean, vertical edges on all sides of the area to be patched. Hot Bituminous Pavement Grading S and SX shall be placed in equal lifts not exceeding three (3) inches. The minimum lift thickness for Grading SX shall be one (1) inch and Grading S shall be (1 ½) inch. HBP Grading SG shall be placed in equal lifts not exceeding four (4) inches and the minimum lift thickness shall be three (3) inches. Overlaying layers of Hot Bituminous Pavement shall not be placed until the lower layer has cooled sufficiently to provide a stable material which will support the equipment without rutting, shoving or moving in any manner. Tack coat shall be placed between all lifts. NOTE: Any leveling courses placed shall be paid for at the contract unit price for Hot Bituminous Pavement. Subsection 403.04 shall include the following: Hot Bituminous Pavement Grading SX, S and SG, will be measured by the ton and paid for at the Contract Unit Price for Asphalt Patching and Hot Bituminous Pavement. Pavement cutting, excavation, subgrade preparation, haul and disposal, bituminous materials, aggregate, asphalt cement, asphalt recycling agent, additives, hydrated lime, and all other work necessary to complete each hot bituminous pavement item will not be paid for separately but shall be included in the unit price bid. Load slips shall be consecutively numbered for each day and shall include batch time. Subsection 403.05 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 403-01 Hot Bituminous Pavement – Grading S-100 - (3” Depth) – (PG 64-28) – (TON) 403-02 Hot Bituminous Pavement – Grading SG-100 (4” Depth) – (PG 64-22) – (TON) 403-03 Overlay Existing Lemay – Grading S-100 (2” Depth) – (PG 64-28) – (TON) 403-04 Overlay Existing Carpenter – Grading S-100 (2” Depth) – (PG 64-28) – (TON) 403-05 Asphalt Leveling Course ¾ Grading S-100 – (PG 64-22) – (TON) 403-06 Asphalt Paver Patching Carpenter Rd – Grading SG-100 (4” Depth) – (PG 64-22) – (TON) 403-07 Asphalt Patching – Grading SG-100 (4” Depth) – (PG 64-22) – (TON) South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 26 The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in Hot Bituminous Pavement and Asphalt Patching, including pavement cutting, excavation, subgrade preparation, haul and disposal, compaction, rolling, surface preparation, and bituminous materials, complete in-place, as shown on these plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 27 REVISION OF SECTION 420 GEOSYNTHETICS Section 420 of the Standard Specifications is hereby revised as follows: Subsection 420.01 is revised to include the following: This work shall consist of furnishing and installing geotextile and geogrid stabilization material and geotextile paving fabric. Subsection 420.02 is revised to include the following: All geogrid or geotextile fabric shall be installed according to the manufacturer’s recommendations and as directed by the Engineer. The geotextile stabilization fabric shall be Typar 3801 or approved equal. The geogrid reinforcement mat shall be Tensar Structural Geogrid BX1100 or approved equal. The geotextile paving fabric shall be as manufactured by Phillips Fibers Corporation, Hoechst Fibers Industries, Amoco Fabrics Company, or an approved equal. The tack coat to be applied to the road surface and/or to the Geotextile Paving Fabric shall meet the following requirements: Asphalt Cement AC-20 NOTE: Emulsified and/or Cutback Asphalt shall not be used as tack coat for Geotextile Paving Fabric. Surface preparation: The pavement to be repaired shall be cleaned and free of dirt, dust, water and vegetation. Cracks shall be cleaned and filled in accordance with "Revision of Section 403, Crack Sealing" of these Specifications if required. If the crack filling materials contain volatiles, adequate curing time must be allowed prior to placement of the fabric. The pavement must be cleared of all sharp or angular protrusions. Application of Tack Coat: The tack coat shall be applied at a rate in accordance with the manufacturer's specifications (approximately 0.25 gal. /sq. yd). Application must be by a distributor. Temperature of the tack coat must be sufficiently high to permit a uniform spray pattern. The maximum asphalt temperature shall be 300º F. Geotextile Paving Fabric Placement: The Geotextile Paving Fabric shall be placed into the tack coat with a minimum of wrinkles. If Geotextile Paving Fabric folds greater than one inch (1") occur, the Geotextile Paving Fabric shall be slit and allowed to lie flat. Additional tack coat shall be placed as required to insure fabric bonding. If Geotextile Paving