HomeMy WebLinkAboutBID - 5789R SALE OF RESOURCE RECOVERY FARMDATE: August 30, 2005
CITY OF FORT COLLINS
PLANHOLDERS LIST FOR
BID #5931
BID NAME: Mason Street/Harmony Road/Fossil Creek Bike/Pedestrian Trail
Flatiron
10090 I-25 Frt. Rd.
Longmont, CO 80504
PH 720-494-8111
FAX 303-776-0072
Wheeler Consolidated, Inc.
9330 James Ave. SO
Bloomington, MN 55431
PH 800-328-3986 x226
FAX 952-929-2909
Korby Landscape
PO Box 989
Wellington, CO 80549
PH 970-568-7633
FAX 970-568-7635
ECI
2526 E. Hwy. 402
Loveland, CO 80539
PH 970-669-6291
FAX 970-669-6411
Big R Manufacturing, LLC
PO Box 1290
Greeley, CO 80632-1290
PH 970-356-9600
GL Hoff
1815 W. 12th St.
Loveland, CO 80537
PH 970-669-3255
FAX 970-663-1566
Lawson Construction Co.
PO Box 1318
Longmont, CO 80501
PH 303-444-8680
FAX 303-938-9955
American Eagle Industries, Inc.
691 First St. Unit B
Nunn, CO 80648
PH 970-897-2880
FAX 970-897-2879
Steadfast Bridges
4021 Gault Ave. S.
Fort Payne, AL 35967
PH 800-749-7515
FAX 256-845-9750
TLM Constructors
1013 67th Ave. Ct.
Greeley, CO 80633
PH 970-346-8323
FAX 970-346-8324
ABCO Contracting Co., Inc.
2180 E. 47th Pl.
Denver, CO 80229
PH 303-288-4140
FAX 303-288-4036
Northstar Concrete, Inc.
Gap Constructors
4505 Inlet Ct.
Fort Colllins, CO 80526
PH 970-214-1192
FAX 970-207-1608
Excel Sheet Metal, Inc.
12001 Shoemaker Ave.
Santa Fe Springs, CA 90670
PH 800-548-0054
FAX 562-944-4025
Hall-Irwin Construction
301 Centennial Dr.
Milliken, CO
PH 970-587-6951
Vogel Concrete
1313 Blue Spruce Dr.
Fort Collins, CO 80524-3506
PH 970-484-3880
Mountain Constructors
PO Box 405
Platteville, CO 80651
PH 970-785-6161
FAX 970-785-2515
Weekly Plan-it
6820 N. Franklin
Loveland, CO 80538
PH 970-593-1171
FAX 970-593-1171
Native-Scopes of CO, Inc.
1613 E. Olive Ct., Unit E
Fort Collins, CO 80524
PH 970-494-1613
FAX 970-494-1613
Korby Landscape
PO Box 989
Wellington, CO 80549-0989
PH 970-568-7633
FAX 970-568-7635
Concrete Works
1260 Rock Creek Cir.
Lafayette, CO 80026
PH 303-665-2933
Bridge America, Inc.
PO Box 907
Alexandria, MN 56308
PH 320-763-5600
FAX 320-763-5672
J-2 Contracting Company
929 38th Ave., Ct. #106
Greeley, CO 80634
Ph 970-392-0694
Arapahoe Utilities & Infrastructure
14251 E. Fremont Ave., Ste E
Englewood, CO 80112
PH 303-690-8888
FAX 303-690-2180
Weld County Construction
PO 67
Pierce, CO 80650
PH 970-834-2631
Administrative Services
Purchasing Divison
215 North Mason Street y 2nd Floor y P.O. Box 580 y Fort Collins, CO 80522-0580 y (970) 221-6775 y Fax (970) 221-6707
www.fcgov.com
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5931 Mason Street/Harmony Road/Fossil Creek Bike/Pedestrian Trail
OPENING DATE: 3:00 P.M. (Our Clock) August 30, 2005
To all prospective bidders under the specifications and contract documents described above,
the following changes are hereby made.
