HomeMy WebLinkAboutBID - 5963 TRAIL WORK 2006SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
Trail Work 2006
BID NO. 5963
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
February 23, 2006 – 3:00 P.M. (OUR CLOCK)
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020 Notice Inviting Bids 00020-1 - 00020-2
00100 Instruction to Bidders 00100-1 - 00100-9
00300 Bid Form 00300-1 - 00300-3
00400 Supplements to Bid Forms 00400-1
00410 Bid Bond 00410-1 - 00410-2
00420 Statements of Bidders Qualifications 00420-1 - 00420-3
00430 Schedule of Major Subcontractors 00430-1
CONTRACT DOCUMENTS
00500 Agreement Forms 00500-1
00510 Notice of Award 00510-0
00520 Agreement 00520-1 - 00520-6
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates 00600-1
00610 Performance Bond 00610-1 - 00610-2
00615 Payment Bond 00615-1 - 00615-2
00630 Certificate of Insurance 00630-1
00635 Certificate of Substantial Completion 00635-1
00640 Certificate of Final Acceptance 00640-1
00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate 00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
SPECIFICATIONS
07/2001 Section 00020 Page 2
SECTION 00020
INVITATION TO BID
07/2001 Section 00020 Page 1
SECTION 00020
INVITATION TO BID
Date: January 30, 2006
Sealed Bids will be received by the City of Fort Collins (hereinafter referred
to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock,
on February 23, 2006, for the Trail Work 2006; BID NO. 5963. If delivered,
they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins,
Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort
Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly
received will be publicly opened and read aloud.
The Contract Documents provide for the construction of Bid 5963 Trail Work
2006 This project includes two (2) sections of trail construction. The Poudre
Trail section is an asphalt to concrete conversion project and the Power Trail
is a new trail construction project. The contract documents provide
information for the removal of the existing 8’ asphalt trail, subgrade
preparations, construction of the 10’ wide colored concrete trail,
construction of the 8’ wide gray concrete sidewalk connection, minor
earthwork, landscape restoration, erosion control and seeding.
All Bids must be in accordance with the Contract Documents on file with The
City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado
80524.
Contract Documents will be available January 31, 2006.
A prebid conference and job walk with representatives of prospective Bidders
will be held at 10:00 a.m., on February 9, 2006, at 215 Mason 2D, Fort
Collins.
Questions concerning the scope of the bid should be directed to Project
Manager Matt Day, (970) 224-6096.
Questions regarding bid submittal or process should be directed to John D
Stephen, CPPO, CPPB, Senior Buyer (970) 221-6777.
A copy of the Bid may be obtained as follows:
1. Download the Bid from the Purchasing Webpage, Current Bids page,
at: https://secure2.fcgov.com/bso/login.jsp.
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins,
and request a copy of the Bid.
Prospective Bidders are invited to present their questions relative to this
07/2001 Section 00020 Page 2
Bid proposal at this meeting.
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section
2.3 of General Conditions. Substantial Completion of the Work is required as
specified in the Agreement.
The successful Bidder will be required to furnish a Performance Bond and a
Payment Bond guaranteeing faithful performance and the payment of all bills
and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date
fixed for opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any
informalities and irregularities therein.
Bid security in the amount of not less than 5% of the total Bid must accompany
each Bid in the form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City
Council, shall have a financial interest in the sale to the City of any real
or personal property, equipment, material, supplies or services where such
officer or employee exercises directly or indirectly any decision-making
authority concerning such sale or any supervisory authority over the services
to be rendered. This rule also applies to subcontracts with the City.
Soliciting or accepting any gift, gratuity favor, entertainment, kickback or
any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited
City of Fort Collins
By ______________________________________
James B. O'Neill, II, CPPO, FNIGP
Purchasing & Risk Management Director
SECTION 00100
INSTRUCTIONS TO BIDDERS
12/03 Section 00100 Page 1
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in the
Standard General Conditions of the Construction Contract (No. 1910-8,
1990 ed.) have the meanings assigned to them in the General Conditions.
The term "Bidder" means one who submits a Bid to OWNER, as distinct from
a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder"
means the lowest, qualified, responsible and responsive Bidder to whom
OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an
award. The term "Bidding Documents" includes the Advertisement or
Invitation to Bid, Instructions to Bidders, the Bid Form, and the
proposed Contract Documents (including all Addenda issued prior to
receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the
Invitation to Bid. No partial sets will be issued. The Bidding
Documents may be examined at the locations identified in the Invitation
to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids;
neither OWNER nor Engineer assumes any responsibility for errors or
misinterpretations resulting from the use of incomplete sets of Bidding
Documents.
2.3. The submitted Bid proposal shall include Sections 00300, 00410,
00420, and 00430 fully executed.
2.4. OWNER and Engineer, in making copies of Bidding Documents available
on the above terms, do so only for the purpose of obtaining Bids on the
Work and do not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must
submit at the time of the Bid opening, a written statement of
qualifications including financial data, a summary of previous
experience, previous commitments and evidence of authority to conduct
business in the jurisdiction where the Project is located. Each Bid must
contain evidence of Bidder's qualification to do business in the state
where the Project is located or covenant to obtain such qualification
prior to award of the contract. The Statement of Qualifications shall be
prepared on the form provided in Section 00420.
12/03 Section 00100 Page 2
3.2. In accordance with Section 8-160 of the Code of the City of Fort
Collins in determining whether a bidder is responsible, the following
shall be considered: (1) The ability, capacity and skill of the bidder to
perform the contract or provide the services required, (2) whether the
bidder can perform the contract or provide the service promptly and
within the time specified without delay or interference, (3) the
character, integrity, reputation, judgment, experience and efficiency of
the bidder, (4) the quality of the bidder's performance of previous
contracts or services, (5) the previous and existing compliance by the
bidder with laws and ordinances relating to the contract or service, (6)
the sufficiency of the financial resources and ability of the bidder to
perform the contract or provide the service, (7) the quality,
availability and adaptability of the materials and services to the
particular use required, (8) the ability of the bidder to provide future
maintenance and service for the use of the subject of the contract, and
(9) any other circumstances which will affect the bidder's performance of
the contract.
3.3. Each Bidder may be required to show that he has handled former Work
so that no just claims are pending against such Work. No Bid will be
accepted from a Bidder who is engaged on any other Work which would
impair his ability to perform or finance this Work.
3.4 No Bidder shall be in default on the performance of any other
contract with the City or in the payment of any taxes, licenses or other
monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid,
to (a) examine the Contract Documents thoroughly, (b) visit the site to
familiarize himself with local conditions that may in any manner affect
cost, progress or performance of the Work, (c) familiarize himself with
federal, state and local laws, ordinances, rules and regulations that may
in any manner affect cost, progress or performance of the Work, (d) study
and carefully correlate Bidder's observations with the Contract
Documents, and (e) notify Engineer of all conflicts, errors or
discrepancies in the Contract Documents.
4.2. Reference is made to the Supplementary Conditions for
identification of: Subsurface and Physical Conditions SC-4.2.
4.3. The submission of a Bid will constitute an incontrovertible
representation by Bidder that Bidder has complied with every requirement
of this Article 4, that without exception the Bid is premised upon
performing and furnishing the Work required by the Contract Documents and
such means, methods, techniques, sequences or procedures of construction
as may be indicated in or required by the Contract Documents, and that
12/03 Section 00100 Page 3
the Contract Documents are sufficient in scope and detail to indicate and
convey understanding of all terms and conditions for performance and
furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to
be submitted in writing to the Engineer and the OWNER. Interpretation or
clarifications considered necessary in response to such questions will be
issued only by Addenda. Questions received less than seven days prior to
the date for opening of the Bids may not be answered. Only questions
answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
5.2. All questions concerning the scope of this project should be
directed to the Engineer. Questions regarding submittal of bids should
be directed to the City of Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as
deemed advisable by OWNER or Engineer.
5.4. Addenda will be mailed or delivered to all parties recorded by the
OWNER as having received the Bidding documents.
6.0 BID SECURITY
6.1. Each Bid must be accompanied by Bid Security made payable to OWNER
in the amount stated in the Invitation to Bid. The required security
must be in the form of a certified or bank cashier's check payable to
OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be
executed by a surety meeting the requirements of the General Conditions
for surety bonds.
6.2. The Bid Security of the successful Bidder will be retained until
such Bidder has executed the Agreement and furnished the required
contract security, whereupon Bid Security will be returned. If the
successful Bidder fails to execute and deliver the Agreement and furnish
the required contract security within 15 days of the Notice of Award,
OWNER may annul the Notice of Award and the Bid Security of that Bidder
will be forfeited. The Bid Security of other Bidders whom OWNER believes
to have reasonable chance receiving the award may be retained by OWNER
until the earlier of the seventh day after the effective date of the
Agreement or the thirty-first day after the Bid Opening, whereupon Bid
Security furnished by such Bidders will be returned. Bid Security with
Bids which are not competitive will be returned within seven days after
the Bid opening.
7.0 CONTRACT TIME.
The number of days within which, or the date by which the Work is to be
12/03 Section 00100 Page 4
substantially complete and also completed and ready for Final Payment
(the Contract Times) are set forth in the Agreement.
8.0 LIQUIDATED DAMAGES.
Provisions for liquidated damages are set forth in the Agreement.
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment
described on the Drawings or specified in the Specifications without
consideration of possible substitute or "or equal" items. Whenever it is
indicated on the Drawings or specified in the Specifications that a
substitute or "or equal" item of material or equipment may be furnished
or used by CONTRACTOR if acceptable to Engineer, application for such
acceptance will not be considered by Engineer until after the "effective
date of the Agreement". The procedure for submittal of any such
application by CONTRACTOR and consideration by Engineer is set forth in
the General Conditions which may be supplemented in the General
Requirements.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to OWNER a list of
principal subcontractors he proposes to use in the Work. Refer to
Section 00430 contained within these Documents.
10.2. If OWNER or Engineer after due investigation has reasonable
objection to any proposed Subcontractor, either may, before the Notice of
Award is given, request the apparent successful Bidder to submit an
acceptable substitute without an increase in Bid price. If the apparent
successful Bidder declines to make any substitution, OWNER may award the
contract to the next lowest responsive and responsible Bidder that
proposes to use acceptable subcontractors. Subcontractors, suppliers,
other persons or organization listed and to whom OWNER or Engineer does
not make written objection prior to the giving of the Notice of Award
will be deemed acceptable to OWNER and ENGINEER subject to revocation of
such acceptance after the effective date of the Agreement as provided in
the General Conditions.
10.3. CONTRACTOR shall not be required to employ any subcontractor,
supplier or other persons or organizations against whom he has reasonable
objection. The use of subcontractors listed by the Bidder and accepted
by OWNER prior to the Notice of Award will be required in the performance
of the Work.
11.0 BID FORM.
11.1. A copy of the Bid Form is bound in the Contract Documents which
12/03 Section 00100 Page 5
may be retained by the Bidder. A separate unbound copy is enclosed for
submission with the Bid.
11.2. Bid Forms must be complete in ink or typed. All lump sum prices
on the form must be stated in words and numerals; in case of conflict,
words will take precedence. Unit prices shall govern over extensions of
sums.
11.3. Bids by corporations must be executed in the corporate name by the
president or a vice-president (or other appropriate officer accompanied
by evidence of authority to sign) and the corporate seal shall be affixed
and attested by the secretary or an assistant secretary. The corporate
address and state of incorporation shall be shown below the corporate
name.
11.4. Bids by partnerships must be executed in the partnership name and
signed by a partner, his title must appear under his signature and the
official address of the partnership must be shown below the signature.
11.5. Bids by joint venture shall be signed by each participant in the
joint venture or by an authorized agent of each participant. The full
name of each person or company interested in the Bid shall be listed on
the Bid Form.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda
(the numbers of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by
erasures, interpolations, or otherwise will be acceptable unless each
such alteration is signed or initialed by the Bidder; if initialed, OWNER
may require the Bidder to identify any alteration so initialed.
11.8. The address and telephone number for communications regarding the
Bid shall be shown.
12.0 BID PRICING.
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS.
13.1. Bids shall be submitted at the time and place indicated in the
Invitation to Bid and shall be enclosed in an opaque sealed envelope
marked with the Project title, Bid No., and name and address of the
Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement
of Bidders Qualifications, and Schedule of Subcontractors as required in
Section 00430. If the Bid is sent through the mail or other delivery
system, the sealed envelope shall be enclosed in a separate envelope with
the notation "BID ENCLOSED" on the face of it.
12/03 Section 00100 Page 6
13.2. Bids shall be deposited at the designated location prior to the
time and date for receipt of Bids indicated in the Invitation to Bid, or
any extension thereof made by addendum. Bids received after the time and
date for receipt of Bids will be returned unopened. Bidder shall assume
full responsibility for timely delivery at the location designated for
receipt of Bids.
13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and
will not receive consideration.
13.4. No Bidder may submit more than one Bid. Multiple Bids under
different names will not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS.
14.1. Bids may be modified or withdrawn by an appropriate document duly
executed (in a manner that a Bid must be executed) and delivered to the
place where Bids are to be submitted at any time prior to the opening of
Bids.
14.2. Bids may also be modified or withdrawn in person by the Bidder or
an authorized representative provided he can prove his identity and
authority at any time prior to the opening of Bids.
14.3. Withdrawn Bids may be resubmitted up to the time designated for
the receipt of Bids provided that they are then fully in conformance with
these Instructions to Bidders.
15.0 OPENINGS OF BIDS.
Bids will be opened and (unless obviously non-responsive) read aloud
publicly as indicated in the Invitation to Bid. An abstract of the
amounts of the Base Bids and major alternates (if any) will be made
available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE.
All Bids shall remain open for forty-five (45) days after the day of the
Bid Opening, but OWNER may, in his sole discretion, release any Bid and
return the Bid Security prior to that date.
17.0 AWARD OF CONTRACT.
17.1. OWNER reserves the right to reject any and all Bids, to waive any
and all informalities not involving price, time or changes in the Work,
to negotiate contract terms with the Successful Bidder, and the right to
disregard all nonconforming, nonresponsive, unbalanced or conditional
12/03 Section 00100 Page 7
Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if
OWNER believes that it would not be in the best interest of the Project
to make an award to that Bidder, whether because the Bid is not
responsive or the Bidder is unqualified or of doubtful financial ability
or fails to meet any other pertinent standard or criteria established by
OWNER. Discrepancies between the indicated sum of any column of figures
and the correct sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, OWNER will consider the qualifications of the
Bidders, whether or not the Bids comply with the prescribed requirements,
and such alternates, unit prices and other data, as may be requested in
the Bid Form or prior to the Notice of Award.
17.3. OWNER may consider the qualification and experience of
Subcontractors, Suppliers, and other persons and organizations proposed
for those portions of the Work as to which the identity of
Subcontractors, Suppliers, and other persons and organizations is
submitted as requested by OWNER. OWNER also may consider the operating
costs, maintenance requirements, performance data and guarantees of major
items of materials and equipment proposed for incorporation in the Work
when such data is required to be submitted prior to the Notice of Award.
17.4. OWNER may conduct such investigations as OWNER deems necessary to
assist in the evaluation of any Bid and to establish the responsibility,
qualifications and financial ability of the Bidder's proposed
Subcontractors, Suppliers and other persons and organizations to do the
Work in accordance with the Contract Documents to OWNER's satisfaction
within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest
responsive and responsible Bidder whose evaluation by OWNER indicates to
OWNER that the award will be in the best interest of the OWNER. Award
shall be made on the evaluated lowest base bid excluding alternates. The
basis for award shall be the lowest Bid total for the Schedule or, in the
case of more than one schedule, for sum of all schedules. Only one
contract will be awarded.
17.6. If the Contract is to be awarded, OWNER will give the Successful
Bidder a Notice of Award within forty-five (45) days after the date of
the Bid opening.
18.0 CONTRACT SECURITY.
The General Conditions and the Supplementary Conditions set forth OWNER's
requirements as to performance and other Bonds. When the Successful
Bidder delivers the executed Agreement to the OWNER, it shall be
accompanied by the required Contract Security.
12/03 Section 00100 Page 8
19.0 SIGNING OF AGREEMENT.
When OWNER gives a Notice of Award to the Successful Bidder, it will be
accompanied by the required number of unsigned counterparts of the
Agreement with all other written Contract Documents attached. Within
fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the
required number of counterparts of the Agreement and attached documents
to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER
shall deliver one fully signed counterpart to CONTRACTOR. Each
counterpart is to be accompanied by a complete set of the Drawings with
appropriate identification.
20.0 TAXES.
OWNER is exempt from Colorado State Sales and Use Taxes on materials and
equipment to be incorporated in the Work. Said taxes shall not be
included in the Contract Price. Reference is made to the General and
Supplementary Conditions.
21.0 RETAINAGE.
Provisions concerning retainage are set forth in the Agreement.
22.0 PURCHASING RESTRICTIONS.
Purchasing restrictions: The Bidder's authorized signature of this Bid
assures the Bidder's compliance with the City's purchasing restrictions.
A copy of the resolutions are available for review in the Purchasing and
Risk Management Division or the City Clerk's office.
A. Cement Restrictions: City of Fort Collins Resolution 91-121
requires that suppliers and producers of cement or products
containing cement to certify that the cement was not made in cement
kilns that burn hazardous waste as a fuel.
23.0 COLLUSIVE OR SHAM BIDS.
Any Bid deemed by the City in its sole discretion to be a collusive or
sham Bid will be rejected and reported to authorities as such. Your
authorized signature of this Bid assures that such Bid is genuine and is
not a collusive or sham Bid.
24.0 BID RESULTS.
For information regarding results for individual Bids send a self-
addressed, self-stamped envelope and a Bid tally will be mailed to you.
Bid results will be posted in the Purchasing office seven (7) days after
the Bid Opening.
12/03 Section 00100 Page 9
END OF SECTION
SECTION 00300
BID FORM
7/96 Section 00410 Page 1
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 2
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned _
as Principal, and as Surety, are hereby held and firmly bound unto the City of
Fort Collins, Colorado, as OWNER, in the sum of $ for the
payment of which, well and truly to be made, we hereby jointly and severally
bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, 5963 Trail Work 2006.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in
the State of Colorado and be accepted by the OWNER.
7/96 Section 00410 Page 3
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this day of , 20__, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above.
PRINCIPAL SURETY
Name:_____________________________ __________________________________
Address:__________________________ __________________________________
__________________________________ __________________________________
By:_______________________________ By: ______________________________
Title: ___________________________ Title:____________________________
ATTEST:
By:_______________________________
(SEAL) (SEAL)
7/96 Section 00420 Page 1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: _________________________________________________
2. Permanent main office address: __________________________________
3. When organized: _________________________________________________
4. If a corporation, where incorporated: ___________________________
5. How many years have you been engaged in the contracting business
under your present firm or trade name?___________________________
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
7. General character of Work performed by your company:
_________________________________________________________________
_________________________________________________________________
8. Have you ever failed to complete any Work awarded to you?________
If so, where and why?____________________________________________
_________________________________________________________________
9. Have your ever defaulted on a contract?__________________________
If so, where and why?____________________________________________
_________________________________________________________________
10. Are you debarred by any government agency? ______________________
If yes list agency name._________________________________________
7/96 Section 00420 Page 2
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
12. List your major equipment available for this contract.
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
13. Experience in construction Work similar in importance to this
project:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
14. Background and experience of the principal members of your organization,
including officers:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
15. Credit available: $______________________________________________________
16. Bank reference:__________________________________________________________
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
_________________________________________________________________________
18. Are you licensed as a General CONTRACTOR?________________________________
If yes, in what city, county and state? __________________________What
class, license and numbers?______________________________________________
19. Do you anticipate subcontracting Work under this
Contract?_________________
If yes, what percent of total contract?__________________________________
and to whom?_____________________________________________________________
20. Are any lawsuits pending against you or your firm at this time?__________
IF yes, DETAIL___________________________________________________________
_________________________________________________________________________
7/96 Section 00420 Page 3
21. What are the limits of your public liability? DETAIL
_________________________________________________________________________
What company?____________________________________________________________
22. What are your company's bonding limitations?_____________________________
_________________________________________________________________________
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at ________________ this ______ day of __________________, 20__.
_____________________________________________
Name of Bidder
By:__________________________________________
Title:_______________________________________
State of________________________
)
County of_______________________
___________________________________being duly sworn deposes and says that he
is ______________________of_____________________________ and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this _______ day of____________, 20__.
___________________________________
Notary Public
___________________________________
___________________________________
My commission expires _____________________________.
7/96 Section 00430 Page 1
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM SUBCONTRACTOR
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
______________________________ _______________________________
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
9/12/01 Section 00510 Page 1
SECTION 00510
NOTICE OF AWARD
Date: March 6, 2006
TO: Daniels Construction Company, LLC
PROJECT: 5963 Trail Work 2006
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated February 23, 2006 for the above
project has been considered. You are the apparent successful Bidder and have
been awarded an Agreement for 5963 Trail Work 2006. This project includes two
(2) sections of trail construction. The Poudre Trail section is an asphalt to
concrete conversion project and the Power Trail is a new trail construction
project. The contract documents provide information for the removal of the
existing 8’ asphalt trail, subgrade preparations, construction of the 10’ wide
colored concrete trail, construction of the 8’ wide gray concrete sidewalk
connection, minor earthwork, landscape restoration, erosion control and
seeding..
The Price of your Agreement is $295,484.08.
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be
delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15)
days of the date of this Notice of Award, that is by March 21, 2006.