Fabric is placed adjacent to patched sections of roadway, the fabric shall overlap said patched section a minimum of 12 inches. All joints shall overlap adjacent fabric approximately 2-6 inches. Transverse joints of the Geotextile Paving Fabric shall be shingled in the direction of the paving to prevent edge pickup by the paver. Additional tack coat shall be uniformly applied to the joints and overlaps to insure bonding. It shall be the Contractors responsibility to maintain the Geotextile Paving Fabric until the overlay is complete. If the Geotextile Paving Fabric begins to be picked up, the Contractor shall immediately broadcast sand or hot mix asphalt over the area or "skin" the Geotextile Paving Fabric with Hot Bituminous Pavement Grading S or SX. Excess sand or hot mix shall be removed before paving. Sand used for this purpose will not be measured and paid for separately under the terms of this contract. Hot Bituminous Pavement Grading S or SX used for this purpose will be measured and paid for at their respective contract unit prices per ton. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 28 Geotextile Paving Fabric shall be clean, dry and sufficiently bonded to the tack coat prior to commencing the paving operations. Paving operations shall be completed the same day as the Geotextile Paving Fabric placement. Subsection 420.09 is revised as follows: The geotextile and geogrid stabilization fabric and geotextile paving fabric shall be measured in the field and paid for by the square yard of material installed – complete in place. The paving fabric shall include surface preparation and AC-20 tack coat. Subsection 420.10 is revised as follows: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 420-01 Geotextile Paving Fabric – (SY) The above prices and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in placing tack coat and Geotextile Paving Fabric, stabilization fabric, including haul and bituminous materials, complete-in-place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 29 REVISION OF SECTION 506 RIPRAP Section 506 of the Standard Specifications is hereby revised as follows: Subsection 506.01 is revised to include the following: This work consists of the construction of riprap sections with riprap, Type II bedding and covered with topsoil in accordance with these specifications and in conformity with the lines and grades shown on the plans or established grades. Subsection 506.02 is revised to include the following: Color of buried riprap shall be approved by the Engineer. Exposed riprap shall be gray to blue gray in color or as approved by the Engineer. Rock used for riprap shall be hard, durable, angular in shape and free from cracks, over-burden, shale and organic matter. Thin, slab type stones, rounded stones and flaking rock shall not be used. Removed concrete shall not be used for riprap without specific written approval by the Engineer. Service records of the proposed material will be considered by the Engineer in determining the acceptability of the rock. Neither breadth nor thickness of a single stone shall be less than one-third (1/3) its length. Bedding material shall conform to the specification for Type II Filter material as per the City of Fort Collins Storm Drainage Design Criteria and Construction Standards (Table 12-3) or CDOT Class A filter material (Section 703.09). Subsection 506.03 is revised to include the following: Wherever possible, the excavation for the riprap sections shall be undisturbed material, or where this is not possible, the underlying materials shall be compacted to 95% of maximum density as determined by ASTM D 698. The bottom of the excavation shall have a uniform slope, be reasonably smooth, free from mounds and windrows and free of debris prior to placing the filter material. Bedding material shall be placed on top of the sub-grade material prior to riprap installation at all locations of riprap sections shown on the plans. The layer shall be shaped to provide the minimum thickness of bedding material as shown on the details of the plans. Riprap material shall be placed immediately after the bedding material is placed and in a manner to provide a well- graded mass of stone with minimum voids. Riprap may be machine-placed with sufficient handwork to minimize disturbance of the bedding material layer. This material shall be placed to the required thickness and grade shown on the details of the plans. Topsoil material shall be used to backfill and bury the entire riprap bed area and compacted to insure thorough settling of the topsoil within the rock