I. Clarification on Railroad Safety and Security Training for Material Suppliers and
Sub-Contractors: It is not necessary for Material Suppliers to have the Railroad Safety
and Security Training. Sub-contractors do not need Railroad Safety and Security
training so long as there are Primary Contractor employees (that are required to have
the Railroad Safety and Security Training) on the job site.
II. Railroad Flagging will be arranged and paid for by The City of Fort Collins. Page
71 of the Contract in the Special Provisions will be revised as follows: under “Railroad
Flagging”:
a. “The Contractor shall notify the Railroad in writing 10 days prior to beginning and
48 hours prior to stopping any work that will require protective services. The
Contractor shall notify the Railroad five days prior to canceling protective
services.” is revised to read: The City of Fort Collins shall notify the Railroad
in writing 10 days prior to beginning and 48 hours prior to stopping any
work that will require protective services. The City of Fort Collins shall
notify the Railroad five days prior to canceling protective services.
b. “ The Railroad will bill the Contractor monthly at the current rates of pay for
flagging services furnished and the Contractor shall pay the Railroad within 30
days after the receipt of bills. The Department will reimburse the Contractor
under the planned force account item “Railroad Flagging” is revised to read: The
Railroad will bill the City of Fort Collins monthly at the current rates of pay
for flagging services furnished and the City of Fort Collins shall pay the
Railroad within 30 days after the receipt of bills. The Department will not
reimburse the Contractor under the planned force account item “Railroad
Flagging”
III. Item 607 – Fence (Plastic) shall be 48” high lightweight orange safety “crowd control”
plastic (high density polyethylene) fencing (Resinet SL24-48100-O, or equal). The post
shall be metal studded “tee” line post spaced at 16 feet. The fencing shall be securely
tied to the post, and shall be removed as directed by the engineer.
IV. Clarification on Wetland Permits: The necessary wetland permits have been filed with
the appropriate agencies by CDOT. Construction activities should be maintained within
the temporary and permenant wetland takes shown on the structure details. Permits
were not acquired to pump out or adjust the water elevation of the Redtail Pond.
V. Clarification of construction easements for temporary shoring tie-backs. There is
no provision in our construction easement agreements for shoring tie-backs on the
temporary shoring at Pedestrian Bridge #2. The temporary shoring quantity and location
are all that is specified in the plan set. It is the responsibility of the contractor to
determine the appropriate shoring type and pricing for this location.
VI. Revision of the Bid Schedule: The Pay Quantity has been adjusted to reflect the
addition of the Concrete Headwall shown on plan sheet 88 at Station 100+00
(installation of an elliptical pipe with headwalls at Sta 100+00). The additional pay
quantities are: Item 514 - Pedestrian Railings – 68 LF; Item 601 - Concrete Class D
(Wall) – 29 CY; Item 601 – Structural Concrete Coating – 56 SY; Item 602 – Reinforcing
Steel – 2101 LBS; Item 206 – Structure Excavation – 74 CY; Item 206 Structure Backfill
(Class 1) – 70 CY. Please use the revised Bid Tab which reflects these changes.
VII. Recycled Asphalt Source Clarification: The City of Fort Collins has recycled asphalt
on hand that is available to the contractor. The material needs to be hauled by the
contractor from the Hoffman Mill Road Yard (at Lemay Ave. and Mulberry Street). The
Hoffman Mill Road Yard will load and weight each truck and will bill the City of Fort
Collins internally for the material (no material cost to the contractor). So the pricing of
Item 406 - Cold Bituminous Pavement (Recycled) should simply include your haul and
placement of the material.
VIII. Clarification on Safety Fencing along Easements: Revisions of Section 104 in the
Specifications Book states under the “Limits of Construction” that all easements and
work areas need to be fenced. This only applies to locations where the trail comes into
contact with existing sidewalks and roadways. You will also need to safety fence any
holes and drop-offs with safety fence. All these uses should be covered by your traffic
control line item.