1. You must deliver to the OWNER three (3) fully executed counterparts of
the Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security
(Bonds) as specified in the Instructions to Bidders, General Conditions
(Article 5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to
declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return
to you one (1) fully-signed counterpart of the Agreement with the Contract
Documents attached.
City of Fort Collins
OWNER
By:________________________________________
James B. O’Neill, II, CPPO, FNIGP
Director of Purchasing & Risk Management
9/12/01 Section 00520 Page 1
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the 6th day of March in the year of 2006 and
shall be effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
Daniels Construction Compnany, LLC (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may be
the whole or only a part is defined as the construction of the 5963 Trail Work
2006and is generally described in Section 01010.
ARTICLE 2. ENGINEER
The Project has been designed by City of Fort Collins Park Planning, who is
hereinafter called ENGINEER and who will assume all duties and
responsibilities and will have the rights and authority assigned to ENGINEER
in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete within Sixty Five (65)
calendar days after the date when the Contract Times commence to run as
provided in the General Conditions and completed and ready for Final Payment
and Acceptance in accordance with the General Conditions within Seventy Five
(75) calendar days after the date when the Contract Times commence to run.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving
in a legal proceeding the actual loss suffered by OWNER if the Work is not
completed on time. Accordingly, instead of requiring any such proof, OWNER
and CONTRACTOR agree that as liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
9/12/01 Section 00520 Page 2
1) Substantial Completion:
Three Hundred Dollars ($300) for each calendar day or fraction
thereof that expires after the Sixty Five (65) calendar day period
for Substantial Completion of the Work until the Work is
Substantially Complete.
2) Final Acceptance:
After Substantial Completion, One Hundred Fifty Dollars ($150) for
each calendar day or fraction thereof that expires after the
Ten(10) calendar day period for Final Payment and Acceptance until
the Work is ready for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows: Two
Hundred Ninety Five Thousand Four Hundred Eighty Four Dollars and Eight Cents,
$295,484.08 Dollars, in accordance with Section 00300, attached and
incorporated herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will be
processed by ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER, once each month during construction as provided
below. All progress payments will be on the basis of the progress of the Work
measured by the schedule of values established in paragraph 2.6 of the General
Conditions and in the case of Unit Price Work based on the number of units
completed, and in accordance with the General Requirements concerning Unit
Price Work.
5.1.1. Prior to Substantial Completion, progress payments will be in the
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
General Conditions. 90% of the value of Work completed until the Work has
been 50% completed as determined by ENGINEER, when the retainage equals 5% of
the Contract Price, and if the character and progress of the Work have been
satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 90% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided in
9/12/01 Section 00520 Page 3
paragraph 14.2 of the General Conditions) may be included in the application
for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient to increase total payments to CONTRACTOR to 95% of the Contract
Price, less such amounts as ENGINEER shall determine or OWNER may withhold in
accordance with paragraph 14.7 of the General Conditions or as provided by
law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of
the Contract Documents, Work, site, locality, and with all local conditions
and Laws and Regulations that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and
tests of subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of the
General Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or
to supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as CONTRACTOR
considers necessary for the performance or furnishing of the Work at the
Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents, including specifically the
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information
or data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provision of
9/12/01 Section 00520 Page 4
paragraph 4.3. of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts,
errors or discrepancies that he has discovered in the Contract Documents and
the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General Conditions,
Supplementary Conditions, those items included in the definition of “Contract
Documents” in Article 1.10 of the General Conditions, and such other items as
are referenced in this Article 7, all of which are incorporated herein by this
reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are not
limited to, the following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as
follows:
N/A
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
7.4. Addenda Numbers 1 to 1, inclusive.
7.5. The Contract Documents also include all written amendments and
other documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or
incorporated by reference in this Article 7. The Contract Documents may only
be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of
the General Conditions.
ARTICLE 8. MISCELLANEOUS
9/12/01 Section 00520 Page 5
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General
Conditions.
8.2. No assignment by a party hereto of any rights under or interests in
the Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due may
not be assigned without such consent (except to the extent that the effect of
this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge that assignor from any duty or responsibility under the Contract
Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
OWNER: CITY OF FORT COLLINS CONTRACTOR:Daniels Construction Company,
LLC
By: ____________________________ By:_______________________________
JAMES B. O’NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING __________________________________
AND RISK MANAGEMENT
Title:____________________________
Date:___________________________ Date:_____________________________
(CORPORATE SEAL)
Attest: ________________________ Attest:___________________________
City Clerk
Address for giving notices: Address for giving notices:
P. O. Box 580 __________________________________
Fort Collins, CO 80522 __________________________________
LICENSE NO.:______________________
Approved as to Form
_______________________________
Assistant City Attorney
7/96 Section 00530 Page 6
SECTION 00530
NOTICE TO PROCEED
Description of Work: 5963 Trail Work 2006
To:
This notice is to advise you:
That the contract covering the above described Work has been
fully executed by the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond
have been received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you
are hereby authorized and directed to proceed within (
) calendar days from receipt of this notice as required by the
Agreement.
Dated this day of , 20__.
The dates for Substantial Completion and Final Acceptance shall
be
_____ _____, 20_ and , 20__, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged
this day of , 20__.
CONTRACTOR: Daniels Construction Company, LLC
By:
Title:
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
7/96 Section 00610 Page 1
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto
City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as the "OWNER", in the penal
sum of ____________ in lawful money of
the United States, for the payment of which sum well and truly to be made, we
bind ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of __________, 20__,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project,5963 Trail Work 2006.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its
duties, all the undertakings, covenants, terms, conditions and agreements of
said Agreement during the original term thereof, and any extensions thereof
which may be granted by the OWNER, with or without Notice to the Surety and
during the life of the guaranty period, and if the Principal shall satisfy all
claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the OWNER all outlay
and expense which the OWNER may incur in making good any default then this
obligation shall be void; otherwise to remain in full force and effect.
7/96 Section 00610 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this __ day of _________, 20__.
IN PRESENCE OF: Principal
______________________________ ________________________________________
______________________________ ________________________________________
(Title)
________________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00615 Page 1
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the
City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as "the OWNER", in the penal
sum of in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind
ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of , 20__,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project, 5963 Trail Work 2006.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor
in the prosecution of the Work provided for in such Agreement and any
authorized extension or modification thereof, including all amounts due for
materials, lubricants, repairs on machinery, equipment and tools, consumed,
rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work
whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
7/96 Section 00615 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this __ day of , 20__.
IN PRESENCE OF: Principal
______________________________ By:___________________________________
______________________________ ______________________________________
(Title)
______________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
______________________________ ______________________________________
______________________________ ______________________________________
IN PRESENCE OF: Surety
______________________________ By:___________________________________
______________________________ By:___________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00630 Page 1
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
7/96 Section 00635 Page 1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS
(OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE:5963 Trail Work 2006
_____________________________
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
____________________________
____________________________ CONTRACTOR: ______________________________
____________________________
CONTRACT DATE:____________________________
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or
specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto.
This list may not be exhaustive, and the failure to include an item on it does
not alter the responsibility of the CONTRACTOR to complete all the Work in
accordance with the Contract Documents.
_________________________________ ________________________________________
ENGINEER
AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time
indicated.
________________________________ By: ________________________________________
CONTRACTOR
AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as
substantially complete and will assume full possession of the project or
specified area of the project at 12:01 a.m., on . The
responsibility for heat, utilities, security, and insurance under the Contract
Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By: ________________________________________
OWNER
AUTHORIZED REPRESENTATIVE DATE
REMARKS:
7/96 Section 00640 Page 1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20__
TO:
Gentlemen:
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by
for the City of Fort Collins project, 5963 Trail Work 2006.
A check is attached hereto in the amount of $_______________________________
as Final Payment for all Work done, subject to the terms of the Contract
Documents which are dated _____________ __, 20__.
In conformance with the Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following
date:____________ __, 20__.
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
7/96 Section 00650 Page 1
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: (CONTRACTOR)
PROJECT:5963 Trail Work 2006
1. The CONTRACTOR acknowledges having received payment, except retainage
from the OWNER for all work, labor, skill and material furnished,
delivered and performed by the CONTRACTOR for the OWNER or for anyone in
the construction, design, improvement, alteration, addition or repair of
the above described project.
2. In consideration of such payment and other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged,
the CONTRACTOR voluntarily waives all rights, claims and liens, including
but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270
a and b), stop notices, equitable liens and labor and material bond
rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land
improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished,
delivered or performed to or for the construction, design, improvement,
alteration, addition or repair of the project were furnished, delivered
or performed by the CONTRACTOR or its agents, employees, and servants, or
by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project
or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns
arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender,
if any, and the Surety on the project against and from any claim
hereinafter made by the CONTRACTOR'S Subcontractors, materialmen,
employees, servants, agents or assigns against the project or against the
OWNER or its officers, employees, agents or assigns arising out of the
7/96 Section 00650 Page 2
project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth
above constitutes and adequate description of the property and
improvements to which this Lien Waiver Release pertains. It is further
acknowledged that this Lien Waiver Release is for the benefit of and may
be relied upon by the OWNER, the lender, if any, and Surety on any labor
and material bonds for the project.
Signed this day of , 20__.
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of
20__, by
Witness my hand and official seal.
My Commission Expires: .
Notary Public
7/96 Section 00660 Page 1
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR:_________________________________
PROJECT: 5963 Trail Work 2006
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicated above, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of , ____ .
(Surety Company)
By
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-
Fact.
Section 00670 Page 1
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
Section 00670 Page 2
SECTION 00700
GENERAL CONDITIONS
SE
SECTION 00800
SUPPLEMENTARY CONDITIONS
7/96 Section 00800 Page 1
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of
the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with
City of Fort Collins modifications) and other provisions of the Contract
Documents as indicated below.
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of
$1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived
by the Owner.
5.4.6 The Comprehensive Automobile Liability Insurance policy will have
limits of $1,000,000 combined single limits (CSL).
5.4.9 This policy will include completed operations coverage/product
liability coverage with limits of $1,000,000 combined single limits
(CSL).
SC-12.3 Add the following language to the end of paragraph 12.3.
Contractor will include in the project schedule 10 days lost due to
abnormal weather conditions.
9/99
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
9/99 Section 00950 Page 1
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost
4. Change in Contract Time:
__
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved) _
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE: __
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
9/997/96 Section 00960 Page 1
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
NUMBER DATE AMOUNT
The present status of the account for this Contract is as
follows:
1
2 Original Contract Amount:
3 Net Change by Change Order:
Current contract Amount: $0.00
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage: $0.00
Less Retainage:
Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract.
The above Amount Due This Application is requested by the
CONTRACTOR.
Date: By:
Payment of the above Amount Due This Application is recommended by the ENGINEER.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
7/96 Section 00960 Page 2
CONTRACT AMOUNTS
APPLICATION FOR
PAYMENT PAGE 2 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
7/96 Section 00960 Page 3
CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4
Work Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00
PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
7/96 Section 00960 Page 4
STORED MATERIALS
SUMMARY PAGE 4 OF 4
On Hand Received Installed On Hand
Item Invoice Previous This This This
Number Number Description Application Period Period Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00 $0.00 $0.00
City of Fort Collins Table of Contents
Park Planning and Development Page 1 of 1
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 1 GENERAL REQUIREMENTS
Section 01000 Project Summary
Section 01100 Summary of Work
Section 01160 Site Conditions
Section 01200 Measurement and Payment
Section 01300 Coordination and Project Meetings
Section 01310 Construction Schedules
Section 01330 Shop Drawings, Product Data and Samples
Section 01340 Survey Data
Section 01400 Quality Control and Testing
Section 01500 Temporary Controls
Section 01510 Temporary Utilities
Section 01570 Traffic Control
Section 01600 Material and Equipment
Section 01700 Contract Close-Out
Section 01800 Definition of Bid Items
DIVISION 2 SITEWORK
Section 02000 Mobilization
Section 02050 Demolition
Section 02110 Clear and Grub
Section 02200 Earthwork and Grading
Section 02221 Trench backfill and Compaction
Section 02270 Slope Protection and Erosion Control
Section 02304 Aggregate Base Course
Section 02520 Portland Cement Concrete Paving
Section 02900 Site Re-vegetation
Section 02950 Sod Construction
DIVISION 7
Section 07900 Joint Sealers
City of Fort Collins SECTION 01000 – PROJECT SUMMARY
Park Planning & Development Division Page 1 of 3
DIVISION 1
SECTION 01000 – PROJECT SUMMARY
PART 1 - GENERAL
1.01 Scope
A. This section contains general requirements that are applicable to this project.
1.02 Description of Work
A. The Contractor shall provide all labor, materials and equipment necessary to perform the work items
called for on the bid schedule.
1.03 City Furnished Materials
A. None.
1.04 Conditions of Work
A. Area of Work: The Contractor shall confine his operations to the immediate work area. Material
storage shall be confined to areas shown on the Drawings or designated by the City.
B. Regulations: The Contractor shall comply with all applicable Federal, State, and local regulations
pertaining to safety, traffic control, fire prevention, erosion control and environmental protection.
C. Working Hours: The Contractor's working hours shall be between 7:00 a.m. and 5:00 p.m., with no
work on weekends or Federal holidays, unless otherwise approved by the City.
D. Material Storage: The Contractor's material and equipment storage site shall be limited to the area of
the project site. The area shall be kept orderly and free of litter.
1.05 Project Cleanup
A. The Contractor is responsible to maintain the construction site in a clean and orderly condition from the
start of the project to completion. Daily cleanups are required.
1. The City may require Contractor to perform cleanup within 100 feet of the progress of the work
and perform cleanup of the site daily prior to work stoppage.
B. Store volatile wastes in covered containers and dispose off-site.
1. Provide on-site covered containers for the collection of waste materials, debris and rubbish.
2. Neatly store construction materials, such as concrete forms, when not in use.
C. Wastes shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers,
streams or waterways.
D. At project completion the Contractor shall remove all equipment, materials, and debris from the site
including toilets and dumpsters. Areas around work sites shall be cleaned with dirt and grass surfaces
raked clean of any slag from the Contractor's operations. Broom clean exterior paved surfaces.
Remaining dirt and fill material shall be removed, or may be scattered, with the approval of the City.
1.06 Trash Removal
A. All non-salvageable items and trash shall be hauled off the site and disposed of in accordance with
applicable state and local regulations. Items shall be transported in tarp-covered or closed vehicles.
Any materials dropped or blown off vehicles shall be picked up immediately by Contractor.
City of Fort Collins SECTION 01000 – PROJECT SUMMARY
Park Planning & Development Division Page 2 of 3
1.07 Verification of Dimensions
A. The Contractor shall he responsible for the coordination and proper relation of the work. He shall field
verify all dimensions and advise the City of any discrepancies prior to proceeding with that phase of
the work.
1.08 Fire Hydrants
A. Fire Hydrant Connections: City’s permission is required for connection to fire hydrants. Only
compatible adapters shall be utilized for hydrant connections. A gate valve shall be provided and
installed by the Contractor between the hydrant and supply hoses to control flow. Connection shall
include backflow protection. Temporary connections to fire hydrants shall he disconnected at the end
of each working day. No quick closing valves such as plug or butterfly valves will he used.
1.09 Outages
A. Utility outages necessitated by the work shall be requested in writing at least fifteen (15) working days
prior to the proposed outage. The request shall be directed to the City and shall stipulate the specific
utility system(s) and circuits to be affected, the location of the work, the time at which the shutdown
will occur, and the duration of the outage for each system. Outages shall be kept to a minimum both in
number and in duration. Where multiple outages are required, as many outages as can be accurately
scheduled shall he submitted as a group.
1.10 Fill Material
A. Excess fill material, including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be
hauled off the site and disposed of in accordance with applicable State and local regulations.
B. Additional fill material, if required, shall be hauled to the site from off the site as a necessary part of
the work. Material composition shall be subject to the requirements of the specifications.
1.11 Parking
A. Parking of the Contractor's vehicles shall be restricted to an area designated by the City.
1.12 Telephone
A. Business Telephone: At the beginning of construction, the Contractor shall provide the City with a
telephone number at which the Contractor or his representative may be contacted at any time during
regular working hours. The Contractor shall also provide a phone number for after-duty hours contact.
1.13 Sanitary Provisions
A. The Contractor shall provide temporary toilets for the use of construction personnel. Location, type,
proposed maintenance, etc., shall be approved by the City prior to placing toilets. Temporary toilets
shall be removed at the completion of construction and the adjacent area restored to the condition
existing prior to the start of construction or as indicated on the plans.
1.14 Pollution Abatement
A. Transporting materials to or from the site shall be accomplished in a manner preventing materials or
particles from becoming airborne. Earth materials shall be covered, wetted or otherwise protected.
Gravel, sand and concrete shall be contained within vehicles to prevent spillage.
B. Prevent the deposit of dirt, mud or debris on improved streets and roads, and remove all should such
deposition occur.
C. Burning of any material on site is prohibited.
City of Fort Collins SECTION 01000 – PROJECT SUMMARY
Park Planning & Development Division Page 3 of 3
D. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils,
bitumen, acids, or other harmful materials. Surface drainage from the construction site, which contains
harmful amounts of sediment, shall not be allowed to drain onto adjacent areas. All grading shall be
accomplished to allow sedimentation to settle out prior to flowing onto adjacent areas.
E. Flushing of concrete trucks is allowed only at the project site or the designated contractor storage area,
with the responsibility of control and cleanup resting with the Contractor.
F. Toxic, corrosive and flammable materials for construction other than specified shall not be used
without prior approval of the City of Fort Collins. When approved, disposal of these materials or their
containers will be off site and conform to state and federal regulations.
1.15 Protection of Property
A. Initiate, maintain and supervise necessary protection to prevent damage, injury or loss to:
1. The Work and materials and equipment to be incorporated in the project, whether in storage on or
off the site: and
2. Property at the site or adjacent thereto, including fences, patios, driveways, sidewalks, pavement,
trees, shrubs, lawns, walks, structures, utilities and underground facilities not designated for
removal, relocation or replacement in the course of construction.
B. Maintain, protect, and support existing utilities and other appurtenances against damage by shoring,
bracing, or other means.
C. Do not stockpile excavated material against existing appurtenances.
1.16 Survey Requirements
A. Contractor shall perform all surveying necessary to complete the work.
1.17 Construction Superintendent
A. The construction superintendent shall be at the job site any time work is being accomplished by any of
the trades.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
DIVISION 1
SECTION 01010 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 Description of Work
A. The City of Fort Collins Trail Work 2006 Project includes two (2) sections of trail construction. The
Poudre Trail section is an asphalt to concrete conversion project and the Power Trail is a new trail
construction project. The contract documents provide information for the removal of the existing 8’
asphalt trail, subgrade preparations, construction of the 10’ wide colored concrete trail, construction of
the 8’ wide gray concrete sidewalk connection, minor earthwork, landscape restoration, erosion control
and seeding.
B. Protection and Restoration.
1. Replace to equal or better conditions all items removed and replaced or damaged during
construction. Restore all areas disturbed to match surrounding surface conditions.
1.02 Notices to Private Owners and Authorities
A. Notify private owners of adjacent property, utilities, affected governmental agencies, and school
district when execution of the work may affect them.
B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is
necessary to temporarily deny access or services.
C. Contact utilities at least 48 hours prior to excavating near underground utilities.
D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed
scope of work schedule and any items that would affect their daily operation.
E. Names and telephone numbers of affected agencies and utilities in the area are listed below for
Contractor's convenience.
Water - City of Fort Collins, Colorado 221-6681
Storm Sewer - City of Fort Collins, Colorado 221-6605
Sanitary Sewer - City of Fort Collins, Colorado 221-6681
Electrical - City of Fort Collins, Colorado 482-5922, 221-8553
Gas - Public Service Company of Colorado 482-5922, 221-8553
Telephone - U.S. West Communications 484-0300, 226-6310
Roads - City of Ft. Collins, Colorado 221-6815
Cable Television – AT&T Cable Services 493-7400
Utility Locates - One-call System 1-800-922-1987
Safety - Occupational Safety and Health Administration (OSHA) 844-3061
Fire - Poudre Fire Authority Non-Emergency 221-6581/ Emergency 911
Police - City of Fort Collins Police Department Non-Emergency 221-6550 / Emergency 911
Larimer County Sheriff's Department - Non-Emergency 221-7177
Postmaster - United States Postal Service 482-2837
Ambulance - Poudre Valley Hospital Non-Emergency 484-1227 / Emergency 911
Public Transportation - TransFort 221-6620
City of Fort Collins SECTION 01100 – SUMMARY OF WORK
Park Planning & Development Division Page 1 of 2
Traffic Control - Traffic Engineering 221-6815
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01100 – SUMMARY OF WORK
Park Planning & Development Division Page 2 of 2
DIVISION 1
SECTION 01160 – SITE CONDITIONS
PART 1 - SITE INVESTIGATIONS AND REPRESENTATION
1.01 General Investigations
A. The Contractor acknowledges that he has satisfied himself as to the nature and location of the work, the
general and local conditions, particularly those bearing upon access to the site; handling, storage, and
disposal of materials; availability of water, electricity and roads; uncertainties of weather, or similar
physical conditions at the site; the conformation and conditions of the ground; the equipment and
facilities needed preliminary to and during the execution of the work; and all other matters which can
in any way affect the work or the cost thereof under this Contract.
