April 10, 2020
Andy Reese
Northern Engineering
301 N. Howes
Suite 100
Fort Collins, CO 80521
RE: PSD Prospect School Site, FDP200003, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of PSD Prospect School Site. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
02/11/2020: INFORMATION ONLY:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2
02/11/2020: INFORMATION ONLY:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed.
Provide reference to specific project plans or explanations of why comments have not
been addressed, when applicable.
Comment Number: 3
02/11/2020: INFORMATION ONLY:
All submittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit please let me know.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetlev@fcgov.com
Topic: General
Comment Number: 19
04/06/2020: FOR APPROVAL:
In the ultimate roadway design for Prospect Road, there are numerous cross
sections between Stationing 16+00 and 28+00 that show an impact to the
properties to the south. The roadway in this area is showing a increase in
elevation up to 7.0'. This ultimate roadway design would have a detrimental
impact on the property owners on the opposite side of the street. The
encroachment would require a slope easement beyond the ultimate right of way
line. The engineer will need to address this issue to either adjust the design or
show that there has been coordination with the property owners to the south.
The engineer needs to show the impact to the residents, the driveways, utilities and any other facilities.
NE Response: Design has been updated to show impacts on properties south of Prospect per
discussion with City and Town.
Comment Number: 20
04/06/2020: FOR INFORMATION:
There seems to still be some confusion on the timing of annexation,
construction, and inspection. We should schedule a meeting with the City of
Timnath and City of Fort Collins inspection staff to be sure that there are no
misunderstanding on the schedule of construction and inspection. It was discussed in previous
meetings to put together a map showing construction timing and inspection responsibility.
NE Response: Acknowledged. We will provide any help requested. As discussed since the
comment was made, current thinking is that construction will start this summer and be completed
in the fall, ahead of any jurisdictional changes.
Comment Number: 21
04/08/2020: FOR INFORMATION:
A meeting was held with Xcel and the City of Timnath on power pole relocation
and feeding the properties to the south of Prospect Road. The power poles to
the properties will need to be relocated out of the proposed improvements. It is
likely that these improvements will take place before the roadway construction.
Xcel will have to perform boring for the utilities which will need to be coordinated with the
waterline placement. John Little is aware of the situation and will be reaching out to Northern.
NE Response: PSD is in contact with Xcel and the design of the relocated utilities is underway.
2
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1
04/07/2020: FOR FINAL APPROVAL:
Please add the following note to the signal sheet:
"Signalization shall occur only upon meeting MUTCD signal warrants. Design
and construction of signals are assumed to be within jurisdiction and/or
oversight of the Town of Timnath. Should change in jurisdiction not occur as
assumed, and signals need to be per City of Fort Collins, contractor shall
contact City Traffic immediately for coordination and any final design changes."
NE Response: Detailed signal plans are now provided and included in the offsite plans. General
Note 24 had been added to each plan in an effort to address this comment. The language we were
provided in this comment differs from what was discussed in our meeting with staff, and that
language has been left in place since we had all discussed it. If there is a need to modify it to what
is provided here, we have no issues making that change.
02/11/2020: FOR FINAL APPROVAL:
Signal plans were not submitted with this round of review. Once they are available, we'll review.
Comment Number: 3
04/07/2020: FOFOR FINAL APPROVAL:
A couple minor striping comments:
On sheet R-10 - EB left turn at McLaughlin please remove skip striping3
NE Response: Removed.
On sheet R-14 - check previous redlines - add "Right Lane Ends" and "Right Lane Must Turn Right" signs
NE Response: Added and labeled on R-14
On sheet R-15 - check previous redlines - transition bike lane to left of right turn
lane on approach to Prospect. Do not include skip striping at beginning of turn lanes, add bike stencils.
NE Response: Ultimate striping updated
Department: Town of Timnath
Contact: Eric Fuhrman,970-226-0557,efuhrman@tstinc.com
Topic: General
Comment Number: 1
04/07/2020: FOR FINAL APPROVAL:
Please see attached redlines.
NE Response: Redlines have been addressed. We anticipate working with staff to resolve any
additional comments that arise so that the onsite plans can be signed and utility installation can
commence separate from approval of the offsite plans.
