HomeMy WebLinkAboutOLIVE GARDEN MINOR SUBDIVISION - 14 92 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYf
W
W
Q
M
•a
r
d
•o
v
0
cn
MEMORANDUM
To: Ron Gates, General Mills Restaurants
Eric Bracke, Fort Collins Transportation Division
Fort Collins Planning Staff
From: Matt Delich
Date: May_22.199.9-
Subject: Olive Garden Restaurant traffic study
(File: 9231MEM1)
General Mills Restaurants is proposing to build and
operate an Olive Garden Restaurant on South College Avenue,
north of Boardwalk Drive in Fort Collins. An Olive Garden
Restaurant is a sit down restaurant specializing in Italian
food. There is currently a quality sit down restaurant on
this site. The existing restaurant has access to College
Avenue (right-in/right-out) and a full -turn access to
Boardwalk Drive located approximately 250 feet west of College
Avenue.
The site plan for the Olive Garden Restaurant indicates
that the College Avenue access will be closed, the Boardwalk
Drive access will remain, and an access to Mason Street will
be added. The Mason Street access is proposed to be located
approximately 150 feet north of Boardwalk Drive. This access
is' proposed to be located as far from Boardwalk Drive as is
practicable. The Boardwalk Drive access lines up with an
access on the south side -of the street. The access to the
south currently serves only a Kentucky Fried Chicken (KFC)
restaurant. However, it is built to provide access to a 600'
X 600' parcel that will likely be developed as a commercial/
retail use. The two accesses to Boardwalk Drive (one on the
north side and one on the south side) are expected to be the
only accesses allowed in this segment of Boardwalk Drive.
Noon and afternoon peak hour traffic volumes were
collected at the College/Boardwalk intersection in May 1992
and are shown in Figure 1. Raw traffic counts are provided
in Appendix A. Also shown in Figure 1 are synthesized traffic
volumes at the Mason/Boardwalk intersection. Operation at the
College/Boardwalk .signalized intersection and the Mason/
Boardwalk stop sign controlled intersection is acceptable.
This is shown in Table 1. Acceptable operation is defined as
level of service D or better. Calculation forms are provided
in Appendix B. At the time of traffic counting, the existing
restaurant on this site was closed for renovation.
Trip generation of the proposed Olive Garden Restaurant
was obtained from information contained in Trip Generation,
K
,985 HCM: SIGNALIZED INTERSECTIONS
:SUMMARY REPORT
JJKFZ##F#AFJFFFF##FF#FFF#FF##JF###F#FFFFJYF#J#FJFF#JYXF#AAAYFFtiFFFJ####FFF
INTERSECTION.. boardwall,college
AREA TYPE ..... OTHER
ANALYST ........ i id
DATE.......... 5122/92
TIME ...
...... .noon
COMMENT......_ 1992 ra
-------------__--__-------------- _------------------------------------
VOLUMES GEOMETRY
EB WB NB SB ES WB NB SB
LT 24 35 16 138 L 12.0 L 12.0 L 12-0 L 12-0
TH 13 18 1250 1341 T 12.0 T 12-0 T 12.0 T 12.0
RT 19 172 14 40 R 12.0 R 12.0 T - 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--..,------------------------------------- --------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 0.00 N 0 0 0.95 5 Y 31.6 3
WB 0.00 0-00. N 0 0 0-95 5 Y 31.8 3
NB 0.00 2.00 N n 2 0.95 5 Y 25-8 3
SB 0.00 2.00 N 0 0.9E 5 Y 25.8 3
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT x NB LT x x
TH X TH x
RT X RT x
PD x PO X
W6 LT x 58 LT x -x
TH x TH x
RT x RT x
PD x PE' x
GREEN 25.0 0.0 0.0 0,.0 GREEN 7.0 61.0 0.0 0.0
YELLOW 6.0 0.0 0.0 0.0 YELLOW 5.0 6.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP, DELAY APP. LOS
EB L 0.098 0.255 23.E C 72.0 C
T 0.030 0.25E 3.4
R 0.039 0.336 16.7 C
WB L 0.094 0.255 23.8 C 21.7 C
T 0. 041 0-255 2a.5 C
R 0.353 0._36 21.1 C
NE, L 0.054 0.691 4.1 A 10.1 E.