1.02 Soil Conditions
A. The Contractor further acknowledges that he has satisfied himself as to the character, quality and
quantity of surface and subsurface materials to be encountered from his inspection of the site and from
reviewing any available records of exploratory work furnished by the Owner or included in these
Documents. Failure by the Contractor to acquaint himself with the physical conditions of the site and
all the available information will not relieve him from responsibility for properly estimating the
difficulty or cost of successfully performing the work.
1.03 Contractor Representation
A. The Contractor warrants that as a result of his examination and investigation of all the aforesaid data
that he can perform the work in a good and workmanlike manner and to the satisfaction of the Owner.
The Owner assumes no responsibility for any representations made by any of its officers or agents
during or prior to the execution of this Contract, unless (1) such representations are expressly stated in
the Contract, and (2) the Contract expressly provides that the responsibility therefore is assumed by the
Owner.
PART 2 - INFORMATION ON SITE CONDITIONS
2.01 General
Any information obtained by the Engineer regarding site conditions, subsurface information,
groundwater elevations, existing construction of site facilities, and similar data will be available for
inspection, as applicable, at the office of the Engineer upon request. Such information is offered as
supplementary information only. Neither the Engineer nor the Owner assumes any responsibility for
the completeness or interpretation of such supplementary information.
A. Differing Subsurface Conditions:
1. In the event that the subsurface or latent physical conditions are found materially different from
those indicated in these Documents, and differing materially from those ordinarily encountered and
generally recognized as inherent in the character of work covered in these Contract Documents,
the Contractor shall promptly, and before such conditions are disturbed, notify the Owner in
writing of such changed conditions.
2. The Engineer will investigate such conditions promptly and following this investigation, the
Contractor shall proceed with the work, unless otherwise instructed by the Engineer. If the
Engineer finds that such conditions do so materially differ and cause an increase or decrease in the
cost of or in the time required for performing the work, the Engineer will recommend to the Owner
the amount of adjustment in cost and time he considers reasonable. The Owner will make the final
decision on all Change Orders to the Contract regarding any adjustment in cost or time for
completion.
City of Fort Collins SECTION 01160 – SITE CONDITIONS
Park Planning & Development Division Page 1 of 3
B. Underground Utilities:
1. Known utilities and structures adjacent to or encountered in the work are shown on the Drawings.
The locations shown are taken from existing records and the best information available from
existing utility plans, however, it is expected that there may be some discrepancies and omissions
in the locations and quantities of utilities and structures shown. Those shown are for the
convenience of the Contractor only, and no responsibility is assumed by either the Owner or the
Engineer for their accuracy or completeness.
PART 3 - CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE
3.01 General
A. Where the Contractor's operations could cause damage or inconvenience to railway, telegraph,
telephone, television, oil, gas, electricity, water, sewer, or irrigation systems, the operations shall be
suspended until all arrangements necessary for the protection of these utilities and services have been
made by the Contractor.
B. Notify all utility offices which are affected by the construction operation at least 48 hours in advance.
Under no circumstances expose any utility without first obtaining permission from the appropriate
agency. Once permission has been granted, locate, expose, and provide temporary support for all
existing underground utilities.
C. The Contractor shall protect all utility poles from damage. If interference of power poles, telephone
poles, guy wires, or anchors are encountered, notify the Owner’s Representative and the appropriate
utility company at least 48 hours in advance of construction operations to permit the necessary
arrangements for protection or relocation of the interfering structure.
D. The Contractor shall be solely and directly responsible to the Owner and operators of such properties
for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character
brought because of any injuries or damage which may result from the construction operations under
this Contract.
E. Neither the Owner nor its officers or agents shall be responsible to the Contractor for damages as a
result of the Contractor's failure to protect utilities encountered in the work.
F. If the Contractor while performing the Contract discovers utility facilities not identified in the
Drawings or Specifications, he shall immediately notify the Owners and the utility in writing.
G. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result of
accidental breakage due to construction operations, promptly notify the proper authority. Cooperate
with said authority in the restoration of service as promptly as possible and bear all costs of repair. In
no case shall interruption of any water or utility service be allowed to exist outside working hours
unless prior approval is granted.
H. The Contractor shall replace, at his own expense, any and all other existing utilities or structures
removed or damaged during construction, unless otherwise provided for in these Contract Documents
or ordered by the Engineer.
3.02 Interfering Structures
A. Take necessary precautions to prevent damage to existing structures whether on the surface,
aboveground, or underground. An attempt has been made to show major structures on the Drawings.
The completeness and accuracy cannot be guaranteed, and it is presented simply as a guide to avoid
known possible difficulties.
3.03 Field Relocation
A. During the progress of construction, it is expected that minor relocations of the work will be necessary.
Such relocations shall be made only by direction of the Owner’s Representative. If existing structures
are encountered that prevent the construction, and that are not properly shown on the Drawings, notify
the Owner’s Representative before continuing with the construction in order that the Owner’s
City of Fort Collins SECTION 01160 – SITE CONDITIONS
Park Planning & Development Division Page 2 of 3
Representative may make such field revision as necessary to avoid conflict with the existing structures.
If the Contractor shall fail to so notify the Owner’s Representative when an existing structure is
encountered, and shall proceed with the construction despite the interference, he shall do so at his own
risk.
3.04 Easements
A. Easements and permits will be obtained by the Owner where portions of the work are located on public
or private property Easements will provide for the use of the property for construction purposes to the
extent indicated on the easements. Copies of these easements and permits are available upon request to
the Owner. It shall be the Contractor's responsibility to determine the adequacy of the easement
obtained in every case and to abide by all requirements and provisions of the easement. The Contractor
shall confine his construction operations to within the easement limits or make special arrangements
with the property owners or appropriate public agency for the additional area required. Any damage to
property, either inside or outside the limits of the easements provided by the Owner, shall be the
responsibility of the Contractor as specified herein. The Contractor shall remove, protect, and replace
all fences or other items encountered on public or private property. Before final payment will be
authorized by the Owner’s Representative, the Contractor will be required to furnish the Owner with
written releases from property owners or public agencies where side agreements or special easements
have been made by the Contractor or where the Contractor's operations, for any reason, have not been
kept within the construction right-of-way obtained by the Owner.
B. It is anticipated that the required easements and permits will be obtained before construction is started.
However, should the procurement of any easement or permit be delayed, the Contractor shall schedule
and perform the work around these areas until such a time as the easement or permit has been secured.
3.05 Land Monuments
A. The Contractor shall notify the Owner’s Representative of any existing Federal, State, Town, County,
and private land monuments encountered. Private monuments shall be preserved, or replaced by a
licensed surveyor at the Contractor's expense. When Government monuments are encountered, the
Contractor shall notify the Owner’s Representative at least two (2) weeks in advance of the proposed
construction in order that the Owner’s Representative will have ample opportunity to notify the proper
authority and reference these monuments for later replacement.
END OF SECTION
City of Fort Collins SECTION 01160 – SITE CONDITIONS
Park Planning & Development Division Page 3 of 3
DIVISION 1
SECTION 01200 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.01 Description
A. This section covers the methods employed in determining the payment due for work completed under
this contract.
B. The bid price should cover all work required by this contract based upon the quantities outlined in the
bid form.
C. Where actual quantities differ from those outlined in the bid form; unit prices as stipulated in the bid
form shall be utilized to compute payment.
D. Where unit prices are not set forth on specific work, that work shall be considered a subsidiary
obligation of the Contractor.
E. Quantities given in the bid form are estimates for the purpose of evaluating bids consequently some
difference may arise in actual and bid quantities.
1.02 Lump Sum Prices
A. Where lump sum (LS) prices are given for an item in the bid schedule or for items added during
construction by change order, the price will include all materials, labor, overhead and any other cost
incurred to complete the construction of the item in accordance with the plans and specifications.
B. All unit prices for each item shall include its pro rata share of profits, taxes, and overhead, and are for
the items installed in place, maintained and guaranteed. Including these factors, unit prices must
accurately reflect actual costs. Unit prices are to be valid for the life of the contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
City of Fort Collins SECTION 01200 – MEASUREMENT AND PAYMENT
Park Planning & Development Division Page 1 of 1
City of Fort Collins SECTION 01300 – COORDINATION AND PROJECT MEETINGS
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01300 – COORDINATION AND PROJECT MEETINGS
PART 1 - GENERAL
1.01 General
A. In order to provide for an orderly progression of work, all parties involved in the construction will meet
at various times during the project to discuss pertinent items regarding the work.
B. Coordinate operations under contract in a manner that will facilitate progress of the Work.
C. Conform to the requirements of public utilities and concerned public agencies in respect to the timing
and manner of performance of operations that affect the service of such utilities, agencies, or public
safety.
1.02 Conferences
A. The pre-construction conference will be held at a time to be determined by the Owner, after the award
of the contract and prior to the issuance of the Notice to Proceed. The meeting will involve the Owner,
the Engineer, the Contractor and representatives of the owners of utilities and other properties that will
be directly affected by the work. Among the Contractor’s representative on the site. The Contractor
will have a complete construction schedule ready for review at the time of the pre-construction
conference.
B. Hold conferences for coordination of the Work when necessary.
C. The City may hold coordination conferences to be attended by all involved when Contractor's
operations affects, or is affected by, the work of others.
1.03 Progress Meetings
A. Contractor and the City shall schedule and hold regular progress meetings at least weekly and at other
times as requested by the City or required by the progress of the Work.
B. Attendance shall include:
1. Contractor and Superintendent
2. Owners Representative
3. Landscape Architect or Engineer
4. Others as may be requested by contractor, Landscape Architect or Owner
C. Minimum Agenda shall include:
1. Review of work progress since last meeting
2. Identification and discussion of problems affecting progress
3. Review of any pending change orders
4. Revisions of Construction Schedule as appropriate
1.04 Job Site Administration
A. Contract administration and construction observation services will be provided by the Owner. The
Owner will make decisions regarding changes in the work and adjustments in contract quantities and/or
unit prices.
END OF SECTION
DIVISION 1
SECTION 01310 - CONSTRUCTION SCHEDULES
PART 1 - GENERAL
1.01 General
A. Prepare detailed schedule of all construction operations and procurements after review of tentative
schedule by parties attending the pre-construction conference. No work is to begin at the site until
City's acceptance of the Construction Schedule.
B. For special restrictions on float and time extensions reference is made to the Agreement.
1.02 Format and Submissions
A. Prepare Construction and Procurement schedules in a graphic format suitable for displaying schedule
and actual progress.
B. Submit two copies of each schedule to owner for review. Owner will return one copy to contractor with
revisions suggested or necessary for coordination of the Work with the needs of Owner or others.
1.03 Progress Revisions
A. Submit revised schedules and reports when changes are foreseen, when requested by City, and with
each application for progress payment.
B. Show changes occurring since previous submission.
1. Actual progress of each item to date.
2. Revised projections of progress and completion.
C. Provide a narrative report as needed to define:
1. Anticipated problems, recommended actions, and their effects on the schedule.
2. The effect of changes on schedules of other work.
1.04 City's Responsibility
A. City's review is only for the purpose of checking conformity with the Contract Documents and
assisting Contractor in coordinating the Work with the needs of the Project.
B. It is not to be construed as relieving Contractor from any responsibility to determine the means,
methods, techniques, sequences, and procedures of construction as provided in the General Conditions.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01310 – CONSTRUCTION SCHEDULES
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01330 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
PART 1 - GENERAL
1.01 Shop Drawings
A. Submit newly prepared information drawn accurately to scale. Highlight, encircle, or otherwise
indicate deviations from the Contract Documents. Do not reproduce Contract Documents or copy
standard information as the basis of Shop Drawings. Standard information prepared without specific
reference to the Project is not a Shop Drawing.
B. Shop Drawings include fabrication and installation Drawings, setting diagrams, schedules, patterns,
templates, and similar Drawings. Include the following information:
1. Dimensions.
2. Identification of products and materials included by sheet and detail number.
3. Compliance with specified standards.
4. Notation of coordination requirements.
5. Notation of dimensions established by field measurement.
6. Sheet Size: Except for templates, patterns and similar full-size Drawings, submit Shop Drawings
on sheets at least 8-1/2 by 11 inches but no larger than 24 by 36 inches.
7. Submittal: Submit 3 blue- or black-line prints and 2 additional prints where required for
maintenance manuals, plus the number of prints needed by the Contractor for distribution. The
Owner’s Representative will retain 2 prints and return the remainder.
a. One of the prints returned shall be marked up and maintained as a “Record Document.”
8. Do not use Shop Drawings without an appropriate final stamp indicating action taken.
1.02 Product Data
A. Collect Product Data into a single submittal for each element of construction or system. Product Data
includes printed information, such as manufacturer’s installation instructions, catalog cuts, standard
color charts, roughing-in diagrams and templates, standard wiring diagrams, and performance curves.
1. Mark each copy to show applicable choices and options. Where printed Product Data includes
information on several products that are not required, mark copies to indicate the applicable
information. Include the following information:
a. Manufacturer’s printed recommendations.
b. Compliance with trade association standards.
c. Compliance with recognized testing agency standards.
d. Application of testing agency labels and seals.
e. Notation of dimensions verified by field measurement.
f. Notation coordination requirements.
2. Do not submit Product Data until compliance with requirements of the Contract Documents has
been confirmed.
City of Fort Collins SECTION 01330 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 1 of 3
3. Preliminary Submittal: Submit a preliminary single copy of Product Data where selection of
options is required.
4. Submittals: Submit 2 copies of each required submittal; submit 4 copies where required for
maintenance manuals plus additional copies as needed by the Contractor for distribution. The
Owner will retain one and will return the other marked with action taken and corrections or
modifications required.
5. Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers,
manufacturers, fabricators, and others required for performance of construction activities. Show
distribution on transmittal forms.
a. Do not proceed with installation until a copy of Product Data is in the Installer’s possession.
b. Do not permit use of unmarked copies of Product Data in connection with construction.
1.03 Samples
A. Submit full-size, full-fabricated Samples cured and finished as specified and physically identical with
the material or product proposed. Samples include partial sections of manufactured or fabricated
components, cuts or containers of materials, color range sets, and swatches showing color, texture, and
pattern.
1. Mount or display Samples in the manner to facilitate review of qualities indicated. Include the
following:
a. Specification Section number and reference.
b. Generic description of the Sample.
c. Sample source.
d. Product name or name of the manufacturer.
e. Compliance with recognized standards.
f. Availability and delivery time.
2. Submit Samples for review of size, kind, color, pattern, and texture. Submit Samples for a final
check of these characteristics with other elements and a comparison of these characteristics
between the final submittal and the actual component as delivered and installed.
a. Where variation in color, pattern, or other characteristic is inherent in the material or product
represented, submit at least 3 multiple units that show approximate limits of the variations.
b. Refer to other Specification Sections for requirements for Samples that illustrate
workmanship, fabrication techniques, details of assembly, connections, operation, and similar
construction characteristics.
c. Refer to other Sections for Samples to be returned to the Contractor for incorporation in the
Work. Such Samples must be undamaged at time of use. On the transmittal, indicated special
requests regarding disposition of Sample submittals.
d. Samples not incorporated into the Work, or otherwise designated as the Owner’s property, are
the property of the Contractor and shall be removed from the site prior to Substantial
Completion.
3. Preliminary Submittals: Submit a full set of choices where Samples are submitted for selection of
color, pattern, texture, or similar characteristics from a range of standard choices. The Owner will
review and return preliminary submittals with the Owner’s notation, indicating selection and other
action.
City of Fort Collins SECTION 01330 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 2 of 3
4. Submittals: Except for Samples illustrating assembly details, workmanship, fabrication
techniques, connections, operation, and similar characteristics, submit 3 sets. The Owner will
return one set marked with the action taken.
5. Maintain sets of Samples, as returned, at the Project Site, for quality comparisons throughout the
course of construction.
a. Unless noncompliance with Contract Document provisions is observed, the submittal may
serve as the final submittal.
b. Sample sets may be used to obtain final acceptance of the construction associated with each
set.
B. Distribution of Samples: Prepare and distribute additional sets to subcontractors, manufacturers,
fabricators, suppliers, installers, and others as required for performance of the Work. Show distribution
on transmittal forms.
1.04 Quality Assurance Submittals
A. Submit quality-control submittals, including design data, certifications, manufacturer’s instructions,
manufacturer’s field reports, and other quality-control submittals as required under other Sections of
the Specifications.
B. Certifications: Where other Sections of the Specifications require certification that a product, material,
or installation complies with specified requirements, submit a notarized certification from the
manufacturer certifying compliance with specified requirements.
1. Signature: an officer of the manufacturer or other authorized individual shall sign Certification
documents.
C. Inspection and Test Reports: Requirements for submittal of inspection and test reports from
independent testing agencies are specified in Division 1 Section “Quality Control and Testing,” and in
the applicable technical specifications.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01330
City of Fort Collins SECTION 01330 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 3 of 3
DIVISION 1
SECTION 01340 - SURVEY DATA
PART 1 - GENERAL
1.01 Survey Requirements
A. Contractor is not responsible for the layout of the trail work. The City will provide field staking.
B. Base all measurements, both horizontal and vertical, on established control points. Verify all
established control points at site prior to laying out the work.
C. Perform layout of the Work with qualified personnel.
1. At minimum stake concrete sidewalks at grade changes, changes in horizontal alignment, and at
25-foot stations along the sidewalk centerline.
D. All field books, notes, and other data developed by Contractor in performing surveys required by the
Work will be available to City for examination throughout the construction period.
1.02 Submittals
A. Submit to City all survey data with other documentation required for final acceptance.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01340 – SURVEY DATA
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01400 - QUALITY CONTROL AND TESTING
PART 1 - GENERAL
1.01 General
A. Provide such equipment and facilities as the City may require for conducting field tests and for collecting
and forwarding samples. Do not use any materials or equipment represented by samples until tests, if
required, have been made and the materials or equipment are found to be acceptable. Any product that
becomes unfit for use after approval hereof shall not be incorporated into the work.
B. All materials or equipment proposed to be used may be tested at any time during their preparation or use.
Furnish the required samples without charge and give sufficient notice of the placing of orders to permit the
testing. Products may be sampled either prior to shipment or after being received at the site of the work.
C. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise provided,
sampling and testing of all materials and the laboratory methods and testing equipment shall be in
accordance with the latest standards and tentative methods of the American Society for Testing Materials
(ASTM).
D. Where additional or specified information concerning testing methods, sample sizes, etc., is required, such
information is included under the applicable sections of the Specifications. Any modification of, or
elaboration on, these test procedures which may be included for specific materials under their respective
sections in the Specifications shall take precedence over these procedures.
1.02 Test Reports
A. Submit 2 copies of the reports of all tests made by testing laboratories, plus copies to be returned to the
contractor.
1.03 City's Responsibilities
A. City of Fort Collins shall be responsible for and shall pay all costs in connection with the following testing:
1. Soils compaction tests.
2. Tests not called for by the Specifications of materials delivered to the site.
3. Concrete test
1.04 Contractor’s Responsibilities
A. In addition to those inspections and tests called for in the General Conditions, Contractor shall also be
responsible for and shall pay all costs in connection with testing required for the following:
1. All performance and field testing specifically called for by the specifications.
2. All re-testing for Work or materials found defective or unsatisfactory, including tests covered under
1.03 above.
3. Testing of pipe.
4. Vacuum testing of manholes.
5. Concrete materials and mix designs.
6. Gradation tests for embedment, fill and backfill materials.
7. Material Substitution - any test for basic material or fabrication of equipment offered as a substitution
for a specified item on which a test may be required in order to prove it compliant with the
specifications.
City of Fort Collins SECTION 01400 – QUALITY CONTROL AND TESTING
Park Planning & Development Division Page 1 of 2
Nothing contained herein is intended to imply that the Contractor does not have the right to have tests
performed on any material at any time for his/her own information and job control so long as the Owner
does not assume responsibility for the cost or for giving them consideration when appraising quality
materials.
1.05 Transmittal of Test Reports
A. Submit 2 copies of each report of tests and engineering data furnished by the Contractor for City
Representative’s review. The Owner’s Representative will retain one and will return the other marked with
action taken and corrections or modifications required.
B. The testing laboratory retained by the Owner will furnish three (3) copies of a written report of each test
performed by laboratory personnel in the field or laboratory. Two (2) copies of each test report will be
transmitted to the City Representative and one (1) copy to the Contractor within seven (7) days after each
test is completed.
1.06 Contractor's Quality Control System
A. General: The Contractor shall establish a quality control system to perform sufficient inspection and tests of
all items of work, including that of his subcontractors, to ensure conformance to the functional performance
of this project. This control shall be established for all construction except where the Contract Documents
provide for specific compliance tests by testing laboratories or engineers employed by the City. Contractor's
control system shall specifically include all testing required by the various sections of the Specifications.
B. Contractor's quality control system is the means by which he assures himself that his construction complies
with the requirements of the Contract Documents. Controls shall be adequate to cover all construction
operations and should be keyed to the proposed construction schedule.
C. Records: maintain correct records on an appropriate form for all inspections and tests performed, instructions
received from the City and actions taken as a result of those instructions. These records shall include
evidence that the required inspections or tests have been performed (including type and number of
inspections or test, nature of defects, causes for rejection, etc.) proposed or directed remedial action, and
corrective action taken. Document inspections and tests as required by each section of the Specifications.
Provide copies to City in a reasonable time.
