HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - SUBMITTAL DOCUMENTS - ROUND 3 - SUPPORTING DOCUMENTATION28’-11”
25’-5” 10’ 8’
17’-1”
5’
2’
19’
17’
17’
17’
19’ 19’-6” 17’
19’
7’
15’
9’
9’
9’
8’-6
8’-6
17’
2’-10” 9’
10’ multi-
use path per
midtown in
motion plan
6’ high vine screen fence
along property line
6’ high vine screen fence
along property line
6’ cross property
pedestrian access
Existing island
Existing island
Existing Trees
Existing parking
Re-striped existing
parking stalls
8’ tree lawn
per midtown in
motion plan
Xeric shrub
planting beds.
Ornamental
Grasses,typ.
Enhanced, accessible
path connection w/
raised crossing, planter
pots and signage.
Buffer planting
Screen fence
Patio
Planter Pots,
typ.
Bike Parking,
typ.
Landscape
Boulders, typ.
6’ accessible
walk
Bike Parking,
typ.
S. COLLEGE A VE.
PROSPECT RD.
SCHRADERS
G A S
ST A TION
26’
Emergency
Access
24’
2’-8”
26’ 19’ 7’-4”
19’
17’
17’
22’ 15’ 3’-3”
24’
24’
24’ 19’
12’
8’
19’ 19’ 20’
24’
Loading
Flush curb
entrance and
arrival
Square planter
pot
Trash/
Recycling
enclosure
Land Use Information
Zone District: General Commercial (CG)
TOD Overlay
Permitted Uses: Lodging (Type 1)
Lot size: 2.00 acres
Building Information:
Bldg Ht: Six Stories, 76’-4”
Total Square footage = 83,320 sf
Beds/units:150 beds
Required vehicle parking: 75 spaces
.5/ unit = 75
Provided parking: 96 spaces on site
Includes 12 compact spaces
Includes 4 accessible spaces
*Shared parking agreement w/ adjacent
property owners. (215 total per shared use
agreement)
Required bike parking: 38 spaces
1/4 units = 38
23 (60% enclosed) 15 (40% fixed)
Provided bike parking:
*Alternative compliance requested.
19 spaces: 11 enclosed, 8 fixed.
2020.APRIL Midtown Hotel
0 20 40 80’
Proposed Plan