TR. 0.412 0-582 10.2 F.
SE L 0.432 0.691 b B 1G.3 B
- TF 0.517 0.582 10.6 B
--------------------------------------------------------------------------
INTERSECTION: Delav = 11.2 (sec/veh) V/C = 0 494 LO' _ "-
196E HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
XYXYYXYYX YZYYZJRK YYYYYYXYYFYYZYX.YYZZiYXY .............................YYXa
I f JTERSECT I Ot4 .. boardwa l k /college
AREA TYPE. ---.OTHER
ANALYST ....... mid
DATE.......... 5/12/92
TIME...........+-:r. nm
COMMENT...... 199
__________________________________________________________________________
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 1.1 36 37 183 L 12.0 L 12-0 L 12.0 L 12.^
TH 16 28 1472 1737 T 12-0 T 12.0 T 12.0 T 12
RT 15 205 25 36 R 11.0 R 12-0 T 12-0 T 1-,.
RR 0 0 0 0 12.0 12-0 TR 12_0 TR 12-0
12.0 12.0 12.0 12-0
12-0 12.0 12.0 12.0
------------------------------- ----- ---------------------------- ---
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) ' Y/N Nm Nb Y/N min T
EB 0.00 0.00 N 0 0 0.95 Y 31.6s
WB 0.00 0.00 N 0 0 0.95 5 Y 31.8 3
NB 0.00 2.00 N 0 2 0.95 5 Y 25.8 3
SB 0-00 2.00 N 0 _ 0.95 5 Y 25-8 3
---------------------------------------------------------------------
SICNAL SETTINGS CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT x x
TH x TH x
RT X RT x
PD x PD x
WB LT x SB LT Y, x
TH x TF; x
RT x RT x
PD x PO x
GREEN 30.0 0.0 0.0 0.0 GREEN 7 D 66.0 0.0 0.(
YELLOW 6.0 0.0 0.0 0.0 YELLOW 5.0 6.0 0.0 0
- - -- --- ----- --- ------ -- - -- -- ---- ----- - -- ------ - - -- ------ --------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EE L 0.047 0." 5 24.3 22.E C
T 0.034 D.27s z4.2 c
F' 0.030 0.350
WB L 0.091 0.215 24. b C ?3. 1 C
T O.060 0.27E 24"4 C
F: O.404 U.`s 50 - 7 C
NB L 0.059 0.675 E.0 12.2 ft
TR 0.566 0.575 12.4 6
SB L 0.783 0.67E 24.2 C 14.7 B
TR 0.671 0.57" 1 .3 E.
-------------------------------------------------------------------------.
INTERSECTION- Delay = 14.f. (sec/,eh/ V/C = 0.6 8 LOS = 6
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
ZZZ;Z###YK#ZZ;##;#;ZZZYY#Z#tZSSZY##Y;Y;Z####SZSZ#SKYZYZiiZ#Y Z.S XtXZ#ZS
IDENTIFYING INFORMATION
------- -------------------------------------------------- ---------
AVERAGE RUNNING SPEED. MAJOR STREET.. 30
PEAK HOUR FACTOR_ ..................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
boardwalk
NAME OF THE NORTH/SOUTH STREET.......
mason
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
5/22/92
TIME PERIOD ANALYZED .................
noon `nem
OTHER INFORMATION.... S4.9"
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
_____________________________________________________________________
EB WE. NE SE.