D. Pipe alignment and grade is to be maintained through the use of suitable surveying instruments or laser
equipment operated continuously during construction. Horizontal tolerances of + 0.3 feet and vertical
tolerances of + 0.1 feet maximum deviation from plan and construction staking are to be maintained, except
that visible “snaking” of the horizontal alignment and changes in directions of slope will not be permitted.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01400 – QUALITY CONTROL AND TESTING
Park Planning & Development Division Page 2 of 2
City of Fort Collins SECTION 01500 – TEMPORARY CONTROLS
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01500 - TEMPORARY CONTROLS
1.01 Noise Control
A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed
in populated areas.
B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and
operated in a manner to cause the least noise consistent with efficient performance of the work.
C. Cease operation of all machinery and vehicles between the hours of 6:00 p.m. and 7:00 a.m.
1.02 Dust Control
A. Dusty materials in piles or in transit shall be covered to prevent blowing.
B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be
kept moist with water or by application of a chemical dust suppressant.
1. Chemical dust suppressant shall not be injurious to existing or future vegetation.
1.03 Pollution Control
A. Prevent the pollution of drains and watercourses by sanitary wastes, concrete, sediment, debris and
other substances resulting from construction activities.
1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the
site.
2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and
culverts.
1.04 Erosion Control
A. Take such measures as are necessary to prevent erosion of soil that might result from construction
activities.
1. Measures in general will include:
a. Control of runoff.
b. Trapping of sediment.
c. Minimizing area and duration of soil exposure.
d. Temporary materials such as hay bales, sandbags, plastic sheets, riprap or culverts to prevent
the erosion of banks and beds of watercourses or drainage swales where runoff will be
increased due to construction activities.
B. Preserve natural vegetation to the greatest extent possible.
C. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize
erosion.
D. Comply with the City of Fort Collins' Storm Drainage Erosion Control Manual.
END OF SECTION
City of Fort Collins SECTION 01510 - TEMPORARY UTILITIES
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01510 - TEMPORARY UTILITIES
PART 1 - GENERAL
1.01 Utilities
A. Furnish all utilities necessary for construction including, but not limited to temporary electric power
and pay all cost associated with utilities during and used for the contract period. All temporary utilities
installation shall meet the construction safety requirements of OSHA, State and local governing
agencies.
1.02 Water
A. Contractor is responsible for obtaining water for construction and shall pay all costs associated with
establishing a temporary meter used during construction.
1.03 Sanitary Facilities
A. Furnish temporary sanitary facilities at the site in the vicinity of the construction for the needs of
construction workers and others performing work or furnishing services on the Project.
B. Properly maintain sanitary facilities of reasonable capacity throughout construction periods.
C. Enforce the use of such sanitary facilities by all personnel at the site.
D. Obscure sanitary facilities from public view to the greatest extent practical.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01570 - TRAFFIC CONTROL
Park Planning & Development Division Page 1 of 2
DIVISION 1
SECTION 01570 - TRAFFIC CONTROL
PART 1 - GENERAL
1.01 General
A. Traffic Control necessary to complete the project as depicted in the plans and specifications will be
provided by the Contractor and will not be paid for separately.
B. The Contractor must submit traffic control plans and coordinate all traffic control with the City's
Traffic Control Coordinator. The traffic control plans must he submitted and approved 72 hours prior to
starting construction and before making each modification.
C. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Manual of Uniform Traffic
Control Devices (U.S. Dept. of Transportation), or applicable statutory requirements of authority
having jurisdiction.
D. Limited closures may be permitted for short periods up to three days to allow installation of concrete
pavement. Closures must be requested and approved 72 hours prior to anticipated closure.
E. Limited alternating one-way traffic operation may be permitted during the hours from 9:00 A.M. to
3:30 P.M. One-way traffic operation must be requested and approved 72 hours prior to anticipated
operation.
F. At all times, Contractor must maintain two-way traffic with a minimum of one lane of traffic in each
direction. Limited closures may be allowed.
G. The Contractor must coordinate with adjacent residents to provide and maintain them sufficient access
during the duration of the project. It will be the Contractor's responsibility to coordinate and
communicate with the residents during construction.
H. Keep traffic areas free of excavated material, construction equipment, pipe, and other materials and
equipment.
I. Keep fire hydrants and utility control devices free from obstruction and available for use at all times.
J. Conduct operations in a manner to avoid unnecessary interference with public and private roads and
drives.
K. Provide and maintain temporary approaches or crossings at streets, businesses, and residences.
L. Keep roads open and in acceptable condition, unless closure or detour has been approved by City's
Traffic Control Coordinator 72 hours prior to closure or detour.
M. Define a temporary pedestrian access route for children coming from the surrounding neighborhoods.
This pedestrian access route shall be located outside of the project limits. The pedestrian access route
shall be kept free of excavated material, construction equipment, pipe, and other materials.
1.02 Traffic Control Plan
A. Submit a detailed traffic control plan to Traffic Control Coordinator for review and acceptance. Plan
must be accepted 72 hours prior to work commencing at the site. Maintain the accepted plan
throughout all phases of construction. Provide copy to Owner prior to submittal.
1. Notify parks dept, police, sheriff, ambulance services, and fire authorities of traffic control plan
and the schedule of it. Distribute copies if requested.
1.03 Flagmen
A. Required where necessary to provide for public safety, or the regulation of traffic, or by jurisdictional
authorities.
City of Fort Collins SECTION 01570 - TRAFFIC CONTROL
Park Planning & Development Division Page 2 of 2
B. Shall be properly equipped and licensed.
1.04 Warning Signs and Lights
A. Provide suitable barricades and warning signs for:
1. Open trenches and other excavations.
2. Obstructions, such as material piles, equipment, piled embankment.
B. Illuminate by means of warning lights all barricades and obstructions from sunset to sunrise.
C. Protect roads and driveways by effective barricades on which are placed acceptable warning signs.
1.05 Parking
A. Provide suitable parking areas for the use of all construction workers and others performing work or
furnishing services in connection with the Project so as to avoid interference with private property,
public traffic, City's operations, or construction activities. Such parking shall occur on the project site
or another suitable location, approved by the City.
1.06 Roadway Usage between Operations
A. At all times when Work is not actually in progress, Contractor shall make passable and shall open to
traffic such portions of the Project and temporary roadways or portions thereof as may be agreed upon
between Contractor and City and all authorities having jurisdiction over any properties involved.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01600 – MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 1 of 3
DIVISION 1
SECTION 01600 – MATERIALS AND EQUIPMENT
PART 1 - GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
other Division 1 Specification Sections, apply to this Section.
1.02 Summary
A. This Section includes administrative and procedural requirements governing the Contractor’s selection
of products for use in the Project.
1.03 Definitions
A. Definitions used in this Article are not intended to change the meaning of other terms used in the
Contract Documents, such as “specialties,” “systems,” “structure,” “finishes,” “accessories,” and
similar terms. Such terms are self-explanatory and have well-recognized meanings in the construction
industry.
1. “Products” are items purchased for incorporation in the Work, whether purchased for the Project
or taken from previously purchased stock. The term “product” includes the terms “material,”
“equipment,” “systems,” and terms of similar intent.
2. “Materials” are products substantially shaped, cut, worked, mixed, finished, refined, or otherwise
fabricated, processed, or installed to form a part of the Work.
3. “Equipment” is a product with operational parts, whether motorized or manually operated, that
requires service connections, such as wiring or piping.
1.04 Submittals
A. Product List: Prepare a list showing products specified in tabular form acceptable to the Owner.
Include generic names of products required. Include the manufacturer’s name and proprietary product
names for each item listed.
1. Coordinate product list with the Contractor’s Construction Schedule and the Schedule of
Submittals.
2. Form: Prepare product list with information on each item tabulated under the following column
headings:
a. Related Specifications Section number.
b. Generic name used in Contract Documents.
c. Proprietary name, model number, and similar designations.
d. Manufacturer’s name and address.
e. Supplier’s name and address.
f. Installer’s name and address.
g. Projected delivery date or time span of delivery period.
3. Initial Submittal: Within 30 days of date commencement of the Work, submit 3 copies of an initial
product list. Provide a written explanation of omissions of data and for known variations from
Contract requirements.
City of Fort Collins SECTION 01600 – MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 2 of 3
4. Complete List: Within 60 days after date of commencement of the Work, submit 3 copies of the
completed product list. Provide a written explanation for omissions of data and for known
variations from Contract requirements.
5. Owner’s Action: The Owner will respond in writing to Contractor within 2 weeks of receipt of the
completed product list. No response within this period constitutes no objection to listed
manufacturers or products, but does not constitute a waiver of the requirement that products
comply with Contract Documents. The Owner’s response will include a list of unacceptable
product selections, containing a brief explanation of reasons for this action.
1.05 Quality Assurance
A. Source Limitations: To the fullest extent possible, provide products of the same kind from a single
source.
B. Compatibility of Options: When the Contractor is given the option of seeking between 2 or more
products for use on the Project, the product selected shall be compatible with products previously
selected, even if previously selected products were also options.
C. Foreign Product Limitations: Except under one or more of the following conditions provide domestic
products, not foreign products, for inclusion in the Work:
1. Not available domestic product complies with the Contract Documents.
2. Domestic products that comply with the Contract Documents are available only at prices or terms
substantially higher than foreign products that comply with the Contract Documents.
1.06 Product Delivery, Storage and Handling
A. Delivery, store, and handle products according to the manufacturer’s recommendations, using means
and methods that will prevent damage, deterioration, and loss, including theft.
1. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of
construction spaces.
2. Coordinate delivery with installation time to assure minimum holding time for items that are
flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.
3. Delivery products to the site in an undamaged condition in the manufacturer’s original sealed
container or other packaging system, complete with labels and instructions for handling, storing,
unpacking, protecting, and installing.
4. Inspect products upon delivery to ensure compliance with the Contract Documents and to ensure
that products are undamaged and properly protected.
5. Store products at the site in a manner that will facilitate inspection and measurement of quantity or
counting of units.
6. Store heavy materials away from the Project structure in a manner that will not endanger the
supporting construction.
7. Store products subject to damage by the elements above ground, under cover in a weather-tight
enclosure, with ventilation adequate to prevent condensation.
PART 2 - PRODUCTS
2.01 Product Selection
A. General Product Requirements: Provide products that comply with the Contract Documents, that are
undamaged and, unless otherwise indicated, new at the time of installation.
B. Product Selection procedures: The Contract Documents and governing regulations govern product
selection. Procedures governing product selection include the following:
City of Fort Collins SECTION 01600 – MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 3 of 3
1. Proprietary Specification Requirements: Where Specifications name only a single product or
manufacturer, provide the product indicated. No substitutions will be permitted.
2. Semiproprietary Specification Requirements: Where Specifications name 2 or more products or
manufacturers or where Specifications specify products or manufacturers by name, accompanied
by the term “or equal” or “or approved equal,” provide one of the products listed or comply with
the Contract Document provisions concerning “substitutions” or obtain approval for use of an
unnamed product.
3. Nonproprietary Specification Requirements: When Specifications list products or manufacturers
that are available and may be incorporated in the Work, but do not restrict the Contractor to use
these products only, the Contractor may propose any available product that complies with Contract
requirements. Comply with Contract Document provisions concerning “substitutions” to obtain
approval for use of an unnamed product.
4. Descriptive Specification Requirements: Where Specifications describe a product or name, provide
a product or assembly that provides the characteristics and otherwise complies with Contract
requirements.
5. Compliance with Standards, Codes, and Regulations: Where Specifications only require
compliance with an imposed code, standard, or regulation, select a product that complies with the
standards, codes, or regulations specified.
6. Visual Matching: Where Specifications require matching an established Sample, the Owner’s
decision will be final on whether a proposed product matches satisfactorily.
7. Visual Selection: Where specified product requirements include the phrase “… as selected from
manufacturer’s standard colors, patterns, textures…” or a similar phrase, select a product and
manufacturer that complies with other specified requirements. The Owner will select the color,
pattern, and texture from the product line selected.
PART 3 - EXECUTION
3.01 Installation of Products
A. Comply with manufacturer’s instructions and recommendations for installation of products in the
applications indicated. Anchor each product securely in place, accurately located and aligned with
other Work.
END OF SECTION
DIVISION 1
SECTION 01700 – CONTRACT CLOSEOUT
PART 1 – GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including general and supplementary conditions and
other Division 1 specification sections, apply to this section.
1.02 Summary
A. This Section includes administrative and procedural requirements for contract closeout including, but
not limited to, the following:
1. Inspection procedures.
2. Project record document submittal.
3. Operation and maintenance manual submittal.
4. Submittal of warranties.
5. Final cleaning.
B. Closeout requirements for specific construction activities are included in the appropriate Sections in
Divisions 2 through 16.
1.03 Substantial Completion
A. Preliminary Procedures: Before requesting inspection for certification of Substantial Completion,
complete the following. List exceptions in the request.
1. In the Application for Payment that coincides with, or first follows, the date Substantial
Completion is claimed, show 100 percent completion for the portion of the Work claimed as
substantially complete.
2. Advise the Owner of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and
similar documents.
4. Obtain and submit releases enabling the Owner unrestricted use of the Work and access to services
and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Submit record drawings, maintenance manuals, final project photographs, damage or settlement
surveys, property surveys, and similar final record information.
6. Deliver tools, spare parts, extra stock, and similar items.
7. Make final changeover of permanent locks and transmit keys to the Owner. Advise the Owner’s
personnel of changeover in security provisions.
8. Complete startup testing of systems and instruction of the Owner’s operation and maintenance
personnel. Discontinue and remove temporary facilities from the site, along with mockups,
construction tools, and similar elements.
9. Complete final cleanup requirements, including touchup painting.
10. Touch up and otherwise repair and restore marred, exposed finishes.
B. Inspection Procedures: On receipt of a request for inspection, the Owner will either proceed with
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 1 of 6
inspection or advise the Contractor of unfilled requirements. The Owner will prepare the Certificate of
Substantial Completion following inspection or advise the Contractor of construction that must be
completed or corrected before the certificate will be issued.
1. If the Owner’s Representative determines that the work is not substantially complete at the time of
review or that deficiencies remain at time of compliance review, the Contractor shall pay for the
additional review(s) by Owner’s Representative.
2. Results of the completed inspection will form the basis of requirements for final acceptance.
1.04 Status after Substantial Completion
A. The date of substantial completion marks the beginning of the maintenance period defined in Section
02970 – Planting Maintenance.
B. During maintenance period, the following conditions hold:
1. Insurance: Same as during construction.
2. Electricity and Irrigation Water: Supplied by Owner, as installed by Contractor under this contract.
3. Bonds: Remain in effect.
4. Retainage: Same as during construction.
1.05 Final Acceptance
A. Preliminary Procedures: Before requesting final inspection for certification of final acceptance and
final payment, complete the following. List exceptions in the request.
1. Submit the final payment request with releases and supporting documentation not previously
submitted and accepted. Include insurance certificates for products and completed operations
where required.
2. Submit an updated final statement, accounting for final additional changes to the Contract Sum.
3. Submit a certified copy of the Owner’s final inspection list of items to be completed or corrected,
endorsed and dated by the Owner. The certified copy of the list shall state that each item has been
completed or otherwise resolved for acceptance and shall be endorsed and dated by the Owner.
4. Submit final meter readings for utilities, a measured record of stored fuel, and similar data as of the
date of Substantial Completion or when the Owner took possession of and assumed responsibility
for corresponding elements of the Work.
5. Submit consent of surety to final payment.
6. Submit a final liquidated damages settlement statement.
7. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
B. Reinspection Procedure: The Owner will reinspect the Work upon receipt of notice that the Work,
including inspection list items from earlier inspections, has been completed, except for items whose
completion is delayed under circumstances acceptable to the Owner.
1. Upon completion of reinspection, the Owner will prepare a certificate of final acceptance. If the
Work is incomplete, the Owner will advise the Contractor of Work that is incomplete or of
obligations that have not been fulfilled but are required for final acceptance.
2. If necessary, reinspection will be repeated.
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 2 of 6
1.06 Record Document Submittals
A. General: Do not use record documents for construction purposes. Protect record documents from
deterioration and loss in a secure, fire-resistant location. Provide access to record documents for the
Owner’s reference during normal working hours.
B. Record Drawings: Maintain a clean, undamaged set of blue or black line white-prints of Contract
Drawings and Shop Drawings. Mark the set to show the actual installation where the installation varies
substantially from the Work as originally shown. Mark which drawing is most capable of showing
conditions fully and accurately. Where Shop Drawings are used, record a cross-reference at the
corresponding location on the Contract Drawings. Give particular attention to concealed elements that
would be difficult to measure and record at a later date.
1. Mark record sets with red erasable pencil. Use other colors to distinguish between variations in
separate categories of the Work.
2. Mark new information that is important to the Owner but was not shown on Contract Drawings or
Shop Drawings.
3. Note related change-order numbers where applicable.
4. Organize record drawing sheets into manageable sets. Bind sets with durable-paper cover sheets;
print suitable titles, dates, and other identification on the cover of each set.
5. Prior to Contract Closeout, obtain from the Owner a reproducible mylar copy of the Drawings.
Using technical drafting pen, duplicate information contained on the Record Drawings maintained
on site.
Label each sheet “Record Drawing.” On the first sheet, the Contractor or resident
Superintendent shall execute the following statement:
Having reviewed this document and all attachments, I affirm that, to the best of my knowledge, the
information presented here is true and accurate.
Signed: Date:
Position:
C. Record Specifications: Maintain one complete copy of the Project Manual, including addenda. Include
with the Project Manual one copy of other written construction documents, such as Change Orders and
modifications issued in printed form during construction.
1. Mark these documents to show substantial variations in actual Work performed in comparison
with the text of the Specifications and modifications.
2. Give particular attention to substitutions and selection of options and information on concealed
construction that cannot otherwise be readily discerned later by direct observation.
3. Note related record drawing information and Product Data.
4. Upon completion of the Work, submit record Specifications to the Owner.
D. Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders
and markup of record drawings and Specifications.
1. Mark these documents to show significant variations in actual Work performed in comparison with
information submitted. Include variations in products delivered to the site and from the
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 3 of 6
manufacturer’s installation instructions and recommendations.
2. Give particular attention to concealed products and portions of the Work that cannot otherwise be
readily discerned later by direct observation.
3. Upon completion of markup, submit complete set of record Product Data to the Owner.
E. Miscellaneous Record Submittals: Refer to other Specification Sections for requirements of
miscellaneous record keeping and submittals in connection with actual performance of Work.
Immediately prior to the date or dates of Substantial Completion, complete miscellaneous records and
place in good order. Identify miscellaneous records properly and bind or file, ready for continued use
and reference. Submit to the Owner.
F. Maintenance Manuals: Organize operation and maintenance data into suitable sets of manageable size.
Bind properly indexed data in individual, heavy-duty, 2-inch (51-mm), 3-ring, vinyl-covered binders,
with pocket folders for folded sheet information. Mark appropriate identification on front and spine of
each binder. Include the following types of information:
1. Emergency instructions.
2. Spare parts list.
3. Copies of warranties.
4. Wiring diagrams.
5. Recommended “turn-around” cycles.
6. Inspection procedures.
7. Shop Drawings and Product Data.
8. Fixture lamping schedule.
1.07 Warranties and Bonds
A. Provide duplicate notarized copies. Maintain copies of all Contractor’s submittals and assemble
documents executed by subcontractors, suppliers, and manufacturers. Provide table of contents and
assemble in binder with durable plastic cover.
B. Submit material prior to final application for payment. For items of Work delayed materially beyond
date of substantial completion, provide updated submittal within ten days after acceptance, listing date
of acceptance as start of warranty period.
1.08 Final Payment
A. At the end of maintenance period, submit written certification that Contract Documents Work has been
reviewed and that Work is complete in accordance with Contract Documents and ready for Owner
Representative’s review.
B. In addition to submittals required by the conditions of the Contract provide submittals required by
governing authorities, and submit a final statement of accounting giving total adjusted Contract Sum,
previous payments and sum remaining due.
C. Owner’s Representative will issue a final Change Order reflecting approved adjustments to Contract
Sum not previously made by Change Order.
D. Retainage will be held until advertisement for liens and encumbrances is completed.
PART 2 – PRODUCTS (Not Applicable)
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 4 of 6
PART 3 – EXECUTION
3.01 Closeout Procedures
A. Operation and Maintenance Instructions: Arrange for each Installer of equipment that requires regular
maintenance to meet with the Owner’s personnel to provide instruction in proper operation and
maintenance. Provide instruction by manufacturer’s representatives if installers are not experienced in
operation and maintenance procedures. Include a detailed review of the following items:
1. Maintenance manuals.
2. Record documents.
3. Spare parts and materials.
4. Tools.
5. Lubricants.
6. Fuels.
7. Identification systems.
8. Control sequences.
9. Hazards.
10. Cleaning.
11. Warranties and bonds.
12. Maintenance agreements and similar continuing commitments.
B. As part of instruction for operating equipment, demonstrate the following procedures:
1. Startup.
2. Shutdown.
3. Emergency operations.
4. Noise and vibration adjustments.
5. Safety procedures.
6. Economy and efficiency adjustments.
7. Effective energy utilization.
3.02 Final Cleaning
A. General: The General Conditions require general cleaning during construction. Regular site cleaning
is included in Division 1.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface
or unit to the condition expected in a normal, commercial building cleaning and maintenance program.
Comply with manufacturer’s instructions.
1. Complete the following cleaning operations before requesting inspection for certification of
Substantial Completion.
C. Removal of Protection: Remove temporary protection and facilities installed for protection of the Work
during construction.
1. Remove labels that are not permanent labels.
2. Clean transparent materials, including mirrors and glass in doors and windows.
3. Clean exposed exterior and interior hard-surfaced finishes to a dust-free condition, free of stains,
films, and similar foreign substances. Restore reflective surfaces to their original condition.