voids. The top three inches (3”) of the topsoil shall be loosely placed. This material shall be placed to the required thickness as shown on the details of the plans. The contractor shall utilize, when appropriate, existing topsoil on site. Subsection 506.04 is revised to include the following: Riprap sections specified in the plans will be paid for at the contract unit price per EA. The unit price bid shall include all costs associated with installation of the bedding material, riprap and topsoil including excavating for the placement of these materials, all materials, delivery, stockpiling and handling of the riprap. Subsection 506.05 is revised to include the following: Payment will be made under: South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 30 Pay Item and Pay Unit The pay unit is denoted by ( ). 506-01 10’ x 45’ Type L Rip-Rap, 6” Topsoil (CIP Per Detail) – (SY) 506-02 6’ x 6’ Type L Rip-Rap, 6” Topsoil (All at the end of Curb and Gutter for Erosion Prevention) – (EA) The above prices and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in excavating, placing riprap, bedding and topsoil, complete-in- place, including haul and stockpile of materials, handling of the riprap and finish grading of the surface as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION . South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 31 REVISION OF SECTION 603 CULVERTS AND SEWERS Section 603 of the Standard Specifications is hereby revised as follows: Subsection 603.01 is revised to include the following: This work shall consist of the construction and reconstruction of reinforced concrete pipe, pipe encasement, pipe connections, and joint encasement in accordance with the plans, specifications, the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. It shall be the Contractor's responsibility to purchase and familiarize themselves with these specifications. The Contractor shall include in the Work all the necessary items to complete the Work including but not limited to excavation, bedding, backfill, and compaction. The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 603-01 42” RCP Class III – (LF) 603-02 42” RCP Class III FES – (EA) 603-03 30” RCP Class III – (LF) 603-04 30” RCP Class III FES – (EA) 603-05 Install Concrete Field Collar – (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all Work involved in installing pipe and encasing joints, complete in-place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. Concrete and/or Asphalt patching will be paid for separately under the appropriate item. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 32 REVISION OF SECTION 604 MANHOLES, INLETS, AND METER VAULTS Section 604 of the Standard Specifications is hereby revised as follows: Fort Collins Loveland Water District Specifications can be obtained at 5150 Snead Drive Fort Collins, Colorado. A mandatory pre-construction will be required before the contractor starts any work on the district system. Subsection 604.01 is revised to include the following: This work shall consist of the construction of manholes, CDOT Type ‘R’ inlets, type 16 combination inlets, and providing and maintaining erosion control, in accordance with the plans, specifications, and the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. It shall be the Contractor's responsibility to purchase and familiarize themselves with these specifications. The Contractor shall include the cost of excavation, backfill, compaction, and installation and maintenance of erosion control into each item listed in this section. The Contractor shall clean all sediment caught in the storm sewer system due to this project. The frequency of the cleaning shall be at the direction of the Engineer. The Contractor will not be allowed to flush the pipes with water. All Erosion Control Devices, Materials, and Techniques required to prevent damage to the storm water facilities as outlined in the City of Fort Collins Standards will be considered incidental to the work, and shall be included in the price. No measurement for payment shall be made for maintenance of Erosion Control devices. Subsection 604.02 is revised to include the following: Proportioning shall conform to the requirements for Class B concrete as described in Section 601. Subsection 604.08 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 604-01 10’ Type R-Inlet – (EA) 604-02 Median Underdrain Pipe System – (4” Perforated Pipe) – (LF) 604-03 Median Underdrain Pipe System – (4” Solid Pipe) – (LF) 604-04 4” Median Under Drain Clean Out – (EA) 604-05 Tie to Existing Storm Sewer Manhole for 