---- ---- ---- ----
LEFT -- 11 0 13
THRU -- 0 334 270
RIGHT -- 16 7 0
NUMBER OF LANES
_______________________________________________________________
EB WE
NE. SE
-------
------- ------- -------
LANES
CAPACITY AND LEVEL -OF -SERVICE Page-c
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______ ________ _____________________ ____________ _
MINOR STREET
W8 LEFT 12 413 409 409 397 8
RIGHT 18 756 756 756 739 A
MAJOR STREET
SB LEFT 14 851 851 851 837 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE `CIS..... 5/22/92 noon pm
OTHER INFORMATION... 1952 1994
1985 HCM: UNSIGNALIZEO INTERSECTIONS Page-1
XX).f.1.XXXi1XXXXRXXRRXXYYIIXXXXXXtX{XtXXXXXXX XIXYRZX4XXXXKAYXX....... Rf
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED. MAJOR STREET.. 30
PEAK HOUR FACTOR .....................
1
AREA POPULATION .......................
100000
NAME OF THE EAST/WEST STREET.........
boardwalk
NAME OF THE NORTH/SOUTH STREET.......
mason
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
5/22/92
TIME PERIOD ANALYZED................._�.aen
pm
OTHER -INFORMATION.... 01*444-
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NE: SE,
---- ---- ---- ----
LEFT -- 226 0 10
THRU --0 361 411
R.I GHT -- 41 5 0
-
NUMBER;OF LANES
---------------------------------------------------------------------
EE. WE. NB
SI.
-------------- -------
LANE-z'
-------
CAPACITY AND LEVEL -OF -SERVICE Page-F.
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(PCPh) c (pcph) c (Peph) c (pcph) e = c - v LOS
P M SH P SH
------------------------------------------------ --
MINOR STREET
WB LEFT 31 319 316 316 286 C
RIGHT 45 733 733 733 688 A
MAJOR STREET
SB LEFT 11 827 827 827 816 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE �.�IS..... 5/22/92 ; noon
1.9pm
OTHER INFORMATION.... 2 1994
APPENDIX C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
xx.xxxx.x.x.x......... x.... .... ...x..... w... xx.xx.... x..............x.x....
INTERSECTION..boardwalV:;colle9e
AREA TYPE..... OTHER
ANALYST....... mid
DATE.......... 5/22/92
TIME......... noon r.
COMMENT .......
++ !'�.<
-----------------`c-------------------------------------------------------
VOLUME- GEOMETRY
EB WB NB SB EB WB NB SB
LT 110 67 52 190 L 12-0 L 12.0 L 12.0 L 12.0
TH 50 46 1275 1368 T 12.0 T 12.0 T 12.0 T 12.0
RT 67 219 48 101 R 17.0 R 12.0 T 12.0 T 12.0
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 0.00 N 0 0 0.95 5 Y 31.8 3
WB 0.00 0.00 N 0 0 0.95 5 Y 31.8 3
N6 0.00 2.00 N 0 2 0.95 5 Y 25.8
SB 0.00 2.00 N 0 2 0.95 5 Y 25.8 3
---------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT x NB LT x x
TH x TH x
RT x RT x
PO x PO x
WB LT X SB LT x x
TH X TH Y.
RT x RT x
PD x PD x
GREEN 25.0 0.0 0.0 0.0 GREEN 7.0 61.0 0.0 0.0
YELLOW 6.0 0.0 0.0 0.0 YELLOW 5.0 6.0 0.0 0.0
-------------------------------------------------------- - ------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP- LOS
EB L 0.586 0.255 "O.5 D 25.b D
T 0.115 0.255 .9 C
R 0.137 0.336 19.3 C -
W6 L 0.220 0.255 24.7 C 22.9 C
T D.106 0.255 23.9
R 0 a49 0.336 2.1 C
NE L 0.054 0.691 �4.1 A 10.2 E.
TR 0.496 0.532 10.4 6
S6 L 0.729 0.691 1-.1 r 11.6 b
TF; 0.554 D.582 11-0 E.
--------------------------------------------------------------------------
INTERSECTION: Delay = 12.8 (sec,yen) V/i = C.585 LO_: = B.
1985 HCM: SIGNALIZED INTERSECTI0N`
SUMMARY REPORT
.* ........ I ........ ..xxx.................. .x.................xx...........