Leave concrete floors broom clean.
4. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and other
substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures and lamps.
5. Clean the site, including landscape development areas, of rubbish, litter, and other foreign
substances. Sweep paved areas broom clean; remove stains, spills, and other foreign deposits.
Rake grounds that are neither paved nor planted to a smooth, even-textured surface.
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 5 of 6
D. Compliance: Comply with regulations of authorities having jurisdiction and safety standards for
cleaning. Do not burn waste materials. Do not bury debris or excess materials on the Owner’s
property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove
waste materials from the site and dispose of lawfully.
1. Where extra materials of value remain after completion of associated Work, they become the
Owner’s property. Dispose of these materials as directed by the Owner.
END OF SECTION 01700
City of Fort Collins SECTION 01700 – CONTRACT CLOSEOUT
Park Planning & Development Division Page 6 of 6
DIVISION 1
SECTION 01800 – DEFINITION OF BID ITEMS
The following items describe the scope of work for this contract and are further clarified through limit-of-work
boundary notes on the drawings and specifications. The work described in each Bid Item may contain work from
one or several technical specification sections. Contractor shall refer to the technical specifications that apply to the
individual components.
Bid Items 1 & 8 – Mobilization
Contractor shall furnish all labor, materials and equipment for mobilization of personnel, equipment and supplies at
the project site in preparation for work on this project.
Bid Items 2 & 9 – Traffic Control
Contractor shall furnish all labor, materials and equipment for approved traffic control plan by a City of Fort Collins
approved Traffic Control Company. This includes furnishing, installing, and maintaining traffic control for the
duration of the trail project.
Bid Item 3 – Demolition
Contractor shall provide all labor and equipment for demolition and removal of 8’ wide asphalt trail (Existing Poudre
Trail). Work includes all hauling and fees. The removed asphalt is to be hauled to 300 Hoffman Mill Road,
coordinate with owner’s representative. Contractor has the option of milling existing trail and reusing as sub-grade
preparations.
Bid Items 4 & 11 – Subgrade Preparation
Contractor shall furnish all labor, materials and equipment to recondition and level subgrade. Recondition the top
6”of Subgrade to 95% compaction. Item includes providing water and minor earthwork associated with the
expansion from 8’ trail to 10’ trail. This item includes stripping and saving 4” of topsoil for landscape restoration
operations.
Bid Items 5 & 14– 5” Colored Concrete Paving
Contractor shall furnish all labor, materials and equipment to install 10’ wide concrete trail. Bid amount includes
installation of 5” thick standard concrete (3,500 psi) with fiber mesh reinforcement. All concrete paving to be
Yosemite Brown Colored Concrete. The Power Trail alignment is to be field staked by the owner’s representative
prior to construction.
Bid Items 6 & 16– Landscape Restoration
Contractor shall provide all labor and equipment to backfill concrete trail; redistribute topsoil, and fine grade
disturbed areas for preparation of seeding operations. This item includes removing any debris and or rocks larger
than 1 ½” from seed preparation area.
Bid Items 7 & 18 Hydro Seeding
Contractor shall provide all materials, labor and equipment to seed areas disturbed by construction. This work
includes hydro mulching disturbed areas.
Bid Item 10 – Site Preparations
Contractor shall furnish all labor, materials and equipment to clear and grub vegetation in the trail alignment. This
item also includes the mowing of existing grasses and removal of debris within the trail alignment.
Bid Item 12 – ABC Class 5
The bid price for this item shall include supplying, placing, and compacting aggregate base course in accordance
with the Drawings and Specifications or as otherwise directed by the ENGINEER. Measurement and payment for
this item will be by the actual number of tons in place (by scale tickets), complete at proper moisture. Quantities
will be adjusted accordingly if the moisture content is too high. The method to bring mixture to optimum moisture
will not be measured or paid for separately, but shall be included in the unit price for this item.
City of Fort Collins Section 01800 - Definition of Bid Items
Park Planning & Development Division Page 1 of 2
Bid Item 13 – Mirafi Geotextile Fabric
Contractor shall furnish all labor, materials and equipment to install Mirafi 500x geotextile fabric for subgrade
preparation.
Bid Item 15 – 8’ Gray Concrete Paving
Contractor shall furnish all labor, materials and equipment to install 8’ wide concrete sidewalk connection. Bid
amount includes installation of 8’ wide, 5” thick standard gray concrete (3,500 psi) with fiber mesh reinforcement.
Bid Item 17 – Bluegrass Sod
Contractor shall provide all soil preparation; fertilizer; herbicide; sod; labor; equipment and maintenance for
bluegrass sod areas.
Bid Item 19 - Erosion Control:
Bid amount includes all labor, equipment; and materials to install and maintain 200 lf of silt fence per drawings and
specifications.
END OF SECTION
END OF DIVISION 1
City of Fort Collins Section 01800 - Definition of Bid Items
Park Planning & Development Division Page 2 of 2
City of Fort Collins Section 02000 – Mobilization
Park Planning and Development Division Page 1 of 2
DIVISION 2
SECTION 02000 - MOBILIZATION
PART 1 - GENERAL
1.01 Work Included
A. Prepare the site for construction.
B. Move in and move out personnel and equipment.
C. Set up and remove temporary offices, buildings, facilities and utilities.
1.02 Site Conditions
A. The City has provided the right-of-way, easement or project site for all permanent access or
permanent construction for the project. Any additional access, access right-of-way, construction
areas, or additional needed land which may be involved in the construction of this project shall be
the responsibility of the Contractor.
B. The land owned by the City may be used as site headquarters, storage yard, or base of operations
provided that the use of said land meets with all of the requirements and restrictions imposed by
the City at the time of usage.
1.03 Site Preparation for Contractor Occupancy
A. The Contractor shall provide all temporary facilities as required for performing the work. The
Contractor shall secure and maintain proper storage areas for equipment and materials in locations
she/he may deem necessary for the proper execution of the job as approved by the City
Representative. No storage yard or project headquarters site may be utilized in conflict with
objections from the adjacent property owners unless the Contractor obtains from the City specific
written permission for such objectionable use. No objectionable material will be allowed to blow
from, wash off or drain off of any storage yard on to adjacent property.
B. The Contractor shall maintain all storage yards in as neat and orderly a manner as possible,
allowing no accumulation of waste materials or disposal piles. The Contractor may construct a
temporary security fence for the protection of materials, tools, and equipment. The fence shall be
maintained during the construction period. Upon completion of work, the security fence shall be
removed from the site. The Contractor shall provide adequate parking facilities within the
designated area for personnel working on the project.
C. The Contractor shall obtain the necessary permits for connection to necessary services provided by
utility companies serving the project area.
D. Materials, equipment, and work required for temporary storm water management during the
construction period shall be provided by the Contractor as required to ensure public safety and to
protect the work in progress and materials stored on site.
1.04 Damage or Use-Fee Claims
A. Any damage or use-fee claims filed against the Contractor may become a part of the final
settlement of this project and may be cause for delay of final acceptance or delay of final payment.
City of Fort Collins Section 02000 – Mobilization
Park Planning and Development Division Page 2 of 2
PART 2 - NOT USED
PART 3 - EXECUTION
3.01 Obstructions
A. The location of some utilities and obstructions may not be shown. Bidders are advised to carefully
inspect the existing facilities before preparing their proposals. The removal and replacement of
minor obstructions such as electrical conduits, air, water, and waste piping and similar items shall
be anticipated and accomplished, even though not shown or specifically mentioned. Major
obstructions encountered that are not shown on the Contract Drawings or could not have been
foreseen by visual inspection of the site prior to bidding should immediately be brought to the
attention of the City Representative. The City Representative will make a determination for
proceeding with the work. If the City Representative finds that the obstruction adversely affects
the Contractor's costs or schedule for completion, a proper adjustment to the Contract will be made
in accordance with the General Conditions.
3.02 Demolition
A. Any pipes or existing structures encountered during construction shall be preserved until accepted
for removal by the City Representative. The Contractor shall be required to repair pipes or
structures in use that are damaged during construction at no cost to the City. The removal of
abandoned pipes shall be reviewed by the City Representative.
3.03 Removal and Salvage of Materials
A. The Contractor shall carefully remove materials specified to be reused or salvaged so as not to
damage the material. Reuse by the Contractor of salvaged material will not be permitted, except as
specifically shown or specified herein. Existing materials to be removed or replaced and not
specifically designated for salvage shall become the property of the Contractor. Provide and
maintain dust tight temporary partitions, bulkheads, or other protective devices during the
construction to permit normal operation of the existing facilities. Construct partitions of plywood,
insulating board, plastic sheets, or similar material.
END OF SECTION
City of Fort Collins Section 02050 - Demolition
Park Planning & Development Division Page 1 of 1
DIVISION 2
SECTION 02050 - DEMOLITION
PART 1 - GENERAL
1.01 Description of Work
A. Demolition or salvage and removal of boulders (if found) for re-use in landscape; and remove
fencing, other plant material, and debris or other items on the site necessary for the construction of
the project.
1.02 Quality Assurance
A. Standards listed hereunder and referenced elsewhere in these specifications shall become a part of
this specification and are incorporated herein by reference. The latest edition, amendment or
supplements thereto in effect thirty (30) days before date of invitation shall apply.
1. City of Fort Collins, Street Cut and Excavation Repair Standards
2. City of Fort Collins, Stormwater Drainage Design and Construction Standards
PART 2 - MATERIALS - Not Used
PART 3 - EXECUTION
3.01 Inspection and Reviews
A. Schedule site meeting with Owner’s Representative to verify and mark limits of demolition.
3.02 Protection
A. Refer to the General Requirements for site protection and temporary controls.
B. Erect barriers and warning signs as necessary to prevent injury to the public and construction
personnel.
C. Protect features and areas not marked for demolition. Limit use of site to the delineated areas.
D. Use of explosives is prohibited.
3.03 Demolition and Removal
A. Items listed for salvage remain the property of the City. Items listed for demolition become the
property of the Contractor.
B. Remove from site items shown on demolition plan.
C. Arrange for and pay costs associated with off-site disposal.
3.04 Hidden Conditions
A. A hidden condition is any feature that could not be discovered or reasonably inferred from a
careful inspection of the site prior to demolition.
B. Promptly report hidden conditions to the Owner’s Representative.
C. Hidden conditions may cause damage to features that are to remain in a finished work if
demolition operations continue. Stop demolition operations affected by hidden conditions until a
determination is made by the Engineer.
D. Hidden conditions may cause a change in contract time or price; refer to the General Conditions.
END OF SECTION
DIVISION 2
SECTION 02110 — CLEARING AND GRUBBING
PART 1 — GENERAL
1.01 Description of work
A. This work shall consist of clearing, grubbing, removing, and disposing of all vegetation and debris
within the limits of the project and such other areas as may be SHOWN ON THE DRAWINGS.
This work shall also include preservation of vegetation and objects designated to remain from
injury or defacement.
B. The Contractor shall be responsible for the procurement of all applicable licenses, permits, and
fees related to Forestry work in the City of Fort Collins as required for the specified work.
PART 2 – MATERIALS – Not used
PART 3 – EXECUTION
3.01 Protection of Existing Improvements
A. Provide protection necessary to prevent damage to existing improvements indicated to remain in
place.
B. Protect improvements on adjoining properties and on City's property.
C. Restore damaged improvements to their original condition, acceptable to parties having
jurisdiction.
D. Protect existing trees and other vegetation indicated to remain in place, against unnecessary
cutting, breaking or skinning of roots, skinning and bruising of bark, smothering of trees by
stockpiling construction material or excavated material within drip line, excess foot or vehicular
traffic, or parking of vehicles within drip line. Provide temporary guards to protect trees and
vegetation to be left standing.
E. Water trees and other vegetation to remain within limits of contract work as required to maintain
their health during course of construction operations.
F. Provide protection for roots over 1-1/2" diameter cut during construction operations. Coat cut
faces with emulsified asphalt, or other acceptable coating, formulated for use on damaged plant
tissues. Temporarily cover exposed roots with wet burlap to prevent roots from drying out; cover
with earth as soon as possible.
G. Repair or replace trees and vegetation indicated to remain which are damaged by construction
operations, in a manner acceptable to parties having jurisdiction. Employ qualified tree surgeon to
repair damages to trees and shrubs. Replace trees which cannot be repaired and restored to full
growth status, as determined by the City.
3.02 Site Clearing
A. Site clearing consists of removing and properly disposing of ground vegetation, shrubs, bushes,
downed trees, and debris within the project area.
B. Branches on remaining trees and bushes in the way of construction shall be trimmed outside the
collar and branch bark ridge of the limb.
C. Cultured shrubs, bushes, and other vegetation to remain shall be protected.
D. Use only hand methods for grubbing inside drip line of trees indicated to be left standing.
City of Fort Collins Section 02110 – Clearing and Grubbing
Park Planning & Development Division Page 1 of 2
E. Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless
further excavation or earthwork is indicated.
F. Place fill material in horizontal layers not exceeding 12" loose depth, and thoroughly compact to a
density equal to adjacent ground.
3.03 Individual Stump Removal
A. Removal of stumps will require the removal of all roots over three inches in diameter to a
minimum depth of six inches below subgrade. Roots over three inches in diameter protruding
from an excavated slope shall be cut flush with the excavated slope surface.
3.04 Disposal
A. Disposal of clearing debris, waste materials and unsuitable or excess topsoil shall be off site at an
area provided by the Contractor, at Contractor's expense, unless otherwise SHOWN ON THE
DRAWINGS.
B. Burning of debris on City property is not allowed.
C. Remove debris from site in a timely manner.
END OF SECTION
City of Fort Collins Section 02110 – Clearing and Grubbing
Park Planning & Development Division Page 2 of 2
City of Fort Collins Section 02200 – Earthwork and Grading
Park Planning & Development Division Page 1 of 5
DIVISION 2
SECTION 02200 - EARTHWORK AND GRADING
PART 1 – GENERAL
1.01 Description of Work
A. The Contractor shall provide all labor, materials and equipment necessary to perform the work
items called for on the bid schedule.
B. The Contractor shall perform all excavation regardless of the type, nature, or condition of material
encountered, as specified or required in order to accomplish the construction.
1.02 City Furnished Materials
A. None, unless otherwise noted on the Bid Schedule.
1.03 Site Conditions
A. A geotechnical investigation may have been performed for the City in order to obtain relative data
concerning the character of material in and upon which the project is to be built. If an
investigation has been performed, the information will be available to the Contractor for
information purposes only, and is not to be considered a part of the Contract Documents. The
Contractor shall satisfy himself as to the kind and type of soil to be encountered and any water
conditions that might affect the construction of the project.
B. The locations of existing utilities are shown in an approximate way only and not all utilities may
be shown. The Contractor shall determine the exact location of all existing utilities prior to
commencing work. The Contractor shall be fully responsible for any and all damages that might
be occasioned by his failure to exactly locate and preserve any and all utilities. If utilities are to
remain in place, the Contractor shall provide adequate means of support and protection during
construction.
C. Should drawn, or incorrectly drawn, piping or other utilities be encountered during excavation, the
Contractor shall advise the City within thirty (30) minutes of encountering the utility. The
Contractor shall cooperate with the City and utility companies in keeping respective services and
facilities in operation to the satisfaction of the respective owners. The City reserves the right to
perform any and all work required should the Contractor fail to cooperate with the respective
companies, and back charge the Contractor for any and all expenses.
D. The Contractor shall provide barricades and signs in accordance with the Uniform Manual of
Traffic Control Devices where applicable. The Contractor shall maintain all devices in a working
manner.
1.04 Fill Material
A. Excess fill material, including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be
hauled off the site and disposed of in accordance with applicable State and local regulations.
B. Additional fill material, if required, shall be hauled to the site from off the site as a necessary part
of the work. Material composition shall be subject to the requirements of the specifications.
City of Fort Collins Section 02200 – Earthwork and Grading
Park Planning & Development Division Page 2 of 5
1.05 Testing and Inspections
Coordinate and schedule testing with City Representative.
PART 2 - MATERIALS
2.01 Soil Materials
A. Coarse-grained soils free from debris, roots, organic material, and non-mineral matter containing
no particles larger than 4-inch size and classified as either:
1. Sands with fines (SM, SC) and less than 25 percent of the soil particles passing the No. 200
sieve, or
2. Clean sands (SW, SP)
3. Native soils as determined acceptable by the Engineer.
2.02 Filter Fabric
A. Filter Fabric shall be Typar 3451W, Mirafi 700X or approved equal.
PART 3 - EXECUTION
3.01 Preparation
A. Field measurements: Before commencing work, locate all baselines and coordinates required for
control of the work, establish required grade staking for control of excavation, fill and
embankment construction. Filed verify by excavation the location all utility crossings, service
connections, and connections to existing lines before proceeding with earthwork.
B. Layout Lines and Levels:
1. The drawings indicate existing elevations and proposed elevations. The existing elevations
and proposed are given for the convenience of the Contractor to assist him in arriving at the
quantities of excavation, grading, backfilling etc.
2. Before earthwork operations are started, all construction items shall be completely staked out
for the Owner’s approval. For any area with a two- percent slope or flatter, the Contractor
shall lay out a 50-foot on-center grid and calculate the exact elevation at every intersection of
the grid lines. These calculations will be approved by the Owner's Representative.
C. Removal of TopSoil: Strip existing earthen material (topsoil) to a depth of 4 inches over the entire
site. Stockpile on site in area approved by Owner’s Representative. Keep topsoil segregated.
Place, grade, and shape stockpile for proper drainage.
3.02 Excavation
A. Prior to beginning excavation operations, accomplish all site preparation in accordance with these
specifications. Perform excavation of every description to the lines and grades indicated on the
drawings.
B. Complete excavation work to the grade elevations shown on the drawings for all areas to be paved.
City of Fort Collins Section 02200 – Earthwork and Grading
Park Planning & Development Division Page 3 of 5
3.03 Clearing the Site
A. All areas underlying new structures, paved areas, site fills and embankments shall be cleared of
stumps, shrubs, brush, and other vegetative growth.
B. Any material containing roots, grasses and other deleterious or organic matter generally found in
the top six inches of undisturbed natural terrain shall be stripped from all areas requiring
excavation, grading, trenching, subgrade preparation for foundations and embankment work. The
City will require stripped top soil deemed suitable for spreading over the finished grades to be
stockpiled and preserved until the finished grading operation, at which time it shall be spread
uniformly over areas to be seeded or sodded.
C. Upon completion of the project, completion of a particular phase of the project, or termination of
the use of any particular area, site, storage yard right-of-way or easement, the Contractor shall
promptly and neatly clean up the area and re-establish the ground to the contours required by the
project or conditions prior to project commencement.
3.04 Earth Fill Construction
A. The Contractor shall perform all grading to the lines and grades specified and/or established by the
Engineer, with an appropriate allowance for topsoil. All slopes shall be free of all exposed roots
and stones exceeding 3-inch diameter, which are loose and liable to fall. Tops of banks shall be
rounded to circular curves not less than 6-feet in radius.
B. Rounded surfaces shall be neatly and smoothly trimmed. Topsoil shall be replaced to a depth of
4-inches in areas to be revegetated.
C. The Contractor shall protect the fill against freezing when atmospheric temperature is less than 35
degrees F (1 degree C).
3.05 Compaction
A. The Contractor shall meet minimum percentage density specified for each area classification as
follows. Percentage of Maximum Density Requirements: Compact soil to not less than the
indicated percentages of maximum density relationship determined in accordance with ASTM D
698.
1. Foundations, Paved Areas, Utilities and Sidewalks - 95 percent
2. Unpaved Areas - 90 percent
B. Control moisture content within 2% of optimum moisture content as determined by ASTM D 698.
Where subgrade or layer of soil material is too dry to permit compaction to the specified density,
uniformly apply water to surface of cut area, subgrade, or loosely placed layer of soil material.
Mix soil and applied water by blading, disking, or other methods to achieve uniform moisture
content throughout the soil mass to be compacted.
C. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to
specified density. Soil material that has been removed because it is too wet to permit compaction
may be stockpiled or spread and allowed to dry. Assist drying by disking, harrowing or
pulverizing until moisture content is reduced to a satisfactory value.
D. Puddling is not an acceptable method of compaction.
City of Fort Collins Section 02200 – Earthwork and Grading
Park Planning & Development Division Page 4 of 5
3.06 Grading
A. Paved Areas: Immediately prior to placing structural pavements, shape area to the required
lines, grades, and limits to provide the finished elevations indicated and roll with an approved
heavy vibratory roller until compacted to the specified density. Maintain moisture content within
2% of optimum during final rolling and until subgrade is covered by subsequent construction.
Remove loose material and protect subgrade until covered. The subgrade under all paved areas
and the play area shall conform to the elevations shown on the drawings.
B. Landscape Area and Remainder of Site:
1. Rough grade areas as indicated on grading plan to 4 inches below finish grade.
After rough grading is finished, compacted and approved, scarify area to a depth of at
least 6 inches.
2. Place previously stockpiled topsoil in all areas within the limits of the project not
indicated to receive subsequent foundations, slabs on grade, walks, safety surfacing
or other similar materials.
3. Uniformly distribute topsoil on the disturbed area and evenly spread to a thickness of
4 inches deep after light compaction. Perform spreading so that planting can proceed
with little additional soil preparation or tillage. Do not place topsoil when subgrade
is frozen, excessively wet, extremely dry or in a condition otherwise detrimental to
specified grading, seeding and planting specifications.
