HomeMy WebLinkAboutWORK ORDER - RFP - 7337 ELECTRICAL CONTRACTOR 2012Dec 261211:07a Dickinson Electric Inc
970-66M882
OEC-26-2012 10:56 Fram:CITY OPERATION BERU 137ORR46071 T0:956938B2
FRRISIT ''A"
WORK ORDER FORM
PURSUANT TD AN AGREEMENT BETWEEN
THE CITY OF FORT COLLIUS
AND
DICKINSON ELECTRIC
DATED: MARCH 15, 2012
Work Order Number: EL-01-2013
Purchase order Number:
Project Title: Old Museum (Carnegi(; Bldg) administration remodel on the mezzanine level,
f:nmmenr:em(`nt nete: .lanuwy07,2013
Completion Pate: January18,2013
P.1
Pave: V I
g1Z�s��
`art bdons
Maximum Fcc (time and reimbursable direct r.nstr,) : $12,500.011
P r of et07 DevC ript ion: Retuodd the upstairs mea?nnine to provide space fur Bact Strect office stag
S :opA or S 9 r•v i ces: De-coustruct the off lee walls, doors and ceiling grid at the old Museum, meyranine area -
Rework the existing c1cutrical, remove the heat panels and lighting in the drop ceiling
install new " lighting.
Service Provider agzc:GS Lo perLurm
the setvicos idenr.:i0 ed above and on
the attached Torm:: in :,rrCrdauce
With the terms a2�d <: q.rJ it ions
contained herein nrid in the Services
Ag ra r-.menr..har_ween the parties_ 1,1
the event of r., conrli.ct between or
ambiguity 1.t, L•.he terms of the
Scrvicc: Agreement and this work
order (inclVding bhe aLtached form:)
the Services Agraomonu si:all
control.
SERVICE PROV1`Dt✓H//J
11 y a t/-
Date: �G /�—
CC: Purchasing
ACCEPTANCE
USER
The attached fotmS oonsizting
or _ (1! pages are hereby
d I:CCE]LFt rl end nr;orporated
herein by Chip rr-_.rer•enc:er arid
Notice to Proceed is herchy
given -
CITY OF FORT COLLINS
RY:
Date: 1'4t - 2G t2
Director of Purchasing and Risk Management over
$60,000.