3
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 3
04/02/2020: FOR FINAL APPROVAL:
Please note that prior to any construction taking place the Erosion Control initial
measure will need to be installed and an initial inspection scheduled, and the
Erosion Escrow needs to be deposited. If a DCP will be issued for this site that
will need to take place prior to issuance of DCP. Otherwise, the contractor will
need to coordinate with the City's Erosion Control inspectors prior to
commencing any construction activity on the site to ensure that initial inspection
is completed and escrow was posted.
FOR FINAL APPROVAL: Thank you for addressing most of the reclined
comments. Please see ESC plans redlines for remaining issues. Mainly a lot of
the road improvements will necessitate grading to match the road to existing
grades, thus, side slopes need to be called out along the length of the proposed
road improvements and where necessary side slope erosion protection should be provided.
NE Response: Redlines have been updated.
02/06/2020 : FOR FINAL APPROVAL:
If the roads are to remain under City jurisdiction rather than Timnath, then please
address all ESC comments provided on the redlined Roadway Plans.
Please adjust the escrow calculations after addressing all provided comments as appropriate.
NE Response: Escrow has been updated.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 1
04/03/2020: FOR FINAL APPROVAL - UPDATED:
It is understood the variance is currently in the works and will be submitted once
completed. In review of the submitted drainage report and talking with Timnath,
it is clear there are outstanding issues to address in the drainage report, mostly
issues with offsite drainage. Please see redlines for more information. It is
encouraged to set up a meeting with Timnath, and Fort Collins too, to go thru
the issues and ensure they are adequately addressed in the next update.
02/05/2020: It is understood the site is proposing to meet Town of Timnath and
New Cache drainage requirements and a variance will be completed to this end
rather than meeting City of Fort Collins' requirements. Please submit
completed variance application with signatures from these parties in order for
the variance to be reviewed by the City of Fort Collins.
Note: Fort Collins is only performing a cursory review of the plans/report
submitted as it is expected these other parties are reviewing and accepting the drainage design.
NE Response: Thank you for the comment. The drainage study has been updated to address the
comments received and incorporate the recent info along the north side of Prospect, west of
McLaughlin. We will work with staff directly to gain the approval of this document ahead of the
offsite roadway approvals so onsite construction is not delayed.
4
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 01
02/11/2020: REQUIRED FIRE ACCESS: (UPDATED 4/8/2020)
There appears to be some confusion regarding fire lane requirements. Prior
discussions and plans detailed fire access however the most recent submittal
does not call out fire lanes (Emergency Access Easement) anywhere on the plat
or plans. Plans will need to be revised to define limits of EAE. Fire access
requirements provided below for reference. The applicant team there was
discussion with PFA to eliminate dedication of fire lanes and I'm hoping the
team can provide details of that discussion, especially person, date, and any
other conversations. Such information would be helpful to me at this stage.
NE Response: EAE added back to plat.
Comment Number: 02
02/11/2020: SIGNAGE:
Fire lanes are required to be visible by red curb and/or signage, and
maintained unobstructed at all times. Sign locations or red curbing should be
labeled and detailed on final plans. Refer to LCUASS detail #1418 & #1419 for
sign type, placement, and spacing. Appropriate directional arrows required on all signs.
NE Response: Fire lane signage added to onsite plans.
Comment Number: 03
02/11/2020: GATE ACCESS:
Gates shall be designed so as to be accessible by Poudre Fire Authority in the
event of an emergency. If details are not provided on the site plans, this
comment will be resolved at time of building permitting.
RB+B Response: (3) Site Vehicle Barrier Access Gates will be provided as follows:
#1 CR 5 ROW Site Access — Automated Control (UP @ 0600 / DOWN @ 2200)
#2 East end of North Property 'Maintenance Drive'— Access via Knox Key -Switch
#3 West end of North Property 'Maintenance Drive'— Access via Knox Key -Switch
Comment Number: 04
02/11/2020: ROOF ACCESS:
Early discussions with the design team touched on the need to improve roof
access in areas exceeding 30' in height and where ladder trucks could not
provide support for roof operations. I've not seen any updated proposals from
the applicant regarding this early discussion but if details are not provided with
the site plan, this comment will be resolved at time of building permit.
