Loading...
HomeMy WebLinkAboutPINECONE PUD THE TOWER SHOPS FINAL - 60 91M - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMay 3, 1995 Ted Shepard Senior Planner City of Fort Collins Planning Department P.O. Box 580 Fort Collins, CO 80522 Dear Ted; co urban design, inc. 3555 stanford road, suite 105 fort Collins, colorado 80525 (303) 226-4074 FAX (303) 226-4196 Attached are five prints of the Tower Shoppes Final PUD for Lot One and Lot Three, revised in response to Staff Comments. Specific responses include: 5. It is our understanding that the site drainage for the Tower Shoppes does conform to the findings and assumptions made for the new school, and does conform to the adopted Master Drainage Plans. Because there is no need for an amended Master Drainage Plan for the Tower Shoppes development, Tower Shoppes cannot be held responsible for another developer's need to amend the Master Drainage Plan, and his ability - or lack thereof - to complete that amendment. 8. The anchor tenant building is not anticipated to be classified as "unlimited" under the UBC. 25.-31. The vehicular and pedestrian circulation for Lot 3 has been redesigned as suggested by Staff. Handicapped parking stalls, bike parking, and landscaping have also been improved. 32.-34. The architectural design of the fast food restaurant has been revised to be more compatible with the overall center through the use of sloped roof elements, gables at entries, and matching materials. The internal illumination of the building is not expected to be any greater than that found in other "storefronts" of retail buildings around Fort Collins. The indoor play area is accessory to the fast food restaurant; not proposed as a primary use. A fast food restaurant with an accessory play area does seem to be a use "traditionally located along major arterial streets." appropriate to be included in a Neighborhood Center as defined with Point Chart B. Making Tower Shoppes more appealing to neighborhood families with young children also seems to be a positive attribute of the center. 35.- 37. We had understood that proposed locations of ground signs should be shown on PUD site plans. Areas for wall mounted signs have been clarified, and noted that such signs are to meet City Sign Code requirements. urban design, inc. Ten sets of prints, reductions, and color renderings will be submitted by May 1 5th, as required for the May 22nd P&Z hearing. We appreciate your assistance in the planning of this project. Please call if you need further information regarding the Tower Shoppes at Pinecone PUD. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Bill Reynolds, The W.W. Reynolds Companies Jerry Lee, The W.W. Reynolds Companies Libby Glass, The W.W. Reynolds Companies Stan Myers, RBD, Inc.