Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE FIVE PRELIMINARY - 48 91K - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMarch 8, 1995 Ted Shepard Planning Department City of Fort Collins RE: Paragon V P.U.D. Preliminary Revisions Dear Ted: This letter is in response to staff comments of February 13, 1995, regarding Paragon Point V P.U.D., Preliminary. The response numbers correspond to those of staff comments. Those not noted will be addressed by the project engineer. 3. The project engineer has indicated that this phase of construction will not cause a conflict with the U.S. West line. 5. ROW width has been modified to a full 54 feet. 6. The site plan indicates 0.08 acres of fill. Runoff enters the adjacent open space in three areas. The topography of the site allows flexibility regarding the volume of water entering at each of these points. The wetland consultant and project engineer will provide a letter regarding the impacts of development. The Corps of Engineers has reviewed the wetlands delineation, and a nationwide permit has been applied for. 7. Trees have been relocated out of the swale. 9. A 9-foot easement has been indicated behind the 54-foot ROW. This allows a 13-foot easement in back of the walk. The extension north has been shown. 10. Planting notes specify that trees will be located to provide the required clearance to the PSCO easement. 11. Blanket easement has been indicated. It should also be noted that lots 6 and 18 are interior lots of quad-plex's. An easement has been shown on lot 8. 12. Street trees have been shown as requested. They will be specifically located to avoid conflict with street lights. S s ill D l "IlK. plannii 9Graprl" J�TekLape 117 ECNnon P e, 805N (V) 484-1921 13. A status report regarding the wildlife plan has been attached. 14. Finch Court has been constructed with full 36' of asphalt in order to provide on -street parking in addition to garages and drives. South Fort Collins Sanitation District has locational requirements that are impractical to meet. 15. The planner has attempted to resite lots 7 and 19 to provide side garage entry. The clearance would not permit driveway parking in front of the garages, causing a loss of off-street parking. 16. There are 8 duplex lots on the site, which are subject to the solar ordinance. Of the combination of duplex and 4-plex lots on the site, 6 units meet the solar requirement. Therefore, the compliance rate is 75 % 17. Legal description has been added. 18. OK 19. OK 20. OK We hope that these revisions address the concerns of the development review staff. Sincerely, JIM SELL_ DESIGN INC. Cam/ Kay Fofce xc: Byron Collins TST CANT TAKE GR-EpiT F&a LOTS UH,LN AX& E" n v-r. . 42-18 = as%