INTERSECTI0N..boardwalk/college
AREA TYPE ..... OTHER
ANALYST....... mid
DATE ......... .5/22/92
TIME.......... ...w+i Pm -
COMMENT...... =:;=' 1094
---------------------------------- ----- ---------
VOLUMES GEOMETRY
ES WB Ne. SB EB WB NB SB
LT 53 62 64 224 L 12.0 L 12.0 L 12.0 L 12.0
TH 37 151 1501 1772 T 12.0 T 12.0 T 12.0 T 12
RT 39 245 53 65 R 12.0 R 12.0 T 12.0 T 1,.
RR 0 0 0 0 12.0 12.0 TR 12.0 TR 12.0
12_.0 12.0- 12.0 12.0
12.0 12.0 12.0 12.0
----------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 0.00 N 0 0 0.95 5 Y 31.8 3
WB 0.00 0.00 N 0 0 0.95 5 Y 31.8 3
NB 0.00 2.00 N 0 2 0.95 5 Y 25.8
58 0.00 2.00 N 0 2 0.95 5 Y 25.8 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH PH-3 PH-4
EB LT x NB LT X x.
TH X TH x
kT x RT x
Pr) x PE) x
WB LT x SB LT x x
TH x TH x
RT x RT- x
PD x PD x
_ GREEN 30.0 0.0 0.0 0.0 GREEN 11.0 62.0 0.0 0.0
YELLOW 6.0 0.0 0.0 0.0 YELLOW 5.0 6.0 0.0 0
------------------------------------------- -------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EE L 0.267 0.275 226.1' D _:,.2 C
T 0.079 0.275 24.5 C
P 0.070 0-3 BS 17.8 C
WB L 0. 172 0.-,75 25.2 D 22.4 C
T 0.108 0.275 94.7 C
fi .441 0.a'8-: 21. 2 C
NE. 0.044 0.675 5.0 A 14.5 6
TR 0.626 0.542 14.8 6
SB L 0.779 0.675 20.8 _ 1?.2. C
TR 0.749 0.542 16.9
--------------------------------------------------------------------------
INTFF:SECTION: Delay = Io (seciveh) V;C = 0.714 LOS _ C
1985 HCM: UNSIGNALIZED INTERSECTIONS F'aae-1
XWW.KXWXXXXXWWRXXXXARYRXXWWWXXXXXXXXXXXXXXXXXXXXWWWRWXRXWWWXWWXWXXXXXW
IDENTIFYING INFORMATION
---------------------------------------- ----------------------------
AVERAGE RUNNING SPEED. MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... boardwalk
NAME OF THE NORTH/SOUTH STREET....... mason
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 5/22/92
TIME PERIOD ANALYZED ................ (Hon)
noon pm
OTHER INFORMATION.... 1992 199a
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EE WE NE'. SE.
---- ---- ---- ---- _
LEFT -- 19 0 20
THRU -- 0 354 286
RIGHT -- 26 11 0
NUMBER OF LANES
---------------------------------------------------------------------
EE• WE. NEI SE-
------- ------- ------- -------
LANES --
CAPACITY AND LEVEL -OF -SERVICE Paae-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
---------------------------------`-------------- .
MINOR STREET
WB LEFT 21 387 381 381 360 B
RIGHT 31 736 736 736706 A
MAJOR STREET
SB LEFT 22 828 828 828 806 A
IDENTIFYING INFORMATION
-----------------------------------------------------------------
NAME OF THE EAST_/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE ANALYST` 5/22/92 noon prti
OTHER INFORMATION.... 1992 199a
1985 HCM: UNSIONAL12ED INTERSECTIONS Pegg-1
xz»»»xxzzxzzxzz»xxxzxzx»»z»zzzzzxzz:xzzzz:xxxzxzzxxzzzx»»»x»zz»»zzxxz
IDENTIFYING INFORMATION
---------------------------------------- -------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
boardwalk
NAME OF THE NORTH/SOUTH STREET.......
mason
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
5/22/92
TIME PERIOD ANALYZED .................
