Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9126573C� /-2, � s?�, WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Connell Resources, Inc. DATED: December21, 2012 Work Order Number: OPA49461 Purchase Order Number: Project Title: Install Perimeter. Drain at Horticulture Buildino Commencement Date: 3/15113 Completion Date: 4/15/13 Maximum Fee: (time and reimbursable direct costs): $32,551.50 Project Description: Provide Perimeter Drain per attached Connell Resources Quotation dated 12121/12. Scope of Services: Provide all necessary. General Conditions: Removal of necessary material Erosion Control. & Storm Drain per attached quote: Acceptance Ethan Cozzens User Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. in the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of Four (4.) pages are hereby accepted and incorporated herein by'this reference, and Notice to Proceed is hereby given. City of Fort Collins By: Date: /2- "L CC: Purchasing Service ovide By: Date: 101�/Z Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970)223-3191 Estimator: Roland Tremble Submitted To: City Of Fort Collins - Operations Services 13m= QUOTATION Date: 12/21/2012 Address: ill N.Mason, PO Box 580 Fort Collins, CO 80522 Contact: Ethan Cozzens Phone: 970-221-6273 Fax: 970-221-6S34 Bid Title Bid Number: Project Location: Project City, State: Engineer/Architect: Gardens At Sprnq Creek Underdrain Gardens At Spring Creek Fort Collins, CO We offer for vour consideration the followino Ouotation which. if accented. shall constitute a contract between us Item # Item Description Estimated Quantity Unit Unit Price Total Price A. General Conditions 00-100 Mobilization 00-145 Site Management 00-175 Pothole Existing Utilities 00-180 Surveying Allowance 00-185 Geotechincal Testing Allowance 23-205 Fine Grade Concrete Flat Work 60-100 Replace Fencing Allowance 08-506 Patch Concrete Sidewalk (6" Thick) 1.00 EACH $4,310.00 $4,310.00, 1.00 WK $2,510.00 $2,510.00 8.00 HR $181.00 $1,448.00 1.00 LS $550.00 $550.00 1.00 LS $550.00 $550.00 600.00 SF $1.50 $900.00 1.00 LS $595.00 $595.00 600.00 SF $5.30 $3,180.00 Total Price for above A. General Conditions Items: $14,043.00 B. Removals 21-100 Clear And Grub, Remove Lanscape Material To A Central 1.00 LS $1,190.00 $1,190.00 Location, Lift Swamp Coolers Off Foundations 22-205 Remove Concrete Flatwork 6" 600.00 SF $1.90 $1,140.00 22-305 Sawcut Concrete 6" 100.00 LF $3.85 $385.00 Total Price for above B. Removals Items: $2,71500 C. Erosion Control 29-100 Silt Fence 50.00 LF $1.85 $92.50 29-104 Gravel Inlet Protection 1.00 EACH $336.00 $336.00 29-108 Concrete Washout 1.00 EACH $1,060.00 $1,060.00 29-116 Gravel Bag 20.00 LF $8.65 $173.00 29-120 Street Sweeping 4.00 HR $113.00 $452.00 Total Price for above C. Erosion Control Items: $2,113.50 F. Storm Drain 02-100 6" HOPE Pipe OutfalLNon Perforated 100.00 LF $45.40 $4,540.00 027100 6" HOPE Perimeter Drain 200.00 LF $45.70 $9,140.00 - Total Price for above F. Storm Drain Items: $13,680.00 Total Bid Price: $32,551.50 Notes:. Pricing is based upon5ite visit with Ethan Cozzens • The following are excluded from this proposal: Engineering; Drainage facility certification; Warrantee period in excess of one year; Street cleaning for vrork performed by others; Permits: including but not limited to, city building, development construction, construction dewatering, wastewater discharge, storm water discharge (NPDES), air quality, etc.; Fees, including but not limited to, for developement, inspection, utility connection, meters, etc.; Dewatering; Maintenance of erosion control devices for others; quality control or acceptance testing; prairie dog removal, relocation, or extermination; landscaping, seeding, or revegetation. • Estimate excludes any landscaping replacement, assumes all replacement seeding and sodding will be by others. • Material Prices for pipeline Items are guaranteed fora period of 30 days from the Date shown on the top of this quote. After 30 days the material prices may change the unit prices quoted. • All work is contingent on the availability of construction water, access to the work, negotiation of acceptable contract terms, a mutually agreeable schedule, and verification of financing. • Please provide a minimum of 2 weeks advanced notification of work requests to allow for scheduling the work. No work will be completed without a signed Contract Agreement. Gardens At Spring Creek Underdrain Page i of 3