IX. Clarification on Interim Milestone Dates: There are no interim milestones, as the
contract is written. The successful bidder will have to time his construction so that it
coincides with the New Mercer Channel's shut-off date of October 15 and turn on date of
March 15.
X. Clarification on Health and Safety Management in the event that hazardous
material are encountered: In the event of encountering hazardous materials on the
jobsite, the City of Fort Collins will overrun Item 250 -Health and Safety Officer (HSO)
quantity for Health and Safety Management. An argument would need to be made for
us to justify force account work for the HSO. However, upon encountering hazardous
materials onsite, we would need to look at the problem and there may very well be
legitimate force account work related to moving and/or disposing of the material. Based
on the environmental report that was done, we are not anticipating hazardous materials
onsite.
XI. Clarification on Note 23 in the General Notes on the plans: The primary contractor
will keep track of all changes on a master set of drawings in red ink. It will be The City of
Fort Collins’ responsibility to coordinate it's surveying services with Felsburg, Holt and
Ullvig to get the storm sewer verification and any other as-built field elevations/locations
and make electronic as-built updates to the plans.
XII. Due to the fact that we have altered the bid schedule with additional pay
quantities, a new bid schedule has been attached to this addendum. These
changes have been highlighted with bold text. Please use the attached bid
schedule to determine the bid total.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Mason Bike/Ped Trail from Harmony Road to Fossil Creek Revised Bid Tab
ADDENDUM 1
ITEM NUMBER DESCRIPTION UNIT UNIT COST QUANTITY TOTAL COST
201.00000 CLEARING AND GRUBBING LS 1.00
202.00010 REMOVAL OF TREE EA 65.00
202.00026 REMOVAL OF SLOPE AND DITCH PAVING SY 72.00
202.00190 REMOVAL OF CONCRETE MEDIAN COVER MATERIAL SY 8.00
202.00200 REMOVAL OF SIDEWALK SY 33.00
202.00203 REMOVAL OF CURB AND GUTTER LF 88.00
202.00495 REMOVAL OF PORTIONS OF PRESENT STRUCTURE LS 1.00
202.01130 REMOVAL OF GUARDRAIL TYPE 3 LF 100.00
203.00010 UNCLASSIFIED EXCAVATION (CIP) CY 2,472.00
203.01500 BLADING HR 16.00
206.00000 STRUCTURE EXCAVATION CY 901.00
206.00100 STRUCTURE BACKFILL (CLASS 1) CY 958.00
206.01750 SHORING (AREA 1) LS 1.00
208.00005 EROSION LOG LF 110.00
208.00020 SILT FENCE LF 588.00
208.00045 CONCRETE WASHOUT STRUCTURE EA 1.00
208.00070 STABILIZED CONSTRUCTION ENTRANCE EA 3.00
208.00100 SEDIMENT REMOVAL AND DISPOSAL LS 1.00
208.00200 EROSION CONTROL SUPERVISOR LS 1.00
210.01200 RESET END ANCHORAGE EA 1.00
212.00006 SEEDING (NATIVE) AC 2.10
212.00047 SOIL PREPARATION (SPECIAL) AC 2.10
213.00002 MULCHING (WEED FREE HAY) AC 2.50
213.00008 MULCHING (WOOD CHIP) CF 846.00
213.00061 MULCH TACKIFIER LB 375.00
214.00000 LANDSCAPE MAINTENANCE LS 1.00
214.00220 DECIDUOUS TREE (2 INCH CALIPER) EA 20.00
214.00350 DECIDUOUS SHRUB (5 GALLON CONTAINER) EA 250.00
214.00905 PERENNIALS (2.25 INCH POT) EA 650.00
214.01010 BRUSH LAYER CUTTING EA 450.00
216.00041 SOIL RETENTION BLANKET (STRAW/COCONUT) SY 45.00
217.00020 HERBICIDE TREATMENT HR 16.00
250.00110 HEALTH AND SAFETY OFFICER HR 20.00
304.06000 AGGREGATE BASE COURSE (CLASS 6) TON 445.00
403.00720 HOT BITUMINOUS PAVEMENT (PATCHING) (ASPHALT) TON 20.00