noon pni ,
OTHER INFORMATION.... 1992 1994
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB
LEFT --- ---a
THRU -- 0
RIGHT -- 55
NUMBER OF LANES
___________________________________________________
EE. Wd NE. SE:
_______ _______ _______ -------
----------------------
NE•
SF
is
382
435
9
0
LANE`,
CAPACITY AND LEVEL -OF -SERVICE Page-S
_____________________________________________________________________
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (Pcpn) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ------------ ------------
MINOR STREET
WB LEFT 37 295 292 292 254 C
RIGHT 61 712 712 712 652 A
MAJOR STREET
SB LEFT 17 804 804 804 787 A
IDENTIFYING INFORMATION
__________________________________________________________________
NAME OF THE EAST/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE ANALYST' 5/22/92 : noon pm
OTHER INFORMATION.... 1992 1994
1985 HCM: LJNSIONAL12ED INTERSECTIONS Page-1
zlzzx.Zzxzzzzzz...Mzzzzz..Y:zzzzzlk zYzzlzzzzTY zxzz'rzzYlzxxx}'xxx{ixzzRzx
IDENTIFYING INFORMATION
---------------------- ---------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... boardwalk
NAME OF THE NORTH/SOUTH STREET....... accesses
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 5/22/92
TIME PERIOD ANALYZED ................ noon pm
OTHER INFORMATION.... 1992 199a
INTERSECTION TYPE AND CONTROL
-------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: EAST/WEST
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOLITHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SE
---- ---- ---- ----
LEFT2 59 10 162
T HRU 18 26 1 1
RIGHT it 114 47 11
NUMF•ER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EE. WF NE 56
------- ------- ------- -------
LANE'. 1 1
CAPACITY AND LEVEL -OF -SERVICE F'a9e-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
P M SH R SH
------------------------------------------------ .
MINOR STREET
NB
LEFT
11
689
656
THROUGH
1
774
743
RIGHT
52
999
999
MINOR
STREET
SB
LEFT
178
702
652
THROUGH
1
822
789
RIGHT
12
996
996
MAJOR
STREET
Eft
LEFT
2
994
994
WB
LEFT
65
1000
1000
IDENTIFYING INFORMATION
> 663 656 > 651 645 >A A
> 743 742 > A
999 947 A
> 653 652 > 474 474 >A A
> 789 > 788 > A
996 984 A
994 992 A
1000 935 . A
NAME OF THE EAST/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... accesses
DATE AND TIME OF THE ANALYS 5/2%/9% nocn pm
OTHER INFORMATION.... 1992 1994 -
1985 HCM: UNSICNALIZED INTERSECTIONS Page-I
ZY#YYZZYZ#YYZZYYZ#Z#YZYZY#Z;Y;YYZZ#ZZZZ##YYZY Z#Z#ZYYZZZ##YY Y;;ZZYYY#X
IDENTIFYING INFORMATION
-------------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR STREET.. 30
PEAK HOUR FACTOR .....................
1
AREA POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
boardwalk
NAME OF THE NORTH/SOUTH STREET.......
accesses
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
5/22/92
TIME PERIOD ANALYZED .................
noon pm
OTHER INFORMATION.... 1992 1994
INTERSECTION TYPE AND CONTROL
--------------------------------------
- -----------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: EAST/WEST
.
CONTROL TYPE NORTHBOUND: STOP SIGN
CONTROL TYPE SOUTHBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EE WB NB SB
---- ---- ---- ----
LEFT 38 6 80
THRU 14 78 1 1
RIGHT 8 84 35 5
NUMBER OF LANES AND LANE USAGE
EB WB NB SF.