4” Underdrain (Core Drill and Connect with Non-shrink Grout) – (EA) 604-06 8” SDR-35 Sewer Main – (LF) 604-07 Tie to Existing Sanitary Sewer Manhole Per FCLWD Specs – (EA) 604-08 4’ Diameter Sewer Manhole – (EA) 604-09 Remove Existing Sewer Stub – (LF) 604-10 4” PVC Conduit Sleeving – (LF) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing inlets, constructing manholes, and installing and maintaining erosion control, complete-in-place, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 33 REVISION OF SECTION 607 FENCES Section 607 of the Standard Specifications is hereby revised as follows: Subsection 607.01 is revised to include the following: Orange Safety Fence: The fence shall be placed on the City of Fort Collins Right of Way on the Existing on Lemay Avenue. The fence shall have metal Tee posts as needed to be straight and non sagging. Plastic or metal ties can be used. All material, labor and equipment used to set and remove shall be placed into the unit cost. Smooth Wire Fence (4Stand Wire T-Post) – Follow Section 710 from Colorado Highway Specifications for installation of new fence. This item consists of installing new fence and will be paid for by the linear foot. Any existing fence that is removed is paid for under Remove Fence (Various Types). Subsection 607.04 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 607-01 Orange Safety Fence – (LF) 607-02 Smooth Wire Fence – (LF) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work listed above: complete in place, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 34 REVISION OF SECTION 608 SIDEWALKS AND DECORATIVE CROSSWALKS Section 608 of the Standard Specifications is hereby revised for this project as follows: Subsection 608.01 is revised to include the following: This work shall consist of the construction of concrete sidewalks (6”), pedestrian access ramps, exposed aggregate median splashblock, driveways, crosspans, and drive approaches, in accordance with the plans and specifications. Required saw cutting will be incidental to the work and will not be measured or paid for separately. The use of aggregate base material for fine grading or over excavated areas will not be paid for separately. Subsection 608.02 is revised to include the following: Proportioning shall conform to the requirements for Class "B" concrete as described in Section 601 with the exception the minimum 28 day compressive strength shall be 4000 psi. The Contractor shall also submit a mix design for High Early Concrete. This mix shall have a minimum 24-hour compressive strength of 3000 psi and a minimum 28-day compressive strength of 3500 psi. It shall include supplying, placing, curing and texturing the high early concrete. The price shall apply to all Sections including Section 412, 608 and 610. Payment for extra cost of using high early concrete will be paid for by the cubic yard for the incremental increase in costs and will be paid only when the Engineer requires use of high early. Non-Shrink backfill – also called Flowable Fill or Unshrinkable Fill – shall be a Portland Cement Concrete Mix. The cement shall conform to the Standard Specifications for Portland Cement, ASTM C 150-85, Type I/II. The minimum 24- hour strength shall be 10-psi and the maximum 28 day strength, 60 psi. The maximum aggregate size shall be one inch (1”). The minimum slump shall be six inches (6”) and the maximum, eight inches (8”). The non-shrink backfill shall be consolidated with a mechanical vibrator. Payment of using flow fill will be paid for by the cubic yard and only when used as required by the Engineer. Subsection 608.04 is revised to include the following: Exposed Aggregate Concrete: The Exposed Aggregate Concrete shall be Class “EA” concrete integrally colored with 1½ lbs. of Davis Color No. 5237 “San Diego Buff” per sack of cement. The surface of the Exposed Aggregate Concrete shall be sealed and protected from drying by applying Davis W-1000 Clear Cure and Seal, or approved equal. “San Diego Buff” shall be used for all exposed aggregate concrete in the median. Truncated Dome Panels: Pedestrian Access Warning Cast Iron Plates – East Jordan Iron Works Model 7005-71. Detectable warnings on new curb ramps shall be truncated domes of the dimensions shown in the plans. Domes shall be prefabricated by the manufacturer as a pattern on concrete or masonry pavers. Pavers shall meet all Americans with Disabilities Act (ADA) requirements for truncated domes, and when installed, shall be capable of producing the pattern of domes as shown in the plans. Pavers shall meet the requirements of ASTM C 