C. Finish Grading:
1. Grade all excavated sections, filled sections, construction disturbed areas and
adjacent transition areas to finish elevation. Make finished surfaces smooth,
compacted and free from irregular surface changes.
2. Unless indicated otherwise on drawings, finish grade area adjacent to sidewalks and
pavements to ½ inch below finish elevation of sidewalk and pavement.
3. Remove all construction debris. Grades not otherwise indicated shall be uniform
levels or slopes between such points and existing finish grade. Abrupt change in
slopes shall be rounded.
3.07 Settlement
A. Where completed compacted areas are disturbed by subsequent construction operations or adverse
weather, the Contractor shall scarify the ground surface, re-shape, and compact to required density
prior to further construction.
B. Any settlement in backfill, fill, or in structures built over the backfill or fill, which may occur
within the guarantee period in the General Conditions will be considered to be caused by improper
compaction methods and shall be corrected at no cost to the City. Any structure damaged by
settlement shall be restored to their original condition by the Contractor at no cost to the City.
3.08 Disposal of Excess Excavation and Waste Materials and Special Requirements
A. The Contractor shall dispose of all excess excavated material not required for fill on-site, as
directed by the Engineer.
City of Fort Collins Section 02200 – Earthwork and Grading
Park Planning & Development Division Page 5 of 5
B. The Contractor shall remove and be responsible for legally disposing of excess fill material not
placed on-site, waste materials, trash and debris.
C. The Contractor shall conduct all site grading operations and other construction activities to
minimize erosion of site soil materials. He/she shall be responsible to maintain streets/public
ROW daily by removing any spillage of dirt, rocks or debris from equipment entering or leaving
the site.
END OF SECTION
City of Fort Collins Section 02221 – Trenching, Backfilling and Compacting
Park Planning & Development Division Page 1 of 2
DIVISION 2
SECTION 02221 – TRENCHING, BACKFILLING, AND COMPACTION
PART 1 - GENERAL
1.01 Scope
Furnish all labor, materials, and equipment, and perform all operations to complete trenching, including
excavation, subgrade preparation, drainage, filter fabric installation, bedding, backfilling, compacting,
and finish grading for underground pipelines, service lines, sleeving, and appurtenances as shown on
the drawings and as specified herein.
1.02 Related Work
A. Section 02200 – Earthwork and Grading.
B. Section 02520 – Portland Cement Concrete Paving.
C. Section 02600 – Domestic Water Supply.
D. Section 02700 – Sanitary Sewerage Systems.
E. Section 02810 – Irrigation.
F. Section 16000 – General Electrical.
1.03 Protection
A. Obtain utility locations before commencing work. Protect all existing underground utilities, above
ground structures or plantings, or repair to original condition.
PART 2 MATERIALS:
2.01 Trench Backfill Material
A. Trench excavation or imported material free from frozen material, stumps, roots, brush, other
organic matter, cinders or other corrosive material, debris, and rocks or stones greater than 2
inches in any dimension.
2.02 Other
A. Bedding, piping, filter fabric, and other materials specified on the drawings and in related sections.
PART 3 EXECUTION
3.01 Preparation
A. Remove and stockpile topsoil from areas to be disturbed by construction. Keep topsoil segregated
from non-organic trench excavation materials and debris.
3.02 Trenching
A. Excavate trenches by open cut methods. Segregate suitable backfill. Rough trench excavation
will leave trench with uniform width and vertical sidewalls from an elevation one foot above the
top of installed pipe to the bottom of pipe.
B. Minimum trench width will provide 6-inch space between pipe wall and side of trench. Maximum
trench width will be shown on the drawings or in the appropriate pipeline section. If not specified
elsewhere the maximum trench width is the pipe O.D. plus 20 inches.
City of Fort Collins Section 02221 – Trenching, Backfilling and Compacting
Park Planning & Development Division Page 2 of 2
C. Grade trench bottom to provide uniform clearance for bedding material. De-water trench.
Remove loose material and foreign objects. When required, install filter fabric per manufacturer’s
specifications.
D. Unstable subgrade is not expected. If unstable subgrade material is encountered, report the
condition to the Owner. Remedy and payment for subgrade stabilization will be based on the
actual conditions encountered.
3.03 Bedding
A. Pipe will be bedded in accordance with the detailed drawings or the appropriate pipeline
specification.
3.04 Backfilling and Compaction
A. Backfill trench promptly after completion of pipe bedding.
B. Deposit material in uniform layers with thickness commensurate with the soil encountered and the
compaction equipment used.
C. Compaction requirements will be made at the moisture content and will meet the densities, by
zone, specified in Section 02200 – Earthwork and Grading.
D. Coordinate and schedule compaction tests with City Representative.
3.05 Surface Restoration
A. Restore pavements according to City of Fort Collins Standards.
B. Restore landscaped areas according to Section 02900 – Landscaping.
END OF SECTION
City of Fort Collins Section 02270 – Erosion Control
Parks Planning and Development Division Page 1 of 2
DIVISION 2
SECTION 02270 – SLOPE PROTECTION AND EROSION CONTROL
PART 1 - GENERAL
1.01 Description
A. Erosion control materials required within the project site as shown on the plans.
PART 2 - MATERIALS
2.01 Erosion Control Materials
A. “Envirofence” silt fence system manufactured by Mirafi, Inc., or equal
B. Curlex erosion control blanket manufactured by American Excelsior Company, or equal
PART 3 - EXECUTION
3.01 General
A. All erosion control products and materials will be installed in accordance with the manufacturer’s
recommendations and as shown on the plans.
B. All sediment barriers shall remain in place until seeding has been established, at which time they
shall be removed by the contractor.
3.02 Silt Fence
A. The height of a silt fence shall not exceed 36 inches (higher fences may impound volumes of water
sufficient to cause failure of the structure).
B. The filter fabric shall be purchased in a continuous roll cut to the length of the barrier to avoid the
use of joints. When joints are necessary, filter cloth shall be spliced together only at a support
post, with a minimum 6-inch overlap, and securely sealed.
C. Posts shall be spaced a maximum of 10 feet apart at the barrier location and driven securely into
the ground (minimum of 12 inches). When extra strength fabric is used without the wire support
fence, post spacing shall not exceed 6 feet.
D. A trench shall be excavated approximately 4 inches wide and 4 inches deep along the line of posts
and up slope from the barrier.
E. When standard strength filter fabric is used, a wire mesh support fence shall be fastened securely
to the up sloped side of the posts using heavy duty wire staples at least 1 inch long, tie wires or
hog rings. The wire shall extend into the trench a minimum of 2 inches and shall not extend more
than 36 inches above the original ground surface.
F. The standard strength filter fabric shall be stapled or wired to the fence, and 8 inches of the fabric
shall be extended into the trench. The fabric shall not extend more than 36 inches above the
original ground surface. Filter fabric shall not be stapled to existing trees.
G. When extra strength filter fabric and closer post spacing are used, the wire mesh support fence
may be eliminated. In such a case, the filter fabric is stapled or wired directly to the posts with all
other provisions of Item F applying.
H. The trench shall be backfilled and the soil compacted over the filter fabric.
I. Silt fences shall be removed when they have served their useful purpose, but not before the up
slope area has been permanently stabilized.
City of Fort Collins Section 02270 – Erosion Control
Parks Planning and Development Division Page 2 of 2
PART 4 - MAINTENANCE
4.01 Silt Fences
A. Silt fences and filter barriers shall be inspected immediately after each rainfall and at least daily
during prolonged rainfall. Any required repairs shall be made immediately.
B. Should the fabric on a silt fence or filter barrier decompose or become ineffective prior to the end
of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly.
C. Sediment deposits should be removed after each storm event. They must be removed when
deposits reach approximately one-half the height of the barrier.
D. Any sediment deposits remaining in place after the silt fence or filter barrier is no longer required
shall be dressed to conform with existing grade, prepared and seeded.
END OF SECTION
DIVISION 2
SECTION 02304 – AGGREGATE BASE COURSE
PART 1 – GENERAL
1.1 Description of work
A. The current edition of the Colorado Department of Transportation Standard Specification Booklet
is referenced into these specifications.
PART 2– REVISIONS
A. Subsection 304.01 is revised to include the following:
This work shall consist of placing Aggregate Base (Class 5) over previously prepared subgrade
approved by the Engineer. Aggregate Base will be used as fill under the curb, gutter, and
sidewalks if there is not any acceptable material onsite.
The proposed material shall meet the following minimum requirements:
LL Maximum: 30
PI Maximum: 6
“R” Value Minimum: 78
The minimum strength coefficient of the Class 5 Aggregate Base shall be 0.12.
B. Subsection 304.07 is revised to include the following:
Aggregate Base Course will be measured by the ton at proper moisture. Quality will be adjusted
accordingly if moisture is too high. Haul and water necessary to bring mixture to optimum
moisture will not be measured paid for separately, but shall be included in the price for Aggregate
Base.
C. Subsection 304/08 is revised to include the following:
The accepted qualities of Aggregate Base Course will be paid for at the contract price per ton.
D. Payment will be made under:
Pay Item Pay Unit
304-01 A.B.C. (C-5) Tons
The above prices and payments shall include full compensation for furnishing all labor, materials,
tools, equipment, and incidentals and for doing all work involved in placing Aggregate Base
Course including haul and water, complete-in-place, as shown on the plans, as specified in the
specifications, and as directed by the Engineer.
END OF SECTION
City of Fort Collins Section 02304 – Aggregate Base Course
Park Planning & Development Division Page 1 of 1
DIVISION 2
SECTION 02520 – PORTLAND CEMENT CONCRETE PAVING
PART 1 - GENERAL
Scope
A. Furnish all labor, materials, supplies, equipment, transportation, and perform all operations in
connection with and reasonably incidental to complete installation of concrete paving as shown on
the drawings and as specified herein. Items of work specifically included are:
B. Subgrade preparation for plazas, walks, ramps, playground curbs and headers.
C. Form work.
D. Reinforcement.
E. Surface finish.
F. Construction, expansion and control joints.
G. Curing.
H. Concrete plazas, sidewalks, ramps, playground curbs and headers.
I. Interior slabs-on-grade in restroom, etc.
Work Not Included
J. Items of work specifically excluded or covered under other sections:
K. Excavation and backfill.
L. Earthwork and grading.
M. Cast-in-place structural concrete or precast concrete, such as foundations, drainage appurtenances,
and pad and building.
N. Joint sealers.
Related Work
A. Division 2 – Site Work:
a. Section 02220– Demolition.
b. Section 02310 – Earthwork/Grading.
c. Section 02221 – Trenching, Backfilling, and Compaction.
B. Not Used
C. Division 7 – Thermal and Moisture Protection:
1. Section 07900 – Joint Sealers.
References
A. ACI 301 – Specifications for Structural Concrete for Buildings.
B. ASTM C33 – Concrete Aggregate.
C. ASTM C150 – Portland Cement.
D. ASTM C260 – Air Entraining Admixtures for Concrete.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 1 of 11
E. ASTM C309 – Liquid Membrane – Forming Compounds for Curing Concrete.
F. ACI 304 – Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete.
G. ACI 305R – Hot Weather Concreting.
H. ACI 306R – Cold Weather Concreting.
I. ACI 308 – Standard Practice for Curing Concrete.
J. ACI 309 – Recommended Practice for Consolidation of Concrete.
K. ACI 318-89 – Building Code Requirements for Reinforced Concrete.
Regulatory Requirements
A. Conform to applicable code of governing authority for paving work within public right-of-way.
Tests
A. Submit proposed mix design to testing laboratory for review prior to commencement of work. For
standard premix concrete mixes, the supplier’s quality control records may be substituted for job
mix testing.
B. Concrete Testing Service: Contractor will engage a testing laboratory to perform materials
evaluation, testing and design of concrete mixes as approved by Owner. All testing costs will be
borne by the Contractor. Should any test(s) fail to meet the specifications, the cost of the failed
test and all subsequent testing shall be borne by the Contractor.
C. Coordinate and schedule sampling testing during concrete placement with City Representative.
Submittals
A. Submit product data under provisions of Section 01600 – Materials and Equipment.
B. Submit data on admixtures and curing compounds.
C. Submit a ten pound sample of aggregate for exposed aggregate finish.
D. Submit manufacturer’s data on leave-in-place construction joint form.
E. Submit sample chips of specified colors indicating pigment number and required dosage rate.
Submittals are for general verification of color and may vary somewhat from concrete finished in
field according to Specifications.
F. Submit samples of colored sealers.
Test Panels
A. Provide a 3’ x 3’ test panel for finish and tooling of joints for Owner approval. Provide one panel
for each pavement type specified. In casting the panels, use personnel and methods to be
employed on the work.
B. If sample disapproved, cast additional samples until approval is obtained. Maintain test panel on
site until finished work is accepted. Test panel will represent minimum workmanship standard.
C. Work completed prior to text panel approval shall be subject to removal and replacement at
Owner’s request.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 2 of 11
PART 2 MATERIALS
2.01 Concrete Materials
A. General: Provide materials of same brand and source throughout the project unless otherwise
noted.
B. Portland Cement: ASTM C150, Type I or Type I/II, gray color.
C. Aggregates: ASTM C33, normal weight. In addition, the combined aggregate shall comply with
the following gradation, shown in percent passing.
Sieve Size ¾-Inch Nominal Maximum Size
¾ Inch 90 – 100
3/8 Inch 60 – 80
No. 4 40 – 60
No. 8 30 – 45
No. 16 20 – 35
No. 30 13 – 23
No. 50 5 – 15
No. 100 0 – 5
D. Coarse Aggregate for Exposed Aggregate Finish: 5/8-inch maximum size; rounded shape, ratio of
maximum to minimum dimensions not to exceed 2.5:1; color to be tan to brown, no more than 2%
white or black combined, no pink, no red, no green.
E. Water: Clean and not detrimental to concrete.
2.02 Pigments for Integrally Colored Concrete
A. Manufacturer:
1. Davis Colors manufactured by Davis Colors: phone (213) 269-7311.
2. Substitutions: Comply with Section 01600 for substitution request procedures.
B. Materials: Pigments shall contain pure, concentrated mineral pigments especially processed for
mixing into concrete and complying with ASTM C979.
C. Packaging: If pigments are to be added to mix at Site, furnish pigments in pre-measured Mix-
Ready disintegrating bags to minimize job site waste.
D. Colors: Concrete mix shall contain the dosage rate of pigments indicated in this specification.
Dosage rate shall be based on weight of Portland cement, fly ash, silica fume, lime and other
cementitious materials but not aggregate or sand. Refer to the site plans for locations of the
various colors of concrete.
2.03 Form Materials
A. Slab Edges: Two by lumber permitted for surfaces not exposed to view in the final work. Use
concrete-form grade hardboard, “plyform” grade plywood, or metal for forming surfaces exposed
to view. Forms shall be straight and sufficiently stiff and well braced to meet line tolerances
specified in Part 3.
B. Keyed Joint Form: Wooden key or leave-in-place metal construction joint form.
C. Form Coatings: Commercial form-coating compounds that will not bond with, stain, or adversely
affect concrete surfaces, and will not impair subsequent treatments of concrete surfaces.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 3 of 11
2.04 Reinforcement
A. Reinforcing Steel: ASTM A615; 60 ksi yield grade; deformed billet-steel bars, uncoated finish.
B. Fibermesh: Bundled, fibrillated, virgin polypropylene fibers manufactured for use in premix
concrete and having the following characteristics:
1. Special Gravity: 0.91.
2. Tensile Strength: 70 to 100 ksi.
3. Fiber Lengths: ½ inch, ¾ inch.
4. Accepted Materials: “Fibermesh” by Fibermesh Company of Chattanooga, TN; or “Forta
CR” by Forta Corporation of Groove City, PA.
C. Dowels: ASTM A615; 40 or 60 ksi yield grade, plain steel, uncoated finish; matched sleeve and
cap one end. Provide dowel basket to hold dowels in parallel alignment.
2.05 Admixtures
A. General: Unless specified in the mix or directed in Part 3, no admixtures shall be used without
approval of the Owner’s Representative. Do not use admixtures that would result in mixing water
with a concentration of more than 150 ppm of chloride ion.
B. Air Entraining: ASTM C260.
C. Water Reducing: ASTM C494, Type A.
D. Accelerator: Nonchloride, ASTM C494, Type C or E.
E. Retarder: ASTM C494, Type B or D.
F. Color Agent: Davis Colors of Los Angeles, California.
2.06 Related Materials
A. Expansion Joint Filler: ASTM D1752, closed cell polyethylene, ½ inch thickness.
B. Joint Sealant: See Section 07900.
C. Surface Retardant: Surface retarding agent intended for exposed aggregate. Retardx-SR0” by
Prokrete of Denver, Colorado, or approved equal.
D. Curing Compound for Standard Non-Colored Walks, Curbs, Gutters, Etc: White pigmented, wax-
resin based compound, ASTM C309, Type I, Class A. Recommended by manufacturer for use on
exterior sidewalks and driveways.
E. Curing Compound for Concrete with Coloring Agent: Davis Seal Color to match colored
concrete.
F. Curing Compound and Sealer for Exposed Aggregate Concrete: Acryseal by Prokete Industries of
Denver, Colorado.
G. Curing Compound for Interior Slabs: Protex Promulsion 100 or equal.
H. Interior Floor Sealer: Protex Triple Seal or equal.
2.07 Concrete Mix
A. Mix concrete in accordance with ASTM C94.
1. Provide non-colored concrete for exterior slabs on grade, sidewalks, curb and gutter,
walls, aprons and ramps (except panel inserts) with the following characteristics:
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 4 of 11
Unit Measurement
a. Compressive Strength 3,500 psi
at 28 days
b. Minimum Cement 564 lb./cy
c. Maximum Aggregate Size 1 ½ inches
d. Fibrous Reinforcement ¾ lb./cy
e. Air Entrainment 4% to 6%
f. Maximum Water/Cement Ratio 0.46
g. Maximum Slump 4 inches
2. Provide colored concrete for plazas, ramps and other flatwork with the following
characteristics:
Unit Measurement
a. Compressive Strength 3,500 psi
at 28 days
b. Minimum Cement 564 lb./cy
c. Maximum Aggregate Size 1 ½ inches
d. Fibrous Reinforcement ¾ lb./cy
e. Air Entrainment 4% to 6%
f. Maximum Water/Cement Ratio 0.46
g. Coloring Agent Per manufacturer’s recommendations
(refer to Definition of Bid Items and/or Drawings for
designated colors)
h. Maximum Slump 4 inches
3. Provide non-colored concrete for playground curb with the following characteristics:
Unit Measurement
a. Compressive Strength 3,500 psi
at 28 days
b. Minimum Cement 564 lb./cy
c. Maximum Aggregate Size 5/8 inches
d. Air Entrainment 5% to 8%
e. Maximum Water/Cement Ratio 0.46
f. Maximum Slump 2.5 inches
4. Provide non colored concrete for interior slabs-on-grade with the following characteristics:
Unit Measurement
a. Compressive Strength 3,500 psi
at 28 days
b. Type I or II Cement 564 lb./cy
c. Maximum Aggregate Size ¾ inches
d. Maximum Air 3%
e. Water reducing agent 3 oz. Minimum to 4 oz maximum
per 100 pounds.; or as recommended
by manufacturer to obtain
desired air content
5. Provide concrete for colored trail flatwork and paving with the following characteristics:
Unit Measurement
a. Compressive Strength 3.500 psi
at 28 days
b. Minimum Cement 564 lb./cy
c. Maximum Aggregate Size 1 ½ inches
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 5 of 11
d. Fibrous Reinforcement ¾ lb./cy
e. Air Entrainment 4% to 6%
f. Maximum Water/Cement Ratio 0.46
g. Coloring Agent 2 lbs. per sack of Yosemite Brown Color
h. Maximum Slump 4 inches
B. Pozzolanic mineral admixture is not permitted.
C. Use accelerating admixtures in cold weather as directed in Part 3.
D. Use set-retarding admixture during hot weather as directed in Part 3.
E. Water reducing agent is permitted.
2.08 Selection of Proportions
A. Mix Design: Cost of concrete mix design is responsibility of Contractor.
B. Selection of Proportions: Use method of ACI 301 3.9. Proportioning base on method of ACI 301
3.10 not allowed.
1. Field test records used for documentation of the average strength produced by a propos mix in
accordance with ACI 301 3.9.3.2 shall, in addition to the requirements listed, comply with the
following:
a. The test record shall represent production concrete from a single design mix produced
during the past year.
b. The test record shall represent concrete proportioned to produce the maximum slur
allowed by these specifications, and for air-entrained concrete, within a +0.5% of t
maximum air content allowed.
2. Mixes proportioned on the basis of trial mixtures shall meet the provisions of ACI 301 3.9.3.3.
PART 3 EXECUTION
3.01 Subgrade Preparation
A. Shape and compact subgrade to match appropriate detail. Compact to 95% density as measured by
ASTM D698. Coordinate with Section 02200 – Earthwork, Article 3.05, Compaction.
B. Where subgrade cannot be compacted, remove subgrade. Replace with bed course. Compact to
95% density as measured by ASTM D698.
C. Moisten subgrade to minimize absorption of water from fresh concrete. Subgrade shall not be
muddy, soft, frozen, or covered with standing water when concrete is placed.
3.02 Form Work
A. General: Design, construct, and brace forms in accordance with ACI 301 and ACI 347. In
addition to those requirements, forms shall be placed and braced so the finished edges and joints
meet the tolerances listed later in this section.