------- ------- ------- -------
LANES 1 I _ 2
LANE USAGE LT n LT 1 R
CAPACITY AND LEVEL -OF -SERVICE Page
--------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
NB LEFT 7 698 677 > 687 677 > 679 670 >
THROUGH 1 778 757 > 751 > 756 >
RIGHT 39 999 999 999 961 A
MINOR STREET
SE LEFT 88 705 670 > 671 670 > 582 582 >A A
THROUGH 1 813 792 > 792 > 790 > A
RIGHT 6 974 974 974 969 A
MAJOR STREET
EB LEFT 2 991 991 991 - 989 A
WB LEFT 42 1000 1000 1000 958 A
IDENTIFYING INFORMATION
---------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... boardwalk
NAME OF THE NORTH/SOUTH STREET.... accesses
DATE AND TIME OF THE ANALYS.Ic 5/22/92 : noon gm
OTHER INFORMATION.... 1992 1994
ft
1985 HCM: UNSIGNALIZED INTERSECTIONS Pa9a-1
X XXXXXXXXXX}XXXXXXX}:t#X}YXt}XXXYXYXXXXXXXXXXX}XX}XXX}XXXXXX}XXXXXXXX}
IDENTIFYING INFORMATION
-------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... access
NAME OF THE NORTH/SOUTH STREET....... mason
NAME OF THE ANALYST .................. mJd
DATE OF THE ANALYSIS (mm/dd/yy)...... 5/22/92
TIME PERIOD ANALYZED ................ noon om
OTHER INFORMATION.... 1992 1994
INTERSECTION TYPE AND CONTROL .
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
--------------------------------------------------------------------
EB WE NB SB
---- ---- ---- ----
LEFT -- - 6 0 13
THRU -- 0 �78 300
RIGHT -- 12 4 0
NUMBER OF LANES
______r______________________________________________________________
EE WE NE. SE
------- ------- ------- -------
LANE`_.
CAPACITY AND LEVEL -OF -SERVICE F•aoe-3
---------------------------------------------------------------------
F'OTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPAC IT CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
_______________ _________ ____________ ____________ ---
MINOR STREET
WB LEFT 7 372 368 > 368 > 361 > B
> 545 > 525 >A
RIGHT 13 718 718 > 718 > 705 > A
MAJOR STREET
S8 LEFT 14 812 812 312 798 A
IDENTIFYING INFORMATION
------------------- __________________________________________________
NAME OF THE EAST/WEST STREET...... access
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE ANALYSIc . 5/22/92 nour� pm
OTHER INFORMATION.... 1992 1994
4th Edition, ITE and from a phone conversation with the marketing
staff of the Olive Garden Restaurants (General Mills). Table 2
shows the expected daily, noon peak, and afternoon peak trip
generation. The newly generated trips were distributed as follows:
Mason Street north and south of Boardwalk
North - 10%
South - 5%
College Avenue north and south of Boardwalk
North - 45%
South - 25%
Boardwalk
East of College - 15%
Since traffic counts were not obtained at the Boardwalk/KFC
access, a trip generation analysis was also conducted on it. These
trips were distributed as indicated in the previous paragraph.
One short range future year (1994) was analyzed. The greatest
impact to the key intersections in this area will be caused by
development of the 600' X 600' parcel to the south of Boardwalk
Drive. It is not known when this will occur, but it is not likely
to occur before 1995. When this larger parcel is proposed for
development, a traffic study should be prepared which will also
include the Olive Garden Restaurant. The traffic study for this
larger parcel should include the long range analysis. Compared to
the development that is likely to occur on this larger parcel, the
impact of the Olive Garden will be small.
Background traffic is defined as that traffic which is on the
street system, but is not related to the proposed development.
Historic counts on College Avenue indicate that traffic has been
fairly stable over the past few years. Therefore, the background
traffic on College Avenue was increased by 1 percent per year.
Since the traffic on College Avenue is high, even this modest
percent increase results in a substantial actual increase.
Selective turning movements at the College/Boardwalk intersection
include traffic that will be generated at the new Fort Collins Post
Office, which should be opened by the end of 1992. Traffic on
Mason Street was increased at 3 percent per year. Figure 2 shows
the 1994 peak hour traffic at the key intersections.