902 or ASTM C 936. It is the Contractor's responsibility to adequately protect their work from damage by weather (including cold, heat, rain, wind), vandalism, or other causes until such time as it is accepted by the City. If traffic control devices are used to protect the work, they will not be paid for separately, but shall be included in the work. Subsection 608.05 is revised to include the following: The Concrete Driveway (6"), Sidewalk (6"), Access Ramps w/Landings (8"), Drive Approach (6”) and Concrete Crosspan/Apron (9 1/2") items will be measured by the square foot of finished flatwork. The price for the Access Ramps (8") shall include the truncated dome panel landing area. Ramp area shall be measured from the back of the curb to the back of the walk from point of curb return to point of curb return. Subsection 608.06 is revised to include the following: South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 35 The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 608-01 Concrete Sidewalk (6”) – (SF) 608-02 Concrete Pedestrian Access Ramps with Truncated Domes (8”) – (SF) 608-03 Concrete Drive Approach (6”) – (SF) 608-04 6” Concrete Driveway Replacement – (SF) 608-05 Hi-Early Concrete (24 Hour) – (CY) 608-06 Flowable Fill Concrete – (CY) 608-07 Exposed Aggregate Median Splashblock (4”) – (SF) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in constructing concrete sidewalks, miscellaneous flatwork, access ramps, drive approaches, and driveways, complete-in-place, including haul, concrete materials, finishing the surface, saw cutting joints, curing, placing dowels, and sealing joints as shown on the plans, protection from staining existing concrete from washing the exposed aggregate, cutting the plastic used to separate the different colors as specified in these specifications, and as directed by the Engineer. END OF SECTION \ South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 36 REVISION OF SECTION 609 CURB AND GUTTER Section 609 of the Standard Specifications is hereby revised as follows: Subsection 609.01 is revised to include the following: This work shall consist of the construction of cast in place vertical 6" curb and gutter, 6" outfall curb and gutter (1-ft pan), and concrete lined irrigation ditch accordance with the details and these specifications. The unit price bid per linear foot of curb and gutter, no sidewalk, includes construction of new curb and gutter sections, complete and in place, measured along the flow line. Removal of curb and gutter is not included in this section, but will be measured and paid separately as described in Section 202. It is the Contractor’s responsibility to adequately protect their Work from damage by weather, vandalism, or other causes until such time as it is accepted by the City. If traffic control devices are used to protect the work, they shall not be paid for separately, but shall be included in the work. Subsection 609.02 is revised to include the following: Proportioning shall conform to the requirements for Class "B" concrete as described in Section 601 with the exception the minimum 28 day compressive strength shall be 4000 psi. Subsection 609.07 is revised to include the following: The accepted quantity of curb and gutter will be paid for at the contract unit price per linear foot. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 609-01 Vertical Curb & Gutter (30”) - (LF) 609-02 Outfall Curb & Gutter (18”) - (LF) 609-03 Driveway Curb Cuts (25’ Width) - (EA) 609-04 R&R Vertical Curb and Gutter – (LF) 609-05 R&R Concrete Sidewalk - (SF) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in constructing vertical curb and gutter, variable height curb and gutter, concrete median curb, complete-in-place, including haul, concrete materials, finishing the surface, saw cutting joints, curing, placing dowels, and sealing joints as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 37 REVISION OF SECTION 619 WATER LINES Section 619 of the Standard Specifications is hereby revised as follows: Subsection 619.01 is revised to include the following: FCLWD WATER LINES ITEMS This work shall include installing ductile iron pipe (DIP), gate valves, tees, bends, tapping saddles, plugs, reaction blocks and joining to existing lines and other items as shown on the plans and as designated by the Engineer. This work shall meet the requirements of the current Fort Collins-Loveland Water District Standards. It shall be the Contractors responsibility to purchase and familiarize themselves with these specifications; they can be obtained at 5150 Snead Drive Fort