406.09501 COLD BITUMINOUS PAVEMENT (RECYCLED) TON 1,193.00
411.10254 EMULSIFIED ASPHALT (SLOW-SETTING) GAL 10.00
412.00800 CONCRETE PAVEMENT (8 INCH) SY 66.00
412.01000 CONCRETE PAVEMENT (10 INCH) SY 80.00
420.00101 GEOTEXTILE (EROSION CONTROL)(CLASS B) SY 24.60
420.00110 GOETEXTILE (DRAINAGE)(CLASS A) SY 13.00
503.00024 DRILLED CAISSON (24 INCH) LF 52.00
506.00212 RIPRAP (12 INCH) CY 6.70
506.00218 RIPRAP (18 INCH) CY 9.00
507.00000 CONCRETE SLOPE AND DITCH PAVING CY 1.00
514.00200 PEDESTRIAN RAILING (STEEL) LF 248.00
601.03040 CONCRETE CLASS D (BRIDGE) CY 137.00
601.03050 CONCRETE CLASS D (WALL) CY 172.00
601.40300 STRUCTURAL CONCRETE COATING SY 302.00
602.00000 REINFORCING STEEL LB 26,889.00
603.01180 18 INCH REINFORCED CONCRETE PIPE LF 361.00
603.02245 30 X 19 INCH REINFORCED CONCRETE PIPE ELLIPTICAL LF 16.00
603.05018 18 INCH REINFORCED CONCRETE END SECTION EA 1.00
604.00305 INLET TYPE C (5 FOOT) EA 2.00
604.30005 MANHOLE SLAB BASE (5 FOOT) EA 1.00
607.00015 END POST (SPECIAL) EA 4.00
607.11300 FENCE COMBINATION WITH TREATED WOOD POST LF 3,066.00
Mason Bike/Ped Trail from Harmony Road to Fossil Creek Revised Bid Tab
ADDENDUM 1
ITEM NUMBER DESCRIPTION UNIT UNIT COST QUANTITY TOTAL COST
622.00250 BENCH EA 1.00
622.00270 BOLLARD EA 2.00
622.00350 TRASH RECEPTACLE EA 1.00
622.00400 DRINKING FOUNTAIN EA 1.00
626.00000 MOBILIZATION LS 1.00
628.00001 BRIDGE GIRDER AND DECK UNIT (120' - 4") EA 2.00
630.10005 TRAFFIC CONTROL LS 1.00
TOTAL SUM OF CONTRACTOR BID ITEMS:
TOTAL IN WORDS:__________________________________________________________________________________________DOLLARS
SPECIFICATIONS AND CONTRACT DOCUMENTS
for
Mason Street/Harmony Road/Fossil Creek
Bike/Pedestrian Trail
Bid No. 5931
PURCHASING DIVISION
215 North N Mason Street, 2nd Floor, Fort Collins
August 30, 2005 – 3:00 (Our Clock)
07/2001 Section 00020 Page 2
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020 Notice Inviting Bids 00020-1 - 00020-2
00100 Instruction to Bidders 00100-1 - 00100-9
00300 Bid Form 00300-1 - 00300-3
00400 Supplements to Bid Forms 00400-1
00410 Bid Bond 00410-1 - 00410-2
00420 Statements of Bidders Qualifications 00420-1 - 00420-3
00430 Schedule of Major Subcontractors 00430-1
CONTRACT DOCUMENTS
00500 Agreement Forms 00500-1
00510 Notice of Award 00510-0
00520 Agreement 00520-1 - 00520-6
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates 00600-1
00610 Performance Bond 00610-1 - 00610-2
00615 Payment Bond 00615-1 - 00615-2
00630 Certificate of Insurance 00630-1
00635 Certificate of Substantial Completion 00635-1
00640 Certificate of Final Acceptance 00640-1
00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate 00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
FEDERAL FORMS
SPECIFICATIONS
GEOTECHNICAL STUDY
07/2001 Section 00020 Page 3
SECTION 00020
INVITATION TO BID
07/2001 Section 00020 Page 1
SECTION 00020
INVITATION TO BID
Date: July 29, 2005
Sealed Bids will be received by the City of Fort Collins (hereinafter referred
to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock,
on August 30, 2005, for the Mason Street/Harmony Road/Fossil Creek
Bike/Pedestrian Trail; BID NO. 5931. If delivered, they are to be delivered
to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed,
the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly
received will be publicly opened and read aloud.