The key intersections shown in Figure 2 were analyzed with the
existing control and geometrics. Table 3 shows the results of
those analyses. Calculation forms are provided in Appendix C. All
intersections will operate acceptably during the peak hours. The
current striped geometrics on the public streets (College Avenue,
Boardwalk Drive, and Mason Street) meet or exceed the geometric
requirements of the future traffic with one exception. The
eastbound left -turn lane on Boardwalk Drive approaching College
Avenue should be at least 130 feet long plus taper. It is
currently 120 feet long plus taper. There is currently a westbound
left -turn lane on Boardwalk Drive approaching the KFC access. This
left -turn lane is not warranted. Therefore, the eastbound turn
s-
1
1985 HCM: UNSIGNALIZED INTERSECTIONS Paoe-I
##YYYYYY#Y#Y#YYYYYYYYYYYYYRYIYYYYY#YYYYYY#Y#YY#YYY.YYYYYYfiKY#YYY#Y YY:t
IDENTIFYING INFORMATION
-----------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET --------- access
NAME OF THE NORTH/SOUTH STREET....... mason
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 5/22/92
TIME PERIOD ANALYZED ................. noon pm
OTHER INFORMATION.... 1992 1994
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WE NE'. SE'
---- ---- ---- ----
LEFT -- 3 0 11
THRU -- 0 434 447
RIGHT -- 6 3 0
NUMBER OF LANES
--------------------------------------------------------------
EE. WE• NE. SE•
------- ------- ------- -------
LANES -- 1 1 1
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------------ -
MINOR STREET
WB LEFT 3 273 270 > 270 > 267 > C
- 450 > 440 >A
RIGHT 7 674 674 > 674 > 668 > A
MAJOR STREET
SB LEFT 12 764 764 764 752 A
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... access
NAME OF THE NORTH/SOUTH STREET.... mason
DATE AND TIME OF THE ANALYST" 5/22/92 : noon pm
OTHER INFORMATION.... 1992 1994
lane can be lengthened at the expense of the unwarranted lane.
However, rather than restripe Boardwalk Drive to gain the little
additional length needed, it is recommended that the existing
striping remain as is. After the Olive Carden Restaurant is open
for a few months (3 or more), traffic should be monitored to
determine if the additional length is needed. Adjustments can be
made pending the results of that determination.
Conclusions
It is concluded that with the development of the Olive Garden
Restaurant, traffic operation at the key intersections will be
acceptable in the short range future. The existing geometrics on
the public streets should remain. Traffic should be monitored
after the restaurant is in operation for a number of months to
verify the geometric recommendation. When the parcel to the south
of Boardwalk is proposed for development, the long range impacts
on the area streets should be determined.
BOARDWALK
Q
N
t,
CM
ce)
T co
co \ T
M T \
vCOr
R— 172/205
• 18/28
35/36
24/ 1 1 —�
T.
13/16 —►
I I
19/15---`
r`Nto
co r N
00 r
W
ul
T \ r
O
c�v
.J
T
Noon / PM
1992 PEAK HOUR TRAFFIC Figure 1
� T
\T N
o\
O M
M T
f /� 1
Ir 6// 33 W
SITE
z I I
M
N c') �
Q\
00
N
M
M
N
\ r.
(D \
00 O
N N
N 0)
00 \
M T
jT
CM
O
E a
.\- O (ND
T z w
28/55
19/34 BOARDWALK
2/2 --)
18/14 --�
1 1 / 8 ---,,
%w
W
J
J
01
N
In T N
CO
CON
T (D O
114/84
r
8
/3
59/38
1 j (' 110/53
I I 50/37
W E to 67/39
`O O M
z^
� KFC
Noon / PM
219/245
-0-- 46/51
,— 67/62
7T'M
(D O tO
\ U)
N r CO
to \
to
N
r
1994 PEAK HOUR TRAFFIC Figure 2
Table 1
1992 Peak Hour Operation
Level of Service
Intersection Noon PM
College/Boardwalk (signal) B B
Mason/Boardwalk (stop sign)
WB LT B C
WB RT A A
SB LT A A
Table 2
Trip Generation
Daily
Noon
Peak
P.M.