Collins, Colorado. All work associated with installing the water lines that is NOT itemized in the bid tab shall be considered incidental to the work and will not be paid for separately. This includes, but is not limited to excavating and backfilling, valve boxes, plugs, thrust blocks, bedding materials, poly-wrap, chlorinating, pressure testing and all materials incidental to completing the installation and connections to existing water lines. Subsection 619.06 is revised to include the following: The contractor will be required to install the irrigation tap and meter pit to Fort Collins Loveland Water District the installation of the backflow preventer and access steel cage to City of Fort Collins Irrigation Specifications. Parks and recreation will have to finial inspection will have to be coordinated by the contractor. Subsection 619.05 is revised as follows: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 619-01 20” x 8” Tapping Saddle & 8” Valve/Tap-TB-Valve Box/FCLWD Spec – (EA) 619-02 8” C-900 Water Main – (LF) 619-03 8” x 2” Temporary Blow-Off – (EA) 619-04 8” 22.5 Ductile Degree Bends – (EA) 619-05 Tie to Existing Irrigation – (EA) 619-06 ¾” Irrigation Service & Meter Pit/Copper-Corp-Curb Stop/FCLWD Spec & COFC Spec Backflow Preventer/Metal Screen Cover – (EA) The above prices and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing ductile iron water pipe and valves, connecting to existing water lines according to the Fort Collins-Loveland Water District Standards, complete-in-place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 38 REVISION OF SECTION 630 TRAFFIC CONTROL DEVICES Section 630 of the Standard Specifications is hereby revised as follows: Subsection 630.01 shall be revised as follows: This work shall consist of furnishing, installing, moving, maintaining and removing temporary traffic signs, advance warning arrows panels, barricades, channeling devices, and delineators as required by the latest revision of the "Manual on Uniform Traffic Control Devices for Streets and Highways" (MUTCD), the City of Fort Collins' "Work Area Traffic Control Handbook", June 1989 with Revisions dated May 29, 1991, and the City of Fort Collins' "Design Criteria and Standards for Streets, Subsection 1.4, "Barricades, Warning Signs, Signal Lights", July, 1986. This work includes use of the above devices to channelize or direct traffic away from the work zone, but does not include work zone protection. It is the Contractor's responsibility to protect his work zone and to protect Pedestrians and Bicyclists from potential hazards arising from his work until such time as the work has been completed and can be opened to traffic. Traffic Control Devices shall be measured and paid for under this section based upon a lump sum pay item. In the event of a conflict between the MUTCD criteria and the City's criteria, the City's criteria shall govern. Traffic control devices shall be placed and/or stored in the City right-of-way in such a manner that minimizes the hazards to pedestrians, bicyclists and vehicles. Proper placement and storage of traffic control devices will be subject to the Engineer’s discretion. Traffic control devices shall be removed from the site immediately upon completion of the Work, but not before the concrete has cured sufficiently to allow vehicular traffic to use it. Message Boards – Will be placed to the plan designed by the City of Fort Collins. This item will be paid for per day (Day). Traffic Control – The scope for the traffic control has been described under Section 01580 Traffic Regulation. This item will be paid for as a lump sum (LS). Subsection 630.02 shall include the following: All traffic control devices placed for this project must meet or exceed the minimum standards set forth in the MUTCD. All traffic control devices shall be clean and in good operating condition when delivered and shall be maintained in that manner on a daily basis. All traffic control devices shall be clearly marked and free of crossed out information or any other form of defacement that detracts from the purpose for which they are intended (i.e. crossed out information, information written in long-hand style, etc.) Additionally, any sign blank with sign faces on both sides must have the back sign face covered when in use to avoid confusion to motorists traveling in the opposite direction and other potentially affected parties, such as residents affected by any information the sign may present. Subsection 630.05, the second paragraph shall include the following: The reflective material shall be AP1000 Polyester (Reflexite Corporation), 3M Type III or Transparent (Reflexite Corporation). Vinyl material is not acceptable unless its brightness is equivalent to or greater than the types named as approved by the Engineer. Subsection 630.08 shall be revised as follows: Traffic control on this project is the responsibility of the Contractor. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 39 For this project, a Traffic Control Plan shall be prepared. The Traffic Control Plan shall be submitted for approval to the Traffic Division by 12:00 noon, two working days prior to the commencement of work. (Note: Traffic Control Plans for work done on Monday and Tuesday shall be submitted the previous Friday by 9:00 a.m.). Facsimiles of plans shall not be allowed. No phase of the construction shall start until the Traffic Control Plan has been approved. Failure to have an approved Traffic Control Plan shall constitute cause for the City to stop work, as well as the Contractor's forfeiture of payment for all work and materials at that location, with no adjustment in the contract time. The Traffic Control Plan shall include, as a minimum, the following: (1) A detailed diagram which shows the location of all sign placements, including advance construction signs (if not previously approved), fines doubled for speeding signs and speed limit signs; method, length and time duration for lane closures, and location of flag persons. (2) A tabulation of all traffic control devices shown on the detailed diagram including, but not limited to: construction signs; vertical panel; vertical panel with light; Type I, Type II, and Type III barricades; cones; drum channeling devices; advance warning flashing or sequencing arrow panel. Certain traffic control devices may be used for more than one operation or phase. However, all devices required for any particular phase must be detailed and tabulated for each phase. (3) Number of flaggers to be used. (4) Parking Restrictions to be in affect. Approval of the proposed method of handling traffic is intended to indicate minimum devices needed to control traffic. Such approval does not relieve the Contractor of liability specifically assigned to him under this contract. Parking Restrictions shall be clearly shown on the Traffic Control Plan, including the location and quantity of "NO PARKING" signs, the date to be placed, and the date to be removed. Failure to have an approved Traffic Control Plan, including the Parking Restriction information listed above shall constitute cause for the City to stop work, as well as the Contractor's forfeiture of payment for all work and materials at that location, with no adjustment in the contract time. Subsection 630.09 shall be revised as follows: Traffic Control Management shall be performed by a Traffic Control Supervisor (TCS). The TCS(s) shall possess a valid Driver's License, a current American Traffic Safety Services Association (ATSSA) certification as a Worksite Traffic Control Supervisor or Colorado Contractor's Association (CCA) certification as a Traffic Control Supervisor. (Proof of certification shall be presented to the City Traffic Control Manager, and when requested by a City representative, for each TCS utilized on this project.) One TCS shall be designated as the Lead TCS. The Lead TCS shall have a minimum of one-year experience as a certified TCS. The Lead TCS shall be on site at all times during the construction. Qualifications shall be submitted to the Engineer for approval a minimum of one week prior to commencement of the work. The Lead TCS shall be equipped with a cellular phone. The cost of this phone shall be incidental to the work. The Lead TCS cellular phone number will be made available to the Engineer, Inspector, and the General Contractor It is the intent of the specifications that the Lead TCS be the same person throughout the project. If the Lead TCS is to be replaced during the project, the Engineer shall be given a minimum of one (1) weeks notice and qualifications shall be submitted for approval of the Lead TCS replacement. Payment for the TCS shall be included in the lump sum pay item. South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 40 The TCS's duties shall include, but not be limited to: (1) Preparing, revising and submitting Traffic Control Plans as required. (2) Direct supervision of project flaggers. (3) Coordinating all traffic control related operations, including those of the Subcontractors, City Streets Department, and suppliers. (4) Coordinating project activities with appropriate police and fire control agencies, Transfort, school