This project is a Federal funded project and will need to meet Davis-Bacon
wage requirements and UDBE goals of 11.5%, as well as any other Federal
requirements as stated in the Specifications Book.
The Contract Documents provide for the construction of: 0.65 miles of 12’ wide
Portland concrete trail, two steel pedestrian bridges, a recycled asphalt
parking area, curb and gutter, Portland concrete pavement, asphalt patching,
grubbing, landscaping, and fence installation.
All Bids must be in accordance with the Contract Documents on file with The
City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado
80524.
Contract Documents will be available August 1, 2005.
Copies of the Contract Documents, complete with Construction Specifications
and Drawings, may be obtained from Purchasing Division at 215 North Mason St.,
2nd floor, Fort Collins, Colorado, 80524 upon payment of a refundable fee of
Fifty Dollars ($50.00) per set. No partial sets will be issued.
The Contract Documents and Construction Drawings may be examined at:
1. City of Fort Collins, Purchasing Division.
2. Dodge Plan Room, 1114 W. 7th Ave., Suite 100, Denver, Colorado.
3. Reed Construction Data, 11397 W. Radcliffe Dr. Littleton Colorado.
4. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado.
5. Construction News Service, 4775 Centennial Blvd Ste 150, Colorado
Springs, Colorado.
A prebid conference and job walk with representatives of prospective Bidders
will be held at, on August 11, 2005, at 1:00 P.M., in the Community Room at
215 N Mason, Fort Collins CO.
607.11525 FENCE (PLASTIC) LF 817.00
608.00006 CONCRETE SIDEWALK (6 INCH) SY 129.00
608.00010 CONCRETE CURB RAMP SY 81.00
608.00026 CONCRETE BIKEWAY (6 INCH) SY 4,258.00
608.10010 SIDEWALK DRAIN EA 3.00
609.21010 CURB AND GUTTER TYPE 2 (SEC. I-B) LF 172.00
609.21020 CURB AND GUTTER TYPE 2 (SEC. II-B) LF 34.00
609.71000 CURB (SPECIAL) LF 1,260.00
610.00110 MEDIAN EDGING LF 28.00
612.00001 DELINEATOR EA 34.00
619.00002 WATER SERVICE EA 1.00
620.00020 SANITARY FACILITY EA 1.00
622.00010 BICYCLE RACK EA 1.00
622.00050 INFORMATION CENTER EA 1.00
FAX 970-834-2631
DBE Manufacturing Supply
431 5th St.
Greeley, CO 80631
PH 970-302-0777
FAX 970-304-1199
NORAA Concrete Construction
39 S. 4th Ave., Ste B
Brighton, CO 80601
PH 303-637-9233
FAX 303-637-9470
Northern Colorado Traffic
PO Box 1826
Greeley, CO 80632
PH 970-356-6881
Dean Contracting
34711 W. Cty. Rd. 23
Windsor, CO 80550
PH 970-686-0351
FAX 970-686-5630
PO Box Y
Berthoud, CO 80513
PH 970-532-0805
Dumar Contractor
PO Box 532
Greeley, CO 80632
PH 970-356-5660
Fax 970-356-5661
Continental Bridge, Inc.
8301 State Hwy. 29 N.
Alexandria, MN 56308
PH 320-852-7500
FAX 320-852-7067