Peak
Land Use Trips
Trips
Trips
Trips
Trips
in
out
in
out
Sit -Down Restaurant - 1200
133
191
106
94
10 KSF
Table 3
1994 Peak Hour Operation
Level
of Service
Intersection
Noon
PM
College/Boardwalk (signal)
B
C
Mason/Boardwalk (stop sign)
WB LT
B
C
WB RT
A
A
SB LT
A
A
Boardwalk/Access (stop sign)
NB LT/T
A
A
NB RT
A
A
SB LT/T
A
A
SB RT
A
A
EB LT
A
A
WB LT
A
A
Mason/Access (stop sign)
WB LT/RT
A
A
SB LT
A
A
APPENDIX A
M
N;AT'i HEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
Observer Date 1 g q Z- Day /44/VDA T Clty rO 12 Y 0,06L1 / S R = Right turn
P- D W A L K S= Straight
INTERSECTION OF O 4 L F�E AND L = Lett tum
TIME
BEGINS
BEG
oc c c-Gc=
coc�c��6
NAhL
South
5o,+40WACK
o,4RDWALe
TOTAL
East
""e"
TOTALALL
I from NORTH
from SOUTH
from EAST
I
I from WEST
R I S
I L I Total
R
I S
L
I Total
R I S I L I Total
II R
S
I L I Total
1 Zo-O II
9 1314
38 136 1
1 Z.
13Z(a
4
1 3-3z II (a 43
1144 1 2 1 9 I ss
1 7
1 2
1 4 1 13
1& 7s
II 7Cv I
IzISIII
334
133 1 38-3
1 4
3041
T
131 1 11l
,
1 ( �
I2-30119 1353
3Z 1314
14
3ts-I
4
13z3 117 17
114G I'? 14 I s z
II 3
1 -3
18 1 1 4
11 is(o
II 7 g 3
tz4Sli(a 134035-13g1
1
3O-)
Is-
131(oII( 4-1
itsl 4 III 1io0
114
14
I I13
1 73
11770
II I
I
I
I
II
I I I I
I
I I
I
II
12-( 11401134-(
t531 Isl9
114
125-011IK
IIZi-Z112$o)
IF, 21 1� 139-1ZZ5'
1111
3
IZ4I S
1 Z81
113022
I 1
1 1
I
I
I II
I I I t
I
I
I I
I
II
I I
I I
I
I II
I i I
I
I
I I
I
II
I I
I I
I
I.
I
I II
I I I I
I
I
I I
I
II
I
I
I
I
I
I
II
I I I I
I
I
I
I
II
I I
I
I
II
I
I
I
II
i I I I
II
I
I I
I
II
430113
142�
3
1 47 3115
4o-o
1 7
141211
3$S
114g1 4 13 1 ss
13
1 3
12 1 13
1 3
II R43
44511
1 1437131K1
4g4
14
366
I g
137 �f
11 3In Z
11451 7 1 7 I s 9
11 7
I Z
13 1 1 z
1 7 1
11 9 33
s00 11
9 03413-7
14�-O
11 7
3s31
I
Ts-1 1
11 ':8s I
115-11 4 11& 1 7(p
11 1
1 1
13 1 5
11 g
11 9 32-
-7
s—t 5' 1ho
144010
1 s1
1 9
353
111
1 3-7311
8 --FTITT
13 1 16 1 7 9
14
1 ./0
13 1 17
11 9C, 71
7-
s 3 v
1131353
50
41(p
11 g
3Z 317
1339
11 7 5*
1145 14 1 g 1 S 7
12
11 Cp
7 3
I$ Z 7
I 1
1
I
11
1
1
1
11
11 1 1 1
1
1
71
430-5 I (D JI731
183I
1`15
Iz5
147ZI37I1534
13490
ZO5-I Z$ I3C0 1 Z& q
II/S
1(9
111 14 Z
11 31 (
11 3(?01
APPENDIX B