districts and other affected agencies and parties prior to construction. (5) Maintaining a project traffic control diary which shall become part of the City's project records. (6) Inspecting traffic control devices on every calendar day for the duration of the project. (7) Insuring that traffic control devices are functioning as required. (8) Overseeing all requirements covered by the plans and specifications, which contribute to the convenience, safety and orderly movement of traffic. (9) Flagging. (10) Setting up and maintaining traffic control devices. (11) Attending weekly progress meetings as requested by the Engineer and/or Contractor. (12) Shall perform a minimum of Five (5) complete site checks per day, during day light hours, including weekends and/or as requested by the City of Fort Collins representatives. Traffic control management shall be maintained on a 24-hour per day basis. The Contractor shall make arrangements so that the Traffic Control Supervisor or their approved representative will be available on every working day, "on call" at all times and available upon the Engineer's request at other than normal working hours. All traffic control devices shall be placed under the supervision of a Traffic Control Supervisor. The Traffic Control Supervisor shall have up to date copies of the City of Fort Collins' "Work Area Traffic Control Handbook", and Part VI of the MUTCD, pertaining to traffic controls for street and highway construction, available at all times. Subsection 630.13 shall be revised as follows: The Contractor shall supply and pay all costs associated with the traffic control for this project. Traffic Control devices as per the provided traffic control plans are minimum requirements, additional devices, signage may be required after initial set-up is completed This applies to all phases of this project. The accepted quantities will be paid for at the contract unit price for each of the pay items listed below: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 630-01 Specialty Signs 3” Letters on 48” x 48” – (EA) 630-02 Message Boards (4 Boards for a total of 6 Days) – (Day) South Lemay Avenue Widening Project (2006) Date: May 10, 2006 P:\Street Oversizing\South Lemay Avenue Widening Project 2006\Bid Docs\Construction Specs\Technical Specs Technical Specs - 41 630-03 New Jersey Barriers – (LF) 630-04 Type III Barricades – (Section) 630-05 Traffic Control – (LS) Flaggers and all incidental equipment will not be measured and paid for separately, but shall be included in the Work. The flaggers shall be provided with electronic communication devices when required. These devices will not be measured and paid for separately, but shall be included in the Work. The cost of batteries, electricity and/or fuel for all lighting or warning devices shall not be paid for separately but shall be considered subsidiary to the item and shall be included in the Work. Sandbags will not be measured and paid for separately, but shall be included in the Work. The Contractor may provide larger construction traffic signs than those typically used in accordance with the MUTCD, if approved; however, no additional payment will be made for the larger signs. The City shall not be responsible for any losses or damage due to theft or vandalism. SPECIAL CONDITIONS FOR WORK ON ARTERIALS AND COLLECTORS NOTE: Cross street traffic shall be maintained at all times unless authorized by the Engineer in writing. NOTE: Full closures on arterials and collectors, including those listed above, will be allowed under extreme circumstances and only upon approval by the Engineer and City Traffic Division. Plans shall be approved a minimum of one week prior to the commencement of work and/or the time required to adequately notify the public through the media. SPECIAL CONDITIONS FOR WORK ON RESIDENTIAL STREETS NOTE: Full closures on all residential streets shall be allowed as shown on the traffic control plans only if approved by the City Traffic Division. END OF SECTION Grade of Asphalt Cement Layers Below Top PG 64-28 PG 58-28 PG 64-22 Voids in the Mineral Aggregate (VMA) % minimum (a) CP 48 14.0 12.0 (a) Voids Filled with Asphalt (VFA) % (a) AI MS-2 65 - 75 65 - 75 (a) (a) Current CDOT Design Criteria (b) Residential 50, Collector 75, Arterial 100 Note: AIMS-2 = Asphalt Institute Manual Series 2 Note: The current version of CPL 5115 is available from the Region Materials Engineer. Note: Mixes with gradations having less than 40% passing the 4.75 mm (No. 4) sieve shall be approached with caution because of constructability problems.