HomeMy WebLinkAboutPROSPECT AND COLLEGE HOTEL - PDP190014 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (2)0 30
SCALE: 1:30
30 15 60
PRELIMINARY DEVELOPMENT PLAN
NORTH
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
FORT COLLINS, COLORADO 80525
OVERALL UTILITY PLAN
PROSPECT AND COLLEGE HOTEL
1623 SOUTH COLLEGE AVENUE
FORT COLLINS, COLORADO
C5.1
JET
18111_UTILITY_PROD.DWG
ICS/LMH
2019/09/16 FIRST PDP SUBMITTAL
-
-
-
-
-
-
-
-
-
-
-
-
- -
18111
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY ENGINEER DATE
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.