RB+B Response: RE: Attached 'Roof Access Diagram' Exhibit for clarification of roof access as
discussed with PFA per 11.4.19 PFA Coordination Meeting. Roof access has been provided at the
(4) corners of the building (and beyond) via code compliant ladder and/or arial access. Additionally,
per PFA's request, roof -to -roof access will be provided by aluminum ships ladders in lieu of vertical
wall ladders, as identified on the attached Exhibit.
Department: Technical Services
5
Contact: Jeff County, 970-221-6588, icounty@fcqov.com
Topic: Construction Drawings
NE Response: It appears all Tech Services comments were from February and have been addressed with
the previous submittals.
Comment Number: 3
02/10/2020: FOR FINAL APPROVAL:
UTILITY: Please revise the Benchmark Statement as marked. See redlines.
Comment Number: 4
02/10/2020: FOR FINAL APPROVAL:
UTILITY: Was the bearing in the Basis Of Bearings statement supposed to
match the Subdivision Plat?
Comment Number: 5
02/10/2020: FOR FINAL APPROVAL:
UTILITY: Some of the sheet titles in the sheet index do not match the sheet titles
on the noted sheets. See redlines.
Comment Number: 6
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There are sheet numbering issues. See redlines.
Comment Number: 7
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There are notes that are missing information. See redlines.
Comment Number: 8
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There is text that needs to be masked. Mask all text in hatched areas.
See redlines for examples.
Comment Number: 9
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There are text over text issues. See redlines.
Comment Number: 10
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There are line over text issues. See redlines.
Comment Number: 11
02/10/2020: FOR FINAL APPROVAL:
UTILITY: There are matchline issues. See redlines.
Comment Number: 16
04/07/2020: FOR FINAL APPROVAL -UNRESOLVED:
ROADWAY IMPROVEMENTS: There are text over text issues. See redlines.
NE Response: Redlines have been addressed.
Comment Number: 17
04/07/2020: FOR FINAL APPROVAL -UPDATED:
ROADWAY IMPROVEMENTS: There are line over text issues. See redlines.
NE Response: Cross-section line over text will be corrected once City approves design and will be
corrected prior to mylar printing.
11
Department: Boxelder Sanitation
Contact: Brian Zick brianz@boxeldersanitation.org
Topic: General
Comment Number: 2
04/07/2020: INFORMATION:
Please see attached letter.
Department: Larimer County Engineering
Contact: Katie Gray, _graykm@co.larimer.co.us, Eric Tracy tracyel@co.larimer.co.us
Topic: General
Comment Number: 1
04/09/2020: INFORMATION:
Larimer County Engineering does not have any further comments at this time for
the PSD Prospect School Site but all comments previously made are still applicable.
NE Response: Per discussions with County staff, ultimate roadway cross sections now show existing
topography south of the existing ROW to better illustrate potential future impacts to adjacent properties.
Prospect Road centerline has also been lowered near McLaughlin to reduce the impacts to existing properties
along the south side of Prospect.
Department: Larimer County Accessor
Contact: Megan Harrity mharrity@larimer.org
Topic: General
Comment Number: 1
02/11/2020: FOR FINAL APPROVAL:
Please confirm hat the new Lot 3 will be a split from parcel number
87150-00-009 / R0157996. With a Tax District of: 11080
Current Owners are:
CW SUBTRUST (.348249) WHITE ERIC S (.175943) ET AL
In addition Lots 1 and 2 will be created from all of parcel number 8715000904 /
R0157945. Tax District is: 1108
Current Owners are:
POUDRE R-1 SCHOOL DISTRICT
Comment Number: 2
02/11/2020: INFORMATION ONLY:
New Lot 3 is in a different taxing district from Lots 1 & 2 but it looks like there is
no overlap of parcel lines crossing tax district boundaries, so it should be just fine.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1
02/11/2020: INFORMATION ONLY:
It is understood the site will be de -annexed from the City of Fort Collins and
served electric from Xcel. Light and Power will not provide electric facilities to
the site or streetlights along the right- of -way. Please contact me if you have any questions.
7
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcqov.com
Topic: Building Insp Plan Review
Comment Number: 1
04/07/2020: INFORMATION:
If all buildings to be constructed will be PSD owned and operated
they are not regulated by Building Services and use the State inspection process.
3