To DINC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
FAX:303/226-4971
November 4, 1992
Steve Olt, Project Planner
Community Planning and Environmental Services
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
RE: PROSPECT - RIVERSIDE MINOR SUBDIVISION
Dear Steve:
The following is offered in response to comments in your letter of
October 28, 1992:
1. A landscape plan for Lot 2 of the subdivision is being
prepared. RAM Electronics informs me that they have retained
Bath Landscaping to prepare the plan for submittal with their
tenant finish building permit. They anticipate that this
submittal will be made within the next two weeks.
2. Stormwater Utility's comment concerning changes to the
existing site is understood. The intent of the site
reconfiguration is to add landscape islands in the parking
areas, and around the site perimeter. This will reduce the
impervious area and the resulting runoff of the site.
3. It is the intent of the project to use the existing water and
sewer services to the existing building on Lot 2. At such
time that Lot 1 is developed, a utility service plan will be
submitted.
4. RBD has reviewed U.S. West's easement requests with them and
the current property owner. It has been agreed to show a 10-
foot utility easement along the north edge of Lot 1 and the
east edge of Lots 1 and 2 with the understanding that
landscaping can be placed within the easement area.
5. Survey monuments have been set where pk nails were found. The
plat has been revised to reflect this.
Other offices: Denver 303r458-5526 • Vail 301476-6340 • Longmont 3031678-9584
0
E
6. The plat has been revised to show the requested right-of-way
on Riverside Avenue.
7. "Plat of...." has been added to the plat.
8. Street right-of-way for Prospect has been shown on the plat.
9. The 8-foot utility easements have been increased to 15-foot
along Prospect and Riverside. This is done with the
understanding that the easements can be used for compliance
with the landscaping requested under item 1.
Three copies of the revised plat are submitted. We look forward to
the administrative public hearing with the Planning Director on
Thursday, November 12, 1992, at 1:30 p.m.
Sincerely,
RBD, Inc.
to d G. Mcl u li
y g
General Manager
Gary Mogensen