B. Preparation of Form Surfaces:
1. Clean reused forms of concrete matrix residue; repair and patch as required to return forms to
acceptable surface condition.
2. Coat contact surfaces of forms with specified form-coating compound before reinforcement is
placed. Apply form-coating compound according to manufacturer’s instructions. Do not
allow excess form-coating material to accumulate in forms or to come in contact with concrete
surfaces against which fresh concrete will be placed.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 6 of 11
C. Slipforming: Slipforming of vertical curb and gutter sidewalks is permitted.
D. For Surfaces Exposed To View: Form faces shall be free from raised grain, tears, worn edges,
patches, dents, or other defects which would impair texture of the concrete surfaces. Minimize
number of seams in form material, and arrange seams in an orderly manner.
3.03 Reinforcement and Embedments
A. General:
1. Fabricate, position, and secure reinforcement and embedded items according to ACI 301 and
ACI 315. Coordinate with other sections for locations, instructions, or equipment for
embedded items.
2. Shop drawings are not required.
3. Welding reinforcement is not permitted.
4. In the event of discrepancy, immediately notify the Owner’s Representative. Do not proceed
with installation in areas of discrepancy until all such discrepancies have been fully resolved.
B. Field-Bending of Reinforcement: Reinforcement partially embedded in concrete shall not be
field-bent, except as noted on the drawings or specifically permitted by the Owner’s
Representative.
C. Inspection of Reinforcement: Completed installation of concrete reinforcement must be reviewed
by the Owner’s Representative before depositing concrete.
D. Unless otherwise indicated, place reinforcement where required at top of slabs on grade. Provide
½-inch minimum cover over reinforcement.
E. Dowels: Grease sleeves, insert dowels and through form, secure dowel basket against movement.
F. Notches for Sleeving: Notch both vertical sides of walk or slab where sleeving occurs.
G. Welded wire fabric shall be overlapped one full mesh and tied.
H. Fibrous Reinforcement:
1. Add fibrous concrete reinforcement to concrete materials at the time concrete is batched in
amounts in accordance with approved submittals for each type of concrete required.
2. Mix batched concrete in accordance with manufacturer’s recommendations for uniform and
complete dispersion.
3.04 Joints
A. General: Place joints in accordance with ACI 301. Conform to the tolerances listed later in Part
3.
B. Isolation/Expansion Joints: Isolation joint and expansion joint are synonymous for concrete
paving.
1. Place isolation joints where work abuts existing walls, curbs and structures, and where shown
on the drawings.
2. Interrupt reinforcement at isolation joint. Install dowels only where indicated on drawings.
3. Joint filler shall extend full depth of the slab. Hold back filler from top of slab as required for
sealant. Attach joint filler to first placement.
4. Seal all expansion joints per Section 07900.
C. Keyed/Construction Joints: Keyed joint and construction joint are synonymous for concrete
paving.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 7 of 11
1. Reinforcement, if required, shall continue through the joint.
2. Install where indicated on drawings, or where required by concrete delivery or finishing rate.
3. Key first placement. Key shall be 1½ inches wide and ¾ inches deep.
4. After first placement has hardened, clean and roughen face. Install control joint form at top of
slab.
5. Subject to Owner’s Representative approval; manufactured leave-in-place cold joint form may
be used.
D. Control/Score Joint: Control joint and score joint are synonymous for concrete paving.
1. Control joints shall penetrate 1/3 of slab thickness.
2. Sawn Joints: Control joints on play area curb shall be sawn. Kerf shall be 3/16-inch wide.
Start cutting as soon as concrete is able to be sawn without dislodging aggregate. Complete
cutting before shrinkage cracks occur. Joints perpendicular to walls may be less than required
depth within 6 inches of the wall, and may stop 2 inches from the wall. Wash slurry from
concrete to avoid staining of slab.
3. Tooled Joints: Control joints may be cut into the plastic concrete during finishing operations.
Tooled joints shall have ¼ radius, and shall not incorporate a troweled edge unless
specifically noted on the drawings.
4. Formed control joints are permitted only in conjunction with keyed joints.
5. Unless otherwise indicated, provide control joints at the following intervals:
Use Type Maximum Spacing
Uncolored Exterior & Tooled broom Symmetrically placed:
Interior Slabs, Sidewalks over joint 10’ maximum or 1 ½
times width of walk,
whichever is smaller
Curb and Gutter Tooled joints 10’ maximum
Pans Tooled joints 15’ maximum
Play Area Curb & Header Tooled joints 10’ maximum
Concrete Tooled joints 10’ maximum
3.05 Concrete
A. Preplacement Inspection: Form work installation, reinforcing steel placement, and installation of
all items to be embedded or cast in, to be verified by the Owner’s Representative prior to
placement.
B. General: Comply with ACI 301, ACI 304, and as herein specified.
C. Added Water: Concrete mix has been designed to a specific water cement ratio in order to
enhance durability of the final product. Do not add water at the job site or concrete will not be
accepted.
D. Cold Weather Placement: When depositing concrete after the first frost or when the mean daily
temperatures area below 40 degrees, follow recommendations of ACI 306 as modified herein. Use
specified accelerator. Maintain concrete temperature at a minimum of 55 degrees for not less than
72 hours after depositing. Do not place concrete without approval of the Owner’s Representative
on days when temperature at 9:00 a.m. is below 30 degrees. Job-cured cylinders for verification of
strength and/or the adequacy of the Contractor’s protective methods will be required.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 8 of 11
E. Hot Weather Placement: When depositing concrete in hot weather, follow recommendations of
ACI 305 as modified herein. When the air temperature is expected to exceed 90 degrees, the
Contractor shall obtain acceptance from the Civil Engineer or Owner’s Representative of the
procedures to be used in protecting, depositing, finishing, and curing the concrete. The
temperature of concrete at the time of placement shall not exceed 90 degrees. Protect to prevent
rapid drying. Start finishing and curing as soon as possible. Specified water reducing retarding
admixture may be used. The use of continuous wetting or fog sprays may be required by the
Owner’s Representative for 24 hours after depositing.
F. Placing: Deposit and consolidate concrete slabs in a continuous operation, within the limits of
construction joints, until the placing of a panel or section is completed. Deposit concrete as nearly
as practicable in its final location to avoid segregation.
G. Consolidation: Consolidate concrete with internal vibrators with a minimum frequency of 7,000
rpm. Maintain one standby vibrator for every three vibrators used. Consolidate according to ACI
309. Do not transport concrete with vibrators. Work concrete into corners and around
embedments and reinforcement.
H. Surface Leveling: Strike off and level surface with screed of sufficient length to span the slab.
On slabs greater than 15 feet wide, use intermediate screed strips.
I. Integral colored concrete: Add color by weight directly into the mixer along with the aggregate,
cement and water while the mixer is operating at mixing speed. Continue mixing for 5-10 minutes
or from 50 – 100 revolutions.
3.06 Finishes
A. Float Finish: After surface stiffens enough to support the operation, float with hand floats or
powered disc floater. Use magnesium float; do not use wood float on air entrained concrete.
Check surface planeness with a 10-foot straight edge, applied at not less than two different angles.
Cut down high spots and fill low spots to produce a surface with Class B tolerance. Refloat the
slab to a uniform sandy texture.
B. Broom Finish: Concrete flatwork shall receive a heavy broom finish applied at a right angle to the
direction of travel. The plaza area shall have smooth troweled joints, 1½ inches from the
centerline of the joint, to result in a total trowel width of 3 inches. All other flatwork shall have
broom finish over joints.
C. Exposed Aggregate Finish: Immediately after floating, apply surface retardant. Apply retardant
uniformly. Cover with polyethylene sheet to retain moisture. When mortar is hard enough to
retain aggregate but soft enough to be removed by brushing, wash the surface with water and
remove mortar from surface aggregate by brushing. Do not dislodge aggregate.
D. Coordinate rate of concrete placement with pace of washing crew.
E. Formed Finishes:
1. Surfaces Not Exposed to View: Patch tie holes and defects. Chip off fins greater than ¼ inch
in height.
2. Surfaces Exposed to View: Patch tie holes and defects. Completely remove fins.
F. Schedule of Finishes:
1. Curbs, gutters, ramps within ROW – per City Specifications.
2. Sidewalk – heavy broom finish.
3. Plaza paving – as shown on plans.
4. Playground curbs and header – exposed aggregate finish.
5. Interior slabs at restroom – medium broom finish.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 9 of 11
G. Notch both vertical sides of concrete flatwork to indicate location of irrigation sleeves.
3.07 Curing/Sealing
A. Apply curing compound within 30 minutes of completing finish. Follow manufacturer’s
recommendations for applying compound. Reapply in areas exposed to rain within 3 hours of
initial application. Maintain continuity of coating and repair damage during 7-day curing period.
Follow manufacturer’s instructions for sealing interior slabs.
B. Integral colored concrete is to be cured with the matching Davis Color Seal (if called for in section
01800 Definition of Bid Items). Follow manufacturer’s recommendations for application.
3.08 Tolerances
A. Surface Planeness: Unless otherwise specified, produce slabs with a Class B tolerance.
1. Finishes with Class B tolerances shall be true planes within ¼ inch in 10 feet, as determined
by a 10-foot straight edge placed anywhere on the slab in any direction.
2. Slope interior slabs to drains as indicated.
B. Formed Surfaces, Joints, and Embedments: Unless otherwise specified, the finished work shall
meet the following tolerances:
1. Variations of formed, or cut or tooled linear element:
a. In 20 feet: ½ inch.
b. For entire length: 1 inch.
3.09 Field Quality Control
A. Field inspection and testing will be performed under provisions of Paragraph 1.06, Tests, and as
specified below.
B. Concrete Tests:
1. Shall be provided by the Contractor and shall be accordance with requirements of ACI 301,
Chapter 16 – Testing, except as noted or modified in this section.
a. Strength test.
i. Mold and cure four cylinders from each sample.
ii. Test one at 7 days and one at 14 days for information and one at 28 days for
acceptance. Keep the remaining one as a spare to be tested as directed by the Owner.
b. Minimum samples.
i. Collect the following minimum samples for each 28-day strength concrete used in the
work for each day’s placing:
Quantity Number of Samples
50 cubic yards or less one
50 to 100 cubic yards two
100 cubic yards or more two plus one sample for each
additional 100 cubic yards
c. Sample marking.
i. Mark or tag each sample of compression test cylinders with date and time of day
cylinders were made.
ii. Identify location in work where concrete represented by cylinders was placed.
iii. Identify delivery truck or batch number, air content, and slump.
d. Slump test.
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 10 of 11
Conduct test for each strength test sample and whenever consistency of concrete appears
to vary.
e. Air content.
Conduct test from one of first three batches mixed each day and for each strength test
sample.
C. Acceptance of Concrete:
1. If the average of three consecutive 7-day tests falls below the specified 7-day strength, the
Owner shall have the right to require conditions of temperature and moisture necessary to
secure the required strength and may require core tests in accordance with ASTM C-42.
2. Strength level of concrete will be considered satisfactory so long as average of all sets of three
consecutive strength test results equals or exceeds specified 28-day strength and no individual
strength test result falls below specified strength by more than 500 psi.
D. Failure of Test Cylinder Results:
1. Upon failure of the 28-day test cylinder results, Owner may require Contractor, at his expense,
to obtain and test at least three cored samples from area in question.
2. Concrete will be considered adequate if average of three core tests is at least 85 percent of,
and if no single core is less than 75 percent of the specified 28-day strength.
3. Upon failure of core test results, Owner may require Contractor, at his expense, to perform
load tests as specified in ACI 318, Chapter 2.
4. In the event an area is found to be structurally unsound, the Owner may order removal and
replacement of concrete as required. The costs of the core tests, the load test and the
structural evaluation shall be borne by the Contractor.
5. Fill all core holes with a non-shrink grout as Master Builders Masterflo 713 or approved
equal.
E. Maintain records of placed concrete items. Record date, location of pour, quantity, air
temperature, and test samples taken.
3.10 Integral Color Schedule
LOCATION DAVIS COLOR DOSAGE/PIGMENT FINISH
Poudre Trail Yosemite Brown 2lbs 641 Heavy Broom
END OF SECTION
City of Fort Collins SECTION 02520 – Portland Cement Concrete Paving
Park Planning & Development Division Page 11 of 11
DIVISION 2
SECTION 02900 - SITE REVEGETATION
PART 1 - GENERAL
1.01 Description of Work
A. The work covered by this specification includes the furnishing of all materials and application of
fertilizer, seed and mulch to areas defined in the plans or required by field condition. The work
shall be completed in accordance with these specifications, accepted horticultural practice, and
with the plans.
1.02 Related Work
A. See appropriate sections for site work needed prior to work required in this section. Obtain
approval from the Engineer prior to starting work required in this section.
1.03 Submittals
A. Submit manufacturer’s specifications and literature on all products.
B. Submit materials list including quantities and description of materials.
1.04 Quality Assurance
A. Source Quality Control: Manufacturer’s test for purity and germination of seed, dated within six
months of seeding.
B. Certificates: Manufacturer’s certification that fertilizer meets specification requirements.
PART 2 - MATERIALS
2.01 Grass Seed
A. Grass seed shall be of the latest crop available. Seed shall meet Colorado Department of
Agriculture Seed Laws, Chapter 35, Article 27.
B. The seeding mixture shall be applied at a pure live seed (PLS) rate per acre AS SHOWN ON
SHEET 4 OF 4.
C. Do not use seed which has become wet, moldy, or otherwise damaged in transit or in storage.
D. The Contractor shall compensate for percentage of purity and germination by furnishing sufficient
additional seed to equal the specified pure live seed product. The formula for determining the
quantity of pure live seed (PLS) shall be: Pounds of Seed (Bulk) x Purity x Germination =
E. Pounds of Pure Live Seed (PLS)
F. The Contractor shall present to the Engineer a certificate of the PLS test of the grass seed which he
intends to use. All grass furnished shall be delivered in sealed bags showing the weight, analysis
and vendor’s name.
2.02 Fertilizer
A. Commercial fertilizer type and application rate shall be AS SHOWN ON SHEET 4 OF 4.
City of Fort Collins Section 02900 – Site Revegetation
Park Planning & Development Division Page 1 of 4
2.03 Mulch
A. Hydraulically spray or approved equal.
2.04 Topsoil
A. Topsoil shall be select earth material of loose friable loam reasonably free of admixtures of
subsoil, refuse stumps, roots, rocks, brush, weeds or other material which can be detrimental to the
proper development of ground cover.
PART 3 - EXECUTION
3.01 General
A. The pattern of seeding and mulching, and fertilization if required, shall be as detailed or as
required by field conditions to provide a uniform stand of grass acceptable to the City. In no case
shall revegetation occur within 30 days of the application of a chemical weed control substance.
B. Warranty excludes replacement of plants after final acceptance because of injury by storm,
drought, drowning, hail, freeze, insects or diseases.
3.02 Preparation
A. Verify that soil preparation has been completed prior to seeding.
B. Seed areas damaged by construction activities as directed by the Engineer.
C. Apply by broadcasting or drillings at the rate specified herein.
D. Selection of the time of seeding shall be Contractor’s responsibility, consistent with erosion
control.
E. Rework previously prepared areas that have become compacted or damaged by rains or traffic.
F. Do not drill or sow during windy weather or when ground is frozen or untillable.
G. Cover seed to depth between ¼ to ½ inch by raking or harrowing.
H. Firm seed areas with roller weighing maximum of 100 lbs. per foot to width.
3.03 Hydraulic Seeding and Mulching
A. Seed and fertilize in the amounts per acre designated. Wood cellulose fiber mulch at 2,000 lbs/
acre.
B. Combine with water to provide a slurry. Perform hydraulic application in such a manner that the
liquid carrier will uniformly distribute the material over the entire area to be seeded at rates not
less than indicated herein. Do not compact. Double the amount of seed per acre if seed and mulch
are applied in a single application.
3.04 Drill Seeding
A. Seed shall be applied in a minimum of two passes at 90 degrees two each other.
3.05 Reseeding and Repair
A. Reseed and mulch areas where there is not a satisfactory stand of grass at the end of 60 days after
seeding.
B. Minimum satisfactory stand: 4 plants per square foot.
City of Fort Collins Section 02900 – Site Revegetation
Park Planning & Development Division Page 2 of 4
3.06 Areas to be Seeded
A. All areas that have been damaged or disturbed by the Contractor’s operation shall be reseeded
according to these specifications and as indicated on the plans.
3.07 Maintenance
A. No maintenance is required, UNLESS NOTED ON THE BID SCHEDULE.
City of Fort Collins Section 02900 – Site Revegetation
Park Planning & Development Division Page 3 of 4
Fertilizer and Seed Mix
Commercial Fertilizer (18-46-0) Percent available by weight
Nitrogen 18
Phosphorus 46
Potassium 0
Application rate of 250 lbs per acre
Seed Mix Pure Live Seed Lbs./Acre Seed
Buffalo Grass 20% 13
Blue Gramma 30% 14
Sheep’s Fescue 50% 13
100 40
END OF SECTION
City of Fort Collins Section 02900 – Site Revegetation
Park Planning & Development Division Page 4 of 4
DIVISION 2
SECTION 02950 - SOD CONSTRUCTION
PART 1 - GENERAL
1.01 Work Included
A. The Contractor shall furnish all labor, materials, tools, equipment and perform all work and
services necessary for sod construction in the quantities required.
B. Furnish and install all supplementary or miscellaneous items, appurtenances and devices incidental
to or necessary for a healthy, sound, and complete, craftsman-like installation. Work to include:
1. Application of herbicides.
2. Soil preparation.
3. Fine grading of all planting areas.
4. Sod installation.
5. Maintenance during establishment.
1.02 Submittals & Quality Assurance
A. Submit three copies of:
1. Manufacturer’s specifications and literature on all products.
2. Manufacturer’s tests (within 6 months of application) on supplied products.
3. Sod grower’s letter certifying the sod’s species composition.
B. Provide at least one person who shall be present at all times during execution of this portion of the
work and who shall be thoroughly familiar with the type of materials being installed and the best
methods for their installation and who shall direct all work performed under this section.
1.03 Inspection
A. Initial Inspection:
1. Contractor will inspect existing site conditions and note irregularities affecting the work of
this section. Verify that grading operations have been satisfactorily completed and that topsoil
of adequate quantity and quality has been placed in all disturbed areas as specified. Verify
that the areas to be sodded are protected from concentrated runoff and sediment from adjacent
areas. Note any previous treatments to the areas such as temporary seeding or mulching and
discuss with the City Representative how these treatments will affect permanent revegetation.
Report all irregularities affecting work of this section to the City Representative before
initiating work. When the Contractor begins work under this section, it implies acceptance of
existing conditions.
B. Substantial and Final Acceptance:
1. Contractor shall notify City Representative prior to start of work. City Representative will be
responsible to monitor the work.
2. Upon completion of the sodding operations, the contractor shall notify the City Representative
to request a review of the work. If all work is acceptable, the City Representative shall record
the date and issue a “Conditional Acceptance” certificate which states that the Contractor shall
begin maintenance of all sodded areas as specified.
City of Fort Collins Section 02950 – Sod Construction
Park Planning & Development Division Page 1 of 4
3. Sodded areas shall receive “Final Acceptance” provided a healthy, even colored, viable turf is
established, free of weeds and undesirable grass species, disease and insects.
1.04 Guarantee
A. Guarantee sod against defects for a period of one growing season from the date of final
acceptance.
B. This guarantee shall not be enforced should sod die due to vandalism, improper maintenance by
Owner, lawn mower damage or other circumstances beyond the control of the Contractor.
C. Replace sod when it is no longer in a satisfactory condition as determined by the Owner’s
Representative for the duration of the guarantee period.
D. Areas sodded in the spring shall be inspected for required coverage the following fall not later than
October. Areas sodded in the fall will be inspected in October of the following year.
PART 2 - MATERIALS
2.01 Herbicide
A. Round-Up
2.02 Soil Amendment
A. Use compost or well rotted manure free from lumps, stones or other foreign matter. Soil
amendment must be free of mineral matter or chemical composition harmful to plant life and have
the following properties:
Organic Matter: 35-40%
PH: 7.4 to 8.5
Salt: < 4 mmhos/cm
2.03 Fertilizer
A. Commercial Fertilizer (20 – 20 – 10) apply at manufacturers recommendation.
2.04 Sod
A. Provide strongly rooted sod not less than 2 years old and free of weeds.
B. Species composition shall be a mix of blue grass.
C. Furnish in rolls:
1. Uniformly mowed height when harvested.
2. Free of disease, nematodes, pests and pest larvae.
3. Thickness: Soil thickness of sod cuts shall not be less than 3/4 inch nor more than 1 inch.
D. Weeds:
1. Free of Bermuda grass, Quack grass, Johnson grass, poison ivy, nut sedge, nimble will,
Canada thistle, bindweed, bent grass, wild garlic, ground ivy, perennial sorrel.
2. Containing less than 10 Jimsonweed, mustard, lamb's quarter, chickweed, cress or crab grass
plant per 100 sq. ft.
2.05 Water
A. Free of substances harmful to plant growth. Contractor responsible for watering even if area
sprinkler system is not operational.
City of Fort Collins Section 02950 – Sod Construction
Park Planning & Development Division Page 2 of 4
2.06 Pegs
A. Softwood, 3/4 inch diameter, 8 inch length.
PART 3 - EXECUTION
3.01 Site Preparation
A. Prepare areas as follows:
1. Remove any existing vegetation not scheduled to remain.
2. Rip existing topsoil to a minimum depth of eight inches in one direction using an agricultural
ripper with tines spaced at no greater than 18 inches. Areas adjacent to walks, structures,
curbs, etc., where the use of large mechanical equipment is difficult, shall be worked with
smaller equipment or by hand.
