Loading...
HomeMy WebLinkAboutPLATT PROPERTY PUD PRELIMINARY - 3 90B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSServices 0 Planning Department May 22, 1991 Linda Hopkins The Group Inc. 375 E: Horsetooth Road Fort Collins, CO. 80525 Dear Linda, City staff has reviewed your submittal for The PLATT PROPERTIES, Preliminary PUD, and offers the following comments: 1. This request does carry a PUD condition with it. A master plan of The Villages at Harmony West PUD showing this area, Parcels B-F-G=H, to be developed as multi -family residential was approved on May 18, 1987. An amended Overall Development Plan (formerly master plan), a. Site Plan (separate from the Plat), a Plat, a Landscape Plan, and a Residential Uses Density Chart from the LDGS must be submitted for review, 2. The Site Plan and Plat should indicate which phase is being reviewed preliminarily at this time. A determination as to how many lots can be platted without constructing Troutman Parkway will be made from review of the traffic impact study. 3. The Final Plat must contain lot areas, lot dimensions, and street names.. 4. A minimum of 6' wide utility easements are required along all rear lot lines. Continuous 8' wide utility easements along all front lot lines on all streets must be included. 5. A minimum 15' wide utility easement is required adjoining the north ROW line of Wakerobin Lane. 6. An updated traffic impact study is required with this. submittal. This study should be done prior to school sessions letting out for the summer. Please contact Eric Bracke with the Transportation Department at 221-6608 if you have any questions. 7: A general location map (vicinity map) is needed on the Site Plan and Plat. 8. Has solar orientation been considered as part of the design development process for this project? A solar orientation policy for residential development will be adopted by the City in the near future. 9. The developer shall be responsible for relocating an existing Parks & Recreation headgate and ditch lateral that serves Troutman Park, if necessary, when Troutman Parkway is constructed. The headgate is located on the Pleasant Valley& Lake Canal in the approximate area of future Troutman Parkway. Water service to Troutman Park cannot be interrupted. All work should be completed when the canal is dry. 281 North College Avenue • P,O. Box 580 • Fort Collins, CO 80522-0580 (303) 221-6750 0 +i Linda Hopkins May 22, 1991 Page 2 10. The Site Plan and Landscape Plan should substantially address considerations for the detention area, the drainage facility along Regency Drive, proposed common open space areas and pedestrian/bicycle links, and the streetscapes along all perimeter street frontages. 11. Who will maintain the common open space/landscaped areas? Is there to be a Home Owners Association in this development? 12. Fencing guidelines should be considered and submitted for review. 13. An internal pedestrian circulation system should be considered, as well as the pedestrian/bicycle links to the schools and adjacent properties. Coordination with the schools is important. 14. A shopping center has been proposed as part of the Pineview PUD to the east. What consideration have been given to pedestrian/bicycle connections to this center and the proposed trail on the east side of the PV&L Canal? 15. Off -site easements will be required through the property to the north for the flows from the detention pond, as shown. 16. Discharge into the PV&L Canal must be approved by the Ditch Company. They must sign the Drainage and Utility Plans. 17. Show all drainage easement dimensions on the Plat. 19. The existing channel adjacent to Regency Drive, north of Wakerobin Lane, requires a 70' wide easement: Only 40' was previously dedicated. The additional 30' must be dedicated with this Phase One approval. This concludes staff comments at this time. In order to stay on schedule for the June 24, 1991 Planning & Zoning Board hearing, please note the following deadlines: Plan revisions are due June S, 1991 by 12.00 noon PMT's, colored renderings, revisions are due June 17, 1991 Final documents are due June 20, 1991 by 12400 noon It is important to have all the documents as indicated in Comment 1 submitted to this office no later than Monday, June 3. I suggest we meet to discuss these comments at your earliest convenience. Please contact me at 221-6750 to set up a meeting in the near future. Sinc rely, 7 S ephen Olt Project. Planner ce Don Parsons