3. Place soil amendment at a rate of six (6) cubic yards per 1,000 square feet.
4. Till all areas to be planted to a depth of 6”.
5. In tree protection areas, the topsoil shall be worked by hand to a depth of 3 inches.
6. Remove all rubble, stones, plant material and extraneous material over 1½ inches in diameter
from the site.
7. Apply pre-planting fertilizer as specified in Part 2 of the Section.
8. Restore fine grade with float drag to remove irregularities resulting from tilling operations.
Float drag in two directions. Coordinate restoration of fine grade to establish the vegetation
subgrade at one inch below adjacent paved surfaces. Match grade at property lines and work-
limit lines.
B. Remove any additional stones over 1½ inches that have come to the surface. Perform drainage test
by applying water with the irrigation system. Do not plant until the finished grade is reviewed by
City Representative. This review does not reduce Contractor's responsibility to provide a finished
product that drains properly.
3.02 Installation
A. Sod areas indicated on drawings.
B. Selection of the time of sodding shall be the Contractor’s responsibility, consistent with weather
limitations. Coordinate with Parks Maintenance if fall watering is required for establishment.
C. Begin sodding from bottom of slopes.
D. Lay first row of sod in a straight line with long dimension of pads parallel to slope contours.
E. Butt side and end joints.
F. Stagger end joints in adjacent rows.
G. Do not stretch or overlap sod.
H. Peg sod on slopes greater than 3 to 1 with a minimum of two pegs per sq. yd.
I. Water sod immediately after transplanting.
J. Roll sod, except on pegged areas, with roller weighing not more than 150 lbs. per foot of roller
width.
K. Water sod and soil to a depth of 4 to 6 inches within four hours after rolling.
L. Provide sufficient barriers and signage notifying the public to keep off the newly sodded areas.
City of Fort Collins Section 02950 – Sod Construction
Park Planning & Development Division Page 3 of 4
3.03 Maintenance
A. Sod establishment period:
1. Sod establishment period shall begin immediately after installation and continue through the
second mowing or until turf is established. Maintenance shall include watering, mowing,
fertilizing and weed control as necessary.
2. Watering: Water sod areas as needed to keep wet to a depth of 4 to 6 inches for 2 to 3 weeks
until grass is established. Avoid standing water, surface wash or erosion from over-watering.
Reduce water application after the first few weeks.
3. Mowing: Mow when the grass is 4inches long, sometime after 2 weeks. Mow at a height of 3
inches. If the turf reaches over 4 inches, mow off one third of the height even if two weeks
has not passed. Do not cut shorter than 3 inches for the first few mowings. Reduce water
prior to mowing so as not to damage sod. Mow with walk behind mower.
4. Disease and Insect Control: A licensed applicator shall apply fungicides and insecticides as
required to control disease and insects in accordance with state law requirements.
3.04 Re-sod and Repair
A. Resod areas where there is not a satisfactory stand of grass at the end of establishment period.
B. Sod shall be established at least 30 days prior to Final Acceptance.
C. Re-sod spots larger than 1 sq. ft. not having a uniform stand of grass.
END OF SECTION
City of Fort Collins Section 02950 – Sod Construction
Park Planning & Development Division Page 4 of 4
DIVISION 7
SECTION 07900 - JOINT SEALERS
PART 1: GENERAL
1.01 Work Included
A. Furnish and Install: Provide all caulking and sealant indicated on the Drawings, specified herein,
and not specified under other sections. In general, seal all openings indicated on the Drawings and
at other locations requiring caulking to seal visually and against infiltration from air and water,
including but not limited to the following:
1. Expansion joints in concrete walks
2. Exterior wall joints
3. Masonry control joints
4. Isolation joints, between structure and other elements
5. Joints at penetrations of walls, decks, and floors by piping and other service
equipment
6. Joints between items of equipment and other construction
7. Joints between door and window frames and adjacent materials, exterior and interior
8. Bedding for door thresholds
9. Open joints between dissimilar materials as required closing and concealing jointing
of the work
10. Construction and expansion of joints, joints between dissimilar materials; joints around
windows, door frames, louvers, and other penetrations and openings
11. Other joints as indicated
1.02 Submittals for Review
A. Color Samples: Submit color chart for each type of sealant in accordance with Division 1.
B. Product Data: Submit for each material intended for use and location of application in accordance
with Division 1.
1.03 Delivery, Storage and Handling
A. General: Comply with Section 01600. Deliver in original unopened containers and store in an
area not subject to extreme heat or cold.
1.04 Project Conditions
A. Environmental Conditions: Do not apply exterior sealants during wet weather or when the outside
temperature is below 40(F. Do not apply interior sealants when the inside temperature is below
60(F.
1.05 Warranty
A. Provide a written three year warranty in writing covering materials and workmanship in
accordance with Section 01700. Warranty shall require installer, at no cost to Owner, to repair or
replace sealants which fail to perform as air-tight and water-tight joints; or fail in joint adhesion,
cohesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain
resistance, or general durability; or appear to deteriorate in any other manner not clearly specified
as an inherent quality of the material by submitted manufacturer s data.
City of Fort Collins Section 07900 – Joint Sealers
Park Planning & Development Division Page 1 of 5
PART 2: PRODUCTS
2.01 Joint Backing Material
A. General: Size joint backing material for minimum 30% compression when inserted in that joint.
Material shall be round or semi-circular type.
B. Acceptable Manufacturers:
1. Dow Chemical Company, Ethafoam
2. Sonneborn, Sonofoam
3. Schlegel Manufacturing Company, Schlegelfoam
4. Denver Foam
5. Accepted Substitute
2.02 Sealant Material
C. Acceptable Manufactures:
1. DAP Incorporated
2. Parr, Inc.
3. Pecora Corporation
4. Products Research and Chemical Corporation
5. Sonneborn Building Products
6. Tremco Manufacturing Company
7. Mameco International
8. W.R. Grace and Company
9. Accepted Substitute
D. Silicone Sealant Manufacturer:
1. General Electric
2. Dow Corning
3. Accepted substitute in accordance with Section 01600
E. Acceptable Materials:
1. Interior and Under Thresholds: Latex acrylic, ASTM C834-761.
2. Other Caulking: Two component polyurethane, FS IT-S-00227E, Type II, Class A, non-
sag
3. Primer: As recommended by the sealant manufacturer.
4. Sealant at Concrete Paving: Two-component self-leveling polyurethane, FS IT-S-
00227E, Type I, Class, pourable type.
5. Sealant at Lavatories: Silicone sealant.
6. Colors: As selected by Architect from standard colors.
2.03 Bond Breaker Tape
A. Tape: Polyethylene tape or other plastic tape as recommended by the sealant manufacturer to be
applied to sealant-contact surfaces where bond to the substrate or joint filler must be avoided for
proper performance of sealant. Provide self-adhesive tape wherever possible. Site Benches
PART 3: EXECUTION
3.01 Inspection
A. Inspection: Inspect work of others prior to application of any work under this section. If any joint
or space to receive this work is not according to detail and cannot be put into proper condition to
receive the work by specified methods; notify the General Contractor in writing or assume
responsibility for and rectify any unsatisfactory caulking and sealing resulting.
City of Fort Collins Section 07900 – Joint Sealers
Park Planning & Development Division Page 2 of 5
B. Acceptance: Beginning of installation means acceptance of existing conditions.
3.02 Preparation
A. Preparation of Surfaces
1. Clean surfaces in accordance with manufacturer s recommendations.
2. Mask edges, if required to protect adjoining surfaces and produce a straight finish
line.
3. Clean joint surfaces immediately before installation of sealant. Remove dirt, insecure
coatings, moisture and other substances which would interfere with bond of sealant.
4. Do not proceed with installation of sealant over joint surfaces which have been painted,
lacquered, waterproofed or treated with water repellent or other treatment of
coating. Remove coating or treatment joint surfaces before installing sealant.
5. Each concrete masonry joint surfaces to remove excess alkalinity unless sealant
manufacturer s printed instruction indicates that alkalinity does not interfere with
sealant bond and performance. Etch with 5% solution of muriatic acid, neutralize with
diluted ammonia solution, rinse thoroughly with water and allow to dry before
sealant installation.
B. Priming: If required, prime surfaces which are to be caulked with manufacturer s recommended or
standard primer, after the surfaces have been prepared as specified. Before use, check primers for
discoloration and dirt pick-up on adjacent surfaces. If staining occurs, after exposure, take
adequate measures to prevent the primer from being applied over the face of adjacent porous
materials by masking or other suitable measures.
C. Joint Backing:
1. Joints shall be of depth necessary to provide for the specified allowable thickness of
sealant and also the required backing where and as specified. Provide backing of extent
and type as specified and required to provide for the allowable depth of the sealant.
2. Back-up Materials for Sealants: Non-staining, compatible with the sealant and primer,
shall be of a resilient nature and as recommended by the manufacturer of the sealant.
Size and shape of the backing shall be as required by the width of the joint and specified.
Do not use materials impregnated with il, solvents, or bituminous materials.
3. Compress backing material a minimum of 30% when inserted in the joint. Backing
material for the upper portion of joint shall be a round rod or semi-circular in cross-
section with the arc in contact with the sealant.
D. Bond Breaker Tape: Install where indicated and as required by manufacturer s recommendations
to ensure that sealants will perform properly.
3.03 Application
A. Exterior Metal Sills: Set in full bed of polyurethane sealant.
B. Thresholds: Set in full bed of latex acrylic sealant.
C. Caulk Joints:
1. Apply sealants in continuous beads without open joints, voids, or air pockets, using a
ratchet hand gun or mechanical powered gun.
2. Confine sealants to joint areas with masking tapes or other precautions. Apply
compounds in concealed compression joints accurately so that excess compound will not
extrude from joints.
City of Fort Collins Section 07900 – Joint Sealers
Park Planning & Development Division Page 3 of 5
3. Remove excess compound or sealant promptly as work progresses, and clean adjoining
surfaces.
4. In rough surfaces or joints of uneven widths, install sealant, well back into joint. Recess
equal to width of joint, or 3/8" minimum at masonry.
5. Use anti-tack agent where necessary to protect freshly applied sealant from public traffic
and dirt.
6. Slightly recessed joints as to facilitate a painter s line. Handtool and finish joints
throughout construction.
7. Comply with manufacturer s printed instructions and specifications.
D. Concrete Paving Expansion Joints: Cut expansion joint filler down to allow joint depth equal to
75% of joint width, but neither more than 0.625" deep nor less than 0.375" deep. Seal over
expansion joint filler with poured sealant.
E. Workmanship: Employ only proven installation techniques, which will ensure that sealants will be
deposited in uniform, continuous ribbons without gaps or air pockets, with complete wetting of
the joint bond surfaces equally on opposite sides. Except as otherwise indicated, fill sealant rabbet
to a slightly concave surface, slightly below adjoining surfaces. Where horizontal joints are
between a horizontal surface and a vertical surface, fill joint to form a slight cove, so that joint will
not trap moisture and dirt.
F. Joint Sizes: Install sealants to depths as indicated or, as recommended by the sealant manufacturer
but within the following general limitations:
1. For normal moving joints sealed with elastomeric sealants but not subject to traffic, fill
joints to a depth equal to 50% of joint width, but not more than 1/2" deep or less than
1/4" deep.
2. For joints sealed with non-elastomeric sealants and caulking compounds, fill joints to a
depth in the range of 75% to 125% of joint width.
G. Spillage:
1. Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to
migrate into the voids of adjoining surfaces. Use masking tape or other precautionary
devices to prevent staining of adjoining surfaces, by either the primer/sealer or the
sealant.
2. Remove excess and spillage of compounds promptly as the work progresses. Clean the
adjoining surfaces by whatever means may be necessary to eliminate evidence of
spillage. Do not damage the adjoining surfaces or finishes.
3.04 FIELD QUALITY CONTROL
A. Samples: Where directed by the Architect, cut out and remove a total of three samples consisting
of the undisturbed sealant and back-up material from the joint. Samples shall be 6" in length.
Reseal cut out areas with the same materials.
3.05 CURING, PROTECTION AND CLEANING
A. Curing: Cure sealants and caulking compounds in compliance with manufacturer s instructions
and recommendations, to obtain high early bond strength, internal cohesive strength and surface
durability.
B. Protection:
City of Fort Collins Section 07900 – Joint Sealers
Park Planning & Development Division Page 4 of 5
1. Advise the General Contractor of procedures required for the protection of sealants
during the construction period, so that they will be without deterioration or damage (other
than normal weathering) at the time of acceptance.
C. Cleaning:
1. Protect surfaces from damage. Clean soiled surfaces immediately. Replace with
new material any damaged material which cannot be cleaned with new material.
END OF SECTION
City of Fort Collins Section 07900 – Joint Sealers
Park Planning & Development Division Page 5 of 5
CITY OF FORT COLLINS
PARK PLANNING AND DEVELOPMENT
TRAIL WORK 2006
CONSTRUCTION DOCUMENTS:
page
LOCATION MAP 1
POUDRE TRAIL 2
POWER TRAIL 3
GOLDEN MEADOWS 4
TRAIL DETAILS 5
COVER
SHEET
Location Map for Trail Work 2006
Poudre Trail: Lemay Ave. to Nix Farm
Power Trail : Horsetooth to Golden Meadows {
Sheet 2
0 0.35 0.7 1.4 2.1 2.8 City of Fort Collins
Miles
POUDRE
TRAIL
POWER
TRAIL
MULBERRY
LEMAY AVE
I - 25
HORSETOOTH ROAD
COLLINDALE
GOLF
COURSE
NIX
FARM
TIMBERLINE RD
Administrative Services
Purchasing Divison
215 North Mason Street y 2nd Floor y P.O. Box 580 y Fort Collins, CO 80522-0580 y (970) 221-6775 y Fax (970) 221-6707 www.fcgov.com
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid No. 5963 TRAILWORK 2006
OPENING DATE: February 23, 3:00 p.m. (Our Clock)
To all prospective bidders under the specifications and contract documents described above,
the following clarifications are hereby made.
DIVISION 1
Section 01800 – Definition of Bid Items
Bid Item 2 & 9 – Traffic Control
Contractor shall furnish all labor, materials and equipment for on-site security. This includes
furnishing, installing, and maintaining barriers that provide for a safe construction site for the
duration of the trail project. The City of Fort Collins Park Planning and Development will have
traffic control provided to allow detour routes for pedestrians. The City will also provide for a
safe access to the sites for our contractors, materials and equipment.
Bid Items 5 & 14– 5” Colored Concrete Paving
Contractor shall furnish all labor, materials and equipment to install 10’ wide concrete trail. Bid
amount includes installation of 5” thick standard concrete (3,500 psi) with fiber mesh
reinforcement. All concrete paving to be Yosemite Brown Colored Concrete. The Power Trail
alignment is to be field staked by the owner’s representative prior to construction.
The Poudre Trail asphalt to concrete conversion is to start to the east of the Lemay Avenue
bridge and pedestrian access ramps. The access ramps and bridge will be maintained by the
City as a detour route for people to cross Lemay avenue, please keep it free and clear of debris
and construction equipment.
Bid Item 12 – ABC Class 5
The bid price for this item shall include supplying, placing, and compacting aggregate base
course in accordance with the Drawings and Specifications or as otherwise directed by the
ENGINEER. Measurement and payment for this item will be by the actual number of tons in
place (by scale tickets), complete at proper moisture. Quantities will be adjusted accordingly if
the moisture content is too high. The method to bring mixture to optimum moisture will not be
measured or paid for separately, but shall be included in the unit price for this item.
Estimated quantities are broken into two locations along the power trail. The engineer’s
estimate is that it will take 86 tons to bring the access ramp off Horsetooth Road at a 5% grade
at approximately 20’ wide. The remaining quantity is designated for subgrade preparations for
the end of the 10’ colored concrete trail at Golden Meadows Park.
Please contact John D. Stephen, CPPO, CPPB at (970) 221-6777 if you have any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
ADDENDUM 1
5963 2006 Trail Work
REVISED BID SCHEDULE: (BASE BID)
Bid items are described in Section 01800
POUDRE TRAIL: LEMAY AVENUE TO NIX FARM
BID ESTIMATED UNIT ITEM
ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL
1 Mobilization 1.00 LS
2 Traffic Control 1.00 LS
3 Demolition 32,696.00 SF
4 Subgrade Prep 40,870.00 SF
5 10' Yosimite Brown colored concrete 40,870.00 SF
6 Landscape Restoration 40,870.00 SF
7 Seeding 40,870.00 SF
POWER TRAIL: HORSETOOTH RD TO GOLDEN MEADOWS PARK
8 Mobilization 1.00 LS
9 Traffic Control 1.00 LS
10 prune and grub 1.00 LS
Subgrade Prep
11 subgrade preparations for trail 34,270.00 SF
12 import and place class 5 abc 200.00 TON
13 Mirafi 500X Geotextile Fabric 5,400.00 SF
Concrete
14 10' Yosimite Brown colored
concrete trail
34,270.00 SF
15 8' Gray Concrete Sidewalk 1,120.00 SF
Landscaping
16 Landscape Restoration 34,270.00 SF
17 Sod 2,000.00 SF
18 Seeding 34,270.00 SF
19 Erosion Control 200.00 LF
TOTAL OF BASE BID
DOLLARS $
(written)
DATE:
DRAWN BY:
DESIGNED BY:
CHECKED BY:
REVISIONS:
City of Fort Collins
SHEET
1/27/2006
CLF
MAD
MAD
TRAIL WORK 2006 02/10/2006
Poudre Trail: Lemay Avenue to Nix Farm
3
6
L - 1
SCALE:
1" = 400'
NIX NATURAL
AREA
HOFFMAN
MILL HAUL
SITE
TRAIL
ACCESS
GATE AT
NIX FARM
LEMAY
AVENUE
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
Trail Work 2006
BID NO. 5963
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
February 23, 2006 – 3:00 P.M. (OUR CLOCK)
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020 Notice Inviting Bids 00020-1 - 00020-2
00100 Instruction to Bidders 00100-1 - 00100-9
00300 Bid Form 00300-1 - 00300-3
00400 Supplements to Bid Forms 00400-1
00410 Bid Bond 00410-1 - 00410-2
00420 Statements of Bidders Qualifications 00420-1 - 00420-3
00430 Schedule of Major Subcontractors 00430-1
CONTRACT DOCUMENTS
00500 Agreement Forms 00500-1
00510 Notice of Award 00510-0
00520 Agreement 00520-1 - 00520-6
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates 00600-1
00610 Performance Bond 00610-1 - 00610-2
00615 Payment Bond 00615-1 - 00615-2
00630 Certificate of Insurance 00630-1
00635 Certificate of Substantial Completion 00635-1
00640 Certificate of Final Acceptance 00640-1
00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate 00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
SPECIFICATIONS
07/2001 Section 00020 Page 2
SECTION 00020
INVITATION TO BID
07/2001 Section 00020 Page 1
SECTION 00020
INVITATION TO BID
Date: January 30, 2006
Sealed Bids will be received by the City of Fort Collins (hereinafter referred
to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock,
on February 23, 2006, for the Trail Work 2006; BID NO. 5963. If delivered,
they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins,
Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort
Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly
received will be publicly opened and read aloud.
The Contract Documents provide for the construction of Bid 5963 Trail Work
2006 This project includes two (2) sections of trail construction. The Poudre
Trail section is an asphalt to concrete conversion project and the Power Trail
is a new trail construction project. The contract documents provide
information for the removal of the existing 8’ asphalt trail, subgrade
preparations, construction of the 10’ wide colored concrete trail,
construction of the 8’ wide gray concrete sidewalk connection, minor
earthwork, landscape restoration, erosion control and seeding.
All Bids must be in accordance with the Contract Documents on file with The
City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado
80524.
Contract Documents will be available January 31, 2006.
A prebid conference and job walk with representatives of prospective Bidders
will be held at 10:00 a.m., on February 9, 2006, at 215 Mason 2D, Fort
Collins.
Questions concerning the scope of the bid should be directed to Project
Manager Matt Day, (970) 224-6096.
Questions regarding bid submittal or process should be directed to John D
Stephen, CPPO, CPPB, Senior Buyer (970) 221-6777.
A copy of the Bid may be obtained as follows:
1. Download the Bid from the Purchasing Webpage, Current Bids page,
at: https://secure2.fcgov.com/bso/login.jsp.
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins,
and request a copy of the Bid.
Prospective Bidders are invited to present their questions relative to this
07/2001 Section 00020 Page 2
Bid proposal at this meeting.
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section
2.3 of General Conditions. Substantial Completion of the Work is required as
specified in the Agreement.
The successful Bidder will be required to furnish a Performance Bond and a
Payment Bond guaranteeing faithful performance and the payment of all bills
and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date
fixed for opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any
informalities and irregularities therein.
Bid security in the amount of not less than 5% of the total Bid must accompany
each Bid in the form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City
Council, shall have a financial interest in the sale to the City of any real
or personal property, equipment, material, supplies or services where such
officer or employee exercises directly or indirectly any decision-making
authority concerning such sale or any supervisory authority over the services
to be rendered. This rule also applies to subcontracts with the City.
Soliciting or accepting any gift, gratuity favor, entertainment, kickback or
any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited
City of Fort Collins
By ______________________________________
James B. O'Neill, II, CPPO, FNIGP